Railway bridge foot plank steel bracket and handrail maintenance hanging bracket mechanism
By designing the railway bridge walking plate steel bracket and railing maintenance hanger mechanism, and using the combination of steel bracket, walking plate steel and steel structure cage, the suspension structure solves the problems of steel bracket corrosion and maintenance risks, and achieves safety , simple maintenance operations, suitable for railway bridges in high humidity environments.
Patent Information
- Application Number
- CN202420512644.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-15
AI Technical Summary
The steel brackets and railings of railway bridges are severely corroded in high-humidity environments, resulting in reduced load-bearing capacity. Maintenance personnel are at high risk of falling when walking. Existing technologies are difficult to effectively maintain, affecting the safety of railway operations.
Design a railway bridge walking plate steel bracket and railing maintenance hanger mechanism, including steel brackets, walking plate steel, steel structure cages, hanging rings, pedals and load-bearing steel pipes. Through the cooperation of the hanging rings and load-bearing steel pipes, the suspension The steel structure cage is placed under the steel bracket to provide a stable working space.
It realizes the safe maintenance of steel brackets and railings, reduces the risks for maintenance personnel, improves the simplicity and safety of maintenance operations, and is suitable for railway bridges in high-humidity environments.
Smart Images

Figure CN221919047U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of railway bridges, in particular to a railway bridge walking board steel bracket and a railing maintenance hanger mechanism. Background Art
[0002] Railway bridges are important settings in rail transit. Some railway bridges are located in Gaoling Mountain Area. Due to the unique geographical features, the temperature and humidity difference in the area is large, and they are in areas with high humidity and more rainy seasons for a long time. Due to the high degree of corrosion, some steel brackets and railings have lost the rust removal and painting maintenance stage. The corrosion of the steel itself has fallen off in layers, and its load-bearing capacity has greatly reduced its design standards, and the risk of failure is extremely high. Therefore, timely maintenance and replacement are required. Since the railway needs to be repaired and maintained during the interval between operations, railway maintenance and maintenance personnel need to walk on the pedestrian walking board. The maintenance tools carried by the personnel, plus their own weight, have a certain probability of causing the failure of some steel brackets. The walking board collapses and the maintenance and maintenance personnel fall from a height. Due to the special position of the steel bracket, the train cannot operate under normal operation, and it must operate in the skylight point of the train stop. In order to give full play to the better and safer working space, according to the spacing of the steel brackets on site, it is necessary to design a railway bridge walking board steel bracket and railing maintenance hanger mechanism. Utility Model Content
[0003] Aiming at the defects in the prior art, the utility model provides a railway bridge walking plate steel bracket and a railing maintenance hanger mechanism.
[0004] The technical solution adopted by the utility model is: a railway bridge walking plate steel bracket and a railing maintenance hanger mechanism, comprising a steel bracket and a walking plate steel arranged on the steel bracket, railings located on both sides of the walking plate steel are arranged on the steel bracket, comprising a steel structure hanging cage, a plurality of hanging rings are arranged on the top of the steel structure hanging cage, and a pedal is arranged on the bottom; and also comprising a load-bearing steel pipe matched with the hanging ring, the load-bearing steel pipe passes through the hanging ring and is placed on the walking plate steel, so that the steel structure hanging cage is suspended below the steel bracket.
[0005] In order to better realize the utility model, the steel structure cage includes a plurality of cross bars and a plurality of vertical bars, the cross bars and the vertical bars are welded and connected, and a hanging ring is welded on the top of each vertical bar.
[0006] In order to better realize the utility model, the horizontal rod and the vertical rod are both made of square steel pipes.
[0007] In order to better realize the utility model, a square groove matching with the bottom cross bar is arranged at the bottom of the pedal.
[0008] In order to better realize the utility model, a plurality of cushion blocks are also included. The cushion blocks are placed on the walking plate steel, and the ends of the load-bearing steel pipes are supported on the cushion blocks.
[0009] In order to better realize the utility model, the cushion block is made of wood.
[0010] In order to better realize the utility model, a groove adapted to the load-bearing steel pipe is provided on the cushion block.
[0011] The beneficial effects of the utility model are embodied in that the railway bridge walking plate steel bracket and railing maintenance hanger mechanism of the utility model, through the cooperation of the steel bracket, walking plate steel, railing, steel structure cage, hanging ring, pedal and load-bearing steel pipe, when maintaining the walking plate steel bracket and the railing, the load-bearing steel pipe is passed through the hanging ring, the walking plate steel carries the load-bearing steel pipe, and the steel structure cage is suspended under the walking plate steel bracket, and the construction personnel can operate by standing on the pedal, which has the advantages of simple structure and convenient construction operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the specific implementation or the prior art description. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0013] Figure 1 It is a structural schematic diagram of a railway bridge walking plate steel bracket and a railing maintenance hanger mechanism of the utility model;
[0014] Figure 2 A structural schematic diagram of a steel structure cage of a railway bridge walking plate steel bracket and a railing maintenance hanger mechanism of the utility model;
[0015] Figure 3 Another structural schematic diagram of the steel structure cage of the railway bridge walking plate steel bracket and the railing maintenance hanger mechanism of the utility model;
[0016] Figure 4 A structural schematic diagram of a pedal of a steel bracket and a railing maintenance hanger mechanism for a railway bridge walking plate of the utility model;
[0017] In the attached figure, 1 is walking plate steel, 2 is railing, 3 is steel bracket, 4 is steel structure cage, 5 is hanging ring, 6 is pedal, 7 is load-bearing steel pipe, 8 is cushion block, 9 is square groove, 10 is horizontal bar, and 11 is vertical bar. DETAILED DESCRIPTION
[0018] The following embodiments of the technical solution of the utility model are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the utility model, and are therefore only used as examples, and cannot be used to limit the protection scope of the utility model.
