Pay-off device for cable production

By designing an adjustable and movable wiring device, the problem of fixed position and large footprint of the guide device after cable wiring is solved, and flexible processing and efficient transportation of the cable are achieved.

CN221970902UActive Publication Date: 2024-11-08TONGYONG TIANJIN ALUMINUM ALLOY PROD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420378475.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-11-08
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

After the cable is released, the guide device is fixed, difficult to move, and it covers a large area.

Method used

A cable production wiring device including a wire laying mechanism and a guide trolley is designed. The guide trolley is connected through a first rope and a second rope. The base is equipped with a slide chute and a locking hole. The power source is a motor. The guide trolley is equipped with a pulley. and the third guide assembly, capable of adjusting and collecting as needed, reducing the footprint.

Benefits of technology

It realizes flexible movement and position adjustment of the guide trolley, reduces the footprint of the guide device, and facilitates movement and processing of cables.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221970902U_ABST
    Figure CN221970902U_ABST
Patent Text Reader

Abstract

The utility model provides a pay-off device for cable production, which comprises a pay-off mechanism and a plurality of guide trolleys arranged on one side of the pay-off mechanism. The pay-off mechanism is connected with the guide trolleys through a first rope, and the guide trolleys are connected through a second rope; the pay-off mechanism comprises a base, a baffle and a power source, and the baffle is arranged on one side of the base; the power source is arranged on one side of the baffle, the output end of the power source is connected with the output rod, the output rod is connected with the rotating disc, the rotating disc is connected with the supporting barrel, the output rod penetrates through the supporting barrel to be connected with the detachable disc, threads are arranged at the end of the output rod, a first locking nut is arranged at the end of the output rod, and the detachable disc is connected with the supporting barrel through the first locking nut. The cable is conveyed to the processing link needing the next cable through the guide trolley, and the guide trolley can move according to the actual conveying position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of cable production, in particular to a wire-releasing device for cable production. Background Art

[0002] Cables are usually made of several or several groups of wires twisted together. Each group of wires is insulated from each other and often twisted around a center. The entire outer layer is covered with a highly insulating covering layer. The cable has the characteristics of being energized inside and insulated outside. In the field of cable production and construction, a wire unwinding machine is often used to unwind the rolled cable.

[0003] In the prior art, during the cable laying process, the guide device is fixed in position after the cable is laid out, is difficult to move, and occupies a large area. Utility Model Content

[0004] In view of this, the utility model aims to provide a cable pay-off device for cable production, so as to solve the problem that the position of the guide device is fixed after the cable is paid off, it is difficult to move, and it occupies a large area.

[0005] In order to achieve the above object, the technical solution of the utility model is implemented as follows:

[0006] A cable pay-off device for cable production comprises a pay-off mechanism and a guide trolley, wherein a plurality of guide trolleys are arranged on one side of the pay-off mechanism; the pay-off mechanism and the guide trolleys are connected by a first rope, and the guide trolleys are connected by a second rope;

[0007] The line-releasing mechanism includes a base, a baffle, and a power source. The baffle is arranged on one side of the base; the power source is arranged on one side of the baffle, the output end of the power source is connected to the output rod, the output rod is connected to the rotating disk, the rotating disk is connected to the support tube, the output rod passes through the support tube and is connected to the detachable disk, the end of the output rod is provided with a thread, the end of the output rod is provided with a first locking nut, and the detachable disk is connected to the support tube through the first locking nut.

[0008] Furthermore, the number of the guide carts is at least 2.

[0009] Furthermore, a first guide assembly and a second guide assembly are sequentially provided on a side of the base power source close to the guide vehicle.

[0010] Furthermore, the first guide assembly includes a first guide roller and a first support plate. The first support plate is arranged on the base. One end of the first guide roller is rotatably arranged on the baffle. The other end of the first guide roller is rotatably arranged on the first support plate. The first guide roller is arranged above the rotating disk.

