System window hoisting construction method based on BIM

Through the BIM-based system window lifting construction method, the preset lifting points, lifting mechanisms and pulley mechanisms are used to realize the overall lifting and installation of the super-large system window, solving the problems of integrity, sealing and aesthetics caused by split transportation, and improving construction efficiency and installation quality.

CN119551589APending Publication Date: 2025-03-04CSCEC CHANGSHA FUJISASH CURTAIN WALL & DECORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411710657.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

During the construction process, the oversized glass system window cannot fully enter the construction elevator and needs to be divided and transported and installed, resulting in a decrease in integrity, sealing and aesthetics.

Method used

The system window lifting construction method based on BIM is adopted, and the lifting mechanism and pulley mechanism are preset, and the overall rapid and stable lifting and installation of the super-large system window is achieved to avoid split transportation.

Benefits of technology

Ensure the integrity, sealing and aesthetics of the super-large system windows, and improve construction efficiency and installation quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119551589A_ABST
    Figure CN119551589A_ABST
Patent Text Reader

Abstract

The invention discloses a system window hoisting construction method based on BIM. The system window hoisting construction method comprises the following steps: S1, modeling: establishing a three-dimensional informatization model for a construction building based on a BIM system; s2, rechecking the model: measuring the construction building, and rechecking the established three-dimensional informatization model; s3, model correction: correcting a model structure according to the rechecked three-dimensional informatization model; s4, door and window fixing, wherein the door and window used for hoisting are fixedly arranged in the keel frame; and S5, door and window hoisting is conducted, specifically, a hoisting point is arranged on one side of the construction building, the gravity center of the to-be-hoisted door and window is located on the hoisting point, and a lifting mechanism is arranged on a to-be-installed floor of the construction building. The output end of the lifting mechanism is collinear with the gravity center of the to-be-hoisted door and window through a pulley mechanism so that the to-be-hoisted door and window can be horizontally moved to a to-be-installed building floor, and a traction mechanism is arranged at the bottom end of the to-be-hoisted door and window so that the to-be-hoisted door and window can be horizontally moved into the building floor; and S6, door and window fixing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of hoisting technology, and more specifically, to a BIM-based system window hoisting construction method. Background Art

[0002] With the rapid development of the economy, urban residents have higher and higher requirements for the facades of office buildings, and people have higher and higher requirements for the beauty and comfort of buildings. Architects have begun to combine doors and windows with curtain walls in super-high-rise residential building projects, and adopt systematic design for residential doors and windows, pursuing large glass floor-to-ceiling visual effects. In recent years, the architectural design of some high-end projects often adopts the combination of curtain walls with peculiar facade shapes and system doors and windows to create a more beautiful and comfortable high-rise building design. At the same time, the design of super-large glass system windows has brought a series of unprecedented challenges to the construction of curtain walls. How to quickly and accurately hoist and install super-large glass system windows has become a new problem in the construction process. At present, the super-large glass system windows are usually pulled into the construction elevator according to the size of the construction elevator during the construction process. Glass and aluminum profiles are then transported to the corresponding floor and then moved to the corresponding installation position. Due to the limited size of the construction elevator, when the system window that is too large cannot be placed, it is necessary to divide the entire system window into two parts for easy transportation, and then connect the two parts of the glass window to each other during installation. However, the system window divided into two parts not only destroys the integrity of the super-large system window, but also makes the sealing and aesthetics of the system window worse.

[0003] Therefore, there is an urgent need for a transportation and hoisting construction method that does not require the segmentation of the oversized system windows. Summary of the invention

[0004] The purpose of the present invention is to provide a BIM-based system window hoisting construction method. The BIM-based system window hoisting construction method provided by the present invention can hoist and transport the doors and windows to be hoisted as a whole quickly and stably through the preset hoisting points, the setting of the lifting mechanism and the cable wind rope, thereby avoiding the segmentation of the system windows and ensuring the integrity, sealing and aesthetics of the super-large system windows.

