Infrastructure construction material hoisting structure
By using servo motor to drive threaded rods and thread sleeves in the material hoisting structure of infrastructure construction, adjusting the position of the hoisting ring, combining the counterweight assembly and the center of gravity, it solves the difficulty of lifting and positioning caused by the inclined slippage of the material and the non-vertical center of gravity. The problem of deviation achieves balanced lifting and efficient lifting of materials.
Patent Information
- Application Number
- CN202422424001.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-10-09
AI Technical Summary
During infrastructure construction, the steel and wood materials of the rectangular or cylinder are prone to tilt when lifting, resulting in the hidden danger of slipping at the tied rope binding nodes, and there is a risk of safety accidents.
A hoisting structure for infrastructure construction materials is designed, including cross beams, bundling straps, hoisting rings and auxiliary adjustment components. The servo motor drives the threaded rod to rotate and drive the threaded sleeves and hoisting rings for position adjustment, combining the counterweight assembly and the center ring. Adjust the equilibrium state of the material, avoid slipping and optimize the perpendicularity of the center of gravity and the lifting center.
It effectively avoids the hidden danger of slippage caused by tilting during the lifting process, reduces the difficulty of lifting and the deviation of the loading, and improves the safety and efficiency of the lifting process.
Smart Images

Figure CN221955624U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of infrastructure construction hoisting, in particular to a infrastructure construction material hoisting structure. Background Art
[0002] Infrastructure construction materials refer to the various materials required for the construction of building installation projects during the infrastructure process. These materials are the material basis that constitute the engineering entity or help the project form. There are many types of infrastructure construction materials. According to different classification standards, they can be divided into multiple categories. Common infrastructure construction materials include steel, cement, concrete, wood, bricks and tiles, glass and asphalt, etc. Steel and wood are usually rectangular or cylindrical. The lifting method is to use ropes to tie their two ends (if the steel or wood is too long, the two ends of the steel or wood will extend outward from the rope binding node). When lifting, the steel or wood is prone to tilt. If one end of the steel or wood tilts downward at too large an angle, there will be a hidden danger of the steel or wood slipping from the rope binding node, which may easily cause a safety accident.
[0003] Therefore, it is necessary to provide a new infrastructure construction material hoisting structure to solve the above technical problems. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a capital construction material hoisting structure.
[0005] The infrastructure construction material hoisting structure provided by the utility model comprises a crossbeam, both ends of which are equipped with binding belts, and a hoisting ring is arranged on the crossbeam;
[0006] An auxiliary adjustment component for adjusting the position of the lifting ring is also installed on the crossbeam, and the auxiliary adjustment component includes a threaded rod, the threaded rod is rotatably installed on the crossbeam through a bracket, and a servo motor for driving the threaded rod to rotate is fixedly installed on the crossbeam, a threaded sleeve with a threaded connection is sleeved on the threaded rod, and the lifting ring is fixedly installed on the threaded sleeve.
[0007] Preferably, side cavities are formed on both side walls of the cross beam, and a counterweight assembly is disposed in each of the side cavities.
[0008] Preferably, the counterweight assembly includes a sliding rod, which is fixedly installed in the side cavity and on which are sleeved two symmetrically distributed and slidably connected counterweight blocks, and springs are serially connected at both ends of the sliding rod.
[0009] Preferably, one end of the spring is fixedly connected to the inner wall of the side cavity, and the other end of the spring is fixedly connected to the outer side wall of the counterweight.
[0010] Preferably, an L-shaped slide groove is provided in the middle of the cross beam, and the L-shaped slide groove is respectively communicated with the side cavities on both sides of the cross beam.
[0011] Preferably, an L-shaped connecting plate is fixedly installed at the bottom of the threaded sleeve, and the L-shaped connecting plate is slidably arranged in an L-shaped slide groove, and center link rings are fixedly installed at both ends of the horizontal plate of the L-shaped connecting plate, and the two center link rings are respectively mounted on the sliding rods in the two sets of counterweight assemblies and are slidably connected to the sliding rods.
[0012] Preferably, the central link ring is located between two symmetrically distributed counterweight blocks, and the central link ring is fixedly connected to the counterweight blocks on both sides respectively.
[0013] Compared with the related art, the infrastructure construction material hoisting structure provided by the utility model has the following beneficial effects:
[0014] 1. The utility model starts the servo motor to drive the threaded rod to rotate, drives the threaded sleeve on the threaded rod to drive the lifting ring to slide toward the threaded rod on the upturned side of the infrastructure construction material, until the infrastructure construction material is adjusted to a balanced state, thereby avoiding the hidden danger of the infrastructure construction material slipping off the binding belt due to one end of the infrastructure construction material being tilted downward at an excessively large angle during the lifting process. At the same time, by adjusting the position of the lifting ring on the beam, the problem of difficulty in lifting construction and large positioning deviation caused by the center of gravity of the hoisted object and the lifting center no longer being on the same vertical plane can be effectively eliminated;
[0015] 2. In the utility model, when the threaded sleeve drives the lifting ring to adjust its position on the crossbeam, the central ring connected to the threaded sleeve through the L-shaped connecting plate can push the counterweight block to slide toward the threaded rod on the upturned side of the infrastructure construction material. The central ring can drive the counterweight blocks on both sides to slide synchronously, thereby reducing the sliding displacement of the lifting ring on the threaded rod, thereby reducing the time for adjusting the balance during the lifting of infrastructure construction materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A structural schematic diagram of a preferred embodiment of the infrastructure construction material hoisting structure provided by the utility model;
[0017] Figure 2 for Figure 1 A schematic cross-sectional view of the crossbeam shown;
[0018] Figure 3 for Figure 1 Schematic diagram of the structure of the lifting ring shown.
