Built-in ballast bed pump room structure
By designing a built-in pump room structure between the high-grade steel spring floating slab track bed and the prefabricated track slab track bed, and using the design of the short pillow type integral track bed connecting section and drainage section, the problem of connecting the drainage systems of different track bed structures has been solved, and effective Excellent drainage connection and construction convenience.
Patent Information
- Application Number
- CN202420168703.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-24
AI Technical Summary
In the construction of rail transit track beds, especially when reconstructing sections, how to organically connect the drainage systems of different types of track beds is an urgent problem to be solved, because the drainage systems of different track bed structures are arranged differently, resulting in difficulty in connection.
Design a built-in track bed pump room structure. A short pillow type integral track bed is set between the high-grade steel spring floating track bed and the prefabricated track track bed. Through the first converging ditch and the central ditch, the second converging ditch and the edge Through the connection of side ditches, water flows into the drainage ditch and is discharged using submersible pumps to realize the connection of different drainage systems.
It realizes the organic connection between the drainage systems of different track bed structures, ensuring that the drainage effect meets the design standards, the construction is simple and reasonable, and it is suitable for promotion.
Smart Images

Figure CN221918787U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rail transit pump house structures, in particular to a built-in track bed pump house structure. Background Art
[0002] With the vigorous development of urban rail transit projects, more and more types of roadbeds are used in shield tunnels for rail transit lines. At present, with the maturity of technology, the requirements for the use of rail transit are gradually increasing, and the first one is the vibration reduction requirement. The vibration reduction requirement refers to how to reduce the impact of the vibration of the rail transit line during operation on the shield tunnel and the external impact. Therefore, different types of roadbed structures have emerged according to the vibration reduction level.
[0003] When constructing the track bed of rail transit, in addition to directly constructing the track bed structure that meets the vibration reduction level requirements in the new line section, it also includes vibration reduction upgrades and renovations of the existing line sections. However, whether it is new construction or renovation, due to the continuity of rail transit lines, it is necessary to consider the connection with the lines on both sides of the line, especially for renovation, it is necessary to consider how the track bed of the renovation section can be organically connected with the existing track beds in the sections on both sides of the line.
[0004] When the ballast structure is connected, in addition to the connection between the ballast and the line structure above, how to connect the drainage system within the line is also a technical problem that must be faced. This is because the layout of the drainage system of different ballast structures is different. For example, the high-grade steel spring floating plate ballast is usually equipped with a central ditch located in the center of the floating plate, and the prefabricated track plate ballast is usually equipped with side ditches located on both sides of the prefabricated plate. Therefore, how to connect the drainage systems of these different ballast structures is a technical problem that needs to be solved urgently. Summary of the invention
[0005] The purpose of the utility model is to provide a built-in roadbed pump house structure in accordance with the above-mentioned deficiencies of the prior art, by designing a short pillow type integral roadbed between the high-grade spring floating plate roadbed and the prefabricated track plate roadbed to provide a built-in pump house, the water in the high-grade spring floating plate roadbed and the prefabricated track plate roadbed is gathered in the built-in pump house for discharge, thereby realizing the organic connection between different drainage systems.
[0006] The purpose of this utility model is achieved by the following technical solutions:
[0007] A built-in roadbed pump house structure is arranged between a high-grade steel spring floating plate roadbed and a prefabricated track plate roadbed, wherein the high-grade steel spring floating plate roadbed has a central ditch, and the two sides of the prefabricated track plate roadbed respectively have side ditches, and is characterized in that: it includes a short-pillow integral roadbed, the range of the short-pillow integral roadbed is the range of the built-in pump house, which includes a middle drainage section and connecting sections located on both sides of the drainage section, wherein one side of the connecting section has a first converging ditch connected to the central ditch, and the other side of the connecting section has a second converging ditch connected to and converging with the side ditches on both sides, a drainage ditch is arranged in the drainage section, and the two ends of the drainage ditch are respectively connected to the first converging ditch and the second converging ditch; the lateral width of the drainage ditch is greater than the first converging ditch and the second converging ditch, and a submersible pump is arranged in the drainage ditch.
[0008] Partition walls are arranged at certain intervals inside the drainage ditch, and drainage holes are arranged on the partition walls; the submersible pump is arranged in the space between the partition walls.
[0009] Along the line direction, the submersible pumps are arranged at intervals in the spaces between the partition walls.
[0010] Water collection wells are respectively arranged at the intersection of the first converging ditch and the central ditch and at the intersection of the second converging ditch and the side ditch.
[0011] A cubic water grate is arranged at the location of the water collection well.
[0012] The central ditch, the side ditch, the first converging ditch, and the second converging ditch each have a certain slope toward the drainage ditch.
[0013] The short-pillow integral ballast is provided with a water pump drainage pipe matching the submersible pump and a cable trough for laying cables.
[0014] The first converging ditch, the second converging ditch and the drainage ditch are all closed above by a polymer resin cover plate.
