Reinforcing structure suitable for open-pit mine double-structural-surface combined damaged road side slope

By using the lower rail piles and concrete retaining wall reinforcement structure on the road slope with dual structural surfaces in the open-pit mine, combined with the combined reinforcement of the upper rail piles, prestressed anchor cables and connecting beams, the dual-structural surface combined damage in the open-pit mine was solved. The stability of the slope has been solved to achieve the safe reinforcement of the slope and the continuous passage of the mine road.

CN221837625UActive Publication Date: 2024-10-15SINOSTEEL MAANSHAN INST OF MINING RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420307898.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-10-15
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

The existing technology lacks reinforcement measures for road slopes damaged by the combination of double structural surfaces in open-pit mines, leading to frequent slope instability and landslide disasters, affecting mine safety production.

Method used

The lower reinforcement structure is composed of rail piles and concrete retaining walls, and the upper reinforcement structure is composed of rail piles, prestressed anchor cables and connecting beams. The prestressed anchor cables penetrate into the bedrock beneath the gently sloping structural surface to form an overall reinforcement structure. Avoid over-reinforcement of steeply sloping structural surfaces.

Benefits of technology

It significantly improves the shear resistance and overall stability of the slope, ensures the safety of mine roads, avoids landslide sliding, reduces construction costs and reinforcement speed, and improves the long-term stability of the slope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837625U_ABST
    Figure CN221837625U_ABST
Patent Text Reader

Abstract

The utility model discloses a reinforcing structure suitable for a strip mine double-structural-surface combined damaged road slope, which is characterized in that a concrete retaining wall (3) is arranged at a shear outlet of a slope gently-inclined structural surface, a row of drill holes are vertically and downwards formed in the middle of the upper surface of the concrete retaining wall (3), and lower steel rail piles (1.1) are inserted into the drill holes; a row of drill holes are vertically and downwards formed in the step platform, upper steel rail piles (1.2) are inserted into the drill holes, and exposed sections, outside the drill holes, of the upper steel rail piles (1.2) are welded to steel bars in the connecting beams (4); and the pre-stressed anchor cables (2) penetrate through the connecting beams (4) at the tops of the upper steel rail piles (1.2), and concrete anchorage piers are poured on the outer surfaces of the connecting beams (4). After reinforcement treatment is conducted through the method, the anti-sliding capacity of the lower slowly-inclined structural plane can be enhanced, the upper steep-inclined structural plane is prevented from being excessively reinforced, it is guaranteed that the stability of a road slope is damaged by the combination of the double structural planes of the strip mine, and the structure has the advantages of being simple in structure, low in construction cost and high in reinforcement construction speed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of open-pit mine road slope management, and in particular relates to a double-structure surface combined destruction road slope reinforcement structure for a non-coal open-pit mine. Background Art

[0002] Under the action of self-weight and other external forces, the slope of an open-pit mine tends to slide from high to low. When there is a structural surface inside the slope, the strength of the structural surface is usually much lower than the strength of the rock and soil. When the slope is unstable, it often slides along the structural surface or a combination of structural surfaces. Especially when there is a steep structural surface on the upper part of the slope, under the gravity of the upper steep rock mass, the lower slope is attached to the gently inclined structural surface to form a shear failure, forming a double structural surface combined destructive slope disease.

[0003] Common measures for the treatment of mine slopes include slope cutting and load reduction, anchor reinforcement, sprayed anchor net slope protection and frame beam reinforcement. A single reinforcement method is often prone to failure under complex load stress, so multiple reinforcement methods are currently used for combined support. The combined support structure composed of anchor rods and retaining walls can achieve the purpose of improving the strength of the slope structure, but it makes the mine road unusable after the slope reinforcement treatment.

[0004] The "double-structure surface combined failure type" is a special slope structure surface failure mode that is different from other typical single-structure surface failure modes of slopes. Although a steeply inclined structure surface develops on the upper part of the slope rock mass, the sliding force along the steeply inclined structure surface is small, and the slope rock mass will not suffer from shear failure. The focus of the slope reinforcement for this diseased slope is to strengthen the gently inclined structure surface at the bottom of the slope to ensure that the shear resistance of the rock mass at the bottom of the slope is greater than the sliding force formed by the gravity of the rock mass attached to the upper steeply inclined structure surface, and it is not advisable to over-reinforce the upper steeply inclined structure surface. At present, there are no targeted reinforcement measures for the double-structure surface combined failure mode. Therefore, a reinforcement structure suitable for the double-structure surface combined destruction road slope in open-pit mines is needed. Summary of the invention

[0005] The utility model aims to provide a reinforcement structure suitable for open-pit mine double-structure surface combination damaged road slopes in view of the problem that the prior art lacks reinforcement measures for open-pit mine double-structure surface combination damaged road slopes.

