Steel structure building truss floor support plate

By designing a steel structure building truss floor decking including a base plate, a fixed plate, a lifting ring, an installation slot, a clamping slot and other components, the problem of the inability to connect and inconvenient disassembly of the floor decking in the existing technology is solved, and the convenience of the floor decking is realized. Mobile and connected, improving the safety and efficiency of the construction process.

CN221798868UActive Publication Date: 2024-10-01ZHAOTONG EXPRESS PREFABRICATED CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420012613.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-01
Estimated Expiration
2034-08-06

AI Technical Summary

Technical Problem

The existing steel structure building trusses and floor decks cannot be connected, causing the cement to fall during cement pouring, and the trusses and floor decks are fixedly connected, making disassembly inconvenient.

Method used

A steel structure building truss floor bearing plate including a base plate, a fixed plate, a second lifting ring, a mounting slot, a mounting plate, a first clamping slot, a first clamping block, a second clamping slot and an electric push rod is designed. Through these components The combined use of them enables the convenient movement, quick disassembly and connection of the floor decking.

Benefits of technology

It achieves convenient connection and disassembly between floor decking boards, prevents cement from falling, and improves operating efficiency and safety during the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798868U_ABST
    Figure CN221798868U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel structure building truss floor support plate, and particularly relates to the technical field of constructional engineering, which comprises a bottom plate, a fixed plate and a second hanging ring, a plurality of mounting grooves are formed in the upper surface of the bottom plate, first clamping grooves and second clamping grooves are formed in one side of the bottom plate, first clamping blocks are arranged on the other side of the bottom plate, a fixing plate is fixedly connected to the lower surface of the bottom plate, and second hanging rings are fixedly connected to the four corners of the upper surface of the bottom plate; by arranging a first lifting ring and a second lifting ring, the device can achieve the effects of conveniently moving a floor support plate and rapidly disassembling the first lifting ring, meanwhile, by arranging a mounting groove and a mounting plate, the device can achieve the effect of conveniently disassembling a steel bar truss, and by arranging a first clamping groove, the steel bar truss can be conveniently disassembled. And the device can achieve the effect of connecting and fixing the two floor support plates, and the situation that cement falls off during pouring is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building engineering, in particular to a steel structure building truss floor deck. Background Art

[0002] The pressed steel plate that supports the floor concrete is called corrugated steel plate, also known as floor decking or steel decking. Floor decking is widely used in steel structures such as power plants, power equipment companies, car showrooms, steel structure workshops, cement warehouses, steel structure offices, airport terminals, railway stations, stadiums, concert halls, theaters, large supermarkets, logistics centers, Olympic venues and stadiums.

[0003] Some existing steel structure building truss floor decking, for example: CN202123382859.8 is a non-disassembly type steel truss floor decking, including a bottom plate, the bottom plate is a calcium silicate board, and a plurality of groups of steel trusses are arranged in parallel on one side of the bottom plate, and the bottom plate and the steel trusses are connected by a connector. The bottom plate of the utility model is a calcium silicate board, which can be used for both civil buildings and steel structures; when used in civil buildings, there is no need to manually remove the bottom plate of the calcium silicate board, which saves labor and time; it solves the problem of traditional steel truss floor decking for steel structure building ceilings, and can be directly puttyed as a roof board, without the need for ceilings, reducing construction labor and costs.

[0004] Although this device can reduce construction labor and costs, the floor decking cannot be connected to each other, which can easily cause cement to fall during cement pouring. In addition, the truss and the floor decking are fixedly connected, which is not convenient to disassemble and has limitations in specific use.

[0005] Therefore, it is necessary to improve and design the building truss floor decking structure to solve the problem that some of the existing floor deckings cannot be connected to each other, which easily leads to cement falling during cement pouring, and the truss and floor decking are fixedly connected and are not convenient to disassemble. Utility Model Content

[0006] In view of the deficiencies in the prior art, the utility model provides a steel structure building truss floor deck to solve the problem that some of the existing floor decks cannot be connected to each other, which easily leads to cement falling during cement pouring, and the truss and the floor deck are fixedly connected and are not convenient to disassemble.

[0007] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:

[0008] A steel structure building truss floor deck, comprising a base plate, a fixed plate and a second lifting ring; a plurality of installation grooves are provided on the upper surface of the base plate, a first clamping groove and a second clamping groove are provided on one side of the base plate, a first clamping block is provided on the other side of the base plate, a fixed plate is fixedly connected to the lower surface of the base plate, and second lifting rings are fixedly connected at the four corners of the upper surface of the base plate.

[0009] Furthermore, a mounting plate is provided in each mounting groove, the mounting plate has the same size as the mounting groove, a steel truss is fixedly connected to the upper surface of the mounting plate, a plurality of threaded holes are opened on the upper surface of the mounting plate, and a first bolt is provided in each threaded hole.

[0010] Furthermore, two slide grooves are mirror-imaged on both sides of the first clamping block, and second clamping blocks are arranged in the two slide grooves. Electric push rods are fixedly connected between the two second clamping blocks and the two slide grooves.

