Reinforcement cage wrapping plastic sheath for karst cave pile foundation construction

By using steel cages to outsource PVC-U plastic sheaths in cave pile foundation construction, the problem of using a large amount of steel and pollution in the steel casing structure is solved, and the low-cost and high-quality pile foundation pile formation effect is achieved, and environmental pollution is reduced. .

CN221972353UActive Publication Date: 2024-11-08HEBEI ROAD & BRIDGE GROUP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420030425.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-11-08
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

The existing steel cage and steel casing structure use a large amount of steel, which increases the cost of the project. The exposed steel casing is easily eroded by air and water, contaminating groundwater.

Method used

The steel cage is outsourced with PVC-U plastic sheath, including plastic sleeves, steel rings and fixed steel cables. The steel cage is fixed inside the plastic sleeve. The plastic sleeve is low cost, chemical corrosion resistance, high impact strength, and prevents mud from spilling out. and groundwater.

Benefits of technology

It reduces the cost of the project, reduces environmental pollution, improves the quality of pile foundation, extends the service life of the pile, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972353U_ABST
    Figure CN221972353U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of string-bead-shaped karst pile foundation construction, in particular to a reinforcement cage wrapping plastic sheath for karst cave pile foundation construction, which comprises a plastic sleeve, a reinforcement cage and a connecting component. The reinforcement cage is connected with the plastic sleeve through the connecting component and located in the plastic sleeve, and the plastic sleeve is a PVC-U plastic sleeve. The steel reinforcement cage is fixed inside the plastic sleeve through the connecting component, concrete is poured into the plastic sleeve, the plastic sleeve is low in cost, excellent in physical and chemical performance, resistant to chemical corrosion, high in impact strength and small in fluid resistance, the steel reinforcement cage is wrapped with the plastic sleeve so that slurry can be prevented from overflowing, the underground water permeability effect is good, the pile forming quality is high, and pollution to the environment is low. The construction cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of beaded karst pile foundation construction, in particular to a plastic sheath wrapped around a steel cage used for cave pile foundation construction. Background Art

[0002] The beaded karst foundation is a karst body such as two or more layers of caves distributed at different stratum depths in the same plane. The development degree, position, shape and scale of the caves in each layer are different. During the pile foundation construction, a single pile encounters a large number of caves. Therefore, it becomes one of the most difficult karst forms to deal with in pile foundation drilling construction, often causing leakage, drill sticking, hammer falling, drill buried, etc., which can easily lead to quality problems such as concrete loss during grouting and broken piles with mud.

[0003] The existing publication number CN208533515U discloses a steel cage plus steel casing structure, including a steel casing, a steel cage and a welded connector, the steel cage and the steel casing are used to be inserted into a drilled hole; the steel cage includes main bars and spiral hoops, and a plurality of main bars are welded to the spiral hoops in parallel in a vertical direction; the steel casing is in a hollow cylindrical shape, the spiral hoop passes through the center of the steel casing, and the steel casing is fixedly connected to the steel cage through a welded connector; the welded connector is a U-shaped rib, the main bar passes through the U-shaped rib, and the U-shaped rib is welded to the main bar, and the two ends of the U-shaped rib are welded to the inner wall of the steel casing; it effectively prevents the loss and over-pouring of pile body concrete, ensures the quality of pile body pouring, and ensures smooth pouring.

[0004] However, the above-mentioned steel cage plus steel casing structure requires a large amount of steel, which increases the project cost, and the exposed steel casing is easily corroded by air and water to rust, thereby polluting groundwater. Utility Model Content

[0005] The purpose of the utility model is to provide a plastic sheath for a steel cage for use in cave pile foundation construction, which solves the problem that the use of the above-mentioned steel cage plus steel casing structure requires the use of a large amount of steel, increases the project cost, and the exposed steel casing is easily corroded by air and water to produce rust, which will further pollute groundwater.

[0006] To achieve the above-mentioned purpose, the utility model provides a steel cage with a plastic sheath for use in cave pile foundation construction, comprising a plastic sleeve, a steel cage and a connecting member;

[0007] The steel cage is connected to the plastic sleeve through the connecting member and is located inside the plastic sleeve. The plastic sleeve is a PVC-U plastic sleeve.

[0008] Among them, the connecting component includes a steel ring and a fixed steel cable. There are multiple steel rings, and the multiple steel rings are respectively fixedly connected to the plastic sleeve and are respectively located on the inner wall of the plastic sleeve; each steel ring is fixedly connected to the fixed steel cable, and the end of the fixed steel cable away from the steel ring is connected to the steel cage.

[0009] Wherein, the steel cage includes longitudinal bars and stirrups, the number of the longitudinal bars is multiple, and the multiple longitudinal bars are welded to the stirrups in parallel along the vertical direction.