[0006] In order to achieve the above-mentioned purpose of the utility model, the utility model adopts the following technical solutions to realize a reinforcement structure suitable for open-pit mine double-structure surface combined destruction road slope:

[0007] The utility model is a reinforcement structure suitable for open-pit mine double structural surface combination damaged road slope. The open-pit mine road slope has double sets of layered structural surfaces, the lower part is a gently inclined structural surface, and the upper part is a steeply inclined structural surface; the inclination angle of the gently inclined structural surface is ≤30°, and the inclination angle of the steeply inclined structural surface is>50°; the utility model is characterized in that it is composed of a lower reinforcement structure and an upper reinforcement structure combination:

[0008] The lower reinforcement structure is located at the bottom of the open-pit mine road slope, and is connected as a whole by the lower rail piles and the concrete retaining wall combination; the concrete retaining wall is arranged at the shear outlet of the slope gentle slope structure surface, and the lower rail piles are inserted into a row of drill holes arranged vertically downward in the middle of the upper surface of the concrete retaining wall according to the designed spacing and penetrate into the stable bedrock, and after the lower rail piles are inserted, fine stone concrete is poured;

[0009] The upper reinforcement structure is located on the step platform above the gently inclined structural surface, and is composed of upper rail piles, prestressed anchor cables, and connecting beams; the upper rail piles are inserted into a row of drill holes arranged vertically downward on the step platform according to the designed spacing and penetrate into the stable bedrock, and are poured with fine stone concrete after the upper rail piles are inserted; the connecting beam is in the shape of a long strip, and the steel bars in the connecting beam are welded to the exposed section of the upper rail pile outside the drill hole; the prestressed anchor cable passes through the connecting beam at the top of the upper rail pile and is cast into a concrete anchor pier on the outer surface of the connecting beam, and the prestressed anchor cable penetrates into the stable bedrock below the gently inclined structural surface, and is cast into an anchor body using cement mortar.

[0010] Furthermore, the prestressed anchor cable is composed of a row of prestressed steel strands that pass through the connecting beam, the gently inclined structural surface and penetrate into the internal stable bedrock below the gently inclined structural surface.

[0011] Furthermore, the width of the upper surface of the concrete retaining wall is ≥2m, the depth of the lower surface extends 0.9 to 1.2m below the road platform, and the slope of the outer surface is < the slope of the lower step side slope.

[0012] Furthermore, drainage holes are arranged 0.5 to 2 m above the gently inclined structural surface, and PVC pipes are pre-buried in the drainage holes before concrete pouring construction to pass through the concrete retaining wall to the outer surface.

[0013] Furthermore, the diameter of the drainage hole is 100-120 mm, and the upward slope is parallel to the gently inclined structural surface.

[0014] Furthermore, the spacing of the lower rail piles is preferably 2.5-5m, preferably 3-4m; the spacing of the upper rail piles is preferably 2.5-5m, preferably 3-4m; similarly, the horizontal spacing between adjacent prestressed anchor cables is preferably 2.5-5m, preferably 3-4m.

[0015] After reinforcement through the above process, the stability of the road slope destroyed by the double-structure surface combination of the open-pit mine has been significantly improved, and the mine road can continue to be used.

[0016] The utility model is suitable for the reinforcement structure of the double-structured surface combined damaged road slope in open-pit mines, and has the following positive effects after adopting the above technical scheme:

[0017] (1) The reinforcement of the double-structure surface combined damage slope focuses on strengthening the gently inclined structural surface at the bottom of the slope. The reinforcement structure of the utility model can greatly improve the shear resistance of the gently inclined structural surface, greatly enhance the anti-sliding ability of the lower gently inclined structural surface, avoid excessive reinforcement of the upper steeply inclined structural surface, effectively limit the sliding of the landslide body along the layer, and ensure the safe production of the mine.

[0018] (2) The lower rail piles of the lower reinforcement structure of the utility model vertically penetrate the concrete retaining wall and penetrate into the gently inclined structural surface, connecting the lower rail piles, the concrete retaining wall, the landslide body and the deep bedrock into a whole, which can greatly improve the overall stability of the reinforcement structure.

[0019] (3) The upper reinforcement structure of the utility model method effectively improves the shear strength of the reinforcement structure by combining and connecting the upper rail piles, the connecting beam and the prestressed anchor cable, thereby ensuring that the reinforcement structure will not slide along the gently inclined structural surface.

