Concrete delivery pump for road construction

By using a motor-driven forward and reverse rotation of the screen drum and a cone-plate structure of the pull-out part in the concrete delivery pump, the problem of small-volume material retention is solved, the concrete delivery efficiency is improved, and material mixing is reduced.

CN221800080UActive Publication Date: 2024-10-01ANHUI JUZHEN CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420518383.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-10-01
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

In existing concrete delivery pumps, due to the cylindrical structure of the screen drum, small-volume materials are retained in the inner cavity of the screen drum, affecting the concrete delivery efficiency.

Method used

A concrete delivery pump for highway construction is designed. A motor is used to drive the screen drum to rotate forward and reverse, and gaps and meshes are set at the bottom of the screen drum to allow small-volume materials to pass through the screen drum and enter the conveying mechanism at one time; at the same time, through pulling The arrangement of the fittings and cone plate promotes large-volume materials to move along the cone-plate slope, reducing small-volume material retention and material mixing.

Benefits of technology

It reduces the probability of small-volume materials being retained in the inner cavity of the screen cylinder, improves the concrete transportation efficiency, reduces the mixing of large-volume materials and small-volume materials, and avoids the situation where some small-volume materials cannot be utilized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221800080U_ABST
    Figure CN221800080U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building equipment, discloses a concrete delivery pump for road construction, and aims to solve the problem that the conveying efficiency of concrete is affected due to retention of small-size materials in a screen drum. The motor and the screen drum are arranged, the notch is formed in the bottom of the screen drum, and the motor is used for driving the screen drum to rotate forwards and backwards incompletely, so that small-size materials penetrating through the screen drum at a time easily and directly enter a conveying mechanism from the notch, and the probability that the small-size materials stay in an inner cavity of the screen drum is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction equipment, and in particular to a concrete delivery pump for highway construction. Background Art

[0002] A concrete pump is a machine that continuously transports concrete along a pipeline and is mainly used in house construction, bridge and tunnel construction.

[0003] Some existing conveying pumps are mainly composed of a screening mechanism and a conveying mechanism. When in use, the mixed concrete is input into the screening mechanism, and the concrete is made to contact the outer surface of the screen drum, so that small-volume materials in the concrete pass through the screen drum and then enter the conveying mechanism, while larger-volume materials move to one side with the rotating screen drum and then fall onto the drawer. Through the above actions, the concrete conveying operation is realized.

[0004] However, in the above process, since the screen drum is a cylindrical structure, small-volume materials need to pass through the screen drum twice before entering the conveying mechanism. At the same time, the screen drum is in a rotating state, so that the small-volume materials that pass through the screen drum once and enter the inner cavity of the screen drum are affected by the rotating state of the screen drum and are easily retained in the inner cavity of the screen drum, which ultimately affects the conveying efficiency of concrete. Utility Model Content

[0005] The present application proposes a concrete delivery pump for highway construction, which has the advantage of reducing the probability of small-volume materials being retained in the inner cavity of a screen drum, and is used to solve the problem that small-volume materials are retained in the screen drum, resulting in a reduction in the delivery efficiency of concrete.

[0006] To achieve the above purpose, the present application adopts the following technical solution: a concrete delivery pump for highway construction, comprising:

[0007] A feed hopper, wherein a feed port, a material receiving chamber and a material discharging chamber are sequentially provided inside the feed hopper from top to bottom, the feed port is connected with the external environment and the material receiving chamber, a material conveying mechanism is provided at the lower position of the feed hopper, and the material discharging chamber is connected with the material receiving chamber and the material conveying mechanism;

[0008] A sieve cylinder, wherein the discharge chamber and the receiving chamber are provided with a sieve cylinder, a rotating shaft is provided at the center of the sieve cylinder, a fixing rod is fixedly installed between the rotating shaft and the sieve cylinder, one end of the rotating shaft extends out of the feed hopper, a motor is fixedly installed on one side of the feed hopper, and the output end of the motor is fixedly connected to the end of the rotating shaft extending out of the feed hopper;

[0009] The motor is a forward and reverse motor;

[0010] A notch is provided at the lower side of the screen cylinder, and mesh holes are provided throughout the screen cylinder.

[0011] The collecting mechanism is arranged inside the material receiving cavity and located on both sides of the screen drum to collect large-volume materials.

[0012] Furthermore, the collecting mechanism includes an opening, a pull-out piece and a handle. An opening is provided inside the feed hopper and on one side of the material receiving chamber. Pull-out pieces are movably installed inside the material receiving chamber and on both sides of the screen cylinder. The pull-out piece extends out of the opening toward one end of the opening, and a handle is fixedly installed on the end of the pull-out piece extending out of the opening.

