Feeding structure for silo
By setting up spiral tracks and fixed components in the silo, the problem of crushing during the coke feeding process is solved, the stable sliding in coke is achieved, the particle size maintenance and discharge efficiency are improved, and the quality of blast furnace production is ensured.
Patent Information
- Application Number
- CN202420595265.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-26
AI Technical Summary
During the feeding process of existing coke, due to the large height of the silo and the low material surface, the coke is easily impacted by gravity and bilge when it falls vertically, resulting in particle size damage and breaking problems.
Design a feeding structure for silo, including first and second spiral tracks in a spiral shape on the inner side wall, fixedly connected to the boom through a top beam and a mounting section, and the tilt offset angle of the spiral track is 28° to 35°, the cross-section is in a v-shaped or c-shaped shape, which is used to guide the coke to slide in along the spiral track, prevent vertical falls, and increase stability and balance.
Effectively prevent coke from breaking, improve particle size maintenance during feeding, improve coke cutting efficiency and stability, reduce coke damage, and ensure the quality indicators of blast furnace ironmaking production.
Smart Images

Figure CN221987603U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of coke transportation, in particular to a material feeding structure for a silo. Background Art
[0002] Coke is an essential fuel for blast furnace ironmaking. It plays the role of reducing agent, exothermic agent, carburizer and skeleton support in the blast furnace ironmaking process. The quality level of coke plays a decisive role in the economic and technical indicators of blast furnace ironmaking. The particle size index is an important part of the coke quality index and has an important impact on the overall operation status and index improvement of the blast furnace.
[0003] However, the current feeding method is to load the materials directly through the belt discharge port. Since the silo height of most companies is generally more than 30 meters, during the feeding process, especially when the material level in the silo is low, the loaded coke falls vertically to the bottom of the cabin. After the action of gravity acceleration, it is impacted by the bottom of the cabin and the subsequent coke, and the particle size is severely damaged.
[0004] Therefore, a feeding structure for a silo is now needed to solve the problem of coke being broken during the coke feeding process of the tipper silo in the prior art. Utility Model Content
[0005] In view of this, the utility model aims to provide a feeding structure for a silo to solve the problems in the prior art.
[0006] In order to achieve the above object, the technical solution of the utility model is implemented as follows:
[0007] The utility model provides a feeding structure for a silo, comprising a silo with an inner cavity formed therein, a first spiral track and a second spiral track in a spiral shape fixedly arranged on the inner side wall of the silo through a fixing assembly, a top beam fixedly arranged on the top of the silo, a first mounting section fixedly arranged at the top end of the first spiral track, and a second mounting section fixedly arranged at the top end of the second spiral track;
[0008] The first mounting section and the second mounting section are fixedly connected to the top beam through at least three groups of suspension rods respectively. The first spiral track and the second spiral track are spirally shaped and have opposite spiral directions. The first spiral track and the second spiral track are fixedly connected to the inner wall of the silo through multiple fixing components.
[0009] Furthermore, the cross-sections of the first spiral track and the second spiral track are V-shaped or C-shaped.
[0010] Further, the fixing assembly includes a second support rod fixedly connected to the inner side wall of the silo through a second fixing screw, and a mounting support fixedly connected to the top surface of the second support rod through a first fixing screw;
[0011] The first spiral track and the second spiral track are fixedly connected to the top of the mounting support.
[0012] Furthermore, the fixing assembly also includes a first support rod, which is obliquely arranged at the bottom of the second support rod, one end of the first support rod is fixedly connected to the bottom surface of the second support rod, and the other end is fixedly connected to the inner side of the silo through a second fixing screw.
[0013] Furthermore, the feeding structure also includes a hanging assembly, which includes a mounting part and a steel wire. The mounting part is fixedly mounted on one side of the bottom of the first mounting section and the second mounting section, one end of the steel wire is fixedly connected to the top of the mounting part, and the other end is fixedly connected to the top beam.
[0014] Furthermore, the inclination offset angle of the first spiral track and the second spiral track is 28° to 35°.
[0015] Furthermore, the spiral diameters of the first spiral track and the second spiral track are 20700 mm.
[0016] Furthermore, the width of the first spiral track and the second spiral track is 850 mm.
[0017] Compared with the prior art, the utility model has the following advantages:
[0018] In the utility model, the first spiral track and the second spiral track are used to guide the coke placed in the silo so that it slides toward the bottom of the silo along the extension direction of the first spiral track and the second spiral track to complete the unloading, so that the coke changes from falling directly vertically into the material surface of the silo bottom to sliding into the material surface of the silo bottom along the track, thereby preventing the coke from being broken.
