Overhead heat insulation roof of fabricated building

Through the overall prefabricated and positioning frame design of prefabricated reinforced concrete structural slabs and insulated pier seats, the problems of inconsistent height and inaccurate positioning of traditional overhead thermally insulated roof support piers are solved, and higher flatness and stability are achieved, simplifying the Construction and extended service life.

CN222009393UActive Publication Date: 2024-11-15HUNAN DONGFANGHONG CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323561246.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-15
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

There are problems of height inconsistency and inaccurate positioning in the traditional overhead insulation roof during the stacking of support piers, resulting in poor flatness and stability of overhead plates, which affects service life.

Method used

Prefabricated reinforced concrete structural plates and prefabricated heat-insulated pier seats are used to accurately position and fix the pier seats through positioning frames and reserved bosses and groove structures, ensuring the uniform shape and size of the pier seats, and providing cross-shaped pluggable slots and positioning frames to facilitate installation and positioning of the bolt plates.

Benefits of technology

It improves the flatness and stability of the overhead board, simplifies the construction process, extends the service life, and facilitates the subsequent replacement of separate prefabricated bolt boards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009393U_ABST
    Figure CN222009393U_ABST
Patent Text Reader

Abstract

The utility model discloses an overhead heat insulation roof of a fabricated building, which comprises a prefabricated reinforced concrete structural plate, a prefabricated heat insulation pier base and a prefabricated bolt plate, the prefabricated heat insulation pier base is fixed on the top surface of the prefabricated reinforced concrete structural plate, the top surface of the prefabricated heat insulation pier base is a horizontal plane and is provided with a positioning frame, and the prefabricated bolt plate is erected on the prefabricated heat insulation pier base. The positioning frame is used for positioning. The heat insulation pier base adopts an integral prefabricated part, so that the uniformity of the shape and the size of the heat insulation pier base can be ensured; the prefabricated heat insulation pier base is fixed to the top face of the prefabricated reinforced concrete structural plate, accurate positioning of the prefabricated pier column can be guaranteed, the top face of the prefabricated pier base is the horizontal plane and provided with the positioning frame, rapid installation of the prefabricated bolt plate can be guaranteed, stress balance and stability after installation are guaranteed, and the service life of the prefabricated bolt plate is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of assembled buildings, in particular to an overhead heat-insulating roof of an assembled building. Background Art

[0002] The traditional overhead insulation roof is that after the reinforced concrete prefabricated panels are laid, the workers determine the position of each supporting pier (the intersection of the vertical and horizontal directions) by marking the vertical and horizontal lines on the top surface, and use ordinary brick blocks as the supporting piers. The overhead panels are laid on the supporting piers, and the four corners of each overhead panel are overlapped and fixed on the supporting piers. This approach has the following defects:

[0003] The thickness of each brick block cannot be guaranteed to be the same, and the thickness of the bonding mortar between the upper and lower blocks cannot be guaranteed to be uniform, so the height of each supporting pier cannot be guaranteed to be uniform, resulting in poor flatness of the overhead slab after installation, making it difficult to handle the joints between adjacent overhead slabs;

[0004] When the supporting piers are stacked, the positioning points cannot be truly aligned, resulting in the inability to ensure the straightness of the supporting pier arrangement, which leads to different erection areas at the four corners of the overhead board, resulting in poor stress and stability of the overhead board, affecting the service life of the overhead board. Utility Model Content

[0005] The utility model aims to provide an overhead heat-insulating roof of a prefabricated building which can not only make on-site construction convenient and quick but also increase the service life of the overhead panels.

[0006] The overhead heat-insulating roof of the assembled building provided by the utility model adopts the following technical scheme: it includes a prefabricated reinforced concrete structural plate, a prefabricated heat-insulating pier and a prefabricated bolt plate, the prefabricated heat-insulating pier is fixed to the top surface of the prefabricated reinforced concrete structural plate, the top surface of the prefabricated heat-insulating pier is a horizontal plane and is provided with a positioning frame, the prefabricated bolt plate is erected on the prefabricated heat-insulating pier and is positioned by the positioning frame.

[0007] In one implementation of the above technical solution, the prefabricated thermal insulation pier is integrally prefabricated with the prefabricated reinforced concrete structural panel.

[0008] In the second mode of the above technical solution, an upper boss is prefabricated on the top surface of the prefabricated reinforced concrete structural plate.

[0009] In the second mode of the above technical solution, an upper groove is reserved on the bottom surface of the prefabricated heat-insulating pier, and is assembled and fixed to the upper boss through the upper groove.

[0010] In a third implementation of the above technical solution, a groove is pre-reserved on the top surface of the prefabricated reinforced concrete structural plate.