[0005] To achieve the above object, the technical solution of the present invention is as follows:

[0006] A BIM-based system window hoisting construction method, the BIM-based system window hoisting construction method is used for the hoisting of super-large door windows, and the BIM-based system window hoisting construction method comprises the following steps:

[0007] S1. Modeling: Establish a three-dimensional information model of the construction building based on the BIM system;

[0008] S2, model review: measure the construction building and review the dimensional data of the three-dimensional information model established in step S1;

[0009] S3, model correction: According to the three-dimensional information model reviewed in step S2, correct the model structure with deviations;

[0010] S4. Fixing doors and windows: Fix the doors and windows for hoisting in the keel frame;

[0011] S5. Door and window hoisting: A hoisting point is provided on one side of the construction building, and the center of gravity of the door and window to be hoisted is located on the hoisting point. A lifting mechanism is provided on the floor to be installed of the construction building, and the output end of the lifting mechanism is collinear with the center of gravity of the door and window to be hoisted through a pulley mechanism so that the door and window to be hoisted can be translated to the floor to be installed, and a traction mechanism is provided at the bottom end of the door and window to be hoisted so that the door and window to be hoisted can be moved horizontally into the building floor;

[0012] S6. Fixing doors and windows: After the doors and windows to be hoisted are transferred to the building floor, they are fixed and installed in the reserved window openings of the building floor.

[0013] Preferably, the lifting mechanism in step S5 includes a winch, and the winch is fixedly installed on the ground of the floor to be installed, and the winch is connected to the doors and windows to be hoisted through the pulley mechanism.

[0014] Preferably, the pulley mechanism in the S5 step includes a first fixed pulley and a second fixed pulley, and the lifting mechanism is connected to the doors and windows to be hoisted through the first fixed pulley and the second fixed pulley one by one, the first fixed pulley is fixedly arranged in the floor to be installed and connected to the inner wall of the reserved window opening, and the second fixed pulley is fixedly arranged above the doors and windows to be hoisted and is colinear with the center of gravity of the doors and windows to be hoisted.

[0015] Preferably, the pulley mechanism comprises a bracket assembly for fixing the second fixed pulley, and the bracket assembly is fixedly arranged on a floor above the floor to be installed.

[0016] Preferably, the bracket assembly includes a fixing part and a bracket body, the bracket body is fixedly connected to the floor, the first end of the bracket body is located inside the floor, the second end of the bracket body extends out of the floor and is located above the doors and windows to be hoisted, the first end and the second end of the bracket body are both fixedly provided with the fixing part, and the fixing part is fixedly connected to the construction building.

[0017] Preferably, the fixing member comprises a first fixing combination or a second fixing combination;

[0018] When the support body is arranged between floors of a construction building, the first fixing assembly comprises a fixing rod and a fixing rope, the fixing rod is fixedly arranged at the first end of the support body, the fixing rod is fixedly connected to the floor, one end of the fixing rope is fixedly arranged at a building floor higher than the support body, the other end of the fixing rope is connected to the second end of the support body to fix the support body, and the second fixed pulley is fixedly arranged at the bottom of the second end of the support body;

[0019] When the bracket body is set on the roof of the construction building, the second fixed combination includes a pair of oblique support rods, and the pairs of oblique support rods are fixedly set on the construction building, and the pairs of oblique support rods are respectively connected to the first end and the second end of the bracket body.

[0020] Preferably, when the bracket body is arranged on the roof of the building under construction, the pulley mechanism also includes a third fixed pulley and a transverse bracket, the transverse bracket is fixedly arranged on the outer wall of the building under construction and faces the side away from the building under construction, the third fixed pulley is fixedly arranged on the end of the transverse bracket, and the lifting mechanism is connected to the doors and windows to be hoisted one by one through the first fixed pulley, the third fixed pulley and the second fixed pulley.