[0019] The first mounting section and the second mounting section are used to fix and install the first spiral track and the second spiral track to increase the overall stability. The top beam provides a fixed position for the first mounting section and the second mounting section, so that the hanger can fix the first mounting section and the second mounting section firmly. The fixing assembly is used to fix the first spiral track and the second spiral track to the inner wall of the silo, ensuring the balance and stability of the coke material flow trajectory during the feeding process. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the accompanying drawings:
[0021] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0022] Figure 2 It is a top view of the utility model;
[0023] Figure 3 It is a structural schematic diagram of the fixing assembly of the utility model;
[0024] Figure 4 This is a schematic diagram of the structure of the hanging assembly of the utility model;
[0025] Figure 5 It is a schematic cross-sectional view of the first spiral track and the second spiral track of the utility model;
[0026] Figure 6 It is another cross-sectional schematic diagram of the first spiral track and the second spiral track of the utility model.
[0027] Description of reference numerals:
[0028] 1. First spiral track; 101. First installation section; 2. Second spiral track; 202. Second installation section; 3. Installation support; 4. First support rod; 401. Second support rod; 5. First fixing screw; 501. Second fixing screw; 6. Hanging rod; 7. Installation part; 701. Steel wire; 8. Top beam; 9. Silo. DETAILED DESCRIPTION
[0029] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0030] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "back" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0031] In addition, in the description of the present invention, unless otherwise clearly defined, the terms "installation", "connection", "connection", and "connector" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood in combination with specific circumstances.
[0032] The following will refer to the attached Figures 1 to 6 The utility model is described in detail in conjunction with the embodiments.
[0033] In general, the utility model relates to a feeding structure for a silo, which is used for unloading coke in a silo 9. It includes a silo 9 with an inner cavity formed therein, a first spiral track 1 and a second spiral track 2 in a spiral shape fixedly arranged on the inner wall of the silo 9 by a fixing assembly, a top beam 8 fixedly arranged on the top of the silo 9, a first mounting section 101 fixedly arranged at the top of the first spiral track 1, and a second mounting section 202 fixedly arranged at the top of the second spiral track 2. The first mounting section 101 and the second mounting section 202 are fixedly welded to the top beam 8 by at least three groups of suspension rods 6, respectively, the first spiral track 1 and the second spiral track 2 are spirally shaped, and the spiral directions are opposite, and the first spiral track 1 and the second spiral track 2 are fixedly connected to the inner wall of the silo 9 by a plurality of fixing assemblies.
[0034] like Figure 1 and Figure 2 As shown, in this embodiment, the first spiral track 1 and the second spiral track 2 are used to guide the coke placed in the silo 9 so that it slides toward the bottom of the silo 9 along the extension direction of the first spiral track 1 and the second spiral track 2 to complete the unloading, so that the coke changes from falling directly vertically into the material surface of the silo bottom to sliding into the material surface of the bottom of the silo 9 along the track, thereby preventing the coke from being broken. The first mounting section 101 and the second mounting section 202 are used to fix the first spiral track 1 and the second spiral track 2 to increase the overall stability. The top beam 8 provides a fixed position for the first mounting section 101 and the second mounting section 202, so that the hanger 6 can fix the first mounting section 101 and the second mounting section 202 firmly. The fixing assembly is used to fix the first spiral track 1 and the second spiral track 2 to the inner wall of the silo 9, thereby ensuring the balance and stability of the coke material flow trajectory during the feeding process.
[0035] It should be noted that the double-track setting of the first spiral track 1 and the second spiral track 2 can increase the efficiency of material discharge. When specifically set, the spiral directions of the first spiral track 1 and the second spiral track 2 are opposite, which can prevent the first spiral track 1 and the second spiral track 2 from restricting each other during installation and affecting the discharge and sliding of coke.
[0036] like Figure 5 and Figure 6 As shown, it needs to be further explained that the cross-section of the first spiral track 1 and the second spiral track 2 is V-shaped or C-shaped, and the opening direction is set upward, which can facilitate the sliding of coke. In addition, as a preferred structure, the inclination offset angle of the first spiral track 1 and the second spiral track 2 is 28° to 35°, the spiral diameter is 20700mm, and the width of the first spiral track 1 and the second spiral track 2 is 850mm. In actual use, the first spiral track 1 and the second spiral track 2 are made of wear-resistant steel.
