Buffer template for self-compacting rock-fill disassembly

By designing a buffer formwork for self-contained rock removal and using buffer plates and return springs for buffering, the damage to the ground during stone transportation is solved, and the protection of cement pavement and asphalt pavement is achieved.

CN221956653UActive Publication Date: 2024-11-05SINOHYDRO BUREAU 12 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323236520.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-28
Publication Date
2024-11-05
Estimated Expiration
2033-11-28

AI Technical Summary

Technical Problem

In construction of self-contained concrete gravity dams, the ground is often damaged during the transportation of stones, especially during transfer and unloading.

Method used

A buffer formwork for self-contained rock removal is designed, including buffer plates, support plates and return springs. During the disassembly, the stones are in contact with the return spring through the buffer plates to avoid direct contact with the ground and through removable buffering. The plate and sliding bracket are initially cushioned to reduce the possibility of ground damage.

Benefits of technology

It effectively reduces the damage to the ground by stones during the dismantling process. It is suitable for construction sites that need protection such as cement pavement and asphalt pavement to ensure the integrity of the pavement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956653U_ABST
    Figure CN221956653U_ABST
Patent Text Reader

Abstract

The utility model discloses a buffer formwork for self-compacting rock-fill disassembly, and relates to the field of water conservancy and hydropower engineering, the buffer formwork comprises a plurality of buffer plates, the bottoms of the buffer plates are provided with supporting plates, and a plurality of reset springs are arranged between the supporting plates and the buffer plates. The device has the effect of reducing damage of stones to the ground.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of construction and building, and in particular to a buffer template for disassembling a self-compacting rockfill. Background Art

[0002] During the construction of self-compacting rockfill, large quantities of rocks are usually transported to the same location and unloaded onto the ground.

[0003] In the process of implementing the above technology, the inventors found that there are at least the following problems in this technology. In the construction of self-compacting concrete gravity dam, the blocks need to be transported by loaders and transferred to the ground after being transported to the designated location; however, during the transfer process, due to the large mass of the self-compacting rock pile, the ground is often damaged. Utility Model Content

[0004] In order to reduce the damage of rocks to the ground, the present application provides a buffer template for disassembling a self-compacting rockfill.

[0005] The present application provides a self-compacting rockfill disassembly buffer template that adopts the following technical solution:

[0006] A buffer template for disassembling a self-compacting rockfill comprises a plurality of buffer plates, a support plate is arranged at the bottom of the buffer plate, and a plurality of return springs are arranged between the support plate and the buffer plate.

[0007] By adopting the above technical solution, during the disassembly process, the stone will not directly contact the ground, but will contact the buffer plate, and a reset spring is arranged between the buffer plate and the support plate. The reset spring can push the buffer plate away from the support plate, that is, push the buffer plate to move in the direction away from the ground. When the stone contacts the buffer plate, it can play a buffering role, thereby reducing the possibility of damage to the ground caused by direct contact between the stone and the ground. The method is suitable for construction conditions that require road protection, such as cement pavement and asphalt pavement.

[0008] Optionally, a plurality of the buffer plates are detachably connected, a slot is formed on a side wall of the buffer plate, an insertion rod is fixed to the side wall of the buffer plate, and the insertion rods of the side walls of different buffer plates can be inserted into the slot.

[0009] By adopting the above technical solution, the insertion rod is inserted into the slot, thereby connecting the buffer plate, facilitating the positioning process of the buffer plate and reducing the possibility of the buffer plate being offset.

[0010] Optionally, a bracket is slidably provided on the buffer plate, and a receiving plate is slidably provided on the bracket.

[0011] By adopting the above technical solution, the bracket can slide on the buffer plate and move with the loader during the stone unloading process. The receiving plate is slidably connected to the bracket, which plays a preliminary buffering role.

[0012] Optionally, the receiving plate is arranged at an angle.

[0013] By adopting the above technical solution, the receiving plate is tilted, so that the stones are conveniently transferred to the buffer plate after contacting the receiving plate and then being transferred to the buffer plate under the action of the tilted receiving plate.

[0014] Optionally, a buffer member is provided between the receiving plate and the bracket, and the buffer member includes a second buffer tube and a first buffer tube, the second buffer tube passes through the first buffer tube, and a buffer spring is provided inside the second buffer tube.

