Geological surveying and mapping balancing device

By adopting the worm and turbine meshing design in the geological mapper, the four screws rotate simultaneously and automatically adjust the angle of the support plate, the error problem caused by the adjustment of multiple telescopic rods in the prior art is solved, and the stability of the device is improved and positioning efficiency.

CN221974787UActive Publication Date: 2024-11-08JIANGXI DIXING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420560687.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-11-08
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

When adjusting the height of existing geological mappers, the adjustment of multiple telescopic rods will cause errors, affecting the stable performance of the device.

Method used

Using a design including a mapping instrument body, a fixed plate, a support frame, a screw, a worm and an elastic rotating assembly, through the meshing of the worm and the second turbine, the four screws are rotated simultaneously, the moving plate moves outward, and the support plate is deployed at the same angle. Automatically adjust the stability of the support frame.

Benefits of technology

It improves the positioning efficiency and stability of the device, reduces the need for manual adjustment, and ensures the height adjustment accuracy of the mapper.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221974787U_ABST
    Figure CN221974787U_ABST
Patent Text Reader

Abstract

The utility model discloses a geological surveying and mapping balancing device which comprises a surveying and mapping instrument body, a fixing plate is fixedly installed at the bottom end of the surveying and mapping instrument body, a supporting frame is fixedly installed at the bottom end of the fixing plate, a supporting column is fixedly connected between the supporting frame and the fixing plate, and screw rods are rotationally connected to the inner walls of the periphery of the supporting frame. Wherein a worm is fixedly installed between two of the screw rods, a second turbine is fixedly connected between the other two screw rods, the second turbine and the worm are meshed with each other, moving plates are installed on the four screw rods in a threaded mode, and jacking columns are fixedly installed on the side walls of the four moving plates. Four elastic rotating assemblies are arranged at the bottom end of the supporting frame. The four movable plates move outwards at the same time, the supporting plates are jacked up by the jacking columns on the side walls of the four movable plates, the unfolding angles of the four supporting plates can be the same, manual adjustment is not needed, the positioning efficiency of the device is improved, and the stability of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of geological surveying and mapping, in particular to a geological surveying and mapping balancing device. Background Art

[0002] Geological surveying refers to the use of certain techniques and tools to survey the land, analyze and summarize the survey results, and then apply this series of analysis results to the appropriate field. It is generally used for geological research, surveying the mineral content of related geology, etc., and the survey results are recorded in the form of documents.

[0003] Geological mapping instruments are generally used in geological mapping. Geological mapping instruments can accurately measure geological elements, whether it is topography, underground rock formations or structures, geological mapping instruments can obtain accurate measurement data through their specific working principles and technical means. These data are of great significance for understanding geological structures and judging geological activities. Secondly, geological mapping instruments can provide comprehensive geological information. Through the coordinated use of different instruments, various information including topography, landforms, underground rock formation distribution, rock properties, etc. can be obtained. This information has important reference value for geological research, mineral resource exploration and engineering construction.

[0004] Patent document CN214008732U discloses a balancing and stabilizing device for a geological surveying instrument, which belongs to the technical field of surveying and mapping devices. A balancing and stabilizing device for a geological surveying instrument comprises a surveying instrument and a support seat, wherein a plurality of main rods are hinged at the lower end of the support seat, a deep hole is provided on the lower side wall of the main rod, the main rod is slidably connected with a telescopic rod in the deep hole, a supporting mechanism is installed at the lower end of the telescopic rod, a slide groove is provided in the deep hole of the main rod, a limit block fixedly connected with the telescopic rod is provided in the slide groove, two first through holes connected with the deep holes are provided on the side wall of the main rod at the lower side of the slide groove, a clamping block is slidably connected with the main rod in the two first through holes, a group of first fixing blocks are fixedly connected with the main rod at the openings of the two first through holes, an eccentric wheel matching with the clamping block is hinged in the two groups of first fixing blocks, which can effectively improve the locking stability of the telescopic rod, improve the measuring accuracy of the surveying instrument, and save the time and energy of the users at the same time.

