Intelligent maintenance trolley for tunnel secondary lining concrete
By using a track and self-propelled trolley structure on the tunnel's secondary lining concrete maintenance trolley, combined with an intelligent water supply system, the problems of trolley tilt and water temperature adjustment are solved, safe and automated maintenance operations are realized, and the quality of concrete maintenance is improved.
Patent Information
- Application Number
- CN202420609942.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-03-27
AI Technical Summary
The existing concrete maintenance trolley for the second lining of the tunnel is prone to tilting when traveling back and forth, causing safety hazards. It also lacks water temperature adjustment and automatic water replenishment systems, which affects the quality of maintenance.
An intelligent maintenance trolley for tunnel secondary lining concrete is designed. It uses a track and self-propelled trolley structure to ensure that the water spray pipe runs in a straight line. A heater and water level measurement component are added to the intelligent water supply system to achieve water temperature adjustment and automatic water replenishment.
It realizes the linear movement of the water spray pipe, ensuring the uniformity of water mist spraying and the quality of concrete maintenance. At the same time, through the automatic heating and water replenishment functions, it realizes unmanned intelligent maintenance operations.
Smart Images

Figure CN221838350U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, in particular to an intelligent maintenance trolley for secondary lining concrete of a tunnel. Background Art
[0002] After the secondary lining construction of underground projects such as tunnels and subways, the lining concrete must be cured in time to ensure the strength and quality of the concrete and prevent cracks and peeling.
[0003] The maintenance of the secondary lining concrete mainly involves spraying water mist at regular intervals and ensuring the appropriate water temperature.
[0004] The disadvantages of the current maintenance trolley are:
[0005] (1) The water spray pipe is fixed on the trolley. When the trolley moves back and forth, water mist is sprayed for maintenance. However, the trolley is prone to go off-center during reciprocating movement, and it is easy to collide with other facilities in the tunnel, causing safety accidents. Therefore, someone must constantly operate and adjust, and automated maintenance operations cannot be achieved.
[0006] (2) No water temperature regulation facilities are installed. When the water temperature is too low, the curing quality of concrete is affected.
[0007] (3) There is no automatic water replenishment system installed, and when the water level is low, water needs to be added to the water tank manually. Summary of the invention
[0008] The technical problem to be solved by the utility model is to overcome the existing defects and provide an intelligent tunnel secondary lining concrete maintenance trolley, which can ensure straight-line movement by spraying water mist to avoid tilting, while increasing water temperature regulation to ensure the maintenance quality of concrete, and can effectively solve the problems in the background technology.
[0009] To achieve the above object, the utility model provides the following technical solutions: a tunnel secondary lining concrete intelligent maintenance trolley, comprising a gantry trolley, the upper end of the gantry trolley is connected to a water spraying maintenance system through legs, and the lower part of the gantry trolley is provided with an intelligent water supply system and an electrical control system;
[0010] The water spray maintenance system comprises a track, a self-propelled trolley, a water spray pipe and an atomizing nozzle, wherein the track is arranged at the upper end of the support leg, the self-propelled trolley is arranged on the track and reciprocates along the track, the upper end of the self-propelled trolley is connected to the water spray pipe through a water spray pipe support rod, the water spray pipe is an arc structure with the same arc as the top of the tunnel, and the atomizing nozzles are evenly distributed on the outer side of the water spray pipe;
[0011] The intelligent water supply system includes a water tank, a submersible pump, a heater, a water temperature measuring instrument, a connecting hose, a water inlet pipe and a water level measuring assembly. The water tank is fixed at the lower end of the gantry trolley, the submersible pump is arranged at the bottom of the water tank, the water outlet pipe of the submersible pump is sequentially installed with a heater and a water temperature measuring instrument, the upper end of the water outlet pipe of the submersible pump is connected to the water spray pipe through a connecting hose, a water inlet pipe is arranged above the water tank, an electromagnetic water valve is arranged on the outer side of the water inlet pipe, the water inlet pipe is connected to an external water pump, and the water level measuring assembly is arranged at the upper end of the water tank for detecting the water level in the water tank;
[0012] The electrical control system is electrically connected to the water spraying maintenance system and the intelligent water supply system respectively to control their operations.
[0013] As a preferred technical solution of the utility model, the self-propelled vehicle includes a vehicle body, a driving motor, a driving sprocket, a chain, a driven sprocket, a driving wheel group and a driven wheel group. The lower end of the vehicle body is provided with a driving wheel group and a driven wheel group, the driving motor is arranged at the upper end of the vehicle body, the driving sprocket is arranged on the outer side of the output shaft of the driving motor, the driven sprocket is arranged on the transmission shaft of the driving wheel group, and the chain is sleeved between the driving sprocket and the driven sprocket.
