Post-pouring section operating platform and material platform hanging basket

By using winch components and infrared ranging sensors in the rear casting section operation platform and material platform hanging basket, the installation problem of π beam pier beam consolidation of rear casting section templates is solved, and efficient transportation of equipment and materials is achieved. A safe and stable platform is achieved High control improves construction efficiency and safety.

CN221972124UActive Publication Date: 2024-11-08ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420374884.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-08
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The installation of the formwork of the π beam pier beam after consolidation of the cast section without an operating platform makes it difficult to construct, the equipment and materials cannot be transported in one go, the progress is slow, and the cost is high. The height of the operating platform needs to be manually controlled, which poses safety risks.

Method used

Design a rear casting section operation platform and material platform hanging basket, adopts winch components and infrared ranging sensors, lifts the beam lower hanging basket platform through the bridge deck upper winch, and is suspended and fixed by beam surface reinforcement, and the infrared ranging sensor is automatically Control the hoist to stop to ensure the platform is at the right height.

Benefits of technology

It realizes the transfer of equipment materials to the working surface at one time, improves construction efficiency, reduces machinery usage costs, reduces construction costs, and reduces the safety hazards of highly controlled operating platforms.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972124U_ABST
    Figure CN221972124U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building equipment, in particular to a post-pouring section operation platform and material platform hanging basket which comprises a pier beam, and a supporting column is installed at the bottom of the pier beam. An electric signal is generated through the infrared distance measuring sensor according to the distance between the hanging basket shell and the pier beam, so that the controller analyzes according to set parameter values, and when a proper distance is reached, the controller controls the winch to stop running, so that the hanging basket shell stops at a proper position; according to the operation platform and material platform hanging basket for the pier beam consolidation post-pouring section of the pi-shaped beam, a winch on a bridge floor lifts a hanging basket platform under the beam through a steel wire rope, the steel wire rope penetrates through a preformed hole of the pier beam consolidation post-pouring section, and the hanging basket platform under the beam is lifted to a preset position and then is suspended and fixed through a beam surface steel bar. A worker enters and exits the construction operation hanging basket from the side face of the hanging basket to be communicated with a bridge deck crawling ladder, and a wood formwork and corresponding auxiliary material equipment are placed into the hanging basket and lifted to a construction working face at a time along with the hanging basket.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction machinery, in particular to a post-casting section operating platform and material platform hanging basket. Background Art

[0002] The π beam pier beam consolidation post-casting section is a new type of structure, with a total of 107 sections. The beam end pier beam consolidation post-casting section has narrow seams, dense steel bars, and no operating platform for template installation, which makes construction difficult. Conventional construction requires the use of a climbing vehicle to assist in manual installation of the template. Wooden templates and auxiliary materials cannot be transported in place at one time, resulting in low efficiency, high machinery usage fees, slow construction progress, and high construction costs. In order to effectively solve the problem of no operating platform for template installation in the π beam pier beam consolidation post-casting section, and to enable equipment and materials to be transported to the working surface at one time, it is convenient for construction and improves construction efficiency. When the operating platform is rising, the height of the operating platform requires the operator to manually control the stop, so that the height of the operating platform is within an appropriate range. However, this method has certain safety hazards. If the operation is wrong, it will lead to the safety hazard of collision between the platform and the pier beam. Therefore, a post-casting section operating platform and material platform hanging basket is needed to improve the above problems. Utility Model Content

[0003] In order to effectively solve the problem of no operating platform for installation of post-casting section formwork for π-beam pier consolidation, and to enable equipment and materials to be transported to the working surface at one time, thereby facilitating construction and improving construction efficiency, the utility model provides a post-casting section operating platform and material platform hanging basket to solve the above-mentioned problem.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A post-casting stage operation platform and material platform hanging basket, comprising a pier beam, a support column is installed at the bottom of the pier beam, a reserved hole is opened on the outer wall of the pier beam, a winch assembly is installed on one side of the reserved hole and located on the base surface of the pier beam, a connecting rope is slidably connected to the inner wall of the reserved hole, one end of the connecting rope passes through the reserved hole and extends to the outer wall of the reserved hole where the hanging basket assembly is installed;