[0005] When the above-mentioned geological mapper is in use, it is necessary to adjust the height of the geological mapper according to the surveying requirements. It is necessary to adjust the multiple telescopic rods under the balancing and stabilizing device to fixed angles respectively, and then the corresponding height of the geological mapper can be controlled. However, adjusting the multiple telescopic rods separately will cause errors, making the angles between each main rod and the support seat different, which will affect the overall stability performance of the device. Utility Model Content

[0006] The purpose of the utility model is to provide a geological surveying and mapping balancing device to solve the above-mentioned deficiencies in the prior art.

[0007] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a geological surveying and mapping balancing device, including a surveying and mapping instrument body, a fixed plate is fixedly installed on the bottom end of the surveying and mapping instrument body, a support frame is fixedly installed on the bottom end of the fixed plate, a support column is fixedly connected between the support frame and the fixed plate, screws are rotatably connected to the inner walls of the support frame, a worm is fixedly installed between two of the screws, a second turbine is fixedly connected between the other two screws, the second turbine and the worm are meshed with each other, a movable plate is threadedly installed on the four screws, top columns are fixedly installed on the side walls of the four movable plates, four elastic rotating components are arranged at the bottom end of the support frame, the bottom end of the support frame is rotatably connected to four support plates through the elastic rotating components, and the four support plates are arranged on one side of the top column.

[0008] As a further description of the above technical solution: the bottom end of the support plate is fixedly connected to two connecting plates, a first rotating shaft is rotatably connected between the two connecting plates, a fixed block is fixedly installed on the first rotating shaft, a support nail is fixedly installed on the bottom end of the fixed block, and a fixing bolt is threadedly connected to the side wall of one of the connecting plates, and the fixing bolt passes through the side wall of the connecting plate and is pressed on the side wall of the fixed block.

[0009] As a further description of the above technical solution: two vertical plates are fixedly installed on the top of the support frame, and a rotating rod is rotatably connected between the two vertical plates. A motor is fixedly installed on the side wall of one of the vertical plates, and the output end of the motor is transmission-connected to the rotating rod. A first turbine is fixedly installed on the side wall of the rotating rod, and the first turbine is meshed with the worm gear.

[0010] As a further description of the above technical solution: one end of the four top columns is rollingly mounted with a ball.

[0011] As a further description of the above technical solution: the top ends of the four movable plates are fixedly installed with limiting columns, and the four limiting columns are slidably connected to the bottom ends of the fixed plates.

[0012] As a further description of the above technical solution: the elastic rotation assembly includes a second rotating shaft, the second rotating shaft is rotatably connected to the support frame, the support plate is fixedly connected to the second rotating shaft, sleeves are provided at both ends of the second rotating shaft, the sleeves are fixedly connected to the support frame, a torsion spring is provided inside the sleeve, one end of the torsion spring is fixedly connected to the second rotating shaft, and the other end of the torsion spring is fixedly connected to the inner wall of the sleeve.

[0013] The utility model provides a geological surveying and mapping balancing device. It has the following beneficial effects: when the surveying instrument body needs to be placed on the ground, that is, when the balancing device needs to be activated, the worm is rotated, and the worm drives the second turbine to rotate, so that four screws rotate simultaneously, and under the sliding action between the limit column and the fixed plate, the four movable plates move outward at the same time, and the top columns on the side walls of the four movable plates lift the support plates, so that the four support plates can be unfolded at the same angle without manual adjustment, thereby increasing the positioning efficiency of the device and improving the stability of the device.

[0014] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.

[0015] This application document provides an overview of various implementations or examples of the technology described in the present disclosure, and is not a comprehensive disclosure of the entire scope or all features of the disclosed technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the overall three-dimensional structure of a geological surveying and mapping balancing device proposed by the utility model;

[0017] Figure 2 It is a schematic diagram of the three-dimensional structure of the support plate of the utility model after unfolding;

[0018] Figure 3 It is a schematic diagram of the three-dimensional structure inside the support frame of the utility model;

[0019] Figure 4 It is a three-dimensional structural schematic diagram of the screw, worm and turbine of the utility model;

[0020] Figure 5 It is a schematic diagram of the three-dimensional exploded structure of the elastic rotating component of the utility model.

