Road construction joint device

By designing a road construction joint device that includes components such as grinding wheels, buckets, nozzles and vacuum cleaners, the problem of joint cracking caused by residual coagulation slurry in the construction joint is solved, and efficient joint treatment and cleaning is achieved, ensuring the improvement of joint effect and quality.

CN119571711AInactive Publication Date: 2025-03-07ZHONGMEI ENGINEERING GROUP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510025561.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2025-03-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During road construction, due to compaction operations and other factors, concrete at the edges is easily allowed to flow into the construction joints, resulting in solidified concrete slurry or other adhesive impurities forming in the joints, hindering the subsequent laying of adhesives, increasing the probability of cracking of joints, and affecting the overall seam effect and quality.

Method used

A road construction joint device is designed, including parts such as mobile vehicles, grinding wheels, buckets, nozzles and vacuum cleaners. The grinding wheels remove the coagulation slurry from the construction joints, the bucket collects the grinding impurities generated by grinding, the nozzles are laid with adhesive, and floating impurities are collected through the vacuum cleaner to ensure the clean end surface of the construction joint.

Benefits of technology

It effectively reduces the probability of seam cracking caused by residual coagulation slurry, ensures the effect and quality of the seam, avoids the random scattering of impurities and the existence of floating objects in the seam environment, and improves environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119571711A_ABST
    Figure CN119571711A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of road construction, in particular to a road construction joint device which comprises a moving vehicle, a feeding part is mounted at the upper end of a vehicle plate part of the moving vehicle, a mounting frame is arranged on the lower right side of the vehicle plate part of the moving vehicle, a grinding wheel is rotationally connected into the mounting frame, and first driving equipment is mounted at the rear end of the mounting frame; an output shaft of the first driving equipment is connected with the grinding wheel, first lifting equipment is arranged at the upper end of a vehicle plate part of the moving vehicle, a movable part of the first lifting equipment penetrates through the vehicle plate part of the moving vehicle and is connected with the mounting frame, and a dust removal piece is arranged at the left end of the mounting frame and extends to the upper end of the vehicle plate part of the moving vehicle; and a functional part is mounted at the lower end of a vehicle plate part of the mobile vehicle, so that residual bonding impurities such as coagulation slurry on a road construction joint are ground and removed, the probability of cracking and the like of a subsequent joint position due to factors of the residual bonding impurities such as the coagulation slurry is effectively reduced, and the joint effect and quality are effectively ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a road construction joint device, belonging to the technical field of road construction. Background Art

[0002] Roads, as infrastructure for various types of trackless vehicles and pedestrians, can be divided into highways, urban roads and rural roads according to their usage characteristics. At present, most roads are paved with concrete materials. In view of the long length of the road, it is usually paved in sections during the construction process, which leads to the formation of construction joints between adjacent paved sections. In order to ensure the overall quality and durability of the road, joint devices are generally used to treat the joints;

[0003] The existing joint device is usually composed of a moving module, a spraying module installed on the moving module, and a storage module connected to the spraying module. In actual operation, the whole device is moved forward steadily along the construction joint by the moving module, and the adhesive in the storage module is evenly spread on the construction joint by the spraying module, and then the slurry is laid and compacted to complete the joint processing process;

[0004] However, in the actual road construction process, due to the influence of factors such as compaction operations, the laid concrete at the edge position is likely to flow into the road construction joint, thereby forming solidified concrete slurry or other bonding impurities in the joint. The presence of these bonding impurities will hinder the subsequent laying of adhesives, resulting in a higher probability of cracking at the subsequent joints, thereby affecting the subsequent overall joint effect and quality. Summary of the invention

[0005] In view of the problems in the prior art, the present invention provides a road construction joint device.

[0006] The technical solution adopted by the present invention to solve the technical problem is: a road construction joint device, comprising a mobile vehicle, a loading piece is installed on the upper end of the vehicle plate of the mobile vehicle, and the loading piece extends into the lower side of the vehicle plate of the mobile vehicle, a mounting frame is arranged on the lower right side of the vehicle plate of the mobile vehicle, and the cross section of the mounting frame is in an inverted U shape, a grinding wheel is rotatably connected inside the mounting frame, and the grinding wheel extends out of the mounting frame, a first driving device is installed at the rear end of the mounting frame, and the output shaft of the first driving device is connected to the grinding wheel;

[0007] A first lifting device is arranged at the upper end of the vehicle deck of the mobile vehicle, and the movable part of the first lifting device passes through the vehicle deck of the mobile vehicle and is connected to the mounting frame, a dust removal component is arranged at the left end of the mounting frame, and the dust removal component extends to the upper end of the vehicle deck of the mobile vehicle, and the dust removal component is located on the right side of the loading component, and a functional component is installed at the lower end of the vehicle deck of the mobile vehicle, and the functional component is located on the lower left side of the dust removal component.