[0013] Furthermore, a cone plate is provided on the bottom surface of the drawer, and the upper side surface of the cone plate is inclined downward toward the side of the screen cylinder.

[0014] Furthermore, a cone plate is fixedly mounted on the bottom surface of the drawer.

[0015] Furthermore, the cone plate is movably connected to the drawer, one end of the cone plate extends out of the opening and the drawer toward the opening, and a No. 2 handle is fixedly mounted on the end of the cone plate extending out of the opening.

[0016] This application has the following beneficial effects:

[0017] The present application provides a concrete pump for highway construction. A notch is opened at the bottom of the screen drum through the arrangement of a motor and a screen drum, and the motor is used to drive the screen drum to perform incomplete forward and reverse rotations, so that a small volume of material passing through the screen drum at one time can easily enter the conveying mechanism directly from the notch, thereby reducing the probability of a small volume of material being retained in the inner cavity of the screen drum.

[0018] By setting the drawer and the cone plate, when a large volume of material falls onto the cone plate on the drawer, the material will move along the inclined surface of the cone plate, causing the material to be pressed on the outer surface of the screen drum. At the same time, the screen drum rotating in the forward and reverse directions is used to move the above material back and forth, thereby causing the small volume of material in the above material to repeatedly participate in the screening operation, thereby reducing the probability of large volume material and small volume material being mixed, resulting in some small volume materials being unusable. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings, which constitute a part of the specification, illustrate embodiments disclosed in the present application and, together with the description, serve to explain the principles disclosed in the present application.

[0020] The present application can be more clearly understood from the following detailed description with reference to the accompanying drawings, in which:

[0021] Figure 1 This is a schematic diagram of the internal structure of the feed hopper in the first embodiment of the utility model;

[0022] Figure 2 This is a schematic diagram of the motor installation position in the first embodiment of the utility model;

[0023] Figure 3 This is a schematic diagram of the relative positions of the drawer and the cone plate in the second embodiment of the utility model.

[0024] In the figure: 1. feed hopper; 2. feed port; 3. material receiving chamber; 4. material discharging chamber; 5. screen drum; 6. rotating shaft; 7. fixing rod; 8. motor; 9. opening; 10. pull-out piece; 11. handle number one; 12. cone plate; 13. handle number two. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0026] Embodiment 1

[0027] See also Figure 1 and Figure 2 A concrete delivery pump for highway construction comprises a feed hopper 1, wherein a feed port 2, a material receiving chamber 3 and a discharge chamber 4 are sequentially provided inside the feed hopper 1 from top to bottom, the feed port 2 is connected to the external environment and the material receiving chamber 3, a feeding mechanism (the prior art, not shown in the figure, such as a piston delivery mechanism in a piston concrete pump) is arranged at the lower position of the feed hopper 1, the discharge chamber 4 is connected to the material receiving chamber 3 and the feeding mechanism, a screen drum 5 is installed together inside the discharge chamber 4 and the material receiving chamber 3, a rotating shaft 6 is arranged at the center position inside the screen drum 5, a fixing rod 7 is arranged between the rotating shaft 6 and the screen drum 5, one end of the fixing rod 7 is fixedly connected to the circumferential side of the rotating shaft 6, the other end of the fixing rod 7 is fixedly connected to the inner wall of the screen drum 5, one end of the rotating shaft 6 extends out of the feed hopper 1, a motor 8 is fixedly installed on one side of the feed hopper 1, the output end of the motor 8 is fixedly connected to the end of the rotating shaft 6 extending out of the feed hopper 1, the motor 8 is a forward and reverse motor, a notch is arranged at the lower side position inside the screen drum 5, and a mesh is opened through the inside of the screen drum 5.

[0028] When in use, the mixed concrete is fed into the receiving cavity 3 through the feed hopper 2, so that the concrete contacts the outer surface of the screen drum 5. During this process, the motor 8 drives the rotating shaft 6 to perform incomplete forward and reverse rotations, so that the fixed rod 7 drives the screen drum 5 to rotate accordingly, thereby allowing the small volume of materials in the concrete to pass through the mesh holes and gaps of the screen drum 5 and then enter the conveying mechanism. Through the above actions, the small volume of materials only needs to pass through the screen drum 5 once, thereby reducing the probability of the small volume of materials being retained in the inner cavity of the screen drum 5.

[0029] See also Figure 1 and Figure 2An opening 9 is provided inside the feed hopper 1 and on one side of the material receiving chamber 3. Pull-out pieces 10 are slidably installed inside the material receiving chamber 3 and on both sides of the screen drum 5. The pull-out piece 10 extends out of the opening 9 toward one end of the opening 9. A handle 11 is fixedly installed on the end of the pull-out piece 10 extending out of the opening 9.

