Rapid jacking device for bridge pier lengthening
By designing a fast lifting device for bridge piers, using right-angle arc-bending steel plates and jacks to fix the piers, the site and stability problems in the existing bridge lifting method are solved, and rapid and economical piers are achieved. promote.
Patent Information
- Application Number
- CN202420044780.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-09
AI Technical Summary
The existing bridge lifting method requires a large site and high brackets, which poses stability risks during construction, and demolition and reconstruction are time-consuming and labor-intensive, and costly.
A fast lifting device is designed, including an upper hinge, a lower hinge, an upper tension jack, a lower tension jack and a vertical jack. The bridge pier is fixed by using right-angle arc-bending steel plates and jacks to achieve stable lifting of the bridge pier, which is suitable for different Size piers and can be quickly disassembled and transported.
The device is not limited by the site and pier height, and can quickly complete the length of the pier, with high stability, fast construction speed and small size, reducing construction costs and risks.
Smart Images

Figure CN221972123U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge engineering, and in particular relates to a fast jacking device for extending bridge piers. Background Art
[0002] With the development of the transportation industry, vehicle loads have gradually increased, and the level of water navigation has become higher and higher, which has placed higher requirements on the clearance under the bridge. Bridges that do not meet the original clearance requirements are faced with the problem of demolition and reconstruction or heightening. Demolition and reconstruction is time-consuming and labor-intensive, and requires a lot of money. In comparison, raising the bridge is more economical and reasonable. At present, the commonly used method of raising the bridge is to erect a support, arrange a jack on top of the support to support the main beam, then remove the cap beam or cut off the pier, and then use the jack to lift the main beam to provide space for the pier to extend. This lifting method requires a larger site to facilitate the installation of the support. If the pier is higher, a higher support needs to be erected. There are stability problems during the construction process, and the risk is relatively high. Summary of the invention
[0003] The purpose of the present utility model is to solve the shortcomings of the above-mentioned background technology and to provide a jacking device for extending bridge piers. Compared with the currently commonly used method of erecting a bracket to jack up and raise the bridge, the utility model is not restricted by the site and is suitable for bridge piers of different sizes. During the construction process, the device of the present utility model can fix the bridge piers to keep them stable, and can quickly complete the jacking and extension of the bridge piers. It can be disassembled after the construction is completed, and its small size makes it easy to transport.
[0004] The technical solution adopted by the utility model is:
[0005] A quick lifting device for extending bridge piers comprises an upper clamp, a lower clamp, an upper tension jack, a lower tension jack and a vertical jack, and is characterized in that the upper clamp and the lower clamp are respectively placed on the bridge pier, the upper clamp fixes the upper part of the bridge pier through the upper tension jack, the lower clamp fixes the lower part of the bridge pier through the lower tension jack, and the vertical jack is installed between the upper clamp and the lower clamp.
[0006] The upper clamp and the lower clamp are respectively composed of 4-8 right-angle arc-bent steel plates, each of which is placed on the upper part of the pier or at the corner of the lower part of the pier. Each right-angle arc-bent steel plate corresponds to an upper tension jack or a lower tension jack. One end of each upper tension jack is installed on a right-angle arc-bent steel plate, and the other end is connected to an adjacent right-angle arc-bent steel plate; one end of each lower tension jack is installed on a right-angle arc-bent steel plate, and the other end is connected to an adjacent right-angle arc-bent steel plate.
[0007] There are 4 to 8 vertical jacks, one vertical jack is installed on each vertical surface of the pier, one end of the vertical jack is connected to the right-angle arc-bent steel plate of the upper clamp, and the other end is connected to the right-angle arc-bent steel plate of the lower clamp.
[0008] The right-angle arc-bent steel plate is formed by bending a steel plate at 90 degrees, and the inside of the steel plate is roughened to increase friction.
[0009] The utility model has the following advantages:
[0010] 1. It is less affected by the site and pier height, and the lifting height is large.
[0011] 2. The device of the utility model can be freely extended and retracted in the transverse direction and the longitudinal direction of the bridge, and can match bridge piers of different sizes.
[0012] 3. The utility model is easy to disassemble and install, has a small size, and a fast construction speed, and no other measures are required to stabilize the bridge structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the planar structure of the utility model.
[0014] Figure 2 It is a schematic diagram of the elevation structure of the utility model.
[0015] 1-upper clamp, 2-lower clamp, 3-upper tension jack, 4-lower tension jack, 5-vertical jack, 6-lower part of pier, 7-upper part of pier, 8-pier joint. DETAILED DESCRIPTION
[0016] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not constitute a limitation on the present invention.