[0008] Furthermore, the dust removal component includes a baffle, which is arranged on the left end of the mounting frame, and a bucket is installed on the left end of the baffle, and the bucket is located on the left side of the grinding wheel. A second main pipe is arranged on the upper end of the vehicle plate portion of the mobile vehicle, and a plurality of folding tubes are equidistantly connected and installed at the lower end of the second main pipe. The other ends of the plurality of folding tubes all penetrate the vehicle plate portion of the mobile vehicle and are connected to the bucket. An exhaust device is installed on the upper end of the vehicle plate portion of the mobile vehicle, and the inlet of the exhaust device is connected and installed with the second main pipe.

[0009] Further, the loading member includes a tank body, the tank body is arranged on the upper end of the vehicle plate of the mobile vehicle, and the tank body is located on the left side of the air extraction device, the extraction device is installed at the lower end of the vehicle plate of the mobile vehicle, and the inlet of the extraction device is connected to the tank body;

[0010] A rectangular frame is arranged at the lower end of the vehicle plate portion of the mobile vehicle, and the rectangular frame is located on the right side of the extraction device, and the rectangular frame is located on the left side of the bucket. A first main pipe is installed inside the rectangular frame, and the outlet of the extraction device is connected to the first main pipe. A plurality of nozzles are equidistantly arranged at the lower end of the first main pipe, and the nozzles extend out of the lower side of the rectangular frame, and control valves are mounted on the plurality of nozzles.

[0011] Furthermore, the interior of the tank body is rotatably connected to a stirrer, a second driving device is arranged at the upper end of the tank body, and an output shaft of the second driving device is connected to the stirrer.

[0012] Further, the functional part includes a second lifting device, which is installed at the lower end of the vehicle plate of the mobile vehicle, and the second lifting device is located on the left side of the extraction device. A functional box is arranged at the lower end of the movable part of the second lifting device, and two telescopic rods are symmetrically installed between the functional box and the vehicle plate of the mobile vehicle, and the two telescopic rods are located at the front and rear sides of the second lifting device;

[0013] The function box is internally rotatably connected to a rotating shaft, a third driving device is arranged at the front end of the function box, and the output shaft of the third driving device is connected to the rotating shaft, a plurality of large bevel gears are equidistantly arranged at the outer end of the rotating shaft, the lower ends of the plurality of large bevel gears are all engaged with small bevel gears, the lower ends of the plurality of small bevel gears are all arranged with connecting shafts, the plurality of connecting shafts are equidistantly rotatably connected to the bottom end of the function box, a plurality of smoothing wheels are equidistantly arranged on the lower side of the function box, and the plurality of connecting shafts extend out of the lower side of the function box and are respectively connected to the plurality of smoothing wheels.

[0014] Furthermore, two round rods are symmetrically arranged on the upper end of the mounting frame, and the two round rods are located at the front and rear sides of the first lifting device. The upper ends of the two round rods both penetrate the vehicle plate of the moving vehicle, and the round rods are slidably connected to the moving vehicle.

[0015] Furthermore, a power supply is arranged at the upper end of the vehicle plate of the mobile vehicle, and the power supply is located between the tank body and the vacuum device, and the power supply is electrically connected to the first driving device, the first lifting device, the vacuum device, the extraction device, the second driving device, the second lifting device and the third driving device respectively.

[0016] Beneficial effects of the present invention:

[0017] 1. Use the second electric push rod to move the grinding wheel down to a suitable position, and then use the third motor, mounting frame, grinding wheel and mobile vehicle to grind away the residual concrete slurry and other bonding impurities on the road construction joint, effectively reducing the probability of subsequent joints cracking due to residual concrete slurry and other bonding impurities, and effectively ensuring the joint effect and quality.