[0030] In the above process, the larger volume of material moves to both sides with the rotating screen drum 5, so that the larger volume of material falls on the pull-out pieces 10 on both sides. Through the above action, the number of pull-out pieces 10 is increased, preventing the larger volume of material from excessively accumulating on one side and affecting the subsequent actions.

[0031] See also Figure 1 and Figure 2 A cone plate 12 is fixedly mounted on the bottom surface of the drawer 10 , and the upper side surface of the cone plate 12 is inclined downward toward the side of the screen drum 5 .

[0032] When a large volume of material falls onto the cone plate 12 on the drawer 10, the material will move along the inclined surface of the cone plate 12, causing the material to be pressed against the outer surface of the screen drum 5. At the same time, the screen drum 5 rotating in the forward and reverse directions is used to move the above-mentioned material back and forth (using the friction between the screen drum 5, the mesh and the larger volume of material), thereby causing the small volume of material in the above-mentioned material to repeatedly participate in the screening operation, thereby reducing the probability of large volume material and small volume material being mixed, resulting in some small volume materials being unusable. Afterwards, after the concrete is delivered, the motor 8 is stopped and the No. 1 handle 11 is pulled, so that the drawer 10 and the cone plate 12 bring out the larger volume of material.

[0033] Embodiment 2

[0034] See also Figure 1 and Figure 3 The cone plate 12 is slidably connected with the drawer 10 , and one end of the cone plate 12 extends out of the opening 9 and the drawer 10 toward the opening 9 . A second handle 13 is fixedly mounted on the end of the cone plate 12 extending out of the opening 9 .

[0035] After the concrete is delivered, the motor 8 is stopped. Then, the second handle 13 is pulled first to make the cone plate 12 leave the feed hopper 1 first, and then the material on the surface of the cone plate 12 falls onto the drawer 10. Then, the first handle 11 is pulled to make the drawer 10 take out the larger volume of material. Through the above actions, it is prevented that the larger volume of material leaves the feed hopper 1 and slides down along the upper side of the cone plate 12 into the working environment, affecting the working environment.

Claims

1. A concrete pump for highway construction, It is characterized in that include: A feed hopper (1), wherein the interior of the feed hopper (1) is provided with a feed port (2), a material receiving chamber (3) and a material discharging chamber (4) in order from top to bottom, the feed port (2) is connected to the external environment and the material receiving chamber (3), a material conveying mechanism is provided at the lower position of the feed hopper (1), and the material discharging chamber (4) is connected to the material receiving chamber (3) and the material conveying mechanism; A sieve drum (5), wherein the discharge chamber (4) and the receiving chamber (3) are provided with a sieve drum (5), a rotating shaft (6) is provided at the center of the sieve drum (5), a fixing rod (7) is fixedly installed between the rotating shaft (6) and the sieve drum (5), one end of the rotating shaft (6) extends out of the feed hopper (1), a motor (8) is fixedly installed on one side of the feed hopper (1), and an output end of the motor (8) is fixedly connected to one end of the rotating shaft (6) extending out of the feed hopper (1); The motor (8) is a forward and reverse motor; A notch is provided at the lower side of the screen cylinder (5), and mesh holes are provided throughout the screen cylinder (5); The collecting mechanism is arranged inside the material receiving chamber (3) and located on both sides of the screen cylinder (5) for collecting large-volume materials.

2. A concrete pump for highway construction according to claim 1, It is characterized in that The collecting mechanism comprises an opening (9), a pull-out piece (10) and a handle (11); an opening (9) is provided inside the feed hopper (1) and located at a position on one side of the material receiving chamber (3); pull-out pieces (10) are movably installed inside the material receiving chamber (3) and located at positions on both sides of the screen drum (5); the pull-out piece (10) extends out of the opening (9) toward one end of the opening (9); and a handle (11) is fixedly installed at one end of the pull-out piece (10) extending out of the opening (9).

3. A concrete delivery pump for highway construction according to claim 2, It is characterized in that A conical plate (12) is arranged on the bottom surface of the drawer (10), and the upper side surface of the conical plate (12) is arranged to be inclined downward toward the side of the screen drum (5).

4. A concrete delivery pump for highway construction according to claim 3, It is characterized in that A cone plate (12) is fixedly mounted on the bottom surface of the drawer (10).

5. A concrete delivery pump for highway construction according to claim 3, It is characterized in that The cone plate (12) is movably connected to the drawer (10); one end of the cone plate (12) extends out of the opening (9) and the drawer (10) toward the opening (9); and a second handle (13) is fixedly mounted on the end of the cone plate (12) extending out of the opening (9).