[0011] Furthermore, second card slots are provided on both sides of the first card slot, the first card block is equal in size to the first card slot, and the second card slot is equal in size to the second card block.

[0012] Furthermore, two fixing plates are mirror-imaged on the lower surface of the base plate, the lower surfaces of the two fixing plates are fixedly connected with first lifting rings, threaded holes are opened at the four corners of the two fixing plates, and a second bolt is arranged in each threaded hole.

[0013] Compared with the prior art, the utility model has at least one of the following beneficial effects:

[0014] 1. The utility model adopts a first lifting ring and a second lifting ring. By placing a fixing plate on both sides of the bottom surface of the base plate, passing the second bolts through the threaded holes at the four corners of the fixing plate, and tightening the second bolts, the two fixing plates are installed on the bottom surface of the base plate. The lifting rope of the tower crane is passed through the two first lifting rings, and the floor decking plate can be moved to a suitable position. By passing the lifting rope of the tower crane through the second lifting rings at the four corners of the upper surface of the base plate, the floor decking plate can be lifted, which can facilitate the movement of the floor decking plate and quickly disassemble the first lifting ring.

[0015] 2. The utility model adopts a mounting groove and a mounting plate. By aligning one side of the mounting plate with the mounting groove inside the base plate, pushing the mounting plate into the mounting groove, and aligning the threaded holes inside the mounting plate with the threaded holes on the upper surface of the base plate, and then inserting the first bolt into the threaded hole and tightening it, it can facilitate the disassembly of the steel truss.

[0016] 3. The utility model adopts a first slot, a first block, a second slot and a second block. By aligning one end of one floor decking plate with one end of another floor decking plate, the second block is moved to the slide grooves on both sides of the first block and retracted through the extension of the electric push rod. At this time, the first block is embedded in the first slot, and then the second block is extended and embedded in the second slot through the extension of the electric push rod, which can achieve the effect of connecting and fixing the two floor decking plates. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0018] Figure 2 It is the bottom view of the overall structure of the utility model.

[0019] Figure 3 It is a side view of the overall structure of the utility model.

[0020] Figure 4 This is a cross-sectional view of the first clamping block of the utility model.

[0021] Figure 5 for Figure 2 A magnified view of the structure in the middle.

[0022] Explanation of the reference numerals: 1. base plate; 2. first slot; 3. second slot; 4. first block; 5. second block; 6. electric push rod; 7. mounting slot; 8. steel truss; 9. mounting plate; 10. first bolt; 11. fixing plate; 12. first lifting ring; 13. second bolt; 14. second lifting ring. DETAILED DESCRIPTION

[0023] like Figure 1-5 In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0024] In the prior art, CN202123382859.8 is a type of disassembly-free steel truss floor decking, which can reduce construction labor and costs, but the floor decking cannot be connected to each other, which easily leads to cement falling during cement pouring. In addition, the truss and the floor decking are fixedly connected, which is not convenient to disassemble and has limitations in specific use.

[0025] To this end, the present application proposes a steel structure building truss floor deck to solve the problem that some of the existing floor decks cannot be connected to each other, which easily leads to cement falling during cement pouring, and the truss and the floor deck are fixedly connected, making disassembly inconvenient.

[0026] For details, please refer to Figure 1-5 A steel structure building truss floor deck comprises a base plate 1, a fixing plate 11 and a second lifting ring 14; a plurality of mounting grooves 7 are provided on the upper surface of the base plate 1, a first card slot 2 and a second card slot 3 are provided on one side of the base plate 1, a first card block 4 is provided on the other side of the base plate 1, the fixing plate 11 is fixedly connected to the lower surface of the base plate 1, and second lifting rings 12 are fixedly connected at the four corners of the upper surface of the base plate 1.

[0027] See also Figure 1-5 A mounting plate 9 is provided in each mounting groove 7, and the size of the mounting plate 9 is equal to that of the mounting groove 7. The upper surface of the mounting plate 9 is fixedly connected with a steel truss 8. A plurality of threaded holes are provided on the upper surface of the mounting plate 9, and a first bolt 10 is provided in each threaded hole. By aligning one side of the mounting plate 9 with the mounting groove 7 inside the base plate 1, the mounting plate 9 is pushed into the mounting groove 7, and the threaded holes inside the mounting plate 9 are aligned with the threaded holes on the upper surface of the base plate 1, and then the first bolt 10 is inserted into the threaded holes and tightened to fix it, the effect of facilitating the disassembly of the steel truss 8 can be achieved.

[0028] See also Figure 1-5 Two slide grooves are mirrored on both sides of the first clamping block 4, and second clamping blocks 5 are arranged in the two slide grooves. Electric push rods 6 are fixedly connected between the two second clamping blocks 5 and the two slide grooves.

[0029] See also Figure 1-5 A second card slot 3 is provided on both sides of the first card slot 2, the first card block 4 is equal to the first card slot 2 in size, and the second card slot 3 is equal to the second card block 5 in size. By aligning one end of one floor decking plate with one end of the other floor decking plate, the electric push rod 6 is extended and retracted to move the second card block 5 into the slide grooves on both sides of the first card block 4 and retract it. At this time, the first card block 4 is embedded in the first card slot 2, and the electric push rod 6 is extended and retracted to drive the second card block 5 to extend and embed it in the second card slot 3, which can achieve the effect of connecting and fixing the two floor decking plates.