[0018] 2. Use the bucket to collect the granular impurities generated by grinding, and the baffle to block the splashing impurities generated by grinding, so that the impurities can effectively enter the bucket, and collect the floating impurities generated by grinding through the vacuum cleaner, multiple folding pipes and the second main pipe, so as to realize the timely collection of impurities in different states generated by grinding, thereby completing the cleaning of the bottom end surface of the road construction joint, effectively avoiding the phenomenon of random scattering of impurities due to grinding operations, effectively reducing the probability of bubbles in subsequent joints, effectively ensuring the joint effect and quality, and effectively avoiding the appearance of floating objects in the joint environment, with high environmental protection.

[0019] 3. Use the first electric push rod to move multiple smoothing wheels down to the appropriate position, and use the second motor, function box, rotating shaft, multiple large bevel gears, multiple small bevel gears and multiple connecting shafts to make the multiple smoothing wheels rotate synchronously to smooth the laid adhesive, effectively reduce the probability of localized gaps in the laying of the adhesive due to injection factors, and effectively ensure the joint effect and quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0021] Figure 1 It is a structural schematic diagram of a road construction joint device of the present invention;

[0022] Figure 2 A three-dimensional diagram of a road construction joint device according to the present invention;

[0023] Figure 3 A cross-sectional view of a road construction joint device according to the present invention;

[0024] Figure 4 It is an assembly diagram of a bucket and a grinding wheel in a road construction joint device of the present invention;

[0025] Figure 5 A three-dimensional diagram of a rectangular frame in a road construction joint device of the present invention;

[0026] Figure 6 A three-dimensional diagram of a functional box in a road construction joint device of the present invention;

[0027] Figure 7 The present invention is a cross-sectional view of a functional box in a road construction joint device.

[0028] In the figure: 1, tank body, 2, mobile vehicle, 3, function box, 4, rectangular frame, 5, bucket, 6, grinding wheel, 7, power supply, 11, first motor, 12, agitator, 13, water pump, 31, second motor, 32, smoothing wheel, 33, first electric push rod, 34, telescopic rod, 35, rotating shaft, 36, large bevel gear, 37, small bevel gear, 38, connecting shaft, 41, first main pipe, 42, nozzle, 51, second main pipe, 52, vacuum cleaner, 53, folding pipe, 54, baffle, 61, mounting frame, 62, second electric push rod, 63, third motor, 64, round rod. DETAILED DESCRIPTION

[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0030] Embodiment 1: Figure 1-5 As shown, a road construction joint device is provided, including a mobile vehicle 2, a tank body 1 located on the left side of the exhaust device is arranged on the upper end of the vehicle plate of the mobile vehicle 2, and the tank body 1 is used to store adhesive, and an extraction device whose inlet is connected to the tank body 1 is installed on the lower end of the vehicle plate of the mobile vehicle 2, and the adhesive in the tank body 1 is extracted by the extraction device, and the extraction device can be a water pump 13, and then the stirrer 12 is rotatably connected to the inside of the tank body 1, and the adhesive in the tank body 1 is stirred by the stirrer 12, and the fixed part of the second driving device whose output shaft is connected to the stirrer 12 is arranged on the upper end of the tank body 1, and the stirrer 12 is driven to rotate by the second driving device, and the second driving device can be a first motor 11;

[0031] A rectangular frame 4 located on the right side of the extraction device and on the left side of the bucket 5 is arranged on the lower end of the vehicle plate of the mobile vehicle 2, and a mounting carrier is provided for the first header 41 and other components through the rectangular frame 4, and the first header 41 connected to the outlet of the extraction device is installed inside the rectangular frame 4, and a mounting carrier is provided for a plurality of nozzles 42 through the first header 41, and then a plurality of nozzles 42 extending from the lower side of the rectangular frame 4 and equipped with control valves are equidistantly connected and arranged on the lower end of the first header 41, and the plurality of nozzles 42 are used in combination to transport adhesive into the road gap;

[0032] A mounting frame 61 having an inverted U-shaped cross section is arranged on the lower right side of the vehicle plate portion of the mobile vehicle 2, and the mounting frame 61 is used to provide a mounting carrier for components such as the grinding wheel 6, and the grinding wheel 6 extending out of the mounting frame 61 is rotatably connected to the inside of the mounting frame 61, and the road gap is ground by the grinding wheel 6, and then the fixed part of the first driving device connected with the output shaft and the grinding wheel 6 is installed on the rear end of the mounting frame 61, and the grinding wheel 6 is driven to rotate by the first driving device, and the first driving device can use a third motor 63;

