Water and soil conservation ecological brick
By designing structures such as card blocks, card slots, fixed blocks and leaking tanks on ecological bricks, the problems of laying difficulties and falling off are solved, and a more stable and beautiful ecological brick installation is achieved, reducing the labor intensity and risk of falling for staff members .
Patent Information
- Application Number
- CN202322998451.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-07
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-11-07
AI Technical Summary
The existing ecological bricks are difficult and easy to fall off during laying, and cannot be effectively fixed, which increases the labor intensity and probability of falling off of staff.
The side walls of the ecological brick body are designed to be equipped with card blocks and slots, and fixed blocks and slots are installed on the bottom. The installation is sliding into and installed through the matching of card blocks and slots, fixed blocks and slots, which reduces the difficulty of laying and increases the difficulty of laying. Fixing is provided, while leaking grooves and anti-slip bumps are provided on the side walls to reduce the risk of rainwater accumulation and fall.
The laying process of ecological bricks is simplified, the probability of falling off is reduced, the risk of rainwater accumulation and fall is reduced, and the stability and aesthetics of the device are improved.
Smart Images

Figure CN221972247U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ecological bricks, in particular to a soil and water conservation ecological brick. Background Art
[0002] Ecological bricks are a type of brick used in slope control projects and ditch control projects. They have the functions of reinforcing river slopes, preventing soil erosion and increasing vegetation coverage. As people pay more attention to environmental protection, the application of ecological bricks is currently increasing.
[0003] Regarding the above-mentioned related technologies, the inventors believe that the following defects exist: during the laying process of existing ecological bricks, workers need to align them manually, which makes the laying more difficult, and since the ecological bricks cannot be fixed to each other, the probability of the ecological bricks falling off is increased. Utility Model Content
[0004] In order to solve the above problems, the utility model provides a soil and water conservation ecological brick.
[0005] The above technical purpose of the utility model is achieved through the following technical solutions: a soil and water conservation ecological brick, including an ecological brick body, two card blocks are symmetrically arranged on the side wall of the ecological brick body, two card slots are symmetrically opened on the side wall of the ecological brick body away from the card blocks, the card blocks and the card slots match each other, a fixed block is fixedly arranged on the upper surface of the ecological brick body, a fixed groove is opened on the bottom surface of the ecological brick body, and the fixed block and the fixed groove match each other.
[0006] By adopting the above technical solution, when the staff needs to lay the eco-brick body, the staff needs to align the card block and the fixing block with the card slot and the fixing slot respectively. Then, the card block and the fixing block are slid into the card slot and the fixing slot respectively. In this process, the staff only needs to slide the card block and the fixing block into the card slot and the fixing slot respectively to complete the installation, thereby reducing the difficulty of the staff's work, and the card block and the card slot connect the two adjacent eco-brick bodies to each other, thereby reducing the probability of the eco-brick body falling off.
[0007] Furthermore, a drainage groove is provided through the side wall of the ecological brick body, and an arc groove is provided on the inner wall of the drainage groove.
[0008] By adopting the above technical solution, when it rains, rainwater enters the ground along the gutter, thereby reducing the probability of rainwater accumulating on the surface of the eco-brick body. In this process, the arc groove reduces the probability of the gutter causing harm to pedestrians.
[0009] Furthermore, a plurality of anti-slip protrusions are fixedly arranged on the side walls of the eco-brick body.
[0010] By adopting the above technical solution, the anti-slip protrusions reduce the probability of pedestrians falling when walking on the eco-brick body, thereby reducing the probability of pedestrians being injured.
[0011] Furthermore, the cross section of the block is trapezoidal.
[0012] By adopting the above technical solution, the trapezoidal cross-section of the block further reduces the probability of two adjacent eco-brick bodies being separated from each other, thereby improving the stability of the device.
[0013] Furthermore, the side walls of the ecological brick body are painted with pigment.
[0014] By adopting the above technical solution, the side walls of the eco-brick body are painted with pigments, which improves the aesthetics of the eco-brick body and thus improves the overall aesthetics of the city.
[0015] Furthermore, the anti-slip protrusion has a rounded corner at one end away from the eco-brick body.