[0010] There is a steel bar protective layer between the steel bar cage and the plastic sleeve, and the steel bar protective layer is at least 5 cm.

[0011] Wherein, the bottom of the plastic casing is at least 0.5 meters below the foundation bearing layer.

[0012] The utility model discloses a steel cage wrapped with a plastic sheath for cave pile foundation construction. The steel cage is fixed inside the plastic sleeve by the connecting member, and concrete is poured into the plastic sleeve. The plastic sleeve has low cost, excellent physical and chemical properties, resistance to chemical corrosion, high impact strength, and low fluid resistance. The steel cage wrapped with the plastic sleeve can prevent mud overflow and groundwater permeability, has high pile quality, low environmental pollution, and saves engineering cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0014] Figure 1 It is a structural schematic diagram of a steel cage wrapped with a plastic sheath for cave pile foundation construction in the first embodiment of the utility model.

[0015] Figure 2 It is a specific embodiment diagram of the first embodiment of the utility model, in which a steel cage is wrapped with a plastic sheath for cave pile foundation construction.

[0016] Figure 3 It is a step diagram of a construction method for wrapping a steel cage with a plastic sheath for cave pile foundation construction according to the second embodiment of the utility model.

[0017] In the figure: 101-plastic sleeve, 102-steel ring, 103-fixing steel cable, 104-longitudinal reinforcement, 105-hoop reinforcement, 106-steel protective layer. DETAILED DESCRIPTION

[0018] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0019] The first embodiment of the present application is:

[0020] See also Figure 1 to Figure 2 ,in, Figure 1 It is a structural schematic diagram of a steel cage wrapped with a plastic sheath for cave pile foundation construction in the first embodiment of the utility model. Figure 2 This is a specific embodiment diagram of a steel cage wrapped with a plastic sheath for karst cave pile foundation construction according to the first embodiment of the utility model. The utility model provides a steel cage wrapped with a plastic sheath for karst cave pile foundation construction: comprising a plastic sleeve 101, a steel cage and a connecting member, the connecting member comprising a steel ring 102 and a fixing steel cable 103, the steel cage comprising longitudinal bars 104 and stirrups 105, and a steel protection layer 106 between the steel cage and the plastic sleeve 101.

[0021] According to this specific embodiment, the steel cage is connected to the plastic sleeve 101 through the connecting member and is located inside the plastic sleeve 101. The plastic sleeve 101 is a PVC-U plastic sleeve 101. The plastic sleeve 101 has threads on the outside and no threads on the inside. It is made of PVC-U plastic material, which has low cost, excellent physical and chemical properties, chemical corrosion resistance, high impact strength, and low fluid resistance. The steel cage wrapped with the plastic sleeve 101 can prevent mud from overflowing and groundwater permeability, and has high pile quality and low environmental pollution.

[0022] There are multiple steel rings 102, which are fixedly connected to the plastic sleeve 101 and located on the inner wall of the plastic sleeve 101. Each steel ring 102 is fixedly connected to a fixing steel cable 103, and one end of the fixing steel cable 103 away from the steel ring 102 is connected to the steel cage. Multiple steel rings 102 are welded to the inner wall of the plastic sleeve 101, and the fixing steel cable 103 is welded and fixed. The fixing steel cable 103 is connected to the steel cage. The steel cage is connected to the fixing steel cable 103 at 3 locations in the longitudinal section and 5 locations in the cross section, and is welded to the steel ring 102 on the inner side of the plastic sleeve 101.

[0023] Secondly, there are multiple longitudinal bars 104, and the multiple longitudinal bars 104 are respectively welded to the stirrups 105 in parallel along the vertical direction. The steel cage is formed by welding the multiple longitudinal bars 104 and the stirrups 105.

[0024] Meanwhile, there is a steel bar protective layer 106 between the steel bar cage and the plastic sleeve 101, and the steel bar protective layer 106 is at least 5 cm. The steel bar protective layer 106 is used to fill concrete.

[0025] In addition, the bottom of the plastic sleeve 101 is at least 0.5 meters below the foundation bearing layer, thereby ensuring the stability of the plastic sleeve 101 after insertion.

[0026] A steel cage for cave pile foundation construction is wrapped with a plastic sheath by using the present embodiment. After a plurality of longitudinal bars 104 and stirrups 105 are welded to form the steel cage, the steel cage is fixed inside the plastic sleeve 101 and located at the center of the plastic sleeve 101 by welding. Concrete is poured into the plastic sleeve 101. The use of the plastic sleeve 101 can avoid over-grouting during grouting and can make groundwater permeable, thereby reducing groundwater pollution. In addition, it can also prevent concrete from being directly washed and dissolved by water, thereby extending the service life of the pile. The plastic sleeve 101 is light in weight, low in cost, good in corrosion resistance, and simple in construction process, which can effectively improve the quality of the pile and reduce the project cost.