[0019] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by technicians in the field of this utility model.
[0020] Example:
[0021] like Figures 1 to 4 As shown, the railway bridge walking plate steel bracket and railing maintenance hanger mechanism of the utility model includes a steel bracket 3 and a walking plate steel 1 arranged on the steel bracket 3, and railings 2 located on both sides of the walking plate steel 1 are arranged on the steel bracket 3, including a steel structure cage 4, the top of the steel structure cage 4 is provided with a plurality of hanging rings 5, and the bottom is provided with pedals 6; it also includes a load-bearing steel pipe 7 matched with the hanging ring 5, the load-bearing steel pipe 7 passes through the hanging ring 5 and is placed on the walking plate steel 1, so that the steel structure cage 4 is suspended below the steel bracket 3. The utility model provides a railway bridge walking plate steel bracket and railing maintenance hanger mechanism, through the cooperation of the steel bracket 3, the walking plate steel 1, the railing 2, the steel structure cage 4, the hanging ring 5, the pedal 6 and the load-bearing steel pipe 7, when maintaining the walking plate steel bracket and the railing, the load-bearing steel pipe 7 is passed through the hanging ring 5, the walking plate steel carries the load-bearing steel pipe 7, and the steel structure cage 4 is suspended under the walking plate steel bracket 3, and the construction personnel can stand on the pedal 6 to operate, which has the advantages of simple structure and convenient construction operation.
[0022] Preferably, the steel structure cage 4 includes a plurality of horizontal bars 10 and a plurality of vertical bars 11 , the horizontal bars 10 and the vertical bars 11 are welded together, and a hanging ring 5 is welded on the top of each vertical bar 11 .
[0023] Preferably, the cross bar 10 and the vertical bar 11 are both made of square steel pipes, which are convenient for workers to hold and improve safety.
[0024] Preferably, a square groove 9 is provided at the bottom of the pedal 6 to cooperate with the bottom cross bar 10. With this design, the installation stability of the pedal 6 can be improved, and the safety of the staff can be improved. It should be noted that the pedal 6 can also be fixedly connected to the bottom of the steel structure cage 4 to further improve safety.
[0025] As a preferred embodiment, a plurality of cushion blocks 8 are also included, and the cushion blocks 8 are placed on the walking plate steel 1, and the ends of the load-bearing steel pipes 7 are supported on the cushion blocks 8. After the cushion blocks 8 are arranged, the insertion and removal of the load-bearing steel pipes 7 can be facilitated.
[0026] Preferably, the cushion block 8 is made of wood.
[0027] Preferably, a groove adapted to the load-bearing steel pipe 7 is provided on the cushion block 8, so that the load-bearing steel pipe 7 can be conveniently supported to prevent slipping.
[0028] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model, and they should all be included in the scope of the claims and specification of the utility model.
Claims
1. A railway bridge walking plate steel bracket and railing maintenance hanger mechanism, comprising a steel bracket (3) and a walking plate steel (1) arranged on the steel bracket (3), wherein railings (2) located on both sides of the walking plate steel (1) are arranged on the steel bracket (3), characterized in that: The invention comprises a steel structure cage (4), the top of which is provided with a plurality of hanging rings (5), and the bottom of which is provided with a pedal (6); and a load-bearing steel pipe (7) matched with the hanging ring (5), the load-bearing steel pipe (7) passes through the hanging ring (5) and is placed on a walking board steel (1), so that the steel structure cage (4) is suspended below a steel bracket (3).
2. The railway bridge walking plate steel bracket and railing maintenance hanger mechanism according to claim 1 is characterized by: The steel structure cage (4) comprises a plurality of cross bars (10) and a plurality of vertical bars (11), wherein the cross bars (10) and the vertical bars (11) are welded together, and a hanging ring (5) is welded on the top of each vertical bar (11).
3. The railway bridge walking plate steel bracket and railing maintenance hanger mechanism according to claim 2 is characterized by: The crossbar (10) and the vertical bar (11) are both made of square steel pipes.
4. The railway bridge walking plate steel bracket and railing maintenance hanger mechanism according to claim 3 is characterized by: A square groove (9) is provided at the bottom of the pedal (6) and matches with the cross bar (10) at the bottom.
5. The railway bridge walking plate steel bracket and railing maintenance hanger mechanism according to claim 1 is characterized by: It also includes a plurality of pads (8), which are placed on the walking plate steel (1), and the ends of the load-bearing steel pipes (7) are supported on the pads (8).
6. The railway bridge walking plate steel bracket and railing maintenance hanger mechanism according to claim 5 is characterized by: The cushion block (8) is made of wood.
7. The railway bridge walking plate steel bracket and railing maintenance hanger mechanism according to claim 6 is characterized by: The cushion block (8) is provided with a groove adapted to the load-bearing steel pipe (7).