[0006] The hoist assembly comprises a mounting bracket, the mounting bracket is mounted on the base surface of the pier beam, a hoist is mounted on the outer wall of the mounting bracket, a controller is mounted on one side of the hoist and located on the outer wall of the mounting bracket, and one end of the hoist is connected to a connecting rope;

[0007] The hanging basket assembly comprises a hanging basket shell, which is installed at one end of a connecting rope, an infrared ranging sensor is installed on the outer wall of the hanging basket shell, and a bottom plate is installed on the inner wall of the hanging basket shell.

[0008] As a preferred solution of the utility model, the cross section of the pier beam is a π-shaped structure, and beam surface steel bars are arranged on the inner wall of the pier beam.

[0009] As a preferred solution of the utility model, the hoisting assembly is located directly above the reserved hole, and the mounting bracket is a frame structure.

[0010] As a preferred solution of the present invention, the controller is respectively connected to the winch and the infrared ranging sensor through wires, and the connection method is electrical connection.

[0011] As a preferred solution of the utility model, the support columns are provided in two groups and are respectively located at the bottom of the pier beam, and the reserved holes are provided in multiple groups and are respectively located on the outer wall of the pier beam.

[0012] As a preferred solution of the utility model, the hoisting assembly is provided in two groups and is respectively located on the base surface of the pier beam, and the hanging basket shell is located directly below the reserved hole.

[0013] As a preferred solution of the utility model, the infrared ranging sensors are provided in multiple groups and are respectively located on the outer wall of the hanging basket shell, and the infrared ranging sensors are located directly below the pier beam.

[0014] Compared with the prior art, the utility model arranges a winch assembly in the hanging basket of the pouring section operation platform and material platform, so that the hanging basket of the pouring section operation platform and material platform after the consolidation of the π beam pier is lifted by the winch on the bridge deck through a wire rope, the wire rope is inserted from the reserved hole of the pouring section after the consolidation of the pier and beam, and the hanging basket platform under the beam is suspended and fixed by the steel bars on the beam surface after it is lifted to the predetermined position, and the personnel enter and exit the construction operation hanging basket through the ladder connected to the bridge deck from the side of the hanging basket, and the wooden formwork and corresponding auxiliary materials and equipment are put into the hanging basket and lifted to the construction work surface at one time with the hanging basket, thereby solving the problems that conventional construction needs to use a climbing vehicle to assist in manual installation of the formwork, the wooden formwork and auxiliary materials cannot be transported to the place at one time, the efficiency is low, the machinery usage fee is high, the construction progress is slow, and the construction cost is high.

[0015] The infrared ranging sensor is operated so that the infrared ranging sensor generates an electrical signal according to the distance between the hanging basket shell and the pier beam. The electrical signal generated by the infrared ranging sensor is transmitted to the controller through a wire, so that the controller analyzes it according to the set parameter values. When the appropriate distance is reached, the controller controls the winch to stop running, so that the hanging basket shell stops at a suitable position, thereby solving the problem that when the operating platform is rising, the height of the operating platform needs to be manually controlled by the operator to stop, so that the height of the operating platform is within a suitable range. However, this method has certain safety hazards. If the operation is wrong, it may cause the safety hazard of collision between the platform and the pier beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 It is a side view structural schematic diagram of the utility model;

[0018] Figure 3 This is a schematic diagram of the structure of the utility model when viewed from above;

[0019] Figure 4 This is a schematic diagram of the structure of the hanging basket shell of the utility model;

[0020] Figure 5 It is a schematic diagram of the structure of the winch assembly of the utility model.