[0011] In a third implementation of the above technical solution, a lower boss is prefabricated on the bottom surface of the prefabricated thermal insulation pier, and the lower boss is assembled and fixed with the lower groove.

[0012] In the three implementations of the above technical solution, the bottom surface size of the prefabricated thermal insulation podium is larger than the top surface size.

[0013] In the three implementations of the above technical solution, a cross-shaped plug-in groove is reserved in the center of the top surface of the prefabricated thermal insulation pier.

[0014] In the three implementations of the above technical solution, the positioning frame is a cross that matches the plug-in slot, the height of the positioning frame is greater than the depth of the plug-in slot, and the extended section is used to position the prefabricated bolt plate.

[0015] The heat-insulating pier seat of the utility model adopts an integral prefabricated part, which can ensure the uniformity of its shape and size; the prefabricated heat-insulating pier seat is fixed to the top surface of the prefabricated reinforced concrete structural plate, which can ensure the accurate positioning of the prefabricated pier column; the top surface of the prefabricated pier seat is a horizontal plane and is equipped with a positioning frame, which can ensure the rapid installation of the prefabricated bolt plate and ensure the force balance and stability after installation, thereby extending the service life of the prefabricated bolt plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a top view schematic diagram of the first embodiment of the utility model (only two adjacent prefabricated bolt plates are installed).

[0017] Figure 2 for Figure 1 An enlarged schematic diagram of the center pier from the front.

[0018] Figure 3 for Figure 2 Schematic diagram from top view.

[0019] Figure 4 for Figure 1 An enlarged schematic diagram of the front view of the middle pier.

[0020] Figure 5 for Figure 4 Schematic top view of .

[0021] Figure 6 for Figure 1 A magnified schematic diagram of part A in FIG.

[0022] Figure 7 It is an enlarged bottom view of the side pier seat in the second embodiment.

[0023] Figure 8 This is an enlarged bottom view of the middle pier in the second embodiment.

[0024] Fig. 9 It is an enlarged schematic diagram of the front view of the side pier seat in Example 3.

[0025] Fig.10 This is an enlarged schematic diagram of the front view of the middle pier in Example 3. DETAILED DESCRIPTION

[0026] Embodiment 1: Combination Figures 1 to 6 It can be seen that:

[0027] The overhead heat-insulating roof of the assembled building disclosed in this embodiment includes a prefabricated reinforced concrete structural plate, a prefabricated heat-insulating pier and a prefabricated bolt plate.

[0028] The prefabricated heat-insulating pier and the prefabricated reinforced concrete structural plate 1 are prefabricated as a whole, that is, the prefabricated heat-insulating pier and the prefabricated reinforced concrete structural plate 1 are formed into an integral part.

[0029] In order to improve the good force-bearing performance and supporting stability of the prefabricated thermal insulation pier, the bottom surface size of the prefabricated thermal insulation pier is designed to be larger than the top surface size, and the top surface is a horizontal plane.

[0030] Since there are parapet walls around the roof, the prefabricated heat-insulating piers on the prefabricated reinforced concrete structural panels 1 around the roof are divided into two types: side piers 2 corresponding to the parapet side and middle piers 3 at other positions.

[0031] The side pier seat 2 adopts a right-angled trapezoidal structure as a whole, and the right-angled side is located on the parapet side.

[0032] The middle pier 3 as a whole adopts an isosceles trapezoidal structure.

[0033] When the side pier seat 2 and the middle pier seat 3 are prefabricated, a cross-shaped insertion groove is reserved in the center of the top surface. A positioning frame 4 of a corresponding shape is arranged at the insertion groove, the height of the positioning frame is greater than the depth of the insertion groove, and the extended section is used to limit the prefabricated bolt plate 5.

[0034] The size of the prefabricated bolt plate 5 is determined according to the arrangement of the side piers 2 and the middle piers 3.

[0035] In this embodiment, the positioning frame 4 is packaged together with the prefabricated reinforced concrete structural plate 1, the side pier seat 2, the middle pier seat 3 and the prefabricated bolt plate 5 and transported to the construction site.

[0036] During the on-site installation, the prefabricated reinforced concrete structural plate 1, the side pier seat 2, and the middle pier seat 3 are first installed, and then the positioning frame 4 is inserted into the top surface of each pier seat and fixed by mortar, and finally the prefabricated bolt plate 5 is installed, so that the four corners of the prefabricated bolt plate 5 are respectively positioned by the positioning frame 4. Finally, the joints between adjacent prefabricated bolt plates are sealed and waterproofed (not shown in the figure).

[0037] Obviously, the position and height of the side piers and the middle pier can ensure the same height, so the flatness of the prefabricated bolt plate after installation is guaranteed, which not only makes it convenient to handle the joints between adjacent prefabricated bolt plates, but also improves the stress performance and stability of the prefabricated bolt plate after installation, thereby extending its service life.