[0015] The first converging ditch, the second converging ditch and the drainage ditch are all coated with a waterproof sealing material layer.
[0016] The utility model has the advantages of achieving organic connection of the drainage system between the high-grade spring floating plate ballast and the prefabricated track plate ballast to ensure that the drainage effect reaches the design standard; the structure is simple and reasonable, the construction is convenient, and it is suitable for promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a top view of the utility model;
[0018] Figure 2 for Figure 1 AA section diagram in;
[0019] Figure 3 for Figure 1 BB section diagram in;
[0020] Figure 4 for Figure 1 CC section diagram in;
[0021] Figure 5 for Figure 1 DD cross section in;
[0022] Figure 6 for Figure 1 EE cross section diagram in;
[0023] Figure 7 This is the layout diagram of the partition wall and cover plate in the utility model. DETAILED DESCRIPTION
[0024] The following is a further detailed description of the features of the present invention and other related features through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:
[0025] like Figure 1-7 As shown, the symbols in the figure represent:
[0026] High-grade steel spring floating plate roadbed section S1, short pillow integral roadbed connection section S2, short pillow integral roadbed drainage section S3, short pillow integral roadbed connection section S4, prefabricated track plate roadbed section S5;
[0027] Central ditch 1, water collection well 2, cubic water grate 3, first converging ditch 4, cable trough 5, drainage ditch 6, partition wall 7, submersible pump 8, water pump drainage pipe 9, second converging ditch 10, side ditch 11, drainage hole 12, sump 13, PIN waterproof coating 14, pump pit 15, polymer resin cover 16.
[0028] Example: Figures 1 to 7As shown, in this embodiment, the built-in roadbed pump house structure is arranged between the high-grade steel spring floating plate roadbed section S1 and the prefabricated track plate roadbed section S5, and serves to connect the different drainage systems of the different roadbed structures on both sides. The built-in roadbed pump house structure in this embodiment is specifically a short-pillow integral roadbed established between the high-grade steel spring floating plate roadbed section S1 and the prefabricated track plate roadbed section S5, and the short-pillow integral roadbed includes a short-pillow integral roadbed connection section S2, a short-pillow integral roadbed drainage section S3 and a short-pillow integral roadbed connection section S4, wherein the short-pillow integral roadbed connection section S2 serves to connect with the high-grade steel spring floating plate roadbed section S1, the short-pillow integral roadbed connection section S4 serves to connect with the prefabricated track plate roadbed section S5, and the short-pillow integral roadbed drainage section S3 mainly serves to drain water.
[0029] Specifically, if Figure 1 As shown, the existing drainage system of the high-grade steel spring floating plate track section S1 is a central ditch 1 arranged in the middle of the floating plate, and the water in the track section is discharged through the central ditch 1. A first converging ditch 4 matching the position of the central ditch 1 is arranged at the center of the short pillow integral track connection section S2, and the first converging ditch 4 is connected with the central ditch 1 and can drain the water in the central ditch 1 to the short pillow integral track drainage section S3.
[0030] In this embodiment, a water collection well 2 is provided between the first converging ditch 4 and the central ditch 1. The height of the water collection well 2 is slightly lower than that of the central ditch 1, so that the water in the central ditch 1 can smoothly flow into the first converging ditch 4. A cubic water grate 3 is provided in the water collection well 2 to prevent debris from further flowing into the drainage system and causing blockage.
[0031] Similarly, the existing drainage system of the prefabricated track slab ballast section S5 is the side ditches 11 arranged on both sides of the prefabricated track slab, and the water in the ballast section is diverted to the side ditches 11 on both sides for discharge. A second converging ditch 10 is arranged in the short pillow type integral ballast connection section S4, and the second converging ditch 10 includes a transverse converging ditch part and a longitudinal converging ditch part, wherein the transverse converging ditch part is arranged along the line direction to connect and converge the side ditches 11 located on both sides, and the longitudinal converging ditch part is arranged in the middle of the transverse converging ditch to further divert water to the short pillow type integral ballast drainage section S3 along the line direction.
[0032] In this embodiment, a water collection well and a cubic water grate 3 are also provided at the intersection of the transverse converging ditch portion and the longitudinal converging ditch portion of the second converging ditch 10 .
[0033] A drainage ditch 6 is arranged at the center of the short-pillow integral ballast drainage section S3 along the line direction, and the two sides of the drainage ditch 6 are respectively connected to the first converging ditch 4 and the second converging ditch 10 to centrally discharge the water in the central ditch 1 gathered by the first converging ditch 4 and the water in the side ditch 11 gathered by the second converging ditch 10. In this regard, the drainage ditch 6 also plays a role in draining the short-pillow integral ballast section itself.
[0034] In this embodiment, at the connection position between the first converging ditch 4 and the drainage ditch 6, the bottom elevation of the first converging ditch 4 is slightly higher than the bottom elevation of the drainage ditch 6 to ensure the inflow of water; similarly, the bottom elevation of the second converging ditch 10 is also slightly higher than the bottom elevation of the drainage ditch 6.