[0021] In the figure: 1. pier beam; 2. support column; 3. reserved hole; 4. winch assembly; 401. mounting bracket; 402. winch; 403. controller; 5. connecting rope; 6. hanging basket assembly; 601. hanging basket shell; 602. infrared ranging sensor; 603. bottom plate. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0023] Example: See Figure 1-5 The illustrated embodiment of a post-casting stage operation platform and material platform hanging basket comprises a pier beam 1, a support column 2 is installed at the bottom of the pier beam 1, a reserved hole 3 is opened on the outer wall of the pier beam 1, a winch assembly 4 is installed on one side of the reserved hole 3 and on the base surface of the pier beam 1, a connecting rope 5 is slidably connected to the inner wall of the reserved hole 3, one end of the connecting rope 5 passes through the reserved hole 3 and extends to the outer wall of the reserved hole 3, where a hanging basket assembly 6 is installed;

[0024] In this embodiment, specific reference Figure 1 , Figure 2 and Figure 5 The hoisting assembly 4 includes a mounting bracket 401, which is mounted on the base surface of the pier beam 1. The mounting bracket 401 is a frame structure. A hoisting machine 402 is mounted on the outer wall of the mounting bracket 401. A controller 403 is mounted on one side of the hoisting machine 402 and on the outer wall of the mounting bracket 401. One end of the hoisting machine 402 is connected to a connecting rope 5.

[0025] In this embodiment, specific reference Figure 3 and Figure 4The hanging basket assembly 6 includes a hanging basket shell 601, which is installed at one end of the connecting rope 5. The hanging basket shell 601 is located directly below the reserved hole 3. An infrared ranging sensor 602 is installed on the outer wall of the hanging basket shell 601. The infrared ranging sensor 602 is provided in multiple groups and is respectively located on the outer wall of the hanging basket shell 601. The infrared ranging sensor 602 is located directly below the pier beam 1, and a bottom plate 603 is installed on the inner wall of the hanging basket shell 601.

[0026] Among them, the cross-section of the pier beam 1 is a π-shaped structure, beam surface steel bars are arranged on the inner wall of the pier beam 1, the winch assembly 4 is located directly above the reserved hole 3, and the controller 403 is respectively connected to the winch 402 and the infrared ranging sensor 602 through wires and the connection method is electrical connection, so that the device is powered on, two groups of support columns 2 are arranged and are respectively located at the bottom of the pier beam 1, multiple groups of reserved holes 3 are arranged and are respectively located on the outer wall of the pier beam 1, and two groups of winch assemblies 4 are arranged and are respectively located on the base surface of the pier beam 1, which is convenient for stably lifting the hanging basket shell 601 and has better practicality.

[0027] When the hanging basket of the post-casting stage operation platform and material platform of this scheme is working, a reserved hole 3 is opened on the outer wall of the pier beam 1, a winch assembly 4 is installed on one side of the reserved hole 3 and on the base surface of the pier beam 1, a connecting rope 5 is slidably connected to the inner wall of the reserved hole 3, one end of the connecting rope 5 passes through the reserved hole 3 and extends to the hanging basket assembly 6 installed on the outer wall of the reserved hole 3, and only the switch of the controller 403 is turned on, so that the controller 403 controls the winch 402 to drive the connecting rope 5 to move, so that the connecting rope 5 pulls the hanging basket Component 6 moves upward, and under the action of the beam surface steel bars arranged on the inner wall of the pier beam 1, when the hanging basket platform under the beam is raised to the predetermined position, it is suspended and fixed by the beam surface steel bars, and personnel enter and exit the construction operation hanging basket through the bridge deck ladder connected to the side of the hanging basket. The wooden formwork and corresponding auxiliary materials and equipment are placed in the hanging basket and lifted to the construction work surface at one time with the hanging basket, thus solving the problem that conventional construction requires the use of aerial platforms to assist in the manual installation of formwork, the wooden formwork and auxiliary materials cannot be transported to the site at one time, the efficiency is low, the machinery usage fee is high, the construction progress is slow, and the construction cost is high.