[0021] Preferably, in the step S5, the bottom end of the door and window to be hoisted is connected to a wind rope for dragging the door and window to be hoisted. When the door and window to be hoisted is moved to the building floor to be installed, a lateral external force is applied to the door and window to be hoisted through the wind rope so that the door and window to be hoisted is laterally translated into the building floor.

[0022] The beneficial effects of the present invention are:

[0023] The BIM-based system window hoisting construction method The BIM-based system window hoisting construction method, through the coordinated setting of the lifting points, the lifting mechanism and the pulley assembly, makes it possible to hoist oversized system doors and windows without dividing the large-sized system doors and windows, thereby avoiding affecting the design effect of the large-sized system doors and windows, ensuring the quality of the installation, and improving the efficiency of the construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a construction schematic diagram of the system window hoisting construction method based on BIM of the present invention when the floor where the doors and windows are to be installed is the top floor;

[0025] Figure 2 It is a construction schematic diagram of the BIM-based system window hoisting construction method of the present invention when the floor where the doors and windows to be installed are located is the 27th floor.

[0026] Description of reference numerals:

[0027] 1. Doors and windows to be hoisted; 21. First fixed pulley; 22. Second fixed pulley; 23. Third fixed pulley; 3. Lifting mechanism; 4. Bracket assembly; 41. Bracket body; 42. Fixed rod; 43. Fixed rope; 44. Oblique support rod. DETAILED DESCRIPTION

[0028] Many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways than those described herein, and those skilled in the art can make similar modifications without violating the connotation of the present invention, so the present invention is not limited to the specific implementation disclosed below.

[0029] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0030] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0031] like Figure 1 and Figure 2 As shown, the present invention provides a BIM-based system window hoisting construction method, which is used for the hoisting of super-large door windows and doors, and the BIM-based system window hoisting construction method includes the following steps:

[0032] S1. Modeling: Establish a three-dimensional information model of the construction building based on the BIM system;

[0033] S2, model review: measure the construction building and review the dimensional data of the three-dimensional information model established in step S1;

[0034] S3, model correction: According to the three-dimensional information model reviewed in step S2, correct the model structure with deviations;

[0035] S4. Fixing doors and windows: Fix the doors and windows for hoisting in the keel frame;

[0036] S5. Door and window hoisting: A hoisting point is provided on one side of the construction building, and the center of gravity of the door and window 1 to be hoisted is located on the hoisting point. A lifting mechanism 3 is provided on the floor to be installed of the construction building. The output end of the lifting mechanism 3 is collinear with the center of gravity of the door and window 1 to be hoisted through a pulley mechanism so that the door and window 1 to be hoisted can be translated to the floor to be installed. A traction mechanism is provided at the bottom end of the door and window 1 to be hoisted so that the door and window 1 to be hoisted can be moved horizontally into the building floor.

[0037] S6. Fixing doors and windows: After the hoisted doors and windows 1 are transported to the building floor, they are fixed and installed in the reserved window openings of the building floor.

[0038] In this embodiment, the BIM-based system window hoisting construction method, through the coordinated setting of the lifting points, the lifting mechanism and the pulley assembly, makes it possible to hoist extra-large system doors and windows without dividing the large-sized system doors and windows, thereby avoiding affecting the design effect of the large-sized system doors and windows, ensuring the quality of the installation, and improving the efficiency of the construction.

[0039] In step S5, the lifting mechanism 3 includes a winch, which is fixedly installed on the floor of the to-be-installed floor, and is connected to the door and window 1 to be hoisted via a pulley mechanism. In this embodiment, by arranging the winch on the floor to be installed, the output end of the winch is connected to the door and window 1 to be hoisted via a pulley mechanism, so that the door and window 1 to be hoisted can be stably lifted vertically.

[0040] like Figure 1 and Figure 2 As shown, in one embodiment, the pulley mechanism in step S5 includes a first fixed pulley 21 and a second fixed pulley 22, and the lifting mechanism 3 is connected to the doors and windows 1 to be hoisted through the first fixed pulley 21 and the second fixed pulley 22 one by one, the first fixed pulley 21 is fixedly arranged in the floor to be installed and connected to the inner wall of the reserved window opening, and the second fixed pulley 22 is fixedly arranged above the doors and windows 1 to be hoisted and is colinear with the center of gravity of the doors and windows 1 to be hoisted.