[0014] As a preferred technical solution of the utility model, a left end travel switch and a right end travel switch are respectively installed at both ends of the track.
[0015] As a preferred technical solution of the utility model, the water spray maintenance system also includes a track support longitudinal beam and a track support cross beam, the track support longitudinal beam is fixed to the upper end of the support leg, the track support cross beam is evenly distributed on the upper surface of the track support longitudinal beam, and the track is fixed on the track support cross beam.
[0016] As a preferred technical solution of the utility model, the water level measuring assembly includes a float, a slide bar, a bump block, a lower water level switch, an upper water level switch and a fixed rod. The float floats on the water surface in the water tank. The slide bar is arranged at the upper end of the float. The upper end of the slide bar passes through the water tank and is connected to the bump block. An upper water level switch and a lower water level switch are respectively arranged above and below the bump block. The upper water level switch is arranged at the lower end of the fixed rod. The fixed rod is connected to the upper surface of the water tank. The lower water level switch is arranged on the upper surface of the water tank.
[0017] Compared with the prior art, the beneficial effects of the utility model are as follows: (1) by adding a track above the gantry trolley, the self-propelled trolley can move in a straight line along the track to prevent deviation, and at the same time, the water spray pipe is set to be arc-shaped, which cooperates with the arc-shaped concrete on the top of the tunnel to ensure uniform water mist spraying; (2) a heater and a water temperature measuring instrument are added to the outlet pipe of the submersible pump. When the water temperature is too low, the pumped water is heated by the heater to ensure the quality of maintenance; (3) by setting a water level measuring component to monitor the water level in the water tank, when the water level is too low, the water pump is triggered to start, and water is added to the water tank through the water inlet pipe. No manual water addition is required, thereby realizing intelligent concrete maintenance operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 Based Figure 1 Left view of
[0020] Figure 3 It is a structural diagram of the self-propelled car;
[0021] Figure 4 It is a structural schematic diagram of the water level measurement component.
[0022] In the figure: 1 gantry trolley, 2 water spray maintenance system, 21 track support longitudinal beam, 22 track support cross beam, 23 track, 24 self-propelled trolley, 241 car body, 242 drive motor, 243 driving sprocket, 244 chain, 245 driven sprocket, 246 driving wheel group, 247 driven wheel group, 25 left end travel switch, 26 right end travel switch, 27 water spray pipe support rod, 28 water spray pipe, 29 atomizing nozzle, 3 legs, 4 intelligent water supply system, 41 water tank, 42 submersible pump, 43 heater, 44 water temperature measuring instrument, 45 connecting hose, 46 water inlet pipe, 47 electromagnetic water valve, 48 water level measuring component, 481 float, 482 slide bar, 483 bump block, 484 water level lower limit switch, 485 water level upper limit switch, 486 fixing rod, 5 electrical control system. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments (for the convenience of description and understanding, the following is a schematic diagram of the present invention). Figure 1 Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0024] See also Figure 1-4The utility model provides a technical solution: a tunnel secondary lining concrete intelligent maintenance trolley, comprising a gantry trolley 1, a walking mechanism is arranged at the lower end of the gantry trolley 1, the upper end of the gantry trolley 1 is connected to a water spraying maintenance system 2 through a support leg 3, and an intelligent water supply system 4 and an electrical control system 5 are arranged at the lower part of the gantry trolley 1;
[0025] The water spraying maintenance system 2 includes a track 23, a self-propelled trolley 24, a water spraying pipe 28 and an atomizing nozzle 29. The track 23 is arranged at the upper end of the support leg 3. The self-propelled trolley 24 is arranged on the track 23 and reciprocates along the track 23. The upper end of the self-propelled trolley 24 is connected to the water spraying pipe 28 through a water spraying pipe support rod 27. The water spraying pipe 28 is an arc structure with the same arc as the top of the tunnel, so that the water mist is evenly sprayed on the top of the tunnel. The atomizing nozzles 29 are evenly distributed on the outer side of the water spraying pipe 28.
[0026] The self-propelled trolley 24 includes a vehicle body 241, a driving motor 242, a driving sprocket 243, a chain 244, a driven sprocket 245, a driving wheel set 246 and a driven wheel set 247. The driving wheel set 246 and the driven wheel set 247 are arranged at the lower end of the vehicle body 241. The driving motor 242 is arranged at the upper end of the vehicle body 241. The driving sprocket 243 is arranged on the outer side of the output shaft of the driving motor 242. The driven sprocket 245 is arranged on the transmission shaft of the driving wheel set 246. The chain 244 is sleeved between the driving sprocket 243 and the driven sprocket 245. The driving motor 242 drives the driving sprocket 243 to rotate, and then the chain 244 drives the driven sprocket 245 to rotate, so that the driving wheel set 246 moves and drives the driven wheel set 247 to reciprocate on the track 23.