[0011] Furthermore, the second guide assembly includes a second support plate, a mounting plate, and a circular ring, wherein the mounting plate and the circular ring are respectively arranged on both sides of the second support plate;

[0012] A slide groove is provided on the base, a slide rail corresponding to the slide groove is provided at the bottom of the mounting plate, locking holes are provided on both sides of the mounting plate, and the mounting plate is abutted against the slide groove through locking bolts;

[0013] The circular ring is arranged below the first guide roller.

[0014] Furthermore, a first connecting plate is provided on one side of the base close to the guide trolley, and second connecting plates are provided on both sides of the guide trolley, and through holes are provided on the first connecting plate and the second connecting plate.

[0015] Furthermore, the power source is an electric motor.

[0016] Furthermore, the guide trolley comprises a vehicle body, a pulley, and a third guide assembly, wherein four pulleys are arranged around the bottom of the vehicle body; and two third guide assemblies are symmetrically arranged on the vehicle body.

[0017] The pulley is a universal wheel with brakes.

[0018] Further, the third guide assembly includes a side plate, a rotating plate, and a second guide roller, the two side plates are arranged on both sides of the vehicle body, a rotating rod is arranged on one side of the rotating plate close to the side plate, and the rotating rod is connected to the side plate through a second locking nut;

[0019] The second guide roller is rotatably arranged between the two rotating plates.

[0020] Furthermore, the third guide assembly further comprises a first guide rod and a second guide rod, and the first guide rod and the second guide rod are arranged above the rotating plate;

[0021] The end of the first guide rod is rotatably provided with a third guide rod, the end of the second guide rod is provided with a convex block, the convex block is provided with a clamping groove, and the end of the third guide rod is provided with a clamping block corresponding to the clamping groove.

[0022] Compared with the prior art, the cable production pay-off device described in the utility model has the following advantages:

[0023] 1. The guide trolley of the present application is connected to the wire-releasing mechanism through a first rope, the cable is arranged on the support cylinder of the wire-releasing mechanism, the cable is output through the wire-releasing mechanism, and the cable is transported to the processing link where the next cable is needed through the guide trolley. The guide trolley can move according to the actual transport position.

[0024] 2. A pulley is provided at the bottom of the guide trolley of the present application to facilitate the movement of the guide trolley. A second guide roller is provided on the guide trolley, and the cable can be moved through the second guide roller. The third guide assembly of the guide trolley can be rotated. When the guide trolley is not in use, the second locking nut of the third guide assembly can be unscrewed, and the rotating plate can be rotated inward to facilitate collection, thereby reducing the footprint of the guide trolley. The guide trolley of the present application occupies a smaller area than the guide device in the prior art and is easy to move.

[0025] 3. The present application can adjust the position of the second wire assembly according to different output positions, and the position of the second guide assembly corresponds to the position of the guide trolley. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the accompanying drawings:

[0027] Figure 1 This is an overall schematic diagram of a cable production pay-off device according to an embodiment of the utility model (the first rope and the second rope are not shown);

[0028] Figure 2 It is a side schematic diagram of the whole of the cable production pay-off device according to the embodiment of the utility model;

[0029] Figure 3 This is a schematic diagram of a guide trolley of a cable production pay-off device according to an embodiment of the utility model.

[0030] Description of reference numerals:

[0031] 1. Base; 2. Baffle; 3. Power source; 4. Bump; 5. Rotating disk; 6. Support cylinder; 7. Removable disk; 8. First locking nut; 9. First guide roller; 10. First support plate; 11. Second support plate; 12. Mounting plate; 13. Ring; 14. Block; 15. First connecting plate; 16. Second connecting plate; 17. Car body; 18. Pulley; 19. Side plate; 20. Rotating plate; 21. Second guide roller; 22. Rotating rod; 23. Second locking nut; 24. First guide rod; 25. Second guide rod; 26. Third guide rod. DETAILED DESCRIPTION

[0032] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0033] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.