[0027] The second embodiment of the present application is:

[0028] Based on the first embodiment, please refer to Figure 3 ,in, Figure 3 This is a step diagram of a construction method for wrapping a steel cage with a plastic sheath for karst cave pile foundation construction in accordance with the second embodiment of the utility model. The construction method for wrapping a steel cage with a plastic sheath for karst cave pile foundation construction in this embodiment comprises the following steps:

[0029] S201: Check the materials and equipment required for construction to ensure they can be used normally.

[0030] Specifically, first check the equipment and facilities needed for construction to ensure that they can be used normally.

[0031] S202: Determine the center point of the drilling hole.

[0032] Specifically, the center point of the borehole is determined by adopting the method of joint measurement and repeated measurement.

[0033] S203: Punch a hole at the center point using a drilling device, clean the hole, and measure the inclination of the hole and the change in groundwater level.

[0034] Specifically, a drilling device is used to punch holes at the located points, the inclination of the holes and the changes in groundwater levels are monitored, and the inside of the holes is cleaned; at the same time, the holes and the hole protection arms are filled with mud and stone, and the steel casing is lowered.

[0035] S204: Weld the steel cage to the steel ring 102 fixed inside the plastic sleeve 101 with a fixing steel cable 103 .

[0036] Specifically, the steel cage is welded to the steel ring 102 on the inner side of the plastic sleeve 101 by the fixing steel cable 103 , and it is ensured that the steel cage is at least 5 cm away from the plastic sleeve 101 .

[0037] S205: The plastic sleeve 101 on which the steel cage has been installed is hoisted by a hoisting device and lowered into the hole.

[0038] Specifically, the plastic sleeve 101 installed on the steel cage is first hoisted by a hoisting device to ensure a firm connection and reduce accidents, and then lowered into the hole to ensure that the plastic sleeve 101 is at least 0.5m below the bearing layer, and measure whether the steel plastic sleeve is installed flat and the water level changes in the hole.

[0039] S206: injecting concrete into the plastic sleeve 101 .

[0040] Specifically, concrete is injected into the plastic sleeve 101, with a grouting speed of 5-10 L / min, a grouting pressure of 0.1-0.5 MPa, and a concrete workability slump of 180-220 mm. During the pouring process, the height of the pouring surface is always observed to avoid under-pulling or over-pulling, and the steel casing is lifted while pouring concrete. During the lifting process, the bottom of the steel casing should always be kept at least 2 m below the concrete surface, and the above operation is repeated until the design elevation is met.

[0041] The use of the plastic sleeve 101 can avoid over-grouting during grouting and improve groundwater permeability, thereby reducing groundwater pollution. In addition, it can prevent concrete from being directly washed and dissolved by water, thereby extending the service life of the pile. The plastic sleeve 101 is light in weight, low in cost, good in corrosion resistance, and has a simple construction process, which can effectively improve the quality of the pile and reduce the project cost.

[0042] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.

Claims

1. The steel cage used for cave pile foundation construction is covered with plastic sheath. It is characterized in that It includes plastic casing, steel cage and connecting components; The steel cage is connected to the plastic sleeve through the connecting member and is located inside the plastic sleeve, and the plastic sleeve is a PVC-U plastic sleeve; The connecting component includes a steel ring and a fixed steel cable. There are multiple steel rings, which are respectively fixedly connected to the plastic sleeve and respectively located on the inner wall of the plastic sleeve. Each steel ring is fixedly connected to the fixed steel cable, and one end of the fixed steel cable away from the steel ring is connected to the steel cage.

2. The steel cage for cave pile foundation construction as claimed in claim 1 is wrapped with a plastic sheath, It is characterized in that The steel cage comprises longitudinal bars and stirrups. The number of the longitudinal bars is multiple, and the multiple longitudinal bars are respectively welded to the stirrups in parallel along the vertical direction.

3. The steel cage for cave pile foundation construction as claimed in claim 1 is wrapped with a plastic sheath, It is characterized in that A steel bar protective layer is provided between the steel bar cage and the plastic sleeve, and the steel bar protective layer is at least 5 centimeters.

4. The steel cage for cave pile foundation construction as claimed in claim 1 is wrapped with a plastic sheath, It is characterized in that The bottom of the plastic sleeve is at least 0.5 meters below the foundation bearing layer.

Citation Information

Cited By

  • Reinforcement cage wrapping plastic sheath for karst cave pile foundation construction and construction method

    CN117587806A