Winch for constructional engineering
By combining fast and slow rope winding components with anti-slip, snap-fit, and drive components, the problem of uneven wire rope winding in winches is solved, achieving uniform winding of the wire rope and reducing loosening, and providing the option of fast and slow rope winding.
Patent Information
- Application Number
- CN202323502412.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-21
AI Technical Summary
Existing construction winches are prone to uneven winding of steel wire ropes, leading to loose winding.
The system employs a combination of fast and slow rope winding components, along with a sliding component, a snap-fit component, and a shifting component. The motor drives the rotating shaft to achieve uniform winding of the wire rope. The combination of fast and slow rope winding utilizes a sliding positioning ring and a meshing gear structure on the rotating shaft to achieve uniform winding of the wire rope.
It achieves uniform winding of the wire rope, reduces winding loosening, provides the option of fast and slow rope winding, and improves the ease of use of the winch.
Smart Images

Figure CN221988045U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of winches, in particular to a winch for construction engineering. Background Art
[0002] A winch is a small and light lifting equipment that uses a drum to wind a wire rope or chain to lift or pull heavy objects. It is widely used due to its simple operation, large rope winding capacity and convenient relocation. It is mainly used for lifting or towing materials in construction projects.
[0003] An existing winch for construction projects, China disclosed a winch for construction projects with patent publication number CN208471418U on February 5, 2019. A shock-absorbing spring is arranged on the inner wall of the support frame of the original winch, and a shock-absorbing pad is arranged on the lower surface of the support frame. When the wire rope is wound onto the rope drum, the shock-absorbing spring and the shock-absorbing pad can reduce the vibration generated by the support frame, reduce the vibration generated by the support frame and bring greater noise to the work site, and reduce the damage caused by the noise to the eardrum of the operator.
[0004] However, in the above-mentioned prior art solution, when the winch winds the wire rope, the winding is often uneven, which causes the winding of the wire rope to be easily loosened when the winch is moved. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies of the prior art, the utility model provides a winch for construction engineering to solve the problem that the prior art winches mentioned in the background technology often wind the wire rope unevenly, resulting in the wire rope being easily loosened when the winch is moved.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a winch for construction engineering, comprising a base plate, a frame, a rope collection shaft, a wire rope, a positioning ring, a sliding drive assembly, a rotating shaft, a fast rope collection assembly, a slow rope collection assembly, a clamping assembly and a driving assembly, wherein the frame is fixedly connected to the base plate, the rope collection shaft is rotatably connected to the frame, the wire rope is wound around the rope collection shaft, the positioning ring is sleeved on the wire rope, the positioning ring is slidably connected to the frame, the sliding drive assembly is arranged on the frame for driving the positioning ring to slide, and the rotating shaft is provided with two, and the two rotating shafts are respectively The fast rope collecting assembly is respectively fixedly connected to the two ends of the rope collecting shaft and passes through the frame to extend to the outside. The fast rope collecting assembly is arranged on one of the rotating shafts to drive the rope collecting shaft to rotate quickly. The slow rope collecting assembly is arranged on the other rotating shaft to drive the rope collecting shaft to rotate slowly. There are two clamping assemblies, and the clamping assemblies are arranged on the rotating shaft to connect the two rotating shafts with the fast rope collecting assembly and the slow rope collecting assembly respectively. There are two driving assemblies, and the driving assemblies are arranged on the bottom plate to drive the fast rope collecting assembly and the slow rope collecting assembly to move.
[0009] Preferably, the sliding drive assembly includes a sliding rod, a sliding block, a first screw, a threaded block and a first motor, the sliding rod is fixedly connected to the frame, the sliding block is slidably mounted on the sliding rod, the first screw is rotatably connected to the frame, the threaded block is threadably mounted on the first screw, the threaded block is fixedly connected to the sliding block, the threaded block is fixedly connected to the positioning ring, the first motor is fixedly mounted on the frame, and the output end of the first motor passes through the frame and is concentrically connected to the first screw.
[0010] Furthermore, the quick rope collection assembly includes a first support frame, a first rotating ring, a first passive gear, a rotating rod, a first driving gear and a second motor. The first support frame is slidably connected to the base plate, the first rotating ring is rotatably sleeved on the first support frame, the first passive gear is fixedly connected to the first rotating ring, the first passive gear is detachably connected to the rotating shaft, the rotating rod is rotatably connected to the first support frame, the first driving gear is fixedly sleeved on the rotating rod, the first driving gear is meshed with the first passive gear, and the second motor is fixedly installed on the first support frame, and the output end of the second motor passes through the first support frame and is concentrically connected to the rotating rod.