[0034] like Figures 1 to 3 As shown, a cable pay-off device for cable production includes a pay-off mechanism and a guide trolley, wherein a plurality of guide trolleys are arranged on one side of the pay-off mechanism; the pay-off mechanism and the guide trolley are connected by a first rope, and the guide trolleys are connected by a second rope; the pay-off mechanism includes a base 1, a baffle 2, and a power source 3, wherein the baffle 2 is arranged on one side of the base 1; the power source 3 is arranged on one side of the baffle 2, the output end of the power source 3 is connected to the output rod, the output rod is connected to the rotating disk 5, the rotating disk 5 is connected to the supporting tube 6, the output rod passes through the supporting tube 6 and is connected to the detachable disk 7, the end of the output rod is provided with a thread, the end of the output rod is provided with a first locking nut 8, and the detachable disk 7 is connected to the supporting tube 6 by the first locking nut 8.

[0035] The number of guide trolleys is at least 2. A first guide assembly and a second guide assembly are sequentially arranged on the side of the power source 3 of the base 1 close to the guide trolley. The first guide assembly includes a first guide roller 9 and a first support plate 10. The first support plate 10 is arranged on the base 1. One end of the first guide roller 9 is rotatably arranged on the baffle 2. The other end of the first guide roller 9 is rotatably arranged on the first support plate 10. The first guide roller 9 is arranged above the rotating disk 5.

[0036] The second guide assembly includes a second support plate 11, a mounting plate 12, and a ring 13. The mounting plate 12 and the ring 13 are respectively arranged on both sides of the second support plate 11; a slide groove is arranged on the base 1, and a slide rail corresponding to the slide groove is arranged at the bottom of the mounting plate 12. Locking holes are arranged on both sides of the mounting plate 12, and the mounting plate 12 is abutted against the slide groove through locking bolts; the ring 13 is arranged below the first guide roller 9. A first connecting plate 15 is arranged on the side of the base 1 close to the guide trolley, and a second connecting plate 16 is arranged on both sides of the guide trolley. Through holes are arranged on the first connecting plate 15 and the second connecting plate 16. The power source 3 is a motor.

[0037] The guide trolley comprises a vehicle body 17, a pulley 18, and a third guide assembly, wherein four pulleys 18 are arranged around the bottom of the vehicle body 17; and two third guide assemblies are symmetrically arranged on the vehicle body 17. The pulley 18 is a universal wheel with a brake.

[0038] The third guide assembly includes a side plate 19, a rotating plate 20, and a second guide roller 21. The two side plates 19 are arranged on both sides of the vehicle body 17. A rotating rod 22 is arranged on the side of the rotating plate 20 close to the side plate 19. The rotating rod 22 is connected to the side plate 19 through a second locking nut 23. The second guide roller 21 is rotatably arranged between the two rotating plates 20. The third guide assembly also includes a first guide rod 24 and a second guide rod 25. The first guide rod 24 and the second guide rod 25 are arranged above the rotating plate 20. The end of the first guide rod 24 is rotatably provided with a third guide rod 26. The end of the second guide rod 25 is provided with a protrusion 4, and a card slot is arranged on the protrusion 4. The end of the third guide rod 26 is provided with a card block 14 corresponding to the card slot.

[0039] The first guide rod 24 and the second guide rod 25 have the same length. The length of the first guide rod 24 and the second guide rod 25 is greater than the diameter of the cable. The diameter of the ring 13 is greater than the diameter of the cable.

[0040] In a specific embodiment, the first locking nut 8 is loosened, the detachable disk 7 is removed, the cable to be processed is wound around the support tube 6, the detachable disk 7 is passed through the output rod, the first locking nut 8 is tightened onto the output rod, the cable to be processed passes over the top of the first guide roller 9, the position of the second support plate 11 is adjusted according to the output direction of the cable to be processed, after the position is adjusted, the mounting plate 12 is fixed to the base 1 by the locking bolt, the guide trolley is slid according to the processing direction of the cable to be processed, one end of the first rope is connected to the first connecting plate 15 of the wire-releasing mechanism, and the other end is connected to the second connecting plate 16 of the guide trolley, and the two ends of the second rope are respectively connected to the second connecting plate 16 of the guide trolley, the pulley 18 is braked, the position of the guide trolley is fixed, the third guide rod 26 is rotated, the cable is placed above the second guide roller 21, the third guide rod 26 is rotated, the block 14 is clamped in the slot corresponding to the protrusion 4, the power source 3 starts to drive the cable to rotate for output, and after the output is completed, the third guide rod 26 is rotated to remove the cable from the second guide roller 21. When the guide trolley is not in use, the second locking nut 23 of the third guide assembly can be unscrewed, and the rotating plate 20 can be rotated inward, thereby facilitating collection and reducing the floor space of the guide trolley.