[0037] Since the silo 9 is made of concrete, which is not conducive to the welding of the spiral track, the above-mentioned fixing assembly can ensure that the first spiral track 1 and the second spiral track 2 are fixed to the inner wall of the silo 9 and also play a supporting role to prevent deformation caused by long-term material feeding. Figure 2 and Figure 3 As shown, the fixing assembly includes a second support rod 401 fixedly connected to the inner wall of the silo 9 by a second fixing screw 501, and a mounting support 3 fixedly connected to the top surface of the second support rod 401 by a first fixing screw 5; the top of the first spiral track 1 and the second spiral track 2 are fixedly connected to the top of the mounting support 3.
[0038] Based on the above fixed component settings, such as Figure 3 As shown, in order to increase the stability of the fixing assembly, the first support rod 4 is tiltedly arranged at the bottom of the second support rod 401, one end is fixedly connected to the bottom surface of the second support rod 401, and the other end is fixedly connected to the inner side of the silo 9 through a second fixing screw 501.
[0039] The first support rod 4 can play a certain supporting role on the second support rod 401 to prevent it from shaking and affecting the sliding of the coke.
[0040] In a specific implementation, in order to facilitate the second fixing screw 501 to be set to the inner wall of the silo 9, the second fixing screw 501 is preferably an expansion bolt.
[0041] In addition, if Figure 2 and Figure 4 As shown, the feeding structure also includes a hanging assembly for fixing the first mounting section 101 and the second mounting section 202, the hanging assembly includes a mounting portion 7 and a steel wire 701, the mounting portion 7 is fixedly mounted on one side of the bottom of the first spiral track 1 and the second spiral track 2, one end of the steel wire 701 is fixedly connected to the top of the mounting portion 7, and the other end is fixedly connected to the top beam 8.
[0042] When the first spiral track 1 and the second spiral track 2 are installed, the first installation section 101 and the second installation section 202 will extend to the outside of the barrel to the lower side of the coke conveyor belt and will not be connected to the silo 9. In order to prevent the suspension rod 6 from being unable to be well fixed, a hanging assembly is provided to ensure the balance and stability of the coke material flow trajectory during the feeding process. In specific implementation, the number of hanging assemblies provided is determined according to actual conditions and is not further limited here.
[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A feeding structure for a silo, characterized in that: The invention comprises a silo (9) having an inner cavity formed therein, a first spiral track (1) and a second spiral track (2) fixedly arranged on the inner wall of the silo (9) by a fixing assembly, a top beam (8) fixedly arranged on the top of the silo (9), a first mounting section (101) fixedly arranged on the top of the first spiral track (1), and a second mounting section (202) fixedly arranged on the top of the second spiral track (2); The first mounting section (101) and the second mounting section (202) are respectively fixedly connected to the top beam (8) via at least three groups of suspension rods (6); the first spiral track (1) and the second spiral track (2) are spirally shaped and have opposite spiral directions; the first spiral track (1) and the second spiral track (2) are fixedly connected to the inner wall of the silo (9) via a plurality of fixing components.
2. A silo feeding structure according to claim 1, characterized in that: The cross-sections of the first spiral track (1) and the second spiral track (2) are V-shaped or C-shaped.
3. A silo feeding structure according to claim 2, characterized in that: The fixing assembly comprises a second support rod (401) fixedly connected to the inner wall of the silo (9) via a second fixing screw (501), and a mounting support (3) fixedly connected to the top surface of the second support rod (401) via a first fixing screw (5); The first spiral track (1) and the second spiral track (2) are fixedly connected to the top of the mounting support (3).
4. A silo feeding structure according to claim 3, characterized in that: The fixing assembly also includes a first support rod (4), which is obliquely arranged at the bottom of the second support rod (401), one end of which is fixedly connected to the bottom surface of the second support rod (401), and the other end of which is fixedly connected to the inner side of the silo (9) via a second fixing screw (501).
5. The silo feeding structure according to claim 1, characterized in that: The feeding structure also includes a hanging assembly, which includes a mounting portion (7) and a steel wire (701), wherein the mounting portion (7) is fixedly mounted on one side of the bottom of the first mounting section (101) and the second mounting section (202), and one end of the steel wire (701) is fixedly connected to the top of the mounting portion (7), and the other end is fixedly connected to the top beam (8).
6. A silo feeding structure according to claim 1, characterized in that: The inclination offset angle of the first spiral track (1) and the second spiral track (2) is 28° to 35°.
7. The silo feeding structure according to claim 1, characterized in that: The spiral diameters of the first spiral track (1) and the second spiral track (2) are 20700 mm.
8. The silo feeding structure according to claim 1, characterized in that: The width of the first spiral track (1) and the second spiral track (2) is 850 mm.
Citation Information
Cited By
Reversing device for wall-mounted spiral chute of coke silo