[0033] The fixed part of the first lifting device whose movable part penetrates the vehicle plate of the mobile vehicle 2 and is connected to the mounting frame 61 is arranged on the upper end of the vehicle plate of the mobile vehicle 2. The mounting frame 61 is driven to move up and down by the first lifting device. The first lifting device can use a second electric push rod 62, and two round rods 64 located at the front and rear sides of the first lifting device, whose upper ends penetrate the vehicle plate of the mobile vehicle 2 and are slidably connected to the mobile vehicle 2, are symmetrically arranged on the upper end of the mounting frame 61. The two round rods 64 are used in combination to guide the movement of the mounting frame 61.

[0034] A power supply 7 located between the tank body 1 and the air extraction device and electrically connected to the first driving device, the first lifting device, the air extraction device, the extraction device, the second driving device, the second lifting device and the third driving device is arranged on the upper end of the vehicle plate of the mobile vehicle 2, and the first driving device, the first lifting device, the air extraction device, the extraction device, the second driving device, the second lifting device and the third driving device are provided with electric energy through the power supply 7;

[0035] The baffle plate 54 is arranged on the left end of the mounting frame 61. The baffle plate 54 is used to connect the mounting frame 61 with the bucket 5 on one hand, and to block the solid particles generated by grinding on the other hand. The bucket 5 located on the left side of the grinding wheel 6 is installed on the left end of the baffle plate 54. The impurities generated by grinding in the road construction joint are collected through the bucket 5. The second main pipe 51 is arranged on the upper end of the vehicle plate of the mobile vehicle 2. The second main pipe 51 is used to provide a mounting carrier for the plurality of folding tubes 53.

[0036] A plurality of folding tubes 53, the other ends of which pass through the vehicle plate of the mobile vehicle 2 and are connected to the bucket 5, are equidistantly connected and installed on the lower end of the second main pipe 51. The plurality of folding tubes 53 are used in combination to connect the second main pipe 51 with the bucket 5, and an exhaust device whose inlet is connected to the second main pipe 51 is installed on the upper end of the vehicle plate of the mobile vehicle 2. The exhaust device is used to adsorb floating impurities, and the exhaust device can be a vacuum cleaner 52.

[0037] When in use, first put a suitable amount of corresponding adhesive into the tank body 1, then move the mobile vehicle 2 to the position of the road construction joint, then start the first motor 11, thereby driving the agitator 12 to rotate, and then stir the adhesive in the tank body 1, effectively avoiding the solidification of the adhesive in the tank body 1, and then start the second electric push rod 62, thereby driving the mounting frame 61 and the baffle 54 to move downward, thereby moving the grinding wheel 6 and the bucket 5 downward to a suitable position, and then start the third motor 63, thereby driving the grinding wheel 6 to rotate, and then move the mobile vehicle 2 along the road construction joint, so as to achieve the use of the rotating grinding wheel 6 to grind away the adhesive impurities such as the residual concrete slurry on the road construction joint, effectively reducing the probability of cracking in the subsequent joint position due to the factors of the residual concrete slurry and other adhesive impurities, and effectively ensuring the joint effect and quality;

[0038] During the movement of the mobile vehicle 2, the bucket 5 is moved along the bottom end surface of the road construction joint, so that the bucket 5 is used to collect the granular impurities generated by grinding. At this time, the splashing impurities generated by grinding will be blocked by the baffle 54, so that the impurities can effectively enter the bucket 5, and the vacuum cleaner 52 is started at the same time, so as to generate an extraction force in the bucket 5. Under the action of the extraction force, the floating impurities generated by grinding enter the vacuum cleaner 52 along the bucket 5, the multiple folding tubes 53 and the second main pipe 51, so as to collect the floating impurities, so as to realize the timely collection of impurities in different states generated by grinding, so as to complete the cleaning of the bottom end surface of the road construction joint, effectively avoid the phenomenon of random scattering of impurities due to grinding operations, effectively reduce the probability of bubbles and the like generated at the subsequent joint positions, effectively ensure the joint effect and quality, and effectively avoid the appearance of floating objects in the joint environment, with high environmental protection.

