Stainless steel water supply pipeline assembly

By connecting the backup de-icing pipe and the hot flow pipe in parallel in the stainless steel water supply pipeline, the problem of pipe freezing and blockage in low-temperature environments is solved, the de-icing function is simplified and used normally, and the complexity of an external heater is avoided.

CN221922521UActive Publication Date: 2024-10-29SHAANXI XINGHENGWEI NEW ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420660242.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-10-29
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

Existing stainless steel water supply pipeline components are prone to freezing and blocking in low-temperature environments, making it difficult to ensure the power supply and insulation performance of the heater, affecting normal use.

Method used

An assembly is designed that includes a main conveying pipe, an ice-prone conveying pipe section, a backup de-icing pipe, a hot flow pipe and a circulation pipe. The backup de-icing pipe is arranged in a spiral shape around the freezing-prone conveying pipe section, and passes through the hot flow pipe and the circulation pipe. It realizes the de-icing function and avoids the complex structure and power supply problems of external heaters.

Benefits of technology

It effectively prevents ice blockage, ensures the normal operation of water supply operations, simplifies the structure and reduces the difficulty of implementation, and is suitable for low temperature environments in winter.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221922521U_ABST
    Figure CN221922521U_ABST
Patent Text Reader

Abstract

The utility model discloses a stainless steel water supply pipeline assembly which comprises a main conveying pipeline, the main conveying pipeline comprises a first normal conveying pipeline section, an easy-to-freeze conveying pipeline section and a second normal conveying pipeline section which are connected in sequence, and the stainless steel water supply pipeline assembly further comprises a standby deicing pipeline. The two ends of the standby deicing pipeline communicate with the two ends of the easy-to-freeze conveying pipeline section correspondingly, and the standby deicing pipeline is integrally in a spiral pipe shape surrounding the easy-to-freeze conveying pipeline section. Compared with the prior art, according to the stainless steel water supply pipeline assembly, the standby deicing pipeline is connected in parallel in the pipeline, the effect of preventing icing and blocking is achieved, and normal water supply operation can be guaranteed. And the conveying pipeline section prone to freezing can be heated and deiced, so that the pipeline returns to the normal use state. The overall structure is simple and implementation is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water supply pipelines, and in particular relates to a stainless steel water supply pipeline component. Background Art

[0002] The water supply pipeline composed of metal pipes has the advantages of stable structure and long service life. However, due to the good thermal conductivity of metal pipes, they are prone to ice and blockage in low temperature environments in winter, affecting normal water supply operations.

[0003] In the prior art, an insulation layer and a heater are arranged outside the water supply pipeline. When the pipeline is blocked by ice, the heater is used to heat it to eliminate the problem of pipeline blockage.

[0004] The disadvantage of the prior art is that since the pipe sections prone to freezing are usually located in non-indoor environments such as outdoor and vents, it is difficult to ensure the power supply and insulation performance of the heater, which affects the normal use of the water supply pipeline.

[0005] Therefore, it is necessary to provide a new stainless steel water supply pipeline component to solve the above technical problems. Utility Model Content

[0006] The technical problem to be solved by the utility model is to address the deficiencies in the above-mentioned prior art and disclose a stainless steel water supply pipeline assembly to solve the technical problem that the anti-icing structure of the existing stainless steel water supply pipeline assembly has difficulty in ensuring the power supply and insulation performance of the heater, thus affecting the normal use of the water supply pipeline.

[0007] The technical solution adopted by the utility model to solve its technical problems is: a stainless steel water supply pipeline assembly, including a main delivery pipeline, the main delivery pipeline includes: a first normal delivery pipeline section, an easy-to-freeze delivery pipeline section and a second normal delivery pipeline section connected in sequence, the stainless steel water supply pipeline assembly also includes a spare deicing pipeline, the two ends of the spare deicing pipeline are respectively connected to the two ends of the easy-to-freeze delivery pipeline section, and the spare deicing pipeline is a spiral tube as a whole arranged around the easy-to-freeze delivery pipeline section.

[0008] Preferably, the inner circle side wall of the spare deicing pipe is in contact with the outer wall of the easy-to-freeze conveying pipe section.

[0009] Preferably, the stainless steel water supply pipeline assembly further comprises a heat flow pipe, one end of which is connected to one end of the easy-to-freeze transport pipeline section, and the other end of which is connected to a heat flow output port.

[0010] Preferably, the stainless steel water supply pipeline assembly also includes a circulation pipe and an indoor water heater, the indoor water heater includes a water inlet and a hot water outlet, the heat flow output port is connected to the hot water outlet; one end of the circulation pipe is connected to one end of the standby deicing pipe, and the other end of the circulation pipe is connected to the water inlet.