[0011] Furthermore, the slow rope collection assembly includes a second support frame, a second rotating ring, a second passive gear, a driving rod, a second driving gear and a third motor. The second support frame is slidably connected to the base plate, the second rotating ring is rotatably sleeved on the second support frame, the second passive gear is fixedly connected to the second rotating ring, the second passive gear is detachably connected to the rotating shaft, the driving rod is rotatably connected to the second support frame, the second driving gear is fixedly sleeved on the driving rod, the second driving gear is meshed with the second passive gear, and the third motor is fixedly mounted on the second support frame, and the output end of the third motor passes through the second support frame and is concentrically connected to the driving rod.
[0012] Furthermore, the clamping assembly includes a clamping plate, a slide cylinder and a moving rod, the rotating shaft is provided with a groove, the clamping plate is slidably connected in the groove, and the first passive gear and the second passive gear are both provided with a clamping groove matching the clamping plate, the slide cylinder is fixedly connected in the groove, a telescopic rod is slidably sleeved on the slide cylinder, the telescopic rod is fixedly connected to the clamping plate, a spring is arranged between the telescopic rod and the slide cylinder, the moving rod is fixedly connected to the clamping plate, and the rotating shaft is provided with a moving groove for moving the moving rod.
[0013] Among them, the driving assembly includes a fixed plate, a second screw, a sliding frame and a fourth motor, two fixed plates are provided, the fixed plate is fixedly connected to the base plate, the second screw is rotatably connected between the two fixed plates, the sliding frame is slidably connected to the base plate, the sliding frame is threadedly sleeved on the second screw, the sliding frame is fixedly connected to the first support frame and the second support frame, the fourth motor is fixedly mounted on the fixed plate, and the output end of the fourth motor passes through the fixed plate and is concentrically connected to the second screw.
[0014] (III) Beneficial effects
[0015] In summary, the present invention includes at least one of the following beneficial technical effects:
[0016] The winch for construction engineering has a fast rope collection component that drives the rope collection shaft to rotate rapidly through the rotating shaft to quickly collect the wire rope, and a slow rope collection component that drives the rope collection shaft to rotate slowly through the rotating shaft to slowly collect the wire rope. When collecting the rope, the positioning ring is driven to slide through the sliding drive component to drive the wire rope to move, so that the wire rope can be evenly wound around the rope collection shaft. The two rotating shafts are respectively connected to the fast rope collection component and the slow rope collection component through the clamping component, and the fast rope collection component and the slow rope collection component are driven to move through the driving component. Therefore, the winch for construction engineering is convenient for evenly winding the wire rope, is not easy to cause the wire rope to loosen, and can choose to collect the rope quickly or slowly. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a schematic diagram of the exploded structure of the first support frame, the first rotating ring and the first passive gear of the utility model;
[0019] Figure 3 It is a schematic diagram of the exploded structure of the cooperation between the second support frame, the second rotating ring and the second passive gear of the utility model;
[0020] Figure 4 It is a schematic diagram of the structure of the partial cross section of the cooperation of the clamping plate, the slide cylinder and the telescopic rod of the utility model;
[0021] Figure 5 It is a schematic diagram of the exploded structure of the slide tube, telescopic rod and spring of the utility model;
[0022] Figure 6 It is a schematic diagram of the structure of the fixed plate, the second screw rod and the sliding frame of the utility model.
[0023] In the figure: 1, bottom plate; 2, frame; 3, rope collection shaft; 4, wire rope; 5, positioning ring; 6, rotating shaft; 7, sliding rod; 8, sliding block; 9, first screw; 10, threaded block; 11, first motor; 12, first support frame; 13, first rotating ring; 14, first passive gear; 15, rotating rod; 16, first driving gear; 17, second motor; 18, second support frame; 19, second rotating ring; 20, second passive gear; 21, driving rod; 22, second driving gear; 23, third motor; 24, card plate; 25, slide; 26, telescopic rod; 27, spring; 28, moving rod; 29, fixed plate; 30, second screw; 31, sliding frame; 32, fourth motor. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0026] Example 1
[0027] Reference Figure 1 A winch for construction engineering, including a base plate 1, a frame 2, a rope collection shaft 3, a wire rope 4, a positioning ring 5, a sliding drive assembly, a rotating shaft 6, a fast rope collection assembly, a slow rope collection assembly, a clamping assembly and a driving assembly. The frame 2 is fixedly connected to the base plate 1, the rope collection shaft 3 is rotatably connected to the frame 2, the wire rope 4 is wound around the rope collection shaft 3, the positioning ring 5 is sleeved on the wire rope 4, the positioning ring 5 is slidably connected to the frame 2, the sliding drive assembly is arranged on the frame 2, and is used to drive the positioning ring 5 to slide. The sliding drive assembly includes a sliding rod 7, a sliding block 8, a first screw rod 9, a threaded block 10 and a first motor 11, the sliding rod 7 is fixedly connected to the frame 2, and the sliding block 8 slides. It is sleeved on the sliding rod 7, the first screw 9 is rotatably connected to the frame 2, the threaded block 10 is threadedly sleeved on the first screw 9, the threaded block 10 is fixedly connected to the sliding block 8, the threaded block 10 is fixedly connected to the positioning ring 5, the first motor 11 is fixedly installed on the frame 2, the output end of the first motor 11 passes through the frame 2 and is concentrically connected to the first screw 9, the output end of the first motor 11 rotates to drive the first screw 9 to rotate, the first screw 9 rotates to drive the threaded block 10 to move, the sliding block 8 slides on the sliding rod 7, thereby driving the positioning ring 5 to move, so as to facilitate the wire rope 4 to be evenly wound around the rope collection shaft 3, and it is not easy to cause the wire rope 4 to loosen.