[0039] At the same time, the water pump 13 is started to extract the adhesive in the tank body 1 and transport the extracted adhesive to the first main pipe 41, and then the adhesive in the first main pipe 41 is diverted to multiple nozzles 42, and then the multiple nozzles 42 lay the adhesive on the bottom end surface of the road construction joint that has been polished and cleaned. After the adhesive is laid, slurry is poured into the road construction joint, and then compaction is performed to complete the joint operation.

[0040] Embodiment 2: Figure 1 , Figure 2 , Figure 3 , Figure 6 and Figure 7As shown, the second lifting device located on the left side of the extraction device is installed on the lower end of the vehicle plate of the mobile vehicle 2. The function box 3 is driven to move up and down through the second lifting device. The second lifting device can use a first electric push rod 33, and the function box 3 is set on the lower end of the movable part of the second lifting device. Through the function box 3, a mounting carrier is provided for components such as the rotating shaft 35. Then, two telescopic rods 34 located on the front and rear sides of the second lifting device are symmetrically installed between the function box 3 and the vehicle plate of the mobile vehicle 2. The two telescopic rods 34 are used in combination to guide the movement of the function box 3.

[0041] The rotating shaft 35 is rotatably connected to the inside of the function box 3, and a mounting carrier is provided for the large bevel gear 36 through the rotating shaft 35, and the fixing part of the third driving device connecting the output shaft with the rotating shaft 35 is arranged on the front end of the function box 3, and the rotating shaft 35 is driven to rotate through the third driving device. The third driving device can use the second motor 31, and then a plurality of large bevel gears 36 are equidistantly arranged on the outer end of the rotating shaft 35, and a plurality of small bevel gears 37 are respectively meshed with the lower ends of the plurality of large bevel gears 36, and the large bevel gears 36 and the small bevel gears 37 are used in conjunction with each other to rotate the connecting shaft 38;

[0042] A plurality of connecting shafts 38 equidistantly connected to the bottom end of the function box 3 are respectively arranged on the lower ends of a plurality of small bevel gears 37, and the small bevel gears 37 are connected to the smoothing wheels 32 through the connecting shafts 38. The connecting shafts 38 are extended out of the lower side of the function box 3 and are respectively connected to a plurality of smoothing wheels 32 located on the lower side of the function box 3. The plurality of smoothing wheels 32 are used in combination to smooth the laid adhesive.

[0043] When using multiple nozzles 42 to lay adhesive on the bottom end surface of the road construction joint after grinding and cleaning, the first electric push rod 33 is started at the same time, thereby driving the function box 3 to move downward, and then the multiple smoothing wheels 32 are moved down to a suitable position, and then the second motor 31 is started to drive the rotating shaft 35 to rotate, thereby causing the multiple large bevel gears 36 to rotate synchronously. Because the large bevel gears 36 and the small bevel gears 37 are meshed with each other, the rotation of the multiple large bevel gears 36 simultaneously causes the multiple small bevel gears 37 to rotate synchronously, and then the multiple connecting shafts 38 rotate synchronously, thereby causing the multiple smoothing wheels 32 to rotate synchronously, thereby smoothing the laid adhesive, effectively reducing the probability of gaps and localized areas in the laying of the adhesive due to injection factors, and effectively ensuring the joint effect and quality.

[0044] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A road construction joint device, characterized in that: The invention comprises a mobile vehicle (2), wherein a loading piece is installed at the upper end of the vehicle plate of the mobile vehicle (2), and the loading piece extends into the lower side of the vehicle plate of the mobile vehicle (2); a mounting frame (61) is arranged at the lower right side of the vehicle plate of the mobile vehicle (2), and the cross section of the mounting frame (61) is in an inverted U shape; the mounting frame (61) is rotatably connected to a grinding wheel (6) inside, and the grinding wheel (6) extends out of the mounting frame (61); a first driving device is installed at the rear end of the mounting frame (61), and the output shaft of the first driving device is connected to the grinding wheel (6); A first lifting device is arranged at the upper end of the vehicle plate of the mobile vehicle (2), and a movable part of the first lifting device passes through the vehicle plate of the mobile vehicle (2) and is connected to a mounting frame (61). A dust removal component is arranged at the left end of the mounting frame (61), and the dust removal component extends to the upper end of the vehicle plate of the mobile vehicle (2), and the dust removal component is located on the right side of the loading component. A functional component is arranged at the lower end of the vehicle plate of the mobile vehicle (2), and the functional component is located on the lower left side of the dust removal component.