[0038] In addition, when the prefabricated bolt plate is installed, the four angles are positioned by the positioning frame respectively, which makes the installation convenient and quick. Moreover, during the subsequent use, if a prefabricated bolt plate is broken, it can be replaced separately and conveniently.

[0039] Embodiment 2: The difference between this embodiment and embodiment 1 is that:

[0040] The side pier base 2 and the middle pier base 3 are prefabricated separately from the prefabricated reinforced concrete structural slab 1 .

[0041] When the prefabricated reinforced concrete structural panel 1 is prefabricated, the top surface is prefabricated to form an upper boss for mounting the prefabricated heat-insulating pier.

[0042] The bottom surfaces of the side pier seat 2 and the middle pier seat 3 are respectively reserved with upper grooves, such as Figure 6 , Figure 7 shown.

[0043] The construction site is assembled and fixed by mortar through the upper groove on the bottom surface of the pier and the upper boss on the top surface of the prefabricated reinforced concrete structural slab.

[0044] Embodiment 3: The difference between this embodiment and embodiment 2 is that:

[0045] When the prefabricated reinforced concrete structural panel 1 is prefabricated, the top surface is prefabricated to form a lower groove for installing the pier seat, and the bottom surfaces of the side pier seat 2 and the middle pier seat 3 are pre-formed with bosses, which are assembled with the lower bosses and the lower grooves and fixed with the seat mortar at the construction site.

[0046] The upper boss and the lower groove in the second and third embodiments are in the shape of a truncated cone and / or a prism to ensure the quick installation of the pier and the stability after installation.

[0047] The above embodiments can be selected according to actual conditions during implementation. The advantage of embodiment 1 is that there is no need to assemble and position the heat-insulating pier and the reinforced concrete structural plate on site, making on-site construction more convenient, but not very conducive to transportation. The advantages of embodiments 2 and 3 are that they are more conducive to transportation, but on-site construction requires assembly and positioning of the heat-insulating pier, making on-site construction more complicated.

[0048] The middle pier in other embodiments may also adopt a frustum or prism structure.

[0049] In summary, the thermal insulation pier of this roof is made of integral prefabricated parts, which can ensure the uniformity of its shape and size; the prefabricated thermal insulation pier is fixed to the top surface of the prefabricated reinforced concrete structural plate, which can ensure the accurate positioning of the prefabricated pier column. The top surface of the prefabricated pier is a horizontal plane and is equipped with a positioning frame, which can ensure the rapid installation of the prefabricated bolt plate and ensure the force balance and stability after installation, thereby extending the service life of the prefabricated bolt plate.

Claims

1. An overhead heat-insulating roof of an assembled building, characterized in that: The roof includes a prefabricated reinforced concrete structural panel, a prefabricated insulation pier and a prefabricated bolt plate. The prefabricated insulation pier is fixed to the top surface of the prefabricated reinforced concrete structural panel. The top surface of the prefabricated insulation pier is a horizontal plane and is provided with a positioning frame. The prefabricated bolt plate is erected on the prefabricated insulation pier and positioned by the positioning frame.

2. The overhead heat-insulating roof of the prefabricated building according to claim 1, characterized in that: The prefabricated heat-insulating pier and the prefabricated reinforced concrete structural plate are prefabricated integrally.

3. The overhead heat-insulating roof of the prefabricated building according to claim 1, characterized in that: The top surface of the prefabricated reinforced concrete structural plate is prefabricated with an upper boss.

4. The overhead heat-insulating roof of the prefabricated building according to claim 3, characterized in that: An upper groove is reserved on the bottom surface of the prefabricated heat-insulating pier, and is assembled and fixed to the upper boss via the upper groove.

5. The overhead heat-insulating roof of the prefabricated building according to claim 1, characterized in that: A groove is pre-reserved on the top surface of the prefabricated reinforced concrete structural plate.

6. The overhead heat-insulating roof of a prefabricated building according to claim 5, characterized in that: The bottom surface of the prefabricated heat-insulating pier is prefabricated with a lower boss, which is assembled with the lower boss and the lower groove.

7. The overhead heat-insulating roof of the prefabricated building according to claim 2, 4 or 6, characterized in that: The bottom surface size of the prefabricated heat-insulating podium is larger than the top surface size.

8. The overhead heat-insulating roof of a prefabricated building according to claim 7, characterized in that: A cross-shaped inserting groove is reserved at the center of the top surface of the prefabricated heat-insulating pier.

9. The overhead heat-insulating roof of a prefabricated building according to claim 8, characterized in that: The positioning frame is a cross that matches the plug-in slot, the height of the positioning frame is greater than the depth of the plug-in slot, and the extended section is used to position the prefabricated bolt plate.