[0011] Preferably, the main delivery pipeline and the backup deicing pipeline are both made of stainless steel.

[0012] Preferably, a first switch valve is provided at the connection between the easy-to-freeze conveying pipeline section and the first normal conveying pipeline section.

[0013] Preferably, a second switch valve is provided at the connection between the easy-to-freeze delivery pipeline section and the second normal delivery pipeline section.

[0014] Preferably, a third switch valve is provided at the connection between the standby deicing pipeline and the first normal delivery pipeline section.

[0015] Preferably, a fourth switch valve is provided at the connection between the standby deicing pipeline and the second normal delivery pipeline section.

[0016] Preferably, a fifth switch valve is provided on the heat flow pipeline; and a sixth switch valve is provided on the circulation pipeline.

[0017] Compared with the prior art, the stainless steel water supply pipeline assembly of the utility model has a spare deicing pipeline in parallel in the pipeline, which can achieve the effect of preventing ice blockage and ensure normal water supply operation. It can also heat and de-ice the easy-to-freeze delivery pipeline section to restore the pipeline to normal use. The overall structure is simple and easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of an implementation method of the utility model Figure 1 (Normal water supply status);

[0019] Figure 2 A schematic diagram of an implementation method of the utility model Figure 2 (standby pipe water supply status);

[0020] Figure 3 A schematic diagram of an implementation method of the utility model Figure 3 (One-way heating state of heat flow pipe);

[0021] Figure 4 It is a schematic diagram of another embodiment of the utility model (heat flow pipeline circulation heating state).

[0022] Description of reference numerals:

[0023] 1. The first normal delivery pipeline section; 2. The delivery pipeline section that is prone to freezing; 3. The second normal delivery pipeline section; 4. The spare deicing pipeline; 5. The heat flow pipeline; 6. The circulation pipeline; 7. The heat flow output port; 8. The first switch valve; 9. The second switch valve; 10. The third switch valve; 11. The fourth switch valve; 12. The fifth switch valve; 13. The water heater; 14. The water inlet; 15. The sixth switch valve. DETAILED DESCRIPTION

[0024] The present invention is described in detail below in conjunction with the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments are not limitations of the present invention, and any equivalent transformations or substitutions in functions, methods, or structures made by ordinary technicians in the field based on these embodiments are all within the scope of protection of the present invention.

[0025] The following is combined with Figure 1-4 The stainless steel water supply pipeline assembly of the utility model is further described.

[0026] The utility model discloses a stainless steel water supply pipeline component, comprising a main delivery pipeline, the main delivery pipeline comprising: a first normal delivery pipeline section 1, an easy-to-freeze delivery pipeline section 2 and a second normal delivery pipeline section 3 which are connected in sequence, the stainless steel water supply pipeline component also comprises a spare deicing pipeline 4, the two ends of the spare deicing pipeline 4 are respectively connected to the two ends of the easy-to-freeze delivery pipeline section 2, and the spare deicing pipeline 4 is in the shape of a spiral tube arranged around the easy-to-freeze delivery pipeline section 2 as a whole.

[0027] In this embodiment, the pipe section prone to freezing is first set as the easy-to-freeze transport pipe section 2 according to the location of the water supply pipe. On the basis of the existing transport scheme, a spare deicing pipe 4 is connected in parallel to the easy-to-freeze transport pipe section 2.

[0028] The standby deicing pipe 4 has two functions. First, when the easy-to-freeze delivery pipe section 2 is blocked by ice, water is supplied from the easy-to-freeze delivery pipe section 2 to ensure normal water supply to the pipeline. Second, it has the function of deicing. When the easy-to-freeze delivery pipe section 2 is blocked by ice, hot water is supplied to the standby deicing pipe 4 to increase the temperature in the frozen delivery pipe section, thereby achieving the function of deicing and unblocking.

[0029] like Figure 1 As shown, when the ambient temperature is high, the stainless steel water supply pipeline assembly of the utility model is in normal use. Water flows from the first normal delivery pipeline section 1, passes through the easy-to-freeze delivery pipeline section 2, and is output from the second normal delivery pipeline section 3.

[0030] like Figure 2As shown, when the ambient temperature is too low and the easy-to-freeze delivery pipeline section 2 is blocked by ice, the stainless steel water supply pipeline assembly of the utility model is in a standby pipe water supply state. The water flow is input from the first normal delivery pipeline section 1, passes through the standby deicing pipeline 4, and is output from the second normal delivery pipeline section 3.

