Transformer hoisting platform for 10-kilovolt transformer platform engineering construction and construction method
By designing a transformer lifting platform for 10 kV transformer engineering construction, using curved clamps, I-frames and U-frames, combined with rear sliders and guide wheels, the friction problem with tower rods during the transformer lifting process is solved, and the equipment is safely lifted and efficiently constructed.
Patent Information
- Application Number
- CN202311742343.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2025-03-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the installation and construction of 10kv outdoor transformer, when the hand-pulled hoist is hoisted, the outer wall of the transformer is prone to collide or rub against the tower rod, resulting in severe wear of the shell.
A transformer hoisting platform for 10 kV transformer engineering construction is designed, including a base plate, a curved clamp, an I-frame and a U-frame. By setting up the rear slide and guide wheel, the friction between the transformer and the tower rod is reduced, and the upward movement of the transformer is achieved by using a hand-crank hoist and a draw rope.
It effectively avoids friction and collision between the transformer and the tower rod during lifting, reduces equipment losses, improves work efficiency and simplifies operation.
Smart Images

Figure CN119612381A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a transformer hoisting tool, in particular to a transformer hoisting platform and a construction method for 10 kV transformer substation engineering construction, belonging to the technical field of transformer installation. Background Art
[0002] When installing a 10kv transformer outdoors, a car crane or outdoor lifting platform is generally used to lift the transformer to the installation height and install it. However, in remote mountainous areas, large lifting equipment cannot reach the construction site. At this time, the staff will use a hand winch to lift the transformer. During this process, the outer wall of the transformer will collide or rub against the tower, causing severe wear on the transformer casing. Summary of the invention
[0003] The technical problem to be solved by the present invention is: to overcome the shortcomings of the prior art and provide a transformer hoisting platform and construction method for 10 kV transformer substation engineering construction, so as to avoid damage to the outer wall of the transformer during the hoisting process, improve work efficiency and reduce the loss rate of equipment.
[0004] The technical solution adopted by the present invention to solve the technical problem is: A transformer hoisting platform for 10kV transformer substation construction includes a bottom plate, a first curved pallet, a second curved pallet, an I-shaped frame and a U-shaped frame. There are two bottom plates, and a first curved pallet is arranged between the left sides of the two bottom plates, a second curved pallet is arranged on the left side of the first curved pallet, a first guide wheel is arranged on the top surface of the bottom plate, an I-shaped frame is arranged above the first guide wheel, a rear slide plate is arranged on the left side of the I-shaped frame, and U-shaped frames are arranged at both ends of the I-shaped frame.
[0005] The right end of the bottom plate is distributed in a slope shape, and the left end of the bottom plate is fixedly connected to the ground through a positioning pin.
[0006] The first arc-shaped clamping plate and the second arc-shaped clamping plate are two identical arc-shaped clamping plates and are symmetrically distributed on both sides of the tower pole. First screw rods are arranged at both ends of the second arc-shaped clamping plate. The first screw rods penetrate the first arc-shaped clamping plate and are fixed by matching nuts.
[0007] The end of the U-shaped frame passes through the I-shaped frame, and a matching nut is screwed on the end of the U-shaped frame.
[0008] A rear bracket is arranged in the middle of the left side of the I-beam frame, and a rear slide plate is fixedly connected to the outer side surface of the rear bracket. The left side surface of the rear slide plate is distributed in an arc-shaped groove shape, and a second guide wheel is arranged on the left side surface of the rear slide plate. A lifting lug is arranged on the top of the rear slide plate.
[0009] A first fixing member and a second fixing member are sequentially arranged above the base plate, and both the first fixing member and the second fixing member are composed of a positioning plate and a clamping strip, the positioning plate is arranged on the left side of the tower pole, and the clamping strip is arranged on the right side of the tower pole, and second screw rods are respectively arranged at both ends of the clamping strip, and the second screw rod passes through the connecting plate at the end of the positioning plate and is fixed by a matching nut so that the fixing member and the tower pole are clamped together.
[0010] A hand-cranked hoist is arranged on the right side of the first fixing member, and a guide wheel is arranged on the right side of the second fixing member. A pull rope runs through the guide wheel, and the right end of the pull rope passes through the handle of the hand-cranked hoist and is fixedly connected to the handle of the hand-cranked hoist.