[0015] By adopting the above technical solution, the second buffer tube is inserted into the first buffer tube, and a buffer spring is arranged inside. The buffer spring can play a buffering role. At the same time, the second buffer tube and the first buffer tube can play a limiting role, reducing the possibility of contact between the receiving plate and the bottom of the bracket. At the same time, the second buffer tube and the first buffer tube can reduce the possibility of the buffer spring position being offset.

[0016] Optionally, the second buffer tube is fixed to an end surface of the bracket, and the first buffer tube is fixed to a lower end surface of the receiving plate.

[0017] By adopting the above technical solution, the second buffer tube is fixed to the end surface of the bracket, and the first buffer tube is fixed to the lower end surface of the receiving plate, which facilitates the receiving plate to receive stones.

[0018] Optionally, the side wall of the receiving plate abuts against the side wall of the bracket.

[0019] By adopting the above technical solution, the side wall of the bracket limits the receiving plate, thereby reducing the possibility of the receiving plate being offset.

[0020] In summary, the present application includes at least one of the following beneficial technical effects:

[0021] 1. During the disassembly process, the stones will not directly contact the ground. When the stones contact the buffer plate, they can play a buffering role, reducing the possibility of damage to the ground caused by direct contact between the stones and the ground. It is suitable for construction situations that require road protection, such as cement roads and asphalt roads;

[0022] 2. The bracket can slide on the buffer plate and move with the loader during the stone unloading process. The receiving plate is slidably connected to the bracket, which plays a preliminary buffering role. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the main structure of an embodiment of the present application.

[0024] Figure 2 yes Figure 1 Enlarged view of part A.

[0025] Description of reference numerals:

[0026] 1. Buffer plate; 2. Support plate; 3. Reset spring; 4. Slot; 5. Insert rod; 6. Bracket; 7. Receiving plate; 8. Buffer member; 9. Second buffer tube; 10. First buffer tube. DETAILED DESCRIPTION

[0027] The following is combined with Figure 1-2 This application is described in further detail.

[0028] The present application embodiment discloses a buffer template for disassembling a self-compacting rockfill. Figure 1 and Figure 2 The buffer template for disassembling self-compacting rockfill includes a buffer plate 1, which has a plurality of buffer plates 1 and is detachably connected to each other. The buffer plate 1 is used to receive stones, thereby reducing the damage of the stones to the ground. A support plate 2 is arranged at the bottom of the buffer plate 1, and the support plate 2 is used to contact the ground. At the same time, a plurality of return springs 3 are arranged between the buffer plate 1 and the support plate 2. One end of the return spring 3 is bonded to the end surface of the support plate 2 facing the buffer plate 1, and the other end is bonded to the end surface of the buffer plate 1 facing the support plate 2. The return spring 3 is used to push the buffer plate 1 to move in a direction away from the support plate 2. In the process of receiving stones, the stones fall from the vehicle onto the buffer plate 1. Since there is a return spring 3 between the buffer plate 1 and the support plate 2, the stones will not directly contact the ground. At the same time, the return spring 3 can play a buffering effect, thereby reducing the possibility of the stones damaging the ground.

[0029] Reference Figure 1 and Figure 2 A slot 4 is provided on one side wall of the buffer plate 1, and a plug rod 5 is fixed on the side wall opposite to the slot 4 by an integrated molding method. The plug rod 5 is used to be inserted into the slot 4 to connect several buffer plates 1. During the installation process, the support plate 2 is first fixed to the ground, and the plug rod 5 on the side wall of the buffer plate 1 is inserted into the slot 4 of the side wall of the adjacent buffer plate 1, so that the several buffer plates 1 are fixed in position, reducing the possibility of the position of the buffer plate 1 being offset. At the same time, the directions of the plug rods 5 are the same. During the process of removing stones, the car moves on the buffer plate 1 along the direction of the plug rod 5, and the movement of the buffer plate 1 will not be interfered with by the plug rod 5 and the slot 4, which is convenient for receiving the stone.