[0021] Legend:

[0022] 1. Surveying instrument body; 2. Fixing plate; 3. Support column; 4. Support frame; 5. Support plate; 6. Connecting plate; 7. First rotating shaft; 8. Fixing block; 9. Fixing bolt; 10. Support nail; 11. Vertical plate; 12. Motor; 13. Rotating rod; 14. First turbine; 15. Limiting column; 16. Screw; 17. Moving plate; 18. Worm; 19. Second turbine; 20. Top column; 21. Ball; 22. Sleeve; 23. Second rotating shaft; 24. Torsion spring. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0024] Reference Figure 1-5 A geological surveying and mapping balancing device comprises a surveying instrument body 1, a fixed plate 2 is fixedly installed at the bottom end of the surveying instrument body 1, a support frame 4 is fixedly installed at the bottom end of the fixed plate 2, a support column 3 is fixedly connected between the support frame 4 and the fixed plate 2, and screws 16 are rotatably connected to the inner walls of the four sides of the support frame 4, wherein a worm 18 is fixedly installed between two of the screws 16, and a second turbine 19 is fixedly connected between the other two screws 16, and the second turbine 19 and the worm 18 are meshed with each other, and a moving plate 17 is threadedly installed on the four screws 16, and a top column 20 is fixedly installed on the side walls of the four moving plates 17, and four An elastic rotating component, the bottom end of the support frame 4 is rotatably connected to four support plates 5 through an elastic rotating component, and the four support plates 5 are arranged on one side of the top column 20; when the surveying instrument body 1 needs to be placed on the ground, that is, when the balancing device needs to be activated, the worm 18 is rotated, and the worm 18 drives the second turbine 19 to rotate, so that the four screws 16 rotate at the same time, and under the sliding action between the limit column 15 and the fixed plate 2, the four movable plates 17 move outward at the same time, and the top columns 20 on the side walls of the four movable plates 17 lift up the support plates 5, so that the four support plates 5 can be unfolded at the same angle without manual adjustment, thereby increasing the positioning efficiency of the device and improving the stability of the device.

[0025] As a preferred technical solution of this embodiment, two connecting plates 6 are fixedly connected to the bottom end of the support plate 5, and a first rotating shaft 7 is rotatably connected between the two connecting plates 6. A fixing block 8 is fixedly installed on the first rotating shaft 7, and a supporting nail 10 is fixedly installed on the bottom end of the fixing block 8. A fixing bolt 9 is threadedly connected to the side wall of one of the connecting plates 6, and the fixing bolt 9 passes through the side wall of the connecting plate 6 and is pressed on the side wall of the fixing block 8; by rotating the first rotating shaft 7, the supporting nail 10 can be adjusted to an angle that is always perpendicular to the ground, and then the fixing block 8 can be fixed by the fixing bolt 9 to achieve the fixation of the supporting nail 10.

[0026] As a preferred technical solution of this embodiment, two vertical plates 11 are fixedly installed on the top of the support frame 4, and a rotating rod 13 is rotatably connected between the two vertical plates 11. A motor 12 is fixedly installed on the side wall of one of the vertical plates 11, and the output end of the motor 12 is transmission-connected to the rotating rod 13. A first turbine 14 is fixedly installed on the side wall of the rotating rod 13, and the first turbine 14 is meshed with the worm 18. When the motor 12 rotates, the motor 12 drives the rotating rod 13 to rotate, and the first turbine 14 on the rotating rod 13 rotates, and the first turbine 14 drives the worm 18 to rotate, thereby realizing the rotation of the worm 18.

[0027] As a preferred technical solution of this embodiment, one end of the four top columns 20 is rollingly mounted with a ball 21; the arrangement of the ball 21 can reduce the friction between the top column 20 and the support plate 5, making the process of the top column 20 lifting the support plate 5 smoother.