2. The road construction joint device according to claim 1, characterized in that: The dust removal component comprises a baffle (54), the baffle (54) being arranged on the left end of the mounting frame (61), a bucket (5) being installed on the left end of the baffle (54), and the bucket (5) being located directly to the left of the grinding wheel (6), a second main pipe (51) being arranged on the upper end of the vehicle plate portion of the mobile vehicle (2), a plurality of folding pipes (53) being installed at equal distances at the lower end of the second main pipe (51), the other ends of the plurality of folding pipes (53) all passing through the vehicle plate portion of the mobile vehicle (2) and all being connected to the bucket (5), an exhaust device being installed on the upper end of the vehicle plate portion of the mobile vehicle (2), and an inlet of the exhaust device being connected to the second main pipe (51).

3. The road construction joint device according to claim 2, characterized in that: The loading member comprises a tank body (1), the tank body (1) being arranged on the upper end of the vehicle plate of the mobile vehicle (2), and the tank body (1) being located on the left side of the air extraction device, the extraction device being installed at the lower end of the vehicle plate of the mobile vehicle (2), and the inlet of the extraction device being connected to the tank body (1); A rectangular frame (4) is arranged at the lower end of the vehicle plate of the mobile vehicle (2), and the rectangular frame (4) is located on the right side of the extraction device, and the rectangular frame (4) is located on the left side of the bucket (5). A first main pipe (41) is installed inside the rectangular frame (4), and the outlet of the extraction device is connected to the first main pipe (41). A plurality of nozzles (42) are arranged at equal distances at the lower end of the first main pipe (41), and the nozzles (42) extend out of the lower side of the rectangular frame (4), and a control valve is installed on each of the plurality of nozzles (42).

4. The road construction joint device according to claim 3, characterized in that: The tank body (1) is rotatably connected to the stirrer (12) inside, and a second driving device is arranged at the upper end of the tank body (1), and the output shaft of the second driving device is connected to the stirrer (12).

5. The road construction joint device according to claim 4, characterized in that: The functional part comprises a second lifting device, the second lifting device is installed at the lower end of the vehicle plate of the mobile vehicle (2), and the second lifting device is located on the left side of the extraction device, a functional box (3) is arranged at the lower end of the movable part of the second lifting device, two telescopic rods (34) are symmetrically installed between the functional box (3) and the vehicle plate of the mobile vehicle (2), and the two telescopic rods (34) are located at the front and rear sides of the second lifting device; The function box (3) is internally rotatably connected to a rotating shaft (35); a third driving device is arranged at the front end of the function box (3), and the output shaft of the third driving device is connected to the rotating shaft (35); a plurality of large bevel gears (36) are equidistantly arranged at the outer end of the rotating shaft (35); the lower ends of the plurality of large bevel gears (36) are all meshed with small bevel gears (37); the lower ends of the plurality of small bevel gears (37) are all provided with connecting shafts (38); the plurality of connecting shafts (38) are equidistantly rotatably connected to the bottom end of the function box (3); a plurality of smoothing wheels (32) are equidistantly arranged at the lower side of the function box (3); the plurality of connecting shafts (38) extend out of the lower side of the function box (3) and are respectively connected to the plurality of smoothing wheels (32).

6. The road construction joint device according to claim 1, characterized in that: Two round rods (64) are symmetrically arranged on the upper end of the mounting frame (61), and the two round rods (64) are located at the front and rear sides of the first lifting device. The upper ends of the two round rods (64) both penetrate the vehicle plate of the moving vehicle (2), and the round rods (64) are slidably connected to the moving vehicle (2).

7. The road construction joint device according to claim 5, characterized in that: A power source (7) is provided at the upper end of the vehicle plate of the mobile vehicle (2), and the power source (7) is located between the tank body (1) and the air extraction device. The power source (7) is electrically connected to the first driving device, the first lifting device, the air extraction device, the extraction device, the second driving device, the second lifting device, and the third driving device, respectively.