[0030] See also Figure 1-5 Two fixing plates 11 are mirror-imaged on the lower surface of the base plate 1, and the lower surfaces of the two fixing plates 11 are fixedly connected with first lifting rings 12. Threaded holes are opened at the four corners of the two fixing plates 11, and a second bolt 13 is arranged in each threaded hole. By placing the fixing plates 11 on both sides of the bottom surface of the base plate 1, the second bolts 13 are passed through the threaded holes at the four corners of the fixing plates 11, and the second bolts 13 are tightened, so that the two fixing plates 11 are installed on the bottom surface of the base plate 1, and the lifting rope of the tower crane is passed through the two first lifting rings 12, the floor decking plate can be moved to a suitable position, and the floor decking plate can be lifted by passing the lifting rope of the tower crane through the second lifting rings 12 at the four corners of the upper surface of the base plate 1, which can facilitate the movement of the floor decking plate and quickly disassemble the first lifting rings 12.

[0031] Working process: When in use, first place the fixing plate 11 on both sides of the bottom surface of the base plate 1, then pass the second bolts 13 through the threaded holes at the four corners of the fixing plate 11, tighten the second bolts 13, install the two fixing plates 11 on the bottom surface of the base plate 1, pass the tower crane's lifting rope through the two first lifting rings 12, and move the floor deck to a suitable position. At this time, the user can align one side of the mounting plate 9 with the mounting groove 7 inside the base plate 1, push the mounting plate 9 into the mounting groove 7, and align the threaded holes inside the mounting plate 9 with the threaded holes on the upper surface of the base plate 1, and then insert the first bolt 10. After the steel truss 8 is installed, the lifting rope of the tower crane is passed through the second lifting rings 12 at the four corners of the upper surface of the base plate 1, the floor decking is lifted, one end of one floor decking is aligned with one end of the other floor decking, and the electric push rod 6 is extended to move the second clamping block 5 to the slide grooves on both sides of the first clamping block 4 and retract it. At this time, the first clamping block 4 is embedded in the first clamping groove 2, and the second clamping block 5 is extended and embedded in the second clamping groove 3 by the electric push rod 6. At this time, the two floor decking plates can be connected and fixed to prevent cement from falling during pouring.

[0032] By adopting the above technical scheme: not only can the first lifting ring 12 and the second lifting ring 12 be provided, so that the device can facilitate the movement of the floor deck and the quick removal of the first lifting ring 12, but also the installation groove 7 and the installation plate 9 can be provided, so that the device can facilitate the removal of the steel truss 8, and the first clamping groove 2 can be provided, so that the device can connect and fix the two floor decks.

[0033] Although the utility model is described herein with reference to a plurality of illustrative embodiments of the utility model, it should be understood that those skilled in the art may devise many other modifications and implementations that fall within the scope and spirit of the principles disclosed herein. More specifically, within the scope of the disclosure, drawings, and claims of the present application, various modifications and improvements may be made to the components and / or layout of the subject combination layout. In addition to the modifications and improvements made to the components and / or layout, other uses will also be apparent to those skilled in the art.

Claims

1. A steel structure building truss floor deck, characterized by: The invention comprises a bottom plate (1), a fixing plate (11) and a second lifting ring (14); the top surface of the bottom plate (1) is provided with a plurality of mounting grooves (7); one side of the bottom plate (1) is provided with a first clamping groove (2) and a second clamping groove (3); the other side of the bottom plate (1) is provided with a first clamping block (4); the bottom surface of the bottom plate (1) is fixedly connected to the fixing plate (11); and the top surface of the bottom plate (1) is fixedly connected to the second lifting rings (14) at four corners.

2. A steel structure building truss floor deck according to claim 1, characterized in that: A mounting plate (9) is arranged in each mounting groove (7), the mounting plate (9) and the mounting groove (7) have the same size, a steel bar truss (8) is fixedly connected to the upper surface of the mounting plate (9), a plurality of threaded holes are opened on the upper surface of the mounting plate (9), and a first bolt (10) is arranged in each of the threaded holes.

3. The steel structure building truss floor deck according to claim 1, characterized in that: Two slide grooves are mirror-imaged on both sides of the first clamping block (4), a second clamping block (5) is disposed in each of the two slide grooves, and an electric push rod (6) is fixedly connected between the two second clamping blocks (5) and the two slide grooves.

4. A steel structure building truss floor deck according to claim 3, characterized in that: Second card slots (3) are provided on both sides of the first card slot (2); the first card block (4) is equal in size to the first card slot (2); and the second card slot (3) is equal in size to the second card block (5).

5. The steel structure building truss floor deck according to claim 1, characterized in that: Two fixed plates (11) are mirror-imaged on the lower surface of the base plate (1), and the lower surfaces of the two fixed plates (11) are fixedly connected to first lifting rings (12). The four corners of the two fixed plates (11) are provided with threaded holes, and each threaded hole is provided with a second bolt (13).