[0028] As the preferred technical solution of this embodiment, the top ends of the four movable plates 17 are fixedly installed with limiting columns 15, and the four limiting columns 15 are slidably connected to the bottom ends of the fixed plates 2; the setting of the limiting columns 15 can realize the limiting effect of the movable plates 17, preventing the movable plates 17 from rotating with the rotation of the screw rod 16.

[0029] As a preferred technical solution of this embodiment, the elastic rotation assembly includes a second rotating shaft 23, the second rotating shaft 23 is rotatably connected to the support frame 4, the support plate 5 is fixedly connected to the second rotating shaft 23, sleeves 22 are provided at both ends of the second rotating shaft 23, the sleeve 22 is fixedly connected to the support frame 4, a torsion spring 24 is provided inside the sleeve 22, one end of the torsion spring 24 is fixedly connected to the second rotating shaft 23, and the other end of the torsion spring 24 is fixedly connected to the inner wall of the sleeve 22; under the action of the torsion spring 24, the support plate 5 can be tightly attached to one end of the top column 20, so that the support plate 5 is more stable, and the stability performance of the support plate 5 can be increased.

[0030] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A geological surveying and mapping balancing device, comprising a surveying and mapping instrument body (1), characterized in that: A fixing plate (2) is fixedly mounted on the bottom end of the surveying instrument body (1), a supporting frame (4) is fixedly mounted on the bottom end of the fixing plate (2), a supporting column (3) is fixedly connected between the supporting frame (4) and the fixing plate (2), screw rods (16) are rotatably connected to the inner walls of the supporting frame (4), a worm (18) is fixedly mounted between two of the screw rods (16), a second turbine (19) is fixedly connected between the other two of the screw rods (16), the second turbine (19) and the worm (18) are meshed with each other, a moving plate (17) is threadedly mounted on the four screw rods (16), a top column (20) is fixedly mounted on the side walls of the four moving plates (17), four elastic rotating components are arranged at the bottom end of the supporting frame (4), four supporting plates (5) are rotatably connected to the bottom end of the supporting frame (4) through the elastic rotating components, and the four supporting plates (5) are arranged on one side of the top column (20).

2. A geological surveying and mapping balancing device according to claim 1, characterized in that: Two connecting plates (6) are fixedly connected to the bottom end of the support plate (5), a first rotating shaft (7) is rotatably connected between the two connecting plates (6), a fixing block (8) is fixedly mounted on the first rotating shaft (7), a supporting nail (10) is fixedly mounted on the bottom end of the fixing block (8), a fixing bolt (9) is threadedly connected to the side wall of one of the connecting plates (6), and the fixing bolt (9) passes through the side wall of the connecting plate (6) and is pressed against the side wall of the fixing block (8).

3. A geological surveying and mapping balancing device according to claim 1, characterized in that: Two vertical plates (11) are fixedly mounted on the top of the support frame (4); a rotating rod (13) is rotatably connected between the two vertical plates (11); a motor (12) is fixedly mounted on the side wall of one of the vertical plates (11); an output end of the motor (12) is transmission-connected to the rotating rod (13); a first turbine (14) is fixedly mounted on the side wall of the rotating rod (13); and the first turbine (14) is meshed with a worm (18).

4. A geological surveying and mapping balancing device according to claim 1, characterized in that: One end of each of the four top columns (20) is rotatably mounted with a ball (21).

5. A geological surveying and mapping balancing device according to claim 1, characterized in that: Limiting columns (15) are fixedly mounted on the top ends of the four movable plates (17), and the four limiting columns (15) are slidably connected to the bottom ends of the fixed plates (2).

6. A geological surveying and mapping balancing device according to claim 1, characterized in that: The elastic rotating assembly comprises a second rotating shaft (23), the second rotating shaft (23) is rotatably connected to the support frame (4), the support plate (5) is fixedly connected to the second rotating shaft (23), sleeves (22) are arranged at both ends of the second rotating shaft (23), the sleeve (22) is fixedly connected to the support frame (4), a torsion spring (24) is arranged inside the sleeve (22), one end of the torsion spring (24) is fixedly connected to the second rotating shaft (23), and the other end of the torsion spring (24) is fixedly connected to the inner wall of the sleeve (22).