[0027] The intelligent water supply system 4 includes a water tank 41, a submersible pump 42, a heater 43, a water temperature measuring instrument 44, a connecting hose 45, a water inlet pipe 46 and a water level measuring assembly 48. The water tank 41 is fixed to the lower end of the gantry trolley 1, the submersible pump 42 is arranged at the bottom of the water tank 41, the heater 43 and the water temperature measuring instrument 44 are sequentially installed on the water outlet pipe of the submersible pump 42, the upper end of the water outlet pipe of the submersible pump 42 is connected to the water spray pipe 28 through the connecting hose 45, a water inlet pipe 46 is arranged above the water tank 41, an electromagnetic water valve 47 is arranged on the outer side of the water inlet pipe 46, the water inlet pipe 46 is connected to an external water pump, and the water level measuring assembly 48 is arranged at the upper end of the water tank 41 for detecting the water level in the water tank 41;
[0028] The water level measuring assembly 48 includes a float 481, a slide bar 482, a bump block 483, a lower water level switch 484, an upper water level switch 485 and a fixed rod 486. The float 481 floats on the water surface in the water tank 41. The slide bar 482 is arranged at the upper end of the float 481. The upper end of the slide bar 482 passes through the water tank 41 and is connected to the bump block 483. The upper and lower parts of the bump block 483 are respectively provided with an upper water level switch 485 and a lower water level switch 484. The upper water level switch 485 is arranged at the fixed rod 486. At the lower end of 486, the fixed rod 486 is connected to the upper surface of the water tank 41, and the lower water level switch 484 is set on the upper surface of the water tank 41. When the water level drops, the float 481 drives the fixed rod 486 to move downward. When the bump block 483 on the fixed rod 486 touches the lower water level switch 484, the water pump starts and adds water to the water tank 41 through the water inlet pipe 46. At this time, the float 481 rises, and when the bump block 483 touches the upper water level switch 485, the water pump stops working and the water adding is completed.
[0029] The output end of the electrical control system 5 is electrically connected to the input end of the drive motor 242, the submersible pump 42, the heater 43 and the electromagnetic water valve 47 respectively, and the output ends of the left end travel switch 25, the right end travel switch 26, the water level measuring instrument 44, the lower water level limit switch 484 and the upper water level limit switch 485 are electrically connected to the input end of the electrical control system 5 respectively.
[0030] Furthermore, a left end travel switch 25 and a right end travel switch 26 are respectively installed at both ends of the track 23. When the self-propelled vehicle 24 touches the left end travel switch 25 or the right end travel switch 26 during movement, the drive motor 242 rotates in the reverse direction to control the self-propelled vehicle 24 to move in the reverse direction.
[0031] Furthermore, the water spray maintenance system 2 also includes a track support longitudinal beam 21 and a track support cross beam 22. The track support longitudinal beam 21 is fixed to the upper end of the support leg 3, the track support cross beam 22 is evenly distributed on the upper surface of the track support longitudinal beam 21, and the track 23 is fixed on the track support cross beam 22.
[0032] When in use: turn on the main switch of the electrical control system 5, start the drive motor 242 and the submersible pump 42, the self-propelled trolley 24 drives the water spray pipe 28 to move to the left, while moving, the water spray pipe 28 sprays atomized water to the surface of the second lining concrete of the tunnel through the atomizing nozzle 29, when the self-propelled trolley 24 reaches the left end and touches the left end travel switch 25, the drive motor 242 rotates in the opposite direction, and the drive motor 242 drives the self-propelled trolley 24 and the water spray pipe 28 to move to the right through the active sprocket 243, the chain 244 and the driven sprocket 245, and this is repeated continuously. After a specified number of round trips, the self-propelled trolley 24 stops moving and the submersible pump 42 stops spraying water for maintenance operations.
[0033] In the process of spraying atomized water to cure the secondary lining concrete, the water temperature measuring instrument 44 measures the water temperature in real time. When the water temperature is lower than the set value, the electrical control system 5 controls the heater 43 to automatically start heating. When the water temperature reaches the set value, the heater 43 stops heating to ensure the curing quality.