[0020] (4) By using prestressed anchor cables and rail pile structures that penetrate deep into the bedrock of the slope, the stress state at the gently inclined structural surface within the slope can be effectively improved. At the same time, the slope and the concrete retaining wall can be formed into an integral area, thereby improving the stability of the open-pit mine double-structure surface combination that destroys the road slope. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 The utility model is a cross-sectional schematic diagram of a reinforcement structure suitable for a double-structure surface combined destruction road slope in an open-pit mine.

[0022] Figure numerals: 1.1 - lower rail pile; 1.2 - upper rail pile; 2 - prestressed anchor cable; 3 - concrete retaining wall; 4 - connecting beam; 5 - gently inclined structural surface; 6 - steeply inclined structural surface; 7 - drainage hole; 8 - drainage ditch. DETAILED DESCRIPTION

[0023] To further describe the utility model, a reinforcement structure of the utility model suitable for the double-structure surface combined destruction of road slopes in an open-pit mine is further described in detail below in conjunction with the accompanying drawings.

[0024] Depend on Figure 1As shown in the cross-sectional schematic diagram of the utility model, a reinforcement structure suitable for the double structural surface combination destruction of the road slope of the open-pit mine, in the embodiment of the utility model, a reinforcement structure suitable for the double structural surface combination destruction of the road slope of the open-pit mine, there are two sets of layered structural surfaces on the road slope of the open-pit mine, the lower part is a gently inclined structural surface 5, and the upper part is a steeply inclined structural surface 6; the inclination angle of the gently inclined structural surface 5 is ≤30°, and the inclination angle of the steeply inclined structural surface 6 is greater than 50°. The specific reinforcement structure used is divided into two parts: the lower reinforcement structure is located at the bottom of the road slope of the open-pit mine, and is connected into a whole by the lower rail pile 1.1 and the concrete retaining wall 3; the upper reinforcement structure is located on the step platform above the gently inclined structural surface 5, and is composed of the upper rail pile 1.2 and the prestressed anchor cable 2.

[0025] The lower reinforcement structure is located at the bottom of the open-pit mine road slope, and is connected as a whole by the lower rail pile 1.1 and the concrete retaining wall 3; the concrete retaining wall 3 is arranged at the shear outlet of the slope gentle structural surface 5, and the lower rail pile 1.1 is inserted into a row of drill holes arranged vertically downward in the middle of the upper surface of the concrete retaining wall 3 at a spacing of 3 to 4 meters and penetrates into the stable bedrock. After the lower rail pile 1.1 is inserted, C20 fine stone concrete is poured; the width of the upper surface of the concrete retaining wall 3 is ≥2m, the depth of the lower surface extends 1m below the road platform, and the slope of the outer surface is < the slope of the lower step slope. The concrete retaining wall 3 is cast with C30 concrete.

[0026] The upper reinforcement structure is located on the step platform above the gently inclined structural surface 5, and is composed of an upper rail pile 1.2, a prestressed anchor cable 2, and a connecting beam 4; the upper rail pile 1.2 is inserted into a row of drill holes arranged vertically downward on the step platform at a spacing of 3 to 4 m and penetrates into the stable bedrock, and is poured with C20 fine stone concrete after the upper rail pile 1.2 is inserted; the connecting beam 4 is in the shape of a long strip, and the steel bars in the connecting beam 4 are welded to the exposed section of the upper rail pile 1.2 outside the drill hole; the prestressed anchor cable 2 passes through the connecting beam 4 at the top of the upper rail pile 1.2 and is cast into a concrete anchor pier on the outer surface of the connecting beam 4, and the prestressed anchor cable 2 penetrates into the stable bedrock below the gently inclined structural surface 5, with an anchoring length of 8 m, and is cast using M30 cement mortar to form an anchor body; the prestressed anchor cable 2 is composed of a row of prestressed steel strands that pass through the connecting beam 4, the gently inclined structural surface 5, and penetrate into the internal stable bedrock below the gently inclined structural surface 5.

[0027] In the embodiment, a drainage system is also provided on the mine slope step, and the drainage system is composed of a drainage hole 7 arranged above the gently inclined structural surface 5 of the mine slope and a drainage ditch 8 arranged on the periphery of the steeply inclined structural surface 7; the drainage hole 7 is pre-buried with a PVC pipe through the concrete retaining wall 3 to the outer surface before the concrete pouring construction, and the drainage hole 7 is arranged 0.5 to 2 m above the gently inclined structural surface 5, with a diameter of 100 to 120 mm, and an upward slope parallel to the gently inclined structural surface 5; the drainage ditch 8 is a mortar-laid stone drainage ditch, and the bottom of the ditch is plastered with mortar, with a size of (0.5 to 1.2 m) × (0.5 to 1.2 m).