[0011] The construction method of the transformer hoisting platform for the 10 kV transformer substation project construction comprises the following steps: S1. Place the bottom plate on one side of the bottom of the tower pole so that the inner wall of the first arc-shaped cardboard is in close contact with the outer wall on the right side of the tower pole, and then place the second arc-shaped cardboard on the left side of the tower pole so that the inner wall of the second arc-shaped cardboard is in close contact with the outer wall on the left side of the tower pole. At this time, the first screw at the right end of the second arc-shaped cardboard passes through the first arc-shaped cardboard, and a matching nut is screwed on the end of the first screw to fix the two arc-shaped cardboards and the bottom of the tower pole together; S2. Insert a positioning rod through the left end of the bottom plate to fix the positioning rod to the ground; S3. According to the installation position of the transformer, a first fixing member is arranged above the position, and a second fixing member is arranged above the first fixing member. Then, a pull rope is passed through the guide wheel on the second fixing member, so that the right end of the pull rope passes through the handle of the hand-cranked hoist below and is fixedly connected with the handle. Then, the right end of the pull rope is naturally lowered. S4. Place the transformer on the I-shaped frame and clamp and fix both ends of the transformer to the I-shaped frame through a U-shaped frame; S5. Place the transformer together with the I-shaped frame on the bottom plate, and move along the bottom plate to the tower pole, fix the handle of the hand chain hoist with the pull rope, and then fix the end of the hand chain hoist zipper to the hook and the lifting ear; S6. One worker holds the left end of the pull rope on the tower pole, and another worker pulls the other end of the pull rope on the ground. The worker on the ground pulls the pull rope repeatedly, and the worker on the tower pole cooperates to prevent the rope from falling. During the repeated pulling, the transformer and the I-beam frame move up along the tower pole; S7. After the transformer and the I-shaped frame are moved to the installation location, the staff will install the transformer. After the installation is completed, the U-shaped frame and the I-shaped frame can be removed using a hand hoist.
[0012] The positive beneficial effects of the present invention are: 1. The present invention places the transformer on an I-shaped frame and arranges a rear slide plate on the left side of the I-shaped frame, thereby avoiding friction and collision between the transformer and the tower pole during hoisting, and facilitating the rear slide plate to quickly move up along the tower pole. By arranging a second guide wheel on the outer side of the rear slide plate, the friction between the rear slide plate and the tower pole is reduced, which is conducive to the staff to quickly carry out hoisting construction.
[0013] 2. The present invention provides a first guide wheel on the bottom plate, which is beneficial for moving the transformer along the bottom plate to the hoisting position or adjusting the transformer on the bottom plate before hoisting. The staff no longer needs to use manual handling to make local adjustments, which reduces the burden on the staff, is easy to use, and is simple to operate.
[0014] 3. The present invention arranges a first arc-shaped clamping plate between two base plates, and arranges a second arc-shaped clamping plate on the left side of the arc-shaped clamping plate, so as to facilitate clamping and fixing the base plate and the tower pole together. By arranging a positioning rod at the left end of the base plate, the base plate can be fixed to the ground, thereby ensuring the stability of the transformer when it moves on the base plate.