[0016] By adopting the above technical solution, the end of the anti-skid protrusion away from the eco-brick body is provided with a rounded corner, which reduces the probability of the anti-skid protrusion causing harm to pedestrians when pedestrians fall, and reduces the probability of pedestrians being injured.
[0017] Furthermore, the anti-slip protrusions are provided in plurality and are cross-arranged on the side walls of the eco-brick body.
[0018] By adopting the above technical solution, a plurality of anti-slip protrusions are provided and cross-arranged on the side wall of the eco-brick body, which further reduces the probability of pedestrians falling, thereby reducing the probability of pedestrians being injured.
[0019] Furthermore, the four corners of the eco-brick body are all provided with arc corners.
[0020] By adopting the above technical solution, the arc angle reduces the probability of the eco-brick body causing harm to pedestrians, thereby reducing the probability of pedestrians being injured.
[0021] In summary, the utility model has the following beneficial effects:
[0022] 1. In this application, when the staff needs to lay the eco-brick body, the staff needs to align the card block and the fixing block with the card slot and the fixing slot respectively. Then, slide the card block and the fixing block into the card slot and the fixing slot respectively. During this process, the staff only needs to slide the card block and the fixing block into the card slot and the fixing slot respectively to complete the installation, thereby reducing the staff's work difficulty, and the card block and the card slot connect the two adjacent eco-brick bodies to each other, thereby reducing the probability of the eco-brick body falling off;
[0023] 2. In this application, when it rains, rainwater flows into the ground along the drainage groove, thereby reducing the probability of rainwater accumulating on the surface of the eco-brick body. In this process, the arc groove reduces the probability of the drainage groove causing harm to pedestrians;
[0024] 3. In the present application, the anti-slip bumps reduce the probability of pedestrians falling when walking on the eco-brick body, thereby reducing the probability of pedestrians being injured. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model;
[0026] Figure 2 This is a schematic diagram of the structure of the eco-brick body in the embodiment of the utility model;
[0027] Figure 3 This utility model embodiment Figure 2 Schematic diagram of the structure of A.
[0028] In the figure: 1. Eco-brick body; 2. Block; 3. Slot; 4. Fixing block; 5. Fixing slot; 6. Leakage slot; 61. Arc groove; 7. Anti-slip convex point; 8. Rounded corner; 9. Arc corner. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.
[0030] like Figure 1-3 As shown, the embodiment of the present application discloses a soil and water conservation ecological brick, including an ecological brick body 1, a clamping block 2, a fixing block 4 and an anti-slip convex point 7. The ecological brick body 1 is a rectangular parallelepiped structure, and the bottom surface of the ecological brick body 1 is provided with a fixing groove 5. The clamping block 2 is provided with two and symmetrically arranged on the side wall of the ecological brick body 1, and the side wall of the ecological brick body 1 away from the clamping block 2 is symmetrically provided with two clamping grooves 3, and the clamping block 2 and the clamping groove 3 match each other. The fixing block 4 is a rectangular block structure, and the fixing block 4 and the fixing groove 5 match each other.
[0031] When the staff needs to lay the eco-brick body 1, the staff needs to align the clamping block 2 and the fixing block 4 with the clamping slot 3 and the fixing slot 5 respectively. Then, the clamping block 2 and the fixing block 4 are slid into the clamping slot 3 and the fixing slot 5 respectively. In this process, the staff only needs to slide the clamping block 2 and the fixing block 4 into the clamping slot 3 and the fixing slot 5 respectively to complete the installation, thereby reducing the staff's work difficulty, and the clamping block 2 and the clamping slot 3 connect the two adjacent eco-brick bodies 1 to each other, thereby reducing the probability of the eco-brick body 1 falling off.
[0032] A water leakage groove 6 is formed through the side wall of the ecological brick body 1 , and an arc groove 61 is formed on the inner wall of the water leakage groove 6 .
[0033] When it rains, rainwater flows into the ground along the gutter 6, thereby reducing the probability of rainwater accumulating on the surface of the eco-brick body 1. In this process, the arc groove 61 reduces the probability of the gutter 6 causing harm to pedestrians.