[0019] Numbers in the figure: 1. Crossbeam; 1a. Side cavity; 1b. L-shaped slide groove; 2. Binding belt; 3. Lifting ring; 4. Auxiliary adjustment assembly; 41. Threaded rod; 42. Servo motor; 43. Threaded sleeve; 5. Counterweight assembly; 51. Sliding rod; 52. Counterweight block; 53. Spring; 6. L-shaped connecting plate; 7. Center ring. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0021] The specific implementation of the present utility model is described in detail below in conjunction with specific embodiments.
[0022] See also Figures 1 to 3 An embodiment of the utility model provides a capital construction material hoisting structure, which includes a crossbeam 1, a binding belt 2, a hoisting ring 3, an auxiliary adjustment component 4 and a counterweight component 5.
[0023] In the embodiments of the present invention, please refer to Figures 1 to 3 , binding belts 2 are installed at both ends of the beam 1, and a lifting ring 3 is provided on the beam 1, and an auxiliary adjustment component 4 for adjusting the position of the lifting ring 3 is also installed on the beam 1, and the auxiliary adjustment component 4 includes a threaded rod 41, the threaded rod 41 is rotatably installed on the beam 1 through a bracket, and a servo motor 42 for driving the threaded rod 41 to rotate is fixedly installed on the beam 1, a threaded sleeve 43 with a threaded connection is sleeved on the threaded rod 41, and the lifting ring 3 is fixedly installed on the threaded sleeve 43.
[0024] It should be noted that when hoisting rectangular or cylindrical infrastructure construction materials such as I-beams and wood boards, the binding belts 2 at both ends of the beam 1 are tied to the materials respectively, and the hooks on the hoisting equipment (such as cranes, hoists, etc.) are used to hang on the hoisting ring 3 and lift the beam 1. If one side of the infrastructure construction material is tilted downward and the other side is tilted upward, the servo motor 42 is turned on to drive the threaded rod 41 to rotate, and the threaded sleeve 43 on the threaded rod 41 drives the hoisting ring 3 to slide toward the threaded rod 41 on the tilted side of the infrastructure construction material until the infrastructure construction material is adjusted to a balanced state, thereby avoiding the hidden danger of the infrastructure construction material (especially cylindrical infrastructure construction materials) slipping off the binding belt 2 due to the excessive downward tilt angle of one end of the infrastructure construction material during the hoisting process. At the same time, by adjusting the position of the hoisting ring 3 on the beam 1, the problem of difficulty in hoisting construction and large positioning deviation caused by the center of gravity of the hoisted object and the hoisting center no longer being on the same vertical plane can be effectively eliminated.
[0025] In the embodiments of the present invention, please refer to Figures 1 to 3 , both side walls of the crossbeam 1 are provided with side cavities 1a, each of the side cavities 1a is provided with a counterweight assembly 5, and the counterweight assembly 5 includes a sliding rod 51, the sliding rod 51 is fixedly installed in the side cavity 1a, and the sliding rod 51 is sleeved with two symmetrically distributed and slidably connected counterweight blocks 52, both ends of the sliding rod 51 are connected in series with springs 53, and one end of the spring 53 is fixedly connected to the inner wall of the side cavity 1a, and the other end of the spring 53 is fixedly connected to the outer wall of the counterweight block 52;
[0026] An L-shaped slide groove 1b is provided in the middle of the crossbeam 1, and the L-shaped slide groove 1b is respectively communicated with the side cavities 1a on both sides of the crossbeam 1, and an L-shaped connecting plate 6 is fixedly installed at the bottom of the threaded sleeve 43, and the L-shaped connecting plate 6 is slidably arranged in the L-shaped slide groove 1b, and central link rings 7 are fixedly installed at both ends of the horizontal plate of the L-shaped connecting plate 6, and the two central link rings 7 are respectively mounted on the sliding rods 51 in the two groups of counterweight assemblies 5 and are slidably connected to the sliding rods 51, and the central link ring 7 is located between two symmetrically distributed counterweight blocks 52, and the central link ring 7 is respectively fixedly connected to the counterweight blocks 52 on both sides.