[0015] 4. The present invention arranges a wire wheel above the hand-cranked hoist, and fixes the pull rope on the wire wheel with the crank handle of the hand-cranked hoist. Two workers only need to cooperate to pull the two ends of the pull rope to move the transformer upward, thereby improving work efficiency, saving time and labor, and being easy to promote. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a structural schematic diagram of the bottom plate of the present invention; Figure 3 It is a structural schematic diagram of the I-shaped frame of the present invention; Figure 4 It is a structural schematic diagram of the inner side of the rear skateboard of the present invention; Among them: 1-bottom plate, 2-first guide wheel, 3-positioning drill, 4-first arc-shaped clamping plate, 5-second arc-shaped clamping plate, 6-first screw, 7-I-shaped frame, 8-U-shaped frame, 9-rear bracket, 10-rear slide plate, 11-lifting ear, 12-second guide wheel, 13-positioning plate, 14-clamping strip, 15-second screw, 16-hand hoist, 17-chain, 18-guide wheel, 19-pull rope. DETAILED DESCRIPTION
[0017] The present invention will be further explained and illustrated below in conjunction with the accompanying drawings: Example 1, see Figure 1-Figure 4A transformer lifting platform for 10 kV transformer substation engineering construction includes a bottom plate 1, a first arc-shaped pallet 4, a second arc-shaped pallet 5, an I-shaped frame 7 and a U-shaped frame 8. There are two bottom plates 1, and the first arc-shaped pallet 4 is arranged between the left sides of the two bottom plates 1, and the second arc-shaped pallet 5 is arranged on the left side of the first arc-shaped pallet 4. A first guide wheel 2 is arranged on the top surface of the bottom plate 1, an I-shaped frame 7 is arranged above the first guide wheel 2, a rear slide plate 10 is arranged on the left side of the I-shaped frame 7, and U-shaped frames 8 are arranged at both ends of the I-shaped frame 7.
[0018] The right end of the bottom plate 1 is distributed in a slope shape, and the left end of the bottom plate 1 is fixedly connected to the ground through a positioning pin 3.
[0019] The first arc-shaped clamping plate 4 and the second arc-shaped clamping plate 5 are two identical arc-shaped clamping plates and are symmetrically distributed on both sides of the tower pole. First screws 6 are arranged at both ends of the second arc-shaped clamping plate 5. The first screws 6 pass through the first arc-shaped clamping plate 4 and are fixed by matching nuts.
[0020] The end of the U-shaped frame 8 passes through the I-shaped frame 7, and a matching nut is screwed on the end of the U-shaped frame 8.
[0021] A rear bracket 9 is arranged in the middle of the left side of the I-beam 7, and a rear skateboard 10 is fixedly connected to the outer side of the rear bracket 9. An arc-shaped groove is distributed on the left side of the rear skateboard 10, and a second guide wheel 12 is arranged on the left side of the rear skateboard 10. A lifting ear 11 is arranged on the top of the rear skateboard 10.
[0022] A first fixing member and a second fixing member are arranged in sequence above the base plate 1. The first fixing member and the second fixing member are both composed of a positioning plate 13 and a clamping strip 14. The positioning plate 13 is arranged on the left side of the tower pole, and the clamping strip 14 is arranged on the right side of the tower pole. Second screw rods 15 are respectively arranged at both ends of the clamping strip 14. The second screw rod 15 passes through the connecting plate at the end of the positioning plate 13 and is fixed by a matching nut so that the fixing member is clamped together with the tower pole.
[0023] A hand-cranked hoist is arranged on the right side of the first fixing member, and a guide wheel 18 is arranged on the right side of the second fixing member. A pull rope 19 passes through the guide wheel 18, and the right end of the pull rope 19 passes through the handle of the hand-cranked hoist 16 and is fixedly connected to the handle of the hand-cranked hoist 16.
[0024] In the above description, connecting plates are respectively provided at both ends of the right side of the positioning plate, and through holes are dug at the positions of the connecting plates corresponding to the second screw rods. When the second screw rod at the end of the clamping strip passes through the through holes, the fixing part can be fixed on the tower pole. At this time, a matching nut can be screwed on the end of the second screw rod.
[0025] In the above description, connecting rings are respectively provided on the right sides of the first fixing member and the second fixing member, the hand-cranked hoist is fixedly connected to the connecting ring on the right side of the first fixing member, and the guide wheel is fixedly connected to the connecting ring on the right side of the second fixing member.
[0026] In the above description, the size of the I-shaped frame satisfies that the transformer can be placed in the I-shaped frame, and then by inserting U-shaped frames at both ends of the transformer, the transformer and the I-shaped frame can be clamped and fixed together.
[0027] In the above description, the left side surface of the rear slide plate is distributed in the shape of an arc-shaped groove, and the arc-shaped groove can be tightly attached to the outer wall of the tower pole.