[0028] Reference Figure 1 and Figure 2, two rotating shafts 6 are provided, and the two rotating shafts 6 are respectively fixedly connected to the two ends of the rope collecting shaft 3 and extend to the outside through the frame 2. The fast rope collecting assembly is arranged on one of the rotating shafts 6, and is used to drive the rope collecting shaft 3 to rotate quickly. The fast rope collecting assembly includes a first support frame 12, a first rotating ring 13, a first passive gear 14, a rotating rod 15, a first driving gear 16 and a second motor 17. The first support frame 12 is slidably connected to the bottom plate 1, the first rotating ring 13 is rotatably sleeved on the first support frame 12, the first passive gear 14 is fixedly connected to the first rotating ring 13, the first passive gear 14 is detachably connected to the rotating shaft 6, the rotating rod 15 is rotatably connected to the first support frame 12, and the first driving gear 16 is fixed The first driving gear 16 is mounted on the rotating rod 15, meshing with the first passive gear 14, and the second motor 17 is fixedly mounted on the first support frame 12. The output end of the second motor 17 passes through the first support frame 12 and is concentrically connected to the rotating rod 15. The number of gears of the first driving gear 16 and the number of gears of the first passive gear 14 are slightly different. The output end of the second motor 17 rotates to drive the rotating rod 15 to rotate, and the rotating rod 15 rotates to drive the first driving gear 16 to rotate. The first driving gear 16 rotates to drive the first passive gear 14 to rotate. The first passive gear 14 rotates to drive the rotating shaft 6 located on one side thereof to rotate, thereby driving the rope collecting shaft 3 to rotate, so as to facilitate the rapid rope collecting of the wire rope 4.
[0029] Reference Figure 1 and Figure 3 The slow rope collecting assembly is arranged on another rotating shaft 6, and is used to drive the rope collecting shaft 3 to rotate slowly. The slow rope collecting assembly includes a second support frame 18, a second rotating ring 19, a second passive gear 20, a driving rod 21, a second active gear 22 and a third motor 23. The second support frame 18 is slidably connected to the bottom plate 1, the second rotating ring 19 is rotatably sleeved on the second support frame 18, the second passive gear 20 is fixedly connected to the second rotating ring 19, the second passive gear 20 is detachably connected to the rotating shaft 6, the driving rod 21 is rotatably connected to the second support frame 18, the second active gear 22 is fixedly sleeved on the driving rod 21, and the second active gear 22 is fixedly sleeved on the driving rod 21. The wheel 22 is meshed with the second passive gear 20, and the third motor 23 is fixedly mounted on the second support frame 18. The output end of the third motor 23 passes through the second support frame 18 and is concentrically connected to the driving rod 21. The number of gears of the second active gear and the number of gears of the second passive gear differ greatly. The output end of the third motor 23 rotates to drive the driving rod 21 to rotate, and the driving rod 21 rotates to drive the second active gear to rotate, and the second active gear rotates to drive the second passive gear to rotate, and the second passive gear rotates to drive the rotating shaft 6 located on one side thereof to rotate, thereby driving the rope collecting shaft 3 to rotate, so as to facilitate the slow rope collecting of the wire rope 4.