[0041] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A pay-off device for cable production, characterized in that: It includes a wire-releasing mechanism and a guide trolley, wherein a plurality of guide trolleys are arranged on one side of the wire-releasing mechanism; the wire-releasing mechanism and the guide trolleys are connected by a first rope, and the guide trolleys are connected by a second rope; The wire-releasing mechanism comprises a base (1), a baffle (2), and a power source (3), wherein the baffle (2) is arranged on one side of the base (1); the power source (3) is arranged on one side of the baffle (2); the output end of the power source (3) is connected to an output rod, the output rod is connected to a rotating disk (5), the rotating disk (5) is connected to a support tube (6), the output rod passes through the support tube (6) and is connected to a detachable disk (7), the end of the output rod is provided with a thread, the end of the output rod is provided with a first locking nut (8), and the detachable disk (7) is connected to the support tube (6) via the first locking nut (8).

2. The cable production pay-off device according to claim 1, characterized in that: The number of guide trolleys is at least 2.

3. The cable production pay-off device according to claim 1, characterized in that: A first guide assembly and a second guide assembly are sequentially arranged on one side of the base (1) power source (3) close to the guide trolley.

4. The cable production pay-off device according to claim 3, characterized in that: The first guide assembly comprises a first guide roller (9) and a first support plate (10); the first support plate (10) is arranged on a base (1); one end of the first guide roller (9) is rotatably arranged on the baffle plate (2); the other end of the first guide roller (9) is rotatably arranged on the first support plate (10); and the first guide roller (9) is arranged above the rotating disk (5).

5. The cable production pay-off device according to claim 3, characterized in that: The second guide assembly comprises a second support plate (11), a mounting plate (12), and a circular ring (13), wherein the mounting plate (12) and the circular ring (13) are respectively arranged on both sides of the second support plate (11); A slide groove is provided on the base (1), a slide rail corresponding to the slide groove is provided at the bottom of the mounting plate (12), locking holes are provided on both sides of the mounting plate (12), and the mounting plate (12) is abutted against the slide groove via locking bolts; The circular ring (13) is arranged below the first guide roller (9).

6. The cable production pay-off device according to claim 1, characterized in that: A first connecting plate (15) is provided on one side of the base (1) close to the guide trolley, and second connecting plates (16) are provided on both sides of the guide trolley. Through holes are provided on the first connecting plate (15) and the second connecting plate (16).

7. The cable production pay-off device according to claim 1, characterized in that: The power source (3) is an electric motor.

8. The cable production pay-off device according to claim 1, characterized in that: The guide trolley comprises a vehicle body (17), a pulley (18), and a third guide assembly. Four pulleys (18) are arranged around the bottom of the vehicle body (17); and two third guide assemblies are symmetrically arranged on the vehicle body (17).

9. The cable production pay-off device according to claim 8, characterized in that: The third guide assembly comprises a side plate (19), a rotating plate (20), and a second guide roller (21), wherein the two side plates (19) are arranged on both sides of the vehicle body (17), a rotating rod (22) is arranged on one side of the rotating plate (20) close to the side plate (19), and the rotating rod (22) is connected to the side plate (19) via a second locking nut (23); The second guide roller (21) is rotatably arranged between the two rotating plates (20).

10. The cable production pay-off device according to claim 1, characterized in that: The third guide assembly further comprises a first guide rod (24) and a second guide rod (25), wherein the first guide rod (24) and the second guide rod (25) are arranged above the rotating plate (20); A third guide rod (26) is rotatably provided at the end of the first guide rod (24), a convex block (4) is provided at the end of the second guide rod (25), a clamping groove is provided on the convex block (4), and a clamping block (14) corresponding to the clamping groove is provided at the end of the third guide rod (26).