[0034] The anti-skid protrusions 7 are cylindrical structures with their axes horizontal. A plurality of anti-skid protrusions 7 are provided and fixedly arranged on the side walls of the eco-brick body 1 .
[0035] The anti-slip protrusions 7 reduce the probability of pedestrians falling when walking on the eco-brick body 1, thereby reducing the probability of pedestrians being injured.
[0036] In order to improve the stability of the device, the cross section of the block 2 is trapezoidal. The trapezoidal cross section of the block 2 further reduces the probability of two adjacent eco-brick bodies 1 being separated from each other, thereby improving the stability of the device.
[0037] In order to improve the overall aesthetics of the city, the side walls of the eco-brick body 1 are painted with pigments. The side walls of the eco-brick body 1 are painted with pigments to improve the aesthetics of the eco-brick body 1, thereby improving the overall aesthetics of the city.
[0038] In order to reduce the probability of pedestrians being injured, the end of the anti-skid protrusion 7 away from the eco-brick body 1 is provided with a rounded corner 8. The end of the anti-skid protrusion 7 away from the eco-brick body 1 is provided with a rounded corner 8 to reduce the probability of the anti-skid protrusion 7 causing injury to pedestrians when pedestrians fall, thereby reducing the probability of pedestrians being injured.
[0039] In order to reduce the probability of pedestrians being injured, a plurality of anti-skid protrusions 7 are provided and cross-arranged on the side wall of the eco-brick body 1. The plurality of anti-skid protrusions 7 are provided and cross-arranged on the side wall of the eco-brick body 1 to further reduce the probability of pedestrians falling, thereby reducing the probability of pedestrians being injured.
[0040] In order to reduce the probability of pedestrians being injured, the four corners of the eco-brick body 1 are all provided with arc corners 9. The arc corners 9 reduce the probability of the eco-brick body 1 causing harm to pedestrians, thereby reducing the probability of pedestrians being injured.
[0041] The use principle of a soil and water conservation ecological brick in this embodiment is as follows: when the staff needs to lay the ecological brick body 1, the staff needs to align the clamping block 2 and the fixing block 4 with the clamping slot 3 and the fixing slot 5 respectively. Then, the clamping block 2 and the fixing block 4 are slid into the clamping slot 3 and the fixing slot 5 respectively. During this process, the staff only needs to slide the clamping block 2 and the fixing block 4 into the clamping slot 3 and the fixing slot 5 respectively to complete the installation, thereby reducing the difficulty of the staff's work, and the clamping block 2 and the clamping slot 3 connect the two adjacent ecological brick bodies 1 to each other, thereby reducing the probability of the ecological brick body 1 falling off.
[0042] The above is only a preferred embodiment of the present invention. The protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A soil and water conservation ecological brick, comprising an ecological brick body (1), characterized in that: Two clamping blocks (2) are symmetrically arranged on the side wall of the eco-brick body (1); two clamping grooves (3) are symmetrically provided on the side wall of the eco-brick body (1) away from the clamping blocks (2); the clamping blocks (2) and the clamping grooves (3) match each other; a fixing block (4) is fixedly arranged on the upper surface of the eco-brick body (1); a fixing groove (5) is provided on the bottom surface of the eco-brick body (1); the fixing block (4) and the fixing groove (5) match each other; a plurality of anti-slip convex points (7) are fixedly arranged on the side wall of the eco-brick body (1); a rounded corner (8) is provided at one end of the anti-slip convex point (7) away from the eco-brick body (1); a plurality of anti-slip convex points (7) are provided and cross-arranged on the side wall of the eco-brick body (1); and arc corners (9) are provided at the four corners of the eco-brick body (1).
2. The soil and water conservation ecological brick according to claim 1 is characterized in that: A water leakage groove (6) is provided through the side wall of the ecological brick body (1), and an arc groove (61) is provided on the inner wall of the water leakage groove (6).
3. The soil and water conservation ecological brick according to claim 1 is characterized by: The cross section of the clamping block (2) is trapezoidal.
4. The soil and water conservation ecological brick according to claim 1 is characterized in that: The side walls of the ecological brick body (1) are painted with pigment.