[0030] Reference Figure 1 , Figure 4 , Figure 5 and Figure 6 , there are two card-connecting assemblies, which are arranged on the rotating shaft 6 and are used to connect the two rotating shafts 6 with the fast rope-collecting assembly and the slow rope-collecting assembly respectively. The card-connecting assemblies include a card plate 24, a slide cylinder 25 and a moving rod 28. A groove is provided on the rotating shaft 6, and the card plate 24 is slidably connected in the groove. A card groove matching the card plate 24 is provided on the first passive gear 14 and the second passive gear 20. The slide cylinder 25 is fixedly connected in the groove. A telescopic rod 26 is slidably sleeved on the slide cylinder 25. The telescopic rod 26 is fixedly connected to the card plate 24. A spring 27 is provided between the telescopic rod 26 and the slide cylinder 25. The moving rod 28 is fixedly connected to the card plate 24. A moving groove for moving the moving rod 28 is provided on the rotating shaft 6. Slide the card plate 24 upward to make the card plate 24 enter the card groove, so that the first passive gear 14 or the second passive gear 20 can be connected to the rotating shaft 6 located on one side thereof. There are two drive assemblies, The driving assembly is arranged on the base plate 1, and is used for driving the fast rope collecting assembly and the slow rope collecting assembly to move. The driving assembly includes a fixed plate 29, a second screw rod 30, a sliding frame 31 and a fourth motor 32. Two fixed plates 29 are provided, and the fixed plates 29 are fixedly connected to the base plate 1. The second screw rod 30 is rotatably connected between the two fixed plates 29. The sliding frame 31 is slidably connected to the base plate 1. The sliding frame 31 is threadedly sleeved on the second screw rod 30. The sliding frame 31 is fixedly connected to the first support frame 12 and the second support frame 18. The fourth motor 32 is fixedly installed on the fixed plate 29. The output end of the fourth motor 32 passes through the fixed plate 29 and is concentrically connected to the second screw rod 30. The output end of the fourth motor 32 rotates to drive the second screw rod 30 to rotate, and the second screw rod 30 rotates to drive the sliding frame 31 to slide, so as to facilitate driving the first support frame 12 or the second support frame 18 to approach the rotating shaft 6 located on one side thereof.
[0031] Example 2
[0032] In summary, the working principle and working process of the winch for construction engineering are as follows: when in use, when it is necessary to quickly retract the rope, first turn on the fourth motor 32 located on one side of the first support frame 12, and the output end of the fourth motor 32 rotates to drive the second screw 30 to rotate, and the second screw 30 rotates to drive the sliding frame 31 to slide, thereby driving the first support frame 12 to approach the rotating shaft 6 located on one side thereof, and the card plate 24 is slid into the groove by the moving rod 28 in advance, and the contraction rod slides into the slide cylinder 25, and the spring 27 elastically contracts. When the card plate 24 is aligned with the card slot on the first passive gear 14, the moving rod 28 is released, and the spring 27 rebounds to drive the card plate 24 into the card slot, and the second support frame 12 is turned on. The motor 17 and the output end of the second motor 17 rotate to drive the rotating rod 15 to rotate, the rotating rod 15 rotates to drive the first driving gear 16 to rotate, the first driving gear 16 rotates to drive the first passive gear 14 to rotate, the first passive gear 14 rotates to drive the rotating shaft 6 located on one side thereof to rotate, thereby driving the rope collecting shaft 3 to rotate, and the wire rope 4 can be quickly collected. At the same time, the first motor 11 is turned on, and the output end of the first motor 11 rotates to drive the first screw rod 9 to rotate, and the first screw rod 9 rotates to drive the threaded block 10 to move, and the sliding block 8 slides on the sliding rod 7, thereby driving the positioning ring 5 to move, and the wire rope 4 can be evenly wound around the rope collecting shaft 3.
[0033] The above-mentioned embodiments only express the specific implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.
Claims
1. A winch for construction engineering, comprising a base plate (1), characterized in that: Also includes: A frame (2), the frame (2) being fixedly connected to the base plate (1); A rope collecting shaft (3), the rope collecting shaft (3) being rotatably connected to the frame (2); A steel wire rope (4), wherein the steel wire rope (4) is wound around the rope collecting shaft (3); A positioning ring (5), wherein the positioning ring (5) is sleeved on the steel wire rope (4), and the positioning ring (5) is slidably connected to the frame (2); A sliding drive assembly, the sliding drive assembly being arranged on the frame (2) and being used for driving the positioning ring (5) to slide; A rotating shaft (6), wherein two rotating shafts (6) are provided, and the two rotating shafts (6) are respectively fixedly connected to the two ends of the rope collecting shaft (3) and penetrate the frame (2) to extend to the outside; A quick rope collection assembly, the quick rope collection assembly being arranged on one of the rotating shafts (6) and being used for driving the rope collection shaft (3) to rotate quickly; A slow rope collecting assembly, the slow rope collecting assembly being arranged on another of the rotating shafts (6) and being used for driving the rope collecting shaft (3) to rotate slowly; A clamping assembly, wherein two clamping assemblies are provided, and the clamping assemblies are arranged on the rotating shaft (6) and are used to connect the two rotating shafts (6) to the fast rope collection assembly and the slow rope collection assembly respectively; A driving assembly, wherein two driving assemblies are provided, and the driving assemblies are arranged on the base plate (1) and are used to drive the fast rope collecting assembly and the slow rope collecting assembly to move.