[0035] like Figure 1 As shown, in this embodiment, the width of the drainage ditch 6 is slightly larger than the width of the first convergence ditch 4 and the second convergence ditch 10 (longitudinal convergence ditch part) on both sides thereof, so as to improve its drainage efficiency and meet the overall drainage requirements after the drainage ditch itself plus the high-grade steel spring floating plate ballast section S1 and the prefabricated track plate ballast section S5 on both sides. At this time, in order to meet the width requirements of the drainage ditch 6, this embodiment selects a short-pillow integral ballast as the layout range of the built-in pump house. The two sleepers on the short-pillow integral ballast are split structures and have a short lateral length. Therefore, a relatively wider drainage ditch 6 can be designed between the two sleepers, and the influence of the wider drainage ditch 6 on the sleepers can also be further avoided.
[0036] Combination Figures 2 to 7 As shown, along the route direction, a number of partition walls 7 are arranged at a certain interval inside the drainage ditch 6; a drainage hole 12 is arranged at the bottom of each partition wall 7 to ensure the connection of the ditch. According to the design requirements, a sump 13 or a pump pit 15 can be formed between adjacent partition walls 7, wherein the sump 13 plays a role in collecting water, and its pit bottom elevation is slightly higher than the height of the pump pit 15 to ensure that water can flow smoothly into the pump pit 15. A submersible pump 8 for drainage is arranged in the pump pit 15, and the submersible pump 8 discharges water out of the tunnel segment through a water pump drainage pipe 9 pre-buried in the short pillow type integral roadbed structure.
[0037] In this embodiment, if Figure 7 As shown, each ditch of the short pillow type integral ballast bed is covered with a polymer resin cover plate 16 to play a sealing and covering role. The polymer resin cover plate 16 is generally designed in blocks according to a certain length along the line direction.
[0038] In the specific implementation of this embodiment: Figures 3 to 6As shown, the surface of the built-in pump room sump and the drainage transition sections on both sides should be waterproofed, and the surface should be coated with PIN waterproof coating 14, including the pit wall and partition wall surface. The surface dust and accumulated water should be cleaned before construction, and the coating thickness is 3-5mm.
[0039] A cable trough 5 is also reserved in the short-pillow integral track bed for the cables to pass through, so as to be used by various types of rail transit equipment.
[0040] Although the above embodiments have described the concepts and embodiments of the purpose of the utility model in detail with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and modifications can still be made to the utility model without departing from the scope of the claims, so they are not described one by one here.
Claims
1. A built-in roadbed pump house structure, arranged between a high-grade steel spring floating plate roadbed and a prefabricated track plate roadbed, wherein the high-grade steel spring floating plate roadbed has a central ditch, and the two sides of the prefabricated track plate roadbed respectively have side ditches, characterized in that: It includes a short-pillow integral ballast, the scope of the short-pillow integral ballast is the scope of the built-in pump room, which includes a middle drainage section and connecting sections located on both sides of the drainage section, wherein one connecting section has a first converging ditch connected to the central ditch, and the other connecting section has a second converging ditch connected to and converging with the side ditches on both sides, a drainage ditch is arranged in the drainage section, and the two ends of the drainage ditch are respectively connected to the first converging ditch and the second converging ditch; the lateral width of the drainage ditch is greater than that of the first converging ditch and the second converging ditch, and a submersible pump is arranged in the drainage ditch.
2. The built-in roadbed pump house structure according to claim 1 is characterized in that: Partition walls are arranged at certain intervals inside the drainage ditch, and drainage holes are arranged on the partition walls; the submersible pump is arranged in the space between the partition walls.
3. The built-in track bed pump house structure according to claim 2 is characterized in that: Along the line direction, the submersible pumps are arranged at intervals in the spaces between the partition walls.
4. The built-in roadbed pump house structure according to claim 1 is characterized in that: Water collection wells are respectively arranged at the intersection of the first converging ditch and the central ditch and at the intersection of the second converging ditch and the side ditch.
5. The built-in roadbed pump house structure according to claim 4 is characterized in that: A cubic water grate is arranged at the location of the water collection well.
6. The built-in roadbed pump house structure according to claim 1, characterized in that: The central ditch, the side ditch, the first converging ditch, and the second converging ditch each have a certain slope toward the drainage ditch.
7. The built-in roadbed pump house structure according to claim 1, characterized in that: The short-pillow integral ballast is provided with a water pump drainage pipe matching the submersible pump and a cable trough for laying cables.
8. The built-in roadbed pump house structure according to claim 1, characterized in that: The first converging ditch, the second converging ditch and the drainage ditch are all closed above by a polymer resin cover plate.
9. The built-in roadbed pump house structure according to claim 1, characterized in that: The first converging ditch, the second converging ditch and the drainage ditch are all coated with a waterproof sealing material layer.