[0031] like Figure 3 As shown, the stainless steel water supply pipeline assembly of the utility model is in a unidirectional heating state of the heat flow pipe 5. In order to clear the easily frozen conveying pipe section 2, hot water can be continuously introduced into the spare deicing pipe 4, and the hot water is led out by the indoor water heater 13. Since the spare deicing pipe 4 is a spiral tube arranged around the easily frozen conveying pipe section 2 as a whole, the heat of the hot water is transferred to the frozen conveying pipe section through the pipe wall of the spare deicing pipe 4, thereby increasing the temperature in the frozen conveying pipe section and achieving the effect of deicing and clearing.

[0032] It should be noted that the stainless steel water supply pipeline assembly of the utility model is more suitable for environments where low temperature and freezing only occur occasionally in winter (such as southern provinces in my country). Pipes outdoors and at vents are selected as the easy-to-freeze delivery pipeline section 2.

[0033] Compared with the prior art, the utility model avoids the use of a complex external heater structure, and does not need to consider the problem of external insulation and power supply. The stainless steel water supply pipeline assembly of the utility model is connected in parallel with a spare deicing pipeline 4 in the pipeline to achieve the effect of preventing ice blockage and ensure normal water supply operation. The easily iced delivery pipeline section 2 can also be heated and deiced to restore the pipeline to normal use. The overall structure of the stainless steel water supply pipeline assembly of the utility model is simple and easy to implement.

[0034] According to a specific implementation of the utility model, the inner circle side wall of the spare deicing pipe 4 is in contact with the outer wall of the easily iced conveying pipe section 2 .

[0035] In this embodiment, this structure is adopted. When the stainless steel water supply pipeline assembly of the utility model is in a unidirectional heating state of the heat flow pipeline 5, it is beneficial to transfer the heat in the spare deicing pipeline 4 to the easily frozen conveying pipeline section 2, thereby accelerating the melting of the easily frozen conveying pipeline section 2.

[0036] According to a specific embodiment of the utility model, the stainless steel water supply pipeline assembly further includes a heat flow pipe 5 , one end of the heat flow pipe 5 is connected to one end of the ice transport pipe section 2 , and the other end of the heat flow pipe 5 is connected to the heat flow output port 7 .

[0037] In this embodiment, by adding the heat flow pipe 5, it is convenient to introduce the hot water output from the heat flow output port 7 into the easy-to-freeze transport pipe section 2 to achieve ice melting.

[0038] According to a specific implementation of the utility model, the stainless steel water supply pipeline assembly also includes a circulation pipe 6 and an indoor water heater 13, the indoor water heater 13 includes a water inlet 14 and a hot water outlet, and the heat flow output port 7 is connected to the hot water outlet; one end of the circulation pipe 6 is connected to one end of the standby deicing pipe 4, and the other end of the circulation pipe 6 is connected to the water inlet 14.

[0039] like Figure 4 As shown, the stainless steel water supply pipeline assembly of the utility model is in a circulating heating state of the heat flow pipe 5. In this embodiment, the hot water in the spare deicing pipe 4 flows into the water inlet 14 of the water heater 13 again through the circulation pipe 6, realizing recycling, which is beneficial to reducing the amount of hot water used and the amount of electricity / gas used in the deicing process.

[0040] According to a specific implementation of the utility model, the main delivery pipeline and the backup deicing pipeline 4 are both made of stainless steel.

[0041] In this embodiment, the water supply pipeline composed of metal pipes has the advantages of stable structure and long service life. In addition, the main delivery pipeline and the spare deicing pipeline 4 have good thermal conductivity, which is conducive to heat exchange between the main delivery pipeline and the spare deicing pipeline 4 during deicing.

[0042] According to a specific embodiment of the utility model, a first switch valve 8 is provided at the connection between the easy-to-freeze delivery pipeline section 2 and the first normal delivery pipeline section 1. More specifically, a second switch valve 9 is provided at the connection between the easy-to-freeze delivery pipeline section 2 and the second normal delivery pipeline section 3. More specifically, a third switch valve 10 is provided at the connection between the standby deicing pipeline 4 and the first normal delivery pipeline section 1. More specifically, a fourth switch valve 11 is provided at the connection between the standby deicing pipeline 4 and the second normal delivery pipeline section 3. More specifically, a fifth switch valve 12 is provided on the heat flow pipeline 5; and a sixth switch valve 15 is provided on the circulation pipeline 6.