2. A winch for construction engineering according to claim 1, characterized in that: The driving and sliding assembly comprises: A sliding rod (7), wherein the sliding rod (7) is fixedly connected to the frame (2); A sliding block (8), wherein the sliding block (8) is slidably mounted on the sliding rod (7); A first screw rod (9), the first screw rod (9) being rotatably connected to the frame (2); a threaded block (10), the threaded block (10) being threadably sleeved on the first screw rod (9), the threaded block (10) being fixedly connected to the sliding block (8), and the threaded block (10) being fixedly connected to the positioning ring (5); A first motor (11), wherein the first motor (11) is fixedly mounted on the frame (2), and an output end of the first motor (11) passes through the frame (2) and is coaxially connected to the first screw rod (9).
3. A winch for construction engineering according to claim 1, characterized in that: The quick rope collection assembly comprises: A first support frame (12), the first support frame (12) being slidably connected to the base plate (1); A first rotating ring (13), the first rotating ring (13) being rotatably sleeved on the first supporting frame (12); a first passive gear (14), wherein the first passive gear (14) is fixedly connected to the first rotating ring (13), and the first passive gear (14) is detachably connected to the rotating shaft (6); A rotating rod (15), the rotating rod (15) being rotatably connected to the first supporting frame (12); A first driving gear (16), wherein the first driving gear (16) is fixedly sleeved on the rotating rod (15), and the first driving gear (16) is meshed with the first passive gear (14); A second motor (17), wherein the second motor (17) is fixedly mounted on the first support frame (12), and an output end of the second motor (17) passes through the first support frame (12) and is coaxially connected to the rotating rod (15).
4. A winch for construction engineering according to claim 3, characterized in that: The slow rope collection assembly comprises: A second support frame (18), the second support frame (18) being slidably connected to the base plate (1); A second rotating ring (19), the second rotating ring (19) being rotatably sleeved on the second supporting frame (18); a second passive gear (20), the second passive gear (20) being fixedly connected to the second rotating ring (19), and the second passive gear (20) being detachably connected to the rotating shaft (6); A driving rod (21), the driving rod (21) being rotatably connected to the second supporting frame (18); A second driving gear (22), wherein the second driving gear (22) is fixedly sleeved on the driving rod (21), and the second driving gear (22) is meshed with the second passive gear (20); A third motor (23), wherein the third motor (23) is fixedly mounted on the second support frame (18), and an output end of the third motor (23) passes through the second support frame (18) and is coaxially connected to the driving rod (21).
5. A winch for construction engineering according to claim 4, characterized in that: The clamping assembly comprises: A card plate (24), wherein a groove is formed on the rotating shaft (6), the card plate (24) is slidably connected in the groove, and the first passive gear (14) and the second passive gear (20) are both provided with a card slot matching the card plate (24); A slide cylinder (25), the slide cylinder (25) is fixedly connected in the groove, a telescopic rod (26) is slidably sleeved on the slide cylinder (25), the telescopic rod (26) is fixedly connected to the clamping plate (24), and a spring (27) is provided between the telescopic rod (26) and the slide cylinder (25); A moving rod (28) is fixedly connected to the clamping plate (24), and a moving groove for the moving rod (28) to move is provided on the rotating shaft (6).
6. A winch for construction engineering according to claim 5, characterized in that: The driving assembly comprises: A fixing plate (29), wherein two fixing plates (29) are provided and the fixing plates (29) are fixedly connected to the bottom plate (1); a second screw rod (30), the second screw rod (30) being rotatably connected between the two fixing plates (29); A sliding frame (31), the sliding frame (31) is slidably connected to the bottom plate (1), the sliding frame (31) is threadedly sleeved on the second screw rod (30), and the sliding frame (31) is fixedly connected to the first support frame (12) and the second support frame (18); A fourth motor (32), the fourth motor (32) is fixedly mounted on the fixing plate (29), and an output end of the fourth motor (32) passes through the fixing plate (29) and is coaxially connected to the second screw rod (30).