[0028] Embodiment 2, the construction method of the transformer hoisting platform for the above-mentioned 10 kV transformer substation construction project comprises the following steps: S1, place the base plate 1 on one side of the bottom of the tower pole, so that the inner wall of the first arc-shaped card plate 4 is close to the outer wall of the right side of the tower pole, and then place the second arc-shaped card plate 5 on the left side of the tower pole, so that the inner wall of the second arc-shaped card plate 5 is close to the outer wall of the left side of the tower pole, at this time, the first screw rod 6 at the right end of the second arc-shaped card plate 5 passes through the first arc-shaped card plate 4, and a matching nut is screwed on the end of the first screw rod 6, so that the two arc-shaped card plates are fixedly connected to the bottom of the tower pole; S2, penetrate the positioning rod 3 at the left end of the bottom plate 1, so that the positioning rod 3 is fixedly connected to the ground; S3. According to the installation position of the transformer, a first fixing member is arranged above the position, and a second fixing member is arranged above the first fixing member, and then a pull rope 19 is passed through the guide wheel 18 on the second fixing member, so that the right end of the pull rope 19 passes through the handle of the hand-cranked hoist 16 below and is fixedly connected with the handle, and then the right end of the pull rope 19 is naturally lowered; S4, placing the transformer on the I-shaped frame 7, and clamping and fixing the two ends of the transformer to the I-shaped frame 7 through the U-shaped frame 8; S5, place the transformer together with the I-shaped frame 7 on the bottom plate 1, and move along the bottom plate 1 to the tower pole, fix the handle of the hand chain hoist 16 with the pull rope 19, and then fix the end of the zipper 17 of the hand chain hoist 16 with the hook and the lifting ear 11; S6. One worker holds the left end of the pull rope 19 on the tower pole, and another worker pulls the other end of the pull rope 19 on the ground. The worker on the ground repeatedly pulls the pull rope 19, and the worker on the tower pole cooperates to prevent the rope from falling. During the repeated pulling, the transformer and the I-beam frame move up along the tower pole; S7, after the transformer and the I-shaped frame are moved to the installation position, the staff will install the transformer. After the installation is completed, the U-shaped frame 8 and the I-shaped frame 7 will be removed by a hand hoist.
[0029] In the above description, the first arc-shaped clamping plate is fixedly connected to the inner walls of the two bottom plates, and the second arc-shaped clamping plate is fixedly connected to the second arc-shaped clamping plate through a screw and a matching nut.
[0030] In the above description, during construction, the workers on the tower pole should be located between the first fixing member and the second fixing member.
[0031] The present invention arranges a rear slide plate on the left side of the I-shaped frame and arranges a second guide wheel on the left side surface of the rear slide plate, so as to avoid friction and collision with the tower pole during the transformer hoisting process, reduce the friction between the rear slide plate and the tower pole, facilitate the staff to quickly carry out hoisting construction, save time and labor, reduce the burden on the staff, and is easy to use, simple to operate, and easy to promote.
Claims
1. A transformer hoisting platform for 10 kV transformer substation construction, comprising a bottom plate (1), a first arc-shaped cardboard (4), a second arc-shaped cardboard (5), an I-shaped frame (7) and a U-shaped frame (8), characterized in that: There are two bottom plates (1), and a first arc-shaped clamping plate (4) is arranged between the left sides of the two bottom plates (1), a second arc-shaped clamping plate (5) is arranged on the left side of the first arc-shaped clamping plate (4), a first guide wheel (2) is arranged on the top surface of the bottom plate (1), an I-shaped frame (7) is arranged above the first guide wheel (2), a rear slide plate (10) is arranged on the left side of the I-shaped frame (7), and U-shaped frames (8) are arranged at both ends of the I-shaped frame (7).
2. The transformer hoisting platform for 10 kV transformer substation construction according to claim 1 is characterized by: The right end of the bottom plate (1) is distributed in a slope shape, and the left end of the bottom plate (1) is fixedly connected to the ground via a positioning pin (3).
3. The transformer hoisting platform for 10 kV transformer substation construction according to claim 1 is characterized by: The first arc-shaped clamping plate (4) and the second arc-shaped clamping plate (5) are two identical arc-shaped clamping plates and are symmetrically distributed on both sides of the tower pole. First screw rods (6) are provided at both ends of the second arc-shaped clamping plate (5). The first screw rods (6) penetrate the first arc-shaped clamping plate (4) and are fixed by matching nuts.
