Flood bank pouring equipment

By designing flood control embankment pouring equipment for brackets, support strips, mobile trolleys and adjustable leveling mechanisms, the problems of pouring difficulties in special locations and the difficulty of concrete leveling are solved, and labor-saving and efficient in the pouring process are achieved.

CN221956729UInactive Publication Date: 2024-11-05BINZHOU WATER DEVELOPMENT GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420245101.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the pouring of concrete flood control dams, automation equipment cannot be used in some special locations, resulting in workers needing to hold concrete discharge pipes for pouring, and the sprayed concrete is difficult to flatten, which increases labor investment and labor intensity.

Method used

A flood control embankment pouring equipment is designed, including brackets, support strips, mobile trolleys, rotary seats, adjustable flattening mechanisms, etc. The movement and adjustment of the discharge pipe are achieved through the walking wheels and rotary seats, and the adjustable flattening mechanism is used. Automatic flattening of concrete.

Benefits of technology

It reduces the labor intensity of workers during the pouring process, improves the pouring efficiency, and automatically leveling concrete reduces labor investment and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956729U_ABST
    Figure CN221956729U_ABST
Patent Text Reader

Abstract

The utility model provides flood bank pouring equipment. The flood bank pouring equipment comprises a support, two supporting battens are fixedly mounted at the top of the support, a moving trolley is arranged at the tops of the two supporting battens, the moving trolley comprises a frame, four walking wheels, a rotating seat and a supporting plate, the four walking wheels are rotationally mounted at the bottom of the frame, and the rotating seat is rotationally mounted at the bottom of the frame. The tops of the two supporting battens make contact with the two corresponding walking wheels, limiting plates are fixedly installed on the outer walls of the two sides of the walking wheels, the two limiting plates are located on the two sides of the supporting battens correspondingly, and the rotating base is rotationally installed on the top of the vehicle frame. The floodwall pouring equipment has the advantages that the concrete discharging pipe can be moved in a labor-saving mode, sprayed concrete can be automatically flattened, and labor input is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of casting, in particular to a flood embankment casting device. Background Art

[0002] Flood control dams are dams built to prevent rivers and floods. At present, the more common flood control dams are slow-setting earth dams. Concrete dams can discharge or take water through the dam body. It is relatively easy to construct diversion and construction during the flood season. When encountering accidental accidents, even if the dam top is overflowing, it will not necessarily fail, and the safety is relatively good.

[0003] During the pouring process of concrete flood control dams, some areas to be poured cannot be poured using automated pouring equipment due to their special locations. In this case, concrete pipes are usually laid to the areas to be poured, and relevant workers hold the slow-setting soil discharge pipe at the end to pour. When changing the pouring point, it is more laborious to move the slow-setting soil discharge pipe. At the same time, at each pouring point, the sprayed concrete is roughly piled up in a cone shape, and other workers are needed to help flatten the concrete.

[0004] Therefore, it is necessary to provide a new flood embankment casting equipment to solve the above technical problems. Utility Model Content

[0005] The technical problem solved by the utility model is to provide a flood embankment casting device which saves labor on moving a concrete discharge pipe, can automatically flatten the sprayed concrete and can reduce labor input.

[0006] In order to solve the above technical problems, the flood embankment pouring equipment provided by the utility model comprises: a bracket, two supporting strips are fixedly installed on the top of the bracket, and a mobile trolley is arranged on the top of the two supporting strips, and the mobile trolley comprises a frame, four walking wheels, a rotating seat and a supporting plate, the four walking wheels are rotatably installed at the bottom of the frame, the tops of the two supporting strips are in contact with the corresponding two walking wheels, and limiting plates are fixedly installed on the outer walls of both sides of the walking wheels, and the two limiting plates are respectively located on both sides of the supporting strips, the rotating seat is rotatably installed on the top of the frame, the supporting plate is fixedly installed on the top of the rotating seat, a discharge pipe is fixedly installed on the top of the supporting plate, an adjustable flattening mechanism is provided on the supporting plate, and one end of the discharge pipe close to the adjustable flattening mechanism extends to the bottom of the supporting plate, a slope plate is fixedly installed on the supporting plate, a concrete hose is provided on the top of the slope plate, and the top of the concrete hose is fixedly connected to one end of the discharge pipe away from the adjustable flattening mechanism, and handles are fixedly installed on the outer walls of both sides of the slope plate;

[0007] The adjustable flattening mechanism includes two sliding columns, a fixed seat, a first motor, a plurality of spreading plates, a fixed cylinder, a lead screw and a second motor. The two sliding columns are both penetrated and slidably mounted on the support plate, the fixed seat is fixedly mounted on the bottom ends of the two sliding columns, the first motor is fixedly mounted on the top of the fixed seat, a rotating shaft is penetrated and rotatably mounted on the fixed seat, a plurality of spreading plates are fixedly mounted on the outer wall of the rotating shaft, the top end of the rotating shaft is fixedly connected to the output shaft of the first motor, the two sliding columns are fixedly sleeved with the same fixed sleeve, the fixed cylinder is fixedly mounted on the top of the fixed sleeve, the lead screw is penetrated and rotatably mounted on the support plate, the bottom end of the lead screw extends into the fixed cylinder, and the lead screw is threadedly connected to the fixed cylinder, the second motor is fixedly mounted on the top of the support plate, and the top end of the lead screw is fixedly connected to the output shaft of the second motor.