[0028] The utility model is a reinforcement structure suitable for the double-structure surface combination of open-pit mines to damage the road slope. It has been tested and applied in the reinforcement and treatment of the double-structure surface combination of a large domestic open-pit iron mine. The lower gently inclined structure surface has an inclination angle of 25° and the upper steeply inclined structure surface has an inclination angle of 62°. Road slope landslide disasters have occurred many times, seriously affecting the safe production of the mine, and once caused the suspension of work and production. After the reinforcement and treatment method of the utility model is adopted, the stability of the double-structure surface combination of the open-pit mine road slope is improved, and it has withstood the test of heavy rainfall that occurs once in a hundred years, ensuring the stability of the double-structure surface combination of the open-pit mine road slope, the mine road can be used sustainably, and the orderly production of the mine is guaranteed. It has the characteristics of simple structure, low construction cost, and fast reinforcement construction speed, and has been highly praised by users.

Claims

1. A reinforcement structure suitable for double structural surface combined destruction of road slopes in open-pit mines, characterized in that It is composed of a lower reinforcement structure and an upper reinforcement structure: The lower reinforcement structure is located at the bottom of the open-pit mine road slope and is connected as a whole by a lower rail pile (1.1) and a concrete retaining wall (3); the concrete retaining wall (3) is arranged at the shear outlet of the slope gentle structural surface (5), and the lower rail pile (1.1) is inserted into a row of drill holes arranged vertically downward in the middle of the upper surface of the concrete retaining wall (3) according to the designed spacing and penetrates into the stable bedrock; The upper reinforcement structure is located on a step platform above the gently inclined structural surface (5), and is composed of an upper rail pile (1.2), a prestressed anchor cable (2), and a connecting beam (4); the upper rail pile (1.2) is inserted into a row of drill holes arranged vertically downward on the step platform according to a designed spacing and penetrates into the stable bedrock; the connecting beam (4) is in the shape of a long strip, and the steel bars in the connecting beam (4) are welded to the exposed section of the upper rail pile (1.2) outside the drill hole; the prestressed anchor cable (2) passes through the connecting beam (4) at the top of the upper rail pile (1.2) and is cast on the outer surface of the connecting beam (4) to form a concrete anchor pier, and the prestressed anchor cable (2) penetrates into the stable bedrock below the gently inclined structural surface (5).

2. A reinforcement structure suitable for double-structured surface combined destruction of road slopes in open-pit mines as claimed in claim 1, characterized in that: The prestressed anchor cable (2) is composed of a row of prestressed steel strands that pass through the connecting beam (4), the gently inclined structural surface (5) and penetrate into the internal stable bedrock below the gently inclined structural surface (5).

3. A reinforcement structure suitable for double-structured surface combined destruction of road slopes in open-pit mines as claimed in claim 1, characterized in that: The width of the upper surface of the concrete retaining wall (3) is ≥2m, the depth of the lower surface extends 0.9-1.2m below the road platform, and the slope of the outer surface is less than the slope of the lower step side slope.

4. A reinforcement structure suitable for double-structured surface combined destruction of road slopes in open-pit mines as claimed in claim 1, 2 or 3, characterized in that: A drainage hole (7) is arranged 0.5 to 2 m above the gently inclined structural surface (5). The drainage hole (7) is pre-buried with a PVC pipe that passes through the concrete retaining wall (3) to the outer surface before concrete pouring construction.

5. A reinforcement structure suitable for double-structured surface combined destruction of road slopes in open-pit mines as claimed in claim 4, characterized in that: The drainage hole (7) has a diameter of 100-120 mm, and its upward slope is parallel to the gently inclined structural surface (5).

6. A reinforcement structure suitable for double-structured surface combined destruction of road slopes in open-pit mines as claimed in claim 5, characterized in that: The spacing between lower rail piles (1.1) is 2.5 to 5 m, the spacing between upper rail piles (1.2) is 2.5 to 5 m, and the horizontal spacing between adjacent prestressed anchor cables (2) is 2.5 to 5 m.

7. A reinforcement structure suitable for double-structured surface combined destruction of road slopes in open-pit mines as claimed in claim 6, characterized in that: The spacing between lower rail piles (1.1) is 3 to 4 m, the spacing between upper rail piles (1.2) is 3 to 4 m, and the horizontal spacing between adjacent prestressed anchor cables (2) is 3 to 4 m.