[0028] The basket housing 601 is installed at one end of the connecting rope 5, an infrared ranging sensor 602 is installed on the outer wall of the basket housing 601, a bottom plate 603 is installed on the inner wall of the basket housing 601, and multiple groups of infrared ranging sensors 602 are respectively located on the outer wall of the basket housing 601. The infrared ranging sensor 602 is located directly below the pier beam 1. When the winch 402 drives the basket housing 601 to move up through the connecting rope 5, the infrared ranging sensor 602 on the outer wall of the basket housing 601 is operated, so that the infrared ranging sensor 602 is based on the basket housing 601 and the pier beam. 1, the infrared ranging sensor 602 generates an electrical signal, and the infrared ranging sensor 602 generates an electrical signal which is transmitted to the controller 403 through a wire, so that the controller 403 performs analysis according to the set parameter values. When the appropriate distance is reached, the controller 403 controls the winch 402 to stop running, so that the hanging basket shell 601 stops at a suitable position, thereby solving the problem that when the operating platform is rising, the height of the operating platform needs to be manually controlled by the operator to stop, so that the height of the operating platform is within a suitable range. However, this method has certain safety hazards. If the operation is wrong, it may cause the safety hazard of collision between the platform and the pier beam.

[0029] The basket of the operation platform and material platform of the post-casting section of the π-beam pier consolidation is lifted by the winch 402 on the bridge deck through the wire rope. The wire rope is inserted from the reserved hole 3 of the post-casting section of the pier and beam consolidation. After the basket platform under the beam is lifted to the predetermined position, it is suspended and fixed by the steel bars on the beam surface. The personnel enter and exit the construction operation basket through the ladder connected to the bridge deck from the side of the basket. The wooden formwork and corresponding auxiliary materials and equipment are placed in the basket and lifted to the construction work surface at one time with the basket.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A post-casting stage operation platform and material platform hanging basket, comprising a pier beam (1), Features: A support column (2) is installed at the bottom of the pier beam (1), a reserved hole (3) is opened on the outer wall of the pier beam (1), a winch assembly (4) is installed on one side of the reserved hole (3) and on the base surface of the pier beam (1), a connecting rope (5) is slidably connected to the inner wall of the reserved hole (3), one end of the connecting rope (5) passes through the reserved hole (3) and extends to the outer wall of the reserved hole (3) where a hanging basket assembly (6) is installed; The hoisting assembly (4) comprises a mounting bracket (401), the mounting bracket (401) being mounted on a base surface of the pier beam (1), a hoisting machine (402) being mounted on an outer wall of the mounting bracket (401), a controller (403) being mounted on one side of the hoisting machine (402) and located on the outer wall of the mounting bracket (401), and a connecting rope (5) being connected to one end of the hoisting machine (402); The hanging basket assembly (6) comprises a hanging basket shell (601), the hanging basket shell (601) being mounted on one end of a connecting rope (5), an infrared ranging sensor (602) being mounted on an outer wall of the hanging basket shell (601), and a bottom plate (603) being mounted on an inner wall of the hanging basket shell (601).

2. A post-casting section operation platform and material platform hanging basket according to claim 1, Features: The cross section of the pier beam (1) is a π-shaped structure, and beam surface steel bars are arranged on the inner wall of the pier beam (1).

3. The post-casting section operation platform and material platform hanging basket according to claim 1, Features: The hoisting assembly (4) is located directly above the reserved hole (3), and the mounting bracket (401) is a frame structure.

4. The post-casting section operation platform and material platform hanging basket according to claim 1, Features: The controller (403) is respectively connected to the hoist (402) and the infrared distance measuring sensor (602) via wires, and the connection method is electrical connection.

5. The post-casting section operation platform and material platform hanging basket according to claim 1, Features: The support columns (2) are provided in two groups and are respectively located at the bottom of the pier beam (1); the reserved holes (3) are provided in multiple groups and are respectively located on the outer wall of the pier beam (1).

6. The post-casting section operation platform and material platform hanging basket according to claim 1, Features: The hoisting assembly (4) is provided in two groups and is respectively located on the base surface of the pier beam (1), and the hanging basket shell (601) is located directly below the reserved hole (3).

7. The post-casting section operation platform and material platform hanging basket according to claim 1, Features: The infrared distance measuring sensors (602) are provided in multiple groups and are respectively located on the outer wall of the hanging basket shell (601); the infrared distance measuring sensors (602) are located directly below the pier beam (1).