[0008] Preferably, an inclined plate is fixedly mounted on the frame, a latch is passed through and movably mounted on the inclined plate, a handle is fixedly mounted on the top of the latch, a plug hole is opened on the inclined plate, the latch passes through the plug hole and is slidably connected to the inner wall of the plug hole.

[0009] Preferably, a tool box is fixedly mounted on the bottom inner wall of the frame, and the tool box is used to place the latch.

[0010] Preferably, two baffles are fixedly mounted on the top of the slope plate, and the concrete hose is located between the two baffles.

[0011] Preferably, the spreading plate is provided with a plurality of slots at equal intervals, and spreading teeth are formed between any two adjacent slots.

[0012] Preferably, a plurality of hoops are sleeved on the outer wall of the discharge pipe, and the plurality of hoops are fixedly connected to the support plate by bolts.

[0013] Compared with the related art, the flood embankment pouring equipment provided by the utility model has the following advantages:

[0014] Beneficial effects:

[0015] The utility model provides a flood control embankment pouring equipment, which is provided with a bracket, two supporting strips, a frame, four walking wheels, a rotating seat, a supporting plate, a discharging pipe and a concrete hose. The frame can walk on the two supporting strips through the four walking wheels, the supporting plate is rotatably installed on the frame through the rotating seat, and the discharging pipe is fixedly installed on the supporting plate. During pouring, relevant workers can adjust the pouring point by pushing the frame to move forward and backward and rotating the supporting plate left and right, which is relatively labor-saving; through the setting of the adjustable leveling mechanism, the accumulated concrete can be automatically leveled, which can effectively reduce the labor input. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A structural schematic diagram of a preferred embodiment of the flood embankment pouring equipment provided by the utility model;

[0017] Figure 2 for Figure 1 An enlarged schematic diagram of part A is shown;

[0018] Figure 3 A right side view of a preferred embodiment of the flood embankment pouring equipment provided by the utility model;

[0019] Figure 4 for Figure 1 The schematic diagram of the adjustable flattening mechanism shown;

[0020] Figure 5 for Figure 1 Schematic diagram of the structure of the latch shown.

[0021] Numbers in the figure: 1. bracket; 2. supporting strip; 3. frame; 4. walking wheel; 5. rotating seat; 6. supporting plate; 7. discharge pipe; 8. concrete hose; 9. adjustable leveling mechanism; 901. sliding column; 902. fixed seat; 903. first motor; 904. spreading plate; 905. fixed sleeve; 906. fixed cylinder; 907. screw; 908. second motor; 10. ramp plate; 11. handle; 12. baffle; 13. latch. DETAILED DESCRIPTION

[0022] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.

[0023] Please refer to Figure 1-Figure 5 ,in, Figure 1 A structural schematic diagram of a preferred embodiment of the flood embankment pouring equipment provided by the utility model; Figure 2 for Figure 1 An enlarged schematic diagram of part A is shown; Figure 3 A right side view of a preferred embodiment of the flood embankment pouring equipment provided by the utility model; Figure 4 for Figure 1 The schematic diagram of the adjustable flattening mechanism shown; Figure 5 for Figure 1The structural diagram of the latch is shown. The flood embankment casting equipment includes: a bracket 1, two supporting strips 2 are fixedly installed on the top of the bracket 1, and a mobile trolley is provided on the top of the two supporting strips 2. The mobile trolley includes a frame 3, four walking wheels 4, a rotating seat 5 and a support plate 6. The four walking wheels 4 are rotatably installed at the bottom of the frame 3, and the tops of the two supporting strips 2 are in contact with the corresponding two walking wheels 4. Limiting plates are fixedly installed on the outer walls of both sides of the walking wheels 4, and the two limiting plates are respectively located on both sides of the supporting strips 2. The rotating seat 5 is rotatably installed on the top of the frame 3, and the support plate 6 is fixedly installed on the top of the rotating seat 5. A discharge pipe 7 is fixedly installed on the top of the support plate 6. Since the rotating seat 5 can rotate, the support plate 6 can drive the discharge pipe 7 to swing in a fan shape. At the same time, the mobile trolley can move forward and backward on the frame 3 to adjust the front and rear positions of the discharge pipe 7, so as to facilitate the relevant workers to change the casting points. Specifically, the outer wall of the discharge pipe 7 The sleeve is provided with a plurality of hoop sleeves, and the plurality of hoop sleeves are fixedly connected to the support plate 6 by bolts. An adjustable flattening mechanism 9 is provided on the support plate 6. One end of the discharge pipe 7 close to the adjustable flattening mechanism 9 extends to the bottom of the support plate 6. The adjustable flattening mechanism 9 is used to flatten the concrete slurry sprayed from the discharge pipe 7. A ramp plate 10 is fixedly installed on the support plate 6. A concrete hose 8 is provided on the top of the ramp plate 10. The top of the concrete hose 8 is fixedly connected to one end of the discharge pipe 7 away from the adjustable flattening mechanism 9. The bottom end of the concrete hose 8 is connected to the concrete feed pipe. The concrete hose 8 has a deformable characteristic, which provides conditions for the mobile trolley to move forward and backward and the support plate 6 to swing left and right. Two baffles 12 are fixedly installed on the top of the ramp plate 10. The concrete hose 8 is located between the two baffles 12. Handles 11 are fixedly installed on the outer walls of both sides of the ramp plate 10. The two handles 11 can be used to push the mobile trolley to move on the bracket 1;