4. The transformer hoisting platform for 10 kV transformer substation construction according to claim 1 is characterized by: The end of the U-shaped frame (8) passes through the I-shaped frame (7), and a matching nut is screwed onto the end of the U-shaped frame (8).
5. The transformer hoisting platform for 10 kV transformer substation construction according to claim 1 is characterized by: A rear bracket (9) is arranged in the middle of the left side of the I-shaped frame (7); a rear slide plate (10) is fixedly connected to the outer side surface of the rear bracket (9); the left side surface of the rear slide plate (10) is distributed in an arc-shaped groove shape; a second guide wheel (12) is arranged on the left side surface of the rear slide plate (10); and a lifting lug (11) is arranged on the top of the rear slide plate (10).
6. The transformer hoisting platform for 10 kV transformer substation construction according to claim 1 is characterized by: A first fixing member and a second fixing member are arranged in sequence above the base plate (1), and the first fixing member and the second fixing member are both composed of a positioning plate (13) and a clamping strip (14), the positioning plate (13) is arranged on the left side of the tower pole, and the clamping strip (14) is arranged on the right side of the tower pole, and second screw rods (15) are respectively arranged at both ends of the clamping strip (14), and the second screw rod (15) passes through the connecting plate at the end of the positioning plate (13) and is fixed by a matching nut, so that the fixing member and the tower pole are clamped together.
7. The transformer hoisting platform for 10 kV transformer substation construction according to claim 1 is characterized by: A hand-cranked hoist is arranged on the right side of the first fixing member, and a guide wheel (18) is arranged on the right side of the second fixing member. A pull rope (19) passes through the guide wheel (18), and the right end of the pull rope (19) passes through the handle of the hand-cranked hoist (16) and is fixedly connected to the handle of the hand-cranked hoist (16).
8. The construction method of the transformer hoisting platform for 10 kV transformer substation construction according to any one of claims 1 to 7, characterized in that: The steps include: S1. Place the base plate (1) on one side of the bottom of the tower pole so that the inner wall of the first arc-shaped clamping plate (4) is in close contact with the outer wall of the right side of the tower pole, and then place the second arc-shaped clamping plate (5) on the left side of the tower pole so that the inner wall of the second arc-shaped clamping plate (5) is in close contact with the outer wall of the left side of the tower pole. At this time, the first screw rod (6) at the right end of the second arc-shaped clamping plate (5) passes through the first arc-shaped clamping plate (4), and a matching nut is screwed on the end of the first screw rod (6) so that the two arc-shaped clamping plates are fixedly connected to the bottom of the tower pole; S2, penetrate the positioning rod (3) at the left end of the bottom plate (1) so that the positioning rod (3) is fixedly connected to the ground; S3. According to the installation position of the transformer, a first fixing member is arranged above the position, and a second fixing member is arranged above the first fixing member, and then a pull rope (19) is passed through the guide wheel (18) on the second fixing member, so that the right end of the pull rope (19) passes through the handle of the hand-cranked hoist (16) below and is fixedly connected to the handle, and then the right end of the pull rope (19) is naturally lowered; S4, placing the transformer on the I-shaped frame (7), and clamping and fixing the two ends of the transformer to the I-shaped frame (7) through the U-shaped frame (8); S5, placing the transformer together with the I-shaped frame (7) on the bottom plate (1), and moving along the bottom plate (1) to the tower pole, fixing the handle of the hand chain hoist (16) with the pull rope (19) together, and then fixing the end of the zipper (17) of the hand chain hoist (16) with the hook and the lifting ear (11); S6. One worker holds the left end of the pull rope (19) on the tower pole, and another worker pulls the other end of the pull rope (19) on the ground. The worker on the ground repeatedly pulls the pull rope (19), and the worker on the tower pole cooperates to prevent the rope from falling. During the repeated pulling, the transformer and the I-shaped frame move up along the tower pole; S7, after the transformer and the I-shaped frame are moved to the installation position, the staff will install the transformer. After the installation is completed, the U-shaped frame (8) and the I-shaped frame (7) will be removed using a hand hoist.