[0034] At the same time, the water level measuring component 48 measures the water level in real time. When the water level in the water tank 41 drops, the float 481, the slide bar 482 and the bump block 483 drop accordingly. When the bump block 483 hits the lower water level limit switch 484, the electrical control system 5 gives a signal to the electromagnetic water valve 47 to open the electromagnetic water valve 47, and at the same time controls the water pump to start and supply water to the water tank 41 through the water inlet pipe 46. As the water level in the water tank 41 gradually rises, when the bump block 483 hits the upper water level switch 485, the electrical control system 5 controls the electromagnetic water valve 47 to close and stop supplying water to the water tank 41, thereby realizing the automatic water adding function.
[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An intelligent tunnel secondary lining concrete maintenance trolley, comprising a portal trolley (1), characterized in that: The upper end of the gantry trolley (1) is connected to the water spraying maintenance system (2) via a support leg (3), and the lower part of the gantry trolley (1) is provided with an intelligent water supply system (4) and an electrical control system (5); The water spraying maintenance system (2) comprises a track (23), a self-propelled trolley (24), a water spraying pipe (28) and an atomizing nozzle (29); the track (23) is arranged at the upper end of the support leg (3); the self-propelled trolley (24) is arranged on the track (23) and reciprocates along the track (23); the upper end of the self-propelled trolley (24) is connected to the water spraying pipe (28) through a water spraying pipe support rod (27); the water spraying pipe (28) is an arc-shaped structure with the same arc as the tunnel top; and the atomizing nozzles (29) are evenly distributed on the outer side of the water spraying pipe (28); The intelligent water supply system (4) comprises a water tank (41), a submersible pump (42), a heater (43), a water temperature measuring instrument (44), a connecting hose (45), a water inlet pipe (46) and a water level measuring assembly (48); the water tank (41) is fixed at the lower end of the gantry trolley (1); the submersible pump (42) is arranged at the bottom of the water tank (41); the heater (43) and the water temperature measuring instrument (44) are sequentially installed on the water outlet pipe of the submersible pump (42); the upper end of the water outlet pipe of the submersible pump (42) is connected to the water spray pipe (28) through a connecting hose (45); a water inlet pipe (46) is arranged above the water tank (41); an electromagnetic water valve (47) is arranged on the outer side of the water inlet pipe (46); the water inlet pipe (46) is connected to an external water pump; and the water level measuring assembly (48) is arranged at the upper end of the water tank (41) for detecting the water level in the water tank (41); The electrical control system (5) is electrically connected to the water spraying maintenance system (2) and the intelligent water supply system (4) respectively, and is used to control their operations.
2. The intelligent tunnel secondary lining concrete maintenance trolley according to claim 1 is characterized by: The self-propelled vehicle (24) comprises a vehicle body (241), a driving motor (242), a driving sprocket (243), a chain (244), a driven sprocket (245), a driving wheel group (246) and a driven wheel group (247); the driving wheel group (246) and the driven wheel group (247) are arranged at the lower end of the vehicle body (241); the driving motor (242) is arranged at the upper end of the vehicle body (241); the driving sprocket (243) is arranged on the outer side of the output shaft of the driving motor (242); the driven sprocket (245) is arranged on the transmission shaft of the driving wheel group (246); and the chain (244) is sleeved between the driving sprocket (243) and the driven sprocket (245).
3. The intelligent tunnel secondary lining concrete maintenance trolley according to claim 1 is characterized by: A left end travel switch (25) and a right end travel switch (26) are respectively installed at both ends of the track (23).
4. The intelligent tunnel secondary lining concrete maintenance trolley according to claim 1, characterized in that: The water spray maintenance system (2) further comprises a track support longitudinal beam (21) and a track support cross beam (22), wherein the track support longitudinal beam (21) is fixed to the upper end of the support leg (3), the track support cross beam (22) is evenly distributed on the upper surface of the track support longitudinal beam (21), and the track (23) is fixed on the track support cross beam (22).
5. The intelligent tunnel secondary lining concrete maintenance trolley according to claim 1 is characterized by: The water level measuring assembly (48) comprises a float (481), a slide bar (482), a bump block (483), a lower water level switch (484), an upper water level switch (485) and a fixed rod (486). The float (481) floats on the water surface in the water tank (41). The slide bar (482) is arranged at the upper end of the float (481). The upper end of the slide bar (482) passes through the water tank (41) and is connected to the bump block (483). The upper and lower parts of the bump block (483) are respectively provided with an upper water level switch (485) and a lower water level switch (484). The upper water level switch (485) is arranged at the lower end of the fixed rod (486). The fixed rod (486) is connected to the upper surface of the water tank (41). The lower water level switch (484) is arranged on the upper surface of the water tank (41).
Citation Information
Cited By
Tunnel secondary lining spraying maintenance equipment based on trolley and using method
CN121760747A