[0024] In this embodiment, the adjustable flattening mechanism 9 specifically includes two sliding columns 901, a fixed seat 902, a first motor 903, a plurality of spreading plates 904, a fixed cylinder 906, a lead screw 907 and a second motor 908. The two sliding columns 901 are both penetrated and slidably installed on the support plate 6. The fixed seat 902 is fixedly installed on the bottom ends of the two sliding columns 901. The first motor 903 is fixedly installed on the top of the fixed seat 902. A rotating shaft is penetrated and rotatably installed on the fixed seat 902. The plurality of spreading plates 904 are fixedly installed on the outer wall of the rotating shaft. The top end of the rotating shaft is fixedly connected to the output shaft of the first motor 903. The two sliding columns 901 are fixedly sleeved with the same fixed sleeve plate 905. The fixed cylinder 906 is fixedly installed on the top of the fixed sleeve plate 905. The lead screw 907 is penetrated and rotatably installed. On the support plate 6, the bottom end of the lead screw 907 extends into the fixed cylinder 906, and the lead screw 907 is threadedly connected to the fixed cylinder 906. Specifically, a nut is fixedly installed at the top position of the fixed cylinder 906, and the lead screw 907 passes through the nut and is threadedly connected to the nut. The second motor 908 is fixedly installed on the top of the support plate 6, and the top end of the lead screw 907 is fixedly connected to the output shaft of the second motor 908. The lead screw 907 is driven by the second motor 908 to rotate forward, which can push the fixed cylinder 906 to move downward to adjust the high position of the fixed seat 902, the first motor 903 and the multiple spreading plates 904. Starting the first motor 903 can drive the multiple spreading plates 904 to rotate in a cycle, and the multiple rotating spreading plates 904 can gradually flatten the conical concrete slurry.

[0025] In this embodiment, before the pouring work is carried out, in order to reliably limit the support plate 6 and the slope plate 10, an inclined plate is fixedly installed on the frame 3, a pin 13 is penetrated and movably installed on the slope plate 10, a handle is fixedly installed on the top of the pin 13, a socket is opened on the inclined plate, the pin 13 penetrates the socket and is slidably connected with the inner wall of the socket, and a tool box is fixedly installed on the bottom inner wall of the frame 3, and the tool box is used to place the pin 13.

[0026] In this embodiment, in order to increase the drainage effect on the concrete slurry and reduce the resistance encountered by the spreading plate 904 during the leveling process, a plurality of slots are opened at equal intervals on the spreading plate 904, and spreading teeth are formed between any two adjacent slots.

[0027] The working principle of the flood embankment pouring equipment provided by the utility model is as follows:

[0028] When in use, first place the bracket 1 on the steel mesh in the area to be poured in the flood control dam (in order to move the position of the bracket 1 later, multiple logs can be used to pad the bottom of the bracket 1), then lift the mobile trolley onto the two supporting strips 2 on the top of the frame 3, and then move the mobile trolley to the front end of the bracket 1 through the four running wheels 4, and connect the end of the concrete hose 8 away from the discharge pipe 7 to the concrete supply pipe;

[0029] After the external concrete delivery pump is started, the concrete is discharged into the concrete hose 8 through the concrete feeding pipe, and then the concrete is discharged downward through the discharge pipe 7. When a sufficient amount of concrete is poured at a point, the second motor 908 is started to drive the screw 907 to rotate forward, and the screw 907 pushes the fixed cylinder 906 to move downward, so that multiple spreading plates 904 are lowered into the newly poured concrete pile, and then the first motor 903 is started to drive the multiple spreading plates 904 to rotate cyclically. Under the push of the multiple spreading plates 904, the accumulated concrete can be pushed to the surroundings. In this process, the moving trolley is pushed back and forth by the handle 11, and finally the concrete can be flattened. After that, the support plate 6 can be rotated by the handle 11 or the trolley can be moved back and forth to adjust the pouring point (before rotating the support plate 6, the pin 13 must be pulled out to release the lock on the slope plate 10). After the pouring work of each pouring point is completed, the adjustable flattening mechanism 9 is used to flatten the concrete, and this cycle is repeated.