[0030] Reference Figure 1 and Figure 2, a bracket 6 is provided on the buffer plate 1, and the bracket 6 can slide on the buffer plate 1. The bottom of the bracket 6 is connected to a roller by rotating a rotating shaft, so the bracket 6 can slide on the buffer plate 1, and the bracket 6 can be detachably connected to the loading vehicle; during the movement of the loading vehicle, the bracket 6 is driven to move synchronously, thereby driving the bracket 6 to move on the buffer plate 1, which is convenient for disassembling the stone to different positions of the buffer plate 1. The bracket 6 is mainly used for preliminary buffering. A receiving plate 7 is slidably provided on the bracket 6, and the receiving plate 7 can slide on the bracket 6 in a vertical direction; during the falling process, the stone first contacts the receiving plate 7, thereby playing a preliminary buffering role, and the receiving plate 7 is inclined, which is convenient for transferring the stone to the buffer plate 1 after contacting the stone; it is convenient for the stone receiving process to proceed.

[0031] Reference Figure 1 and Figure 2 A buffer member 8 is provided between the receiving plate 7 and the bracket 6. The buffer member 8 is used to buffer the receiving plate 7 and reset the receiving plate 7 after the stone is separated from the receiving plate 7. The buffer member 8 includes a second buffer tube 9 and a first buffer tube 10. The second buffer tube 9 is fixed to the end face of the bracket 6 facing the receiving plate 7 by an integral molding method. The first buffer tube 10 is fixed to the lower end face of the receiving plate 7 by an integral molding method. At the same time, the axial direction of the second buffer tube 9 is parallel to the axial direction of the first buffer tube 10. At the same time, the second buffer tube 9 is arranged in the first buffer tube 10. A buffer tube 10 is provided, and the second buffer tube 9 can slide in the first buffer tube 10. At the same time, a buffer spring is arranged in the first buffer tube 10. One end of the buffer spring is bonded to the end face of the bracket 6, and the other end is bonded to the end face of the receiving plate 7. The buffer spring is used to push the receiving plate 7 to move in the direction away from the bracket 6. After the stone is separated from the receiving plate 7, the receiving plate 7 returns to its original position under the action of the buffer spring. At the same time, the receiving plate 7 abuts against the side wall of the bracket 6, and the side wall of the bracket 6 limits the receiving plate 7, thereby reducing the possibility of the position of the receiving plate 7 being offset.

[0032] The implementation principle of a buffer template for self-compacting rock pile disassembly in the embodiment of the present application is as follows: during the stone disassembly process, first drive the vehicle onto the buffer plate 1, and fix the bracket 6 to the loading vehicle by bolts or by hooks. When the loading vehicle's bucket is tilted, the stone can fall onto the receiving plate 7, and the loading vehicle is controlled to move along the insertion rod 5, that is, the loading vehicle will press down the buffer plate 1 at the bottom of the tire to move toward the support plate 2, but will not affect the buffer plate 1 at the rear of the loading vehicle. The stone will pass through the receiving plate 7 and then fall onto the buffer plate 1, and perform preliminary buffering on the receiving plate 7, and perform secondary buffering on the buffer plate 1, thereby reducing the possibility of the stone damaging the ground. This disassembly method is applicable to cement pavements and other pavements that need to be protected.

[0033] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A buffer template for disassembling self-compacting rockfill, comprising a plurality of buffer plates (1), characterized in that: A support plate (3) is arranged at the bottom of the buffer plate (1), a plurality of return springs (2) are arranged between the support plate (3) and the buffer plate (1), a bracket (6) is slidably arranged on the buffer plate (1), a receiving plate (7) is slidably arranged on the bracket (6), a buffer member (8) is arranged between the receiving plate (7) and the bracket (6), the buffer member (8) comprises a second buffer tube (9) and a first buffer tube (10), the second buffer tube (9) is inserted into the first buffer tube (10), and a buffer spring is arranged inside the second buffer tube (9).

2. The buffer template for disassembly of self-compacting rockfill according to claim 1 is characterized in that: The plurality of buffer plates (1) are detachably connected to each other, a slot (4) is provided on the side wall of the buffer plate (1), an insertion rod (5) is fixed on the side wall of the buffer plate (1), and the insertion rods (5) on the side walls of different buffer plates (1) can be inserted into the slot (4).

3. The buffer template for disassembly of self-compacting rockfill according to claim 1 is characterized in that: The receiving plate (7) is arranged in an inclined manner.

4. The buffer template for disassembly of self-compacting rockfill according to claim 1, characterized in that: The second buffer tube (9) is fixed to the end surface of the bracket (6), and the first buffer tube (10) is fixed to the lower end surface of the receiving plate (7).

5. The buffer template for disassembly of self-compacting rockfill according to claim 1, characterized in that: The side wall of the receiving plate (7) abuts against the side wall of the bracket (6).