[0041] The pulley mechanism includes a bracket assembly 4 for fixing the second fixed pulley 22, and the bracket assembly 4 is fixedly arranged on the upper floor of the floor to be installed. The bracket assembly 4 includes a fixing part and a bracket body 41, and the bracket body 41 is fixedly connected to the floor. The first end of the bracket body 41 is located in the floor, and the second end of the bracket body 41 extends out of the floor and is located above the door and window 1 to be hoisted. The first end and the second end of the bracket body 41 are fixedly arranged with fixing parts, and the fixing parts are fixedly connected to the construction building.

[0042] In one embodiment, the fixing member includes a first fixing combination or a second fixing combination; under different construction conditions, different fixing combination schemes are used to hoist doors and windows at different floor positions, and the hoisting schemes are as follows:

[0043] like Figure 2 As shown, when the bracket body 41 is set between floors of the construction building, the first fixing combination includes a fixing rod 42 and a fixing rope 43, the first end of the bracket body 41 is fixedly provided with the fixing rod 42, the fixing rod 42 is fixedly connected to the floor, one end of the fixing rope 43 is fixedly provided at a building floor higher than the bracket body 41, the other end of the fixing rope 43 is connected to the second end of the bracket body 41 to fix the bracket body 41, and a second fixed pulley 22 is fixedly provided at the bottom of the second end of the bracket body 41; in this embodiment, when the floor to be installed with doors and windows is n floors, the bracket body 41 is set on the n+1th floor of the construction building, and one end of the fixing rope 43 is fixedly provided on the n+2th floor.

[0044] like Figure 1 As shown, when the bracket body 41 is set on the roof of the construction building, the second fixed combination includes a pair of oblique support rods 44, and the pair of oblique support rods 44 are fixedly set on the construction building, and the pair of oblique support rods 44 are respectively connected to the first end and the second end of the bracket body 41. In this embodiment, when the floor to be installed with doors and windows is the top floor, the bracket body 41 is set on the roof of the construction building, and the pulley mechanism also includes a third fixed pulley 23 and a transverse bracket, and the transverse bracket is fixedly set on the outer wall of the construction building, and the end of the transverse bracket facing away from the construction building is fixedly provided with a third fixed pulley 23, and the lifting mechanism 3 is connected to the doors and windows 1 to be hoisted through the first fixed pulley 21, the third fixed pulley 23 and the second fixed pulley 22 one by one.

[0045] In the above-mentioned embodiment, the super-high-rise and super-large system window hoisting construction method uses the setting of a pulley mechanism so that the wire rope from the winch can change the direction of the external force applied by the winch through the pulley mechanism, so that the door and window 1 to be hoisted can be quickly and stably lifted to the floor to be installed under the action of the winch.

[0046] In a preferred embodiment, in step S5, the bottom end of the door and window 1 to be hoisted is connected to a guy rope for dragging the door and window 1 to be hoisted. When the door and window 1 to be hoisted is moved to the building floor to be installed, a lateral external force is applied to the door and window 1 to be hoisted through the guy rope so that the door and window 1 to be hoisted is translated laterally into the building floor.

[0047] Furthermore, during the installation of doors and windows, the glass is hoisted to the corresponding position of the glass, and the gaps in the glass groove are filled with glue. The total station is used throughout the entire installation process to calibrate the verticality and elevation.