[0030] After the area in front of the support 1 is poured, the support 1 can be pulled back for a distance, and then pouring can be continued.

[0031] Compared with the related art, the flood embankment pouring equipment provided by the utility model has the following advantages:

[0032] Beneficial effects:

[0033] The utility model provides a flood control embankment pouring equipment, which is provided with a bracket 1, two supporting strips 2, a frame 3, four walking wheels 4, a rotating seat 5, a supporting plate 6, a discharging pipe 7, and a concrete hose 8. The frame 3 can walk on the two supporting strips 2 through the four walking wheels 4, the supporting plate 6 is rotatably installed on the frame 3 through the rotating seat 5, and the discharging pipe 7 is fixedly installed on the supporting plate 6. During pouring, relevant workers can adjust the pouring point by pushing the frame 3 to move forward and backward and rotating the supporting plate 6 left and right, which is more labor-saving; through the provision of an adjustable leveling mechanism 9, the accumulated concrete can be automatically leveled, which can effectively reduce labor input.

[0034] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A flood embankment casting device, comprising a bracket, characterized in that: The top of the carriage is fixedly provided with two support strips, and the top of the two support strips is provided with a moving trolley. The moving trolley comprises a frame, a four walking wheel, a swivel seat and a support plate, and the four walking wheels are rotatably mounted on the bottom of the frame, and the tops of the two support strips are in contact with the corresponding two walking wheels. Limit plates are fixedly mounted on the outer walls of both sides of the walking wheels, and the two limit plates are respectively located on both sides of the support strips, and the swivel seat is rotatably mounted on the top of the frame, and the support plate is fixedly mounted on the top of the swivel seat, and a discharge pipe is fixedly mounted on the top of the support plate, and an adjustable flattening mechanism is provided on the support plate, and one end of the discharge pipe close to the adjustable flattening mechanism extends to the bottom of the support plate, and a ramp is fixedly mounted on the support plate, and a concrete hose is provided on the top of the ramp, and the top of the concrete hose is fixedly connected to one end of the discharge pipe away from the adjustable flattening mechanism, and handles are fixedly mounted on the outer walls of both sides of the ramp; The adjustable flattening mechanism includes two sliding columns, a fixed seat, a first motor, a plurality of spreading plates, a fixed cylinder, a lead screw and a second motor. The two sliding columns are both penetrated and slidably mounted on the support plate, the fixed seat is fixedly mounted on the bottom ends of the two sliding columns, the first motor is fixedly mounted on the top of the fixed seat, a rotating shaft is penetrated and rotatably mounted on the fixed seat, a plurality of spreading plates are fixedly mounted on the outer wall of the rotating shaft, the top end of the rotating shaft is fixedly connected to the output shaft of the first motor, the two sliding columns are fixedly sleeved with the same fixed sleeve, the fixed cylinder is fixedly mounted on the top of the fixed sleeve, the lead screw is penetrated and rotatably mounted on the support plate, the bottom end of the lead screw extends into the fixed cylinder, and the lead screw is threadedly connected to the fixed cylinder, the second motor is fixedly mounted on the top of the support plate, and the top end of the lead screw is fixedly connected to the output shaft of the second motor.

2. The flood embankment casting equipment according to claim 1, characterized in that: An inclined plate is fixedly mounted on the frame, a latch is penetrated through and movably mounted on the inclined plate, a handle is fixedly mounted on the top of the latch, a plug hole is provided on the inclined plate, the latch penetrates through the plug hole and is slidably connected to the inner wall of the plug hole.

3. The flood embankment casting equipment according to claim 2, characterized in that: A tool box is fixedly mounted on the bottom inner wall of the frame, and the tool box is used for placing the latch.

4. The flood embankment casting equipment according to claim 1, characterized in that: Two baffles are fixedly installed on the top of the slope plate, and the concrete hose is located between the two baffles.

5. The flood embankment casting equipment according to claim 1, characterized in that: The spreading plate is provided with a plurality of slots at equal intervals, and spreading teeth are formed between any two adjacent slots.

6. The flood embankment casting equipment according to claim 1, characterized in that: A plurality of hoops are sleeved on the outer wall of the discharge pipe, and the plurality of hoops are fixedly connected to the support plate by bolts.