[0017] like Figure 1-2As shown, the utility model is a fast lifting device for extending bridge piers, comprising an upper hoop 1, a lower hoop 2, four upper tension jacks 3, four lower tension jacks 4, and four vertical jacks 5, characterized in that: the upper hoop 1 and the lower hoop 2 are respectively placed on the bridge piers, the upper hoop 1 fixes the upper part 7 of the bridge pier through the four upper tension jacks 3, and the lower hoop 2 fixes the lower part 6 of the bridge pier through the four lower tension jacks 4. When the cross-section of the bridge pier is square, the upper hoop 1 and the lower hoop 2 are respectively composed of four right-angle arc-bent steel plates, and the right-angle arc-bent steel plates are made of steel plates bent 90 degrees, and the inside of the steel plates is roughened. Processing to increase friction; four right-angle arc-bent steel plates are placed at the corners of the upper part 7 of the pier, one end of each upper tension jack 3 is installed on a right-angle arc-bent steel plate, and the other end is connected to an adjacent right-angle arc-bent steel plate; four right-angle arc-bent steel plates are placed at the corners of the lower part 6 of the pier, one end of each lower tension jack 4 is installed on a right-angle arc-bent steel plate, and the other end is connected to an adjacent right-angle arc-bent steel plate; four vertical jacks 5 are respectively installed between the upper clamp 1 and the lower clamp 2 on the four sides of the pier; one end of each vertical jack 5 is connected to the right-angle arc-bent steel plate of the upper clamp 1, and the other end is connected to the right-angle arc-bent steel plate of the lower clamp 2.
[0018] Of course, when the cross-section of the pier is hexagonal, the upper hoop 1 and the lower hoop 2 are respectively composed of six right-angle arc-bent steel plates, and six upper tension jacks 3 and six lower tension jacks 4 are required, and six vertical jacks 5 are also required; at the same time, when the cross-section of the pier is octagonal, the upper hoop 1 and the lower hoop 2 are respectively composed of eight right-angle arc-bent steel plates, and eight upper tension jacks 3 and eight lower tension jacks 4 are required, and eight vertical jacks 5 are also required.
[0019] The following is a specific application of the device of the utility model using a double-pier simply supported beam bridge (the whole bridge has 4 piers, and the cross section of the pier is square):
[0020] Assuming that the bridge pier is 4.5m high and needs to be raised by 1m, the friction coefficient between the device of the utility model and the bridge pier is 0.8, and the bridge pier extension point 8 should be set at the place where the vertical jack 5 is less stressed on the bridge pier. In this case, the inflection point along the bridge direction, that is, 2 / 3 of the pier height, is selected as the extension point. The weight of the part of the bridge pier and the cap beam that needs to be lifted is 100t (the weight of a single cap beam and two piers that need to be lifted), the weight of a single device of the utility model is 1t, and the main beam weighs 600t. The total weight G of the main beam, the part of the bridge pier that needs to be lifted, and the cap beam can be calculated. 上 The total weight of the main beam, the bridge piers that need to be lifted, the cap beam and the lifting device is G 下 :
[0021] G 上 =600÷4+100÷2=200t
[0022] G下 =600÷4+100÷2+1=201t
[0023] The pulling force F of each upper jack 3 can be obtained 上 and the tension F of each lower tension jack 4 下 :
[0024] F 上 =G 上 ÷μ÷4=62.50t
[0025] F 下 =G 下 ÷μ÷4=62.81t
[0026] After the jack load is determined, the lower hoop 2 and four lower tension jacks 4 are installed first. At this time, each lower jack 4 applies a tension of 62.81t, so that the lower hoop 2 holds the lower part 6 of the pier; then the upper hoop 1 and four upper tension jacks 3 are installed. At this time, each upper jack 3 applies a tension of 62.50t, so that the upper hoop 1 holds the upper part 7 of the pier; then four vertical jacks 5 are installed. After the device is installed, the pier needs to be cut off at the pier extension 8 by using a crushing machine and a cutting machine. Each vertical jack 5 is lifted upward by 1m, and then steel bars are arranged at the pier extension 8 and concrete is poured. After the concrete strength reaches the design requirements, the device of the utility model can be dismantled. If the stroke of the vertical jack 5 is less than 1 m, arrange steel bars and pour concrete at the pier joint 8 after the stroke reaches the end. After the concrete strength reaches the design requirement, insert a steel plate at the pier joint 8, and then install the lower hoop 2 on the newly poured concrete to achieve continued jacking.
Claims
1. A rapid lifting device for pier extension, comprising an upper hoop, a lower hoop, an upper tension jack, a lower tension jack, and a vertical jack, characterized in that: The upper hoop and the lower hoop are respectively placed on the piers. The upper hoop fixes the upper part of the pier through the upper tension jack, and the lower hoop fixes the lower part of the pier through the lower tension jack. The vertical jack is installed between the upper hoop and the lower hoop.
2. A rapid lifting device for pier extension according to claim 1, characterized in that: The upper clamp and the lower clamp are respectively composed of 4-8 right-angle arc-bent steel plates, each of which is placed on the upper part of the pier or at the corner of the lower part of the pier. Each right-angle arc-bent steel plate corresponds to an upper tension jack or a lower tension jack. One end of each upper tension jack is installed on a right-angle arc-bent steel plate, and the other end is connected to an adjacent right-angle arc-bent steel plate; one end of each lower tension jack is installed on a right-angle arc-bent steel plate, and the other end is connected to an adjacent right-angle arc-bent steel plate.
3. The rapid lifting device for pier extension according to claim 1 is characterized in that: There are 4 to 8 vertical jacks, one vertical jack is installed on each vertical surface of the pier, one end of the vertical jack is connected to the right-angle arc-bent steel plate of the upper clamp, and the other end is connected to the right-angle arc-bent steel plate of the lower clamp.
4. The rapid lifting device for pier extension according to claim 2 is characterized in that: The right-angle arc-bent steel plate is formed by bending the steel plate at 90 degrees, and the inside of the steel plate is roughened.
Citation Information
Cited By
Square hoop lifting device
CN120945800A