[0027] It should be noted that: when the threaded sleeve 43 drives the lifting ring 3 to adjust its position on the beam 1, the central ring 7 connected to the threaded sleeve 43 through the L-shaped connecting plate 6 can push the counterweight block 52 to slide toward the threaded rod 41 on the upturned side of the infrastructure construction material. The central ring 7 can drive the counterweight blocks 52 on both sides to slide synchronously, thereby reducing the sliding displacement of the lifting ring 3 on the threaded rod 41, thereby reducing the time for adjusting the balance during the lifting of infrastructure construction materials.
[0028] The working principle of the infrastructure construction material hoisting structure provided by the utility model is as follows:
[0029] When hoisting rectangular or cylindrical infrastructure construction materials such as I-beams and wood boards, the binding belts 2 at both ends of the beam 1 are tied to the materials respectively, and the hooks on the hoisting equipment (such as cranes, hoists, etc.) are hung on the hoisting ring 3 to lift the beam 1. If one side of the infrastructure construction material tilts downward and the other side tilts upward, the servo motor 42 is turned on to drive the threaded rod 41 to rotate, and the threaded sleeve 43 on the threaded rod 41 drives the hoisting ring 3 to slide toward the threaded rod 41 on the tilted side of the infrastructure construction material until the infrastructure construction material is adjusted to a balanced state, thereby avoiding the infrastructure construction material (especially the infrastructure construction material) from tilting too much due to one end tilting downward during the hoisting process. The hidden danger of cylindrical infrastructure construction materials) slipping off the binding belt 2, and at the same time, by adjusting the position of the lifting ring 3 on the beam 1, the problem of difficult lifting construction and large positioning deviation caused by the center of gravity of the hoisted object and the lifting center no longer being in the same vertical plane can be effectively eliminated. When the threaded sleeve 43 drives the lifting ring 3 to adjust its position on the beam 1, the middle ring 7 connected by the threaded sleeve 43 through the L-shaped connecting plate 6 can push the counterweight block 52 to slide toward the threaded rod 41 on the upturned side of the infrastructure construction material. The middle ring 7 can drive the counterweight blocks 52 on both sides to slide synchronously, thereby reducing the sliding displacement of the lifting ring 3 on the threaded rod 41, thereby reducing the time for adjusting the balance during the lifting of infrastructure construction materials.
[0030] The circuits and controls involved in the present invention are all prior art and will not be described in detail here.
[0031] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A construction material hoisting structure, characterized in that: It comprises a crossbeam (1), both ends of which are provided with binding belts (2), and a lifting ring (3) is provided on the crossbeam (1); The crossbeam (1) is also mounted with an auxiliary adjustment component (4) for adjusting the position of the lifting ring (3), and the auxiliary adjustment component (4) comprises a threaded rod (41), the threaded rod (41) is rotatably mounted on the crossbeam (1) via a bracket, and a servo motor (42) for driving the threaded rod (41) to rotate is fixedly mounted on the crossbeam (1), a threaded sleeve (43) threadedly connected is sleeved on the threaded rod (41), and the lifting ring (3) is fixedly mounted on the threaded sleeve (43).
2. The infrastructure construction material hoisting structure according to claim 1, characterized in that: Side cavities (1a) are provided on both side walls of the crossbeam (1), and a counterweight assembly (5) is arranged in each of the side cavities (1a).
3. The infrastructure construction material hoisting structure according to claim 2 is characterized in that: The counterweight assembly (5) comprises a sliding rod (51) which is fixedly mounted in the side cavity (1a), and on which two symmetrically distributed and slidably connected counterweight blocks (52) are sleeved, and springs (53) are serially connected at both ends of the sliding rod (51).
4. The infrastructure construction material hoisting structure according to claim 3 is characterized in that: One end of the spring (53) is fixedly connected to the inner wall of the side cavity (1a), and the other end of the spring (53) is fixedly connected to the outer wall of the counterweight (52).
5. The infrastructure construction material hoisting structure according to claim 3, characterized in that: A L-shaped sliding groove (1b) is provided in the middle of the crossbeam (1), and the L-shaped sliding groove (1b) is respectively communicated with the side cavities (1a) on both sides of the crossbeam (1).
6. The infrastructure construction material hoisting structure according to claim 5, characterized in that: A L-shaped connecting plate (6) is fixedly mounted on the bottom of the threaded sleeve (43), and the L-shaped connecting plate (6) is slidably arranged in an L-shaped sliding groove (1b). Central link rings (7) are fixedly mounted on both ends of the horizontal plate of the L-shaped connecting plate (6), and the two central link rings (7) are respectively sleeved on the sliding rods (51) in the two sets of counterweight assemblies (5) and are slidably connected to the sliding rods (51).
7. The infrastructure construction material hoisting structure according to claim 6, characterized in that: The central link ring (7) is located between two symmetrically distributed counterweight blocks (52), and the central link ring (7) is fixedly connected to the counterweight blocks (52) on both sides respectively.
Citation Information
Cited By
Lifting appliance capable of automatically adjusting lifting point and mass center and leveling method
CN119954009A