[0048] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0049] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A BIM-based system window hoisting construction method, which is used for the hoisting of super-large door windows and doors, and is characterized in that: The BIM-based system window hoisting construction method comprises the following steps: S1. Modeling: Establish a three-dimensional information model of the construction building based on the BIM system; S2, model review: measure the construction building and review the dimensional data of the three-dimensional information model established in step S1; S3, model correction: According to the three-dimensional information model reviewed in step S2, correct the model structure with deviations; S4. Fixing doors and windows: Fix the doors and windows for hoisting in the keel frame; S5. Door and window hoisting: A hoisting point is provided on one side of the construction building, and the center of gravity of the door and window to be hoisted is located on the hoisting point. A lifting mechanism is provided on the floor to be installed of the construction building, and the output end of the lifting mechanism is collinear with the center of gravity of the door and window to be hoisted through a pulley mechanism so that the door and window to be hoisted can be translated to the floor to be installed, and a traction mechanism is provided at the bottom end of the door and window to be hoisted so that the door and window to be hoisted can be moved horizontally into the building floor; S6. Fixing doors and windows: After the doors and windows to be hoisted are transferred to the building floor, they are fixed and installed in the reserved window openings of the building floor.

2. The BIM-based system window hoisting construction method according to claim 1 is characterized in that: The lifting mechanism in step S5 includes a winch, which is fixedly installed on the ground of the floor to be installed, and is connected to the door and window to be hoisted through the pulley mechanism.

3. The BIM-based system window hoisting construction method according to claim 1 is characterized in that: The pulley mechanism in the S5 step includes a first fixed pulley and a second fixed pulley, and the lifting mechanism is connected to the doors and windows to be hoisted through the first fixed pulley and the second fixed pulley one by one. The first fixed pulley is fixedly arranged in the floor to be installed and connected to the inner wall of the reserved window opening, and the second fixed pulley is fixedly arranged above the doors and windows to be hoisted and is colinear with the center of gravity of the doors and windows to be hoisted.

4. The BIM-based system window hoisting construction method according to claim 3 is characterized in that: The pulley mechanism comprises a bracket assembly for fixing the second fixed pulley, and the bracket assembly is fixedly arranged on a floor above the floor to be installed.

5. The BIM-based system window hoisting construction method according to claim 4 is characterized in that: The bracket assembly includes a fixing part and a bracket body, the bracket body is fixedly connected to the floor, the first end of the bracket body is located inside the floor, the second end of the bracket body extends out of the floor and is located above the doors and windows to be hoisted, the first end and the second end of the bracket body are both fixedly provided with the fixing part, and the fixing part is fixedly connected to the construction building.

6. The BIM-based system window hoisting construction method according to claim 5 is characterized in that: The fixing member includes a first fixing combination or a second fixing combination; When the support body is arranged between floors of a construction building, the first fixing assembly comprises a fixing rod and a fixing rope, the fixing rod is fixedly arranged at the first end of the support body, the fixing rod is fixedly connected to the floor, one end of the fixing rope is fixedly arranged at a building floor higher than the support body, the other end of the fixing rope is connected to the second end of the support body to fix the support body, and the second fixed pulley is fixedly arranged at the bottom of the second end of the support body; When the bracket body is set on the roof of the construction building, the second fixed combination includes a pair of oblique support rods, and the pairs of oblique support rods are fixedly set on the construction building, and the pairs of oblique support rods are respectively connected to the first end and the second end of the bracket body.

7. The BIM-based system window hoisting construction method according to claim 6 is characterized in that: When the bracket body is set on the roof of the construction building, the pulley mechanism also includes a third fixed pulley and a transverse bracket. The transverse bracket is fixedly set on the outer wall of the construction building and faces the side away from the construction building. The third fixed pulley is fixedly set on the end of the transverse bracket. The lifting mechanism is connected to the doors and windows to be hoisted one by one through the first fixed pulley, the third fixed pulley and the second fixed pulley.

8. The BIM-based system window hoisting construction method according to claim 1 is characterized in that: In the step S5, the bottom end of the door and window to be hoisted is connected to a wind rope for dragging the door and window to be hoisted. When the door and window to be hoisted is moved to the building floor to be installed, a lateral external force is applied to the door and window to be hoisted through the wind rope so that the door and window to be hoisted is laterally translated into the building floor.