[0043] In this embodiment, valves corresponding to the switches are set on the pipeline to control the path of the water flow. Specifically, the first switch valve 8 is used to control the connection and disconnection between the easy-to-freeze delivery pipeline section 2 and the first normal delivery pipeline section 1. The second switch valve 9 is used to control the connection and disconnection between the easy-to-freeze delivery pipeline section 2 and the second normal delivery pipeline section 3. The third switch valve 10 is used to control the connection and disconnection between the standby deicing pipeline 4 and the first normal delivery pipeline section 1. The fourth switch valve 11 is used to control the connection and disconnection between the standby deicing pipeline 4 and the second normal delivery pipeline section 3. The fifth switch valve 12 is used to control the opening and closing of the heat flow pipeline 5. The sixth switch valve 15 is used to control the opening and closing of the circulation pipeline 6.

[0044] like Figure 1 When the stainless steel water supply pipeline assembly of the utility model is in a normal water supply state, the first switch valve 8 and the second switch valve 9 are opened, and the other switch valves are in a closed state.

[0045] like Figure 2 When the stainless steel water supply pipeline assembly of the utility model is in the standby water supply state, the third switch valve 10 and the fourth switch valve 11 are opened, and the remaining switch valves are in the closed state. The first switch valve 8 and the second switch valve 9 can also be in the open state, but the easy-to-freeze delivery pipeline section 2 is in a blocked state under the action of ice. The remaining switch valves are in the closed state.

[0046] like Figure 3 When the stainless steel water supply pipeline assembly of the utility model is in the one-way heating state of the heat flow pipeline 5, the fifth switch valve 12 and the fourth switch valve 11 are in the open state, forming a one-way heating pipeline. The first switch valve 8 and the second switch valve 9 are also in the open state, which is conducive to the outflow of melted ice water. The remaining switch valves are in the closed state.

[0047] like Figure 4 When the stainless steel water supply pipeline assembly of the utility model is in the circulating heating state of the heat flow pipeline 5, the fifth switch valve 12 and the sixth switch valve 15 are in the open state to form a circulating heating pipeline. The first switch valve 8 and the second switch valve 9 are also in the open state, which is conducive to the outflow of melted ice water. The remaining switch valves are in the closed state.

[0048] The series of detailed descriptions listed above are only specific descriptions of feasible implementation methods of the utility model. They are not intended to limit the protection scope of the utility model. Any equivalent implementation methods or changes that do not deviate from the technical spirit of the utility model should be included in the protection scope of the utility model.

[0049] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A stainless steel water supply pipeline assembly, It is characterized in that It includes a main delivery pipeline, which includes: a first normal delivery pipeline section, an easy-to-freeze delivery pipeline section and a second normal delivery pipeline section connected in sequence. The stainless steel water supply pipeline assembly also includes a spare deicing pipeline, and the two ends of the spare deicing pipeline are respectively connected to the two ends of the easy-to-freeze delivery pipeline section. The spare deicing pipeline is a spiral tube as a whole arranged around the easy-to-freeze delivery pipeline section.

2. The stainless steel water supply pipeline assembly according to claim 1, It is characterized in that The inner circle side wall of the standby deicing pipe is in contact with the outer wall of the easy-to-freeze transport pipe section.

3. The stainless steel water supply pipeline assembly according to claim 2, It is characterized in that The stainless steel water supply pipeline assembly also includes a heat flow pipeline, one end of which is connected to one end of the easy-to-freeze transport pipeline section, and the other end of which is connected to a heat flow output port.

4. The stainless steel water supply pipeline assembly according to claim 3, It is characterized in that The stainless steel water supply pipeline assembly also includes a circulation pipeline and an indoor water heater, the indoor water heater includes a water inlet and a hot water outlet, and the heat flow output port is connected to the hot water outlet; one end of the circulation pipeline is connected to one end of the standby deicing pipeline, and the other end of the circulation pipeline is connected to the water inlet.

5. The stainless steel water supply pipeline assembly according to claim 4, It is characterized in that The main delivery pipeline and the spare deicing pipeline are both made of stainless steel.

6. The stainless steel water supply pipeline assembly according to claim 5, It is characterized in that A first switch valve is provided at the connection between the easy-to-freeze delivery pipeline section and the first normal delivery pipeline section.

7. The stainless steel water supply pipeline assembly according to claim 6, It is characterized in that A second switch valve is provided at the connection between the easy-to-freeze delivery pipeline section and the second normal delivery pipeline section.

8. The stainless steel water supply pipeline assembly according to claim 7, It is characterized in that A third switch valve is provided at the connection between the standby deicing pipeline and the first normal delivery pipeline section.

9. The stainless steel water supply pipeline assembly according to claim 8, It is characterized in that A fourth switch valve is provided at the connection between the standby deicing pipeline and the second normal delivery pipeline section.

10. The stainless steel water supply pipeline assembly according to claim 9, It is characterized in that The heat flow pipeline is provided with a fifth switch valve; the circulation pipeline is provided with a sixth switch valve.