Inverted arch temporary supporting structure additionally arranged in existing tunnel

By designing a temporary support structure in the tunnel expansion and temporarily supporting the tunnel with jacks and anchors, the problems of tunnel collapse and support plate separation are solved, and the stability and safety of construction are improved.

CN222010249UActive Publication Date: 2024-11-15广东省高速公路有限公司 +4
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420833764.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-11-15
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

During the tunnel expansion process, existing tunnels may fall before the construction of the new arch, and the risk of separation of the support plates and tunnels is high, affecting construction stability and safety.

Method used

Design a temporary support structure including support base plate, jack, support plate, limit plate, vertical anchor rod and inclined anchor rod, temporary support of the tunnel through jack, and use the coordination of support plate and limit plate to reduce the support plate and support plate and The possibility of tunnel separation and enhance the stability of the support base plate through anchors.

Benefits of technology

It effectively reduces the possibility of tunnel falling, improves the stability and safety of construction, and ensures a stable connection between the support plate and the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222010249U_ABST
    Figure CN222010249U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunnel extension construction, in particular to an inverted arch temporary supporting structure additionally arranged on an existing tunnel, which comprises a supporting bottom plate and a jack arranged on the supporting bottom plate, the output end of the jack is connected with a supporting plate, and the supporting plate is suitable for supporting the tunnel; the supporting plate is provided with two limiting plates, and the two limiting plates are arranged on the two sides of the bottom of one end of the tunnel in the width direction of the tunnel. The inverted arch temporary supporting structure is additionally arranged on the existing tunnel, the tunnel is temporarily supported through the jack, the probability that the existing tunnel sinks is reduced, meanwhile, the probability that the supporting plate is separated from the tunnel is reduced while the tunnel is supported through cooperation of the supporting plate and the limiting plate, and the stability and safety of construction are further guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel expansion construction, in particular to a temporary supporting structure for adding an invert to an existing tunnel. Background Art

[0002] When a tunnel is expanded, it is often necessary to dismantle the original invert before constructing a new one. However, the existing tunnel may collapse before the new invert is constructed. Utility Model Content

[0003] The technical problem to be solved by the utility model is: in order to solve the technical problem in the prior art, the utility model provides a temporary supporting structure for adding an invert to an existing tunnel.

[0004] The technical solution adopted by the utility model to solve its technical problems is: a temporary support structure for an inverted arch is added to an existing tunnel, comprising a support base plate and a jack arranged on the support base plate, wherein the output end of the jack is connected to the support plate, and the support plate is suitable for supporting the tunnel; a limit plate is arranged on the support plate, and two limit plates are arranged on both sides of the bottom of one end of the tunnel along the width direction of the tunnel.

[0005] The utility model adds a temporary invert support structure to the existing tunnel, temporarily supports the tunnel through jacks, reduces the possibility of collapse of the existing tunnel, and simultaneously utilizes the cooperation of the support plate and the limit plate to support the tunnel while reducing the possibility of separation of the support plate and the tunnel, thereby further ensuring the stability and safety of the construction.

[0006] Furthermore, a connecting sleeve is provided at the bottom of the support plate, the connecting sleeve is sleeved on the output end of the jack, and the connecting sleeve is fixedly connected to the output end of the jack by bolts.

[0007] Furthermore, an adjustment plate is connected to the bottom of the limit plate, a waist-shaped groove is provided on the adjustment plate along the width direction of the tunnel, and a locking bolt is fixedly connected to the bottom of the support plate, and the locking bolt passes through the waist-shaped groove and is connected to a locking nut.

[0008] Furthermore, a plurality of support blocks are disposed on the support plate, and the plurality of support blocks are arranged at intervals.

[0009] Furthermore, the support block is made of rubber.

[0010] Furthermore, the support base plate is provided with vertical anchor rods, and the vertical anchor rods are driven into the soil.

[0011] Furthermore, an inclined anchor rod is provided on the supporting bottom plate, and the bottom of the inclined anchor rod is arranged toward the outside of the supporting bottom plate.

[0012] Furthermore, the inclined anchor rod is provided with a threaded section, and the threaded section is threadedly connected to the supporting base plate.

[0013] Furthermore, the projection of the inclined anchor rod along the vertical direction is staggered with the jack.

[0014] The beneficial effects of the utility model are:

[0015] 1. Use jacks to temporarily support the tunnel to reduce the possibility of collapse of the existing tunnel. At the same time, use the support plate and limit plate to support the tunnel while reducing the possibility of separation between the support plate and the tunnel.

[0016] 2. By setting up vertical anchor rods and inclined anchor rods, it is convenient to improve the stability of the supporting base plate, thereby improving the stability of the tunnel support. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0018] Figure 1 It is a structural schematic diagram of the overall temporary supporting structure of an additional invert arch in the existing tunnel in the utility model.

[0019] Figure 2 It is a schematic diagram of a vertical anchor rod in the utility model.

[0020] Figure 3 It is a schematic diagram of the waist-shaped groove and the locking bolt in the utility model.

[0021] Figure 4 It is a schematic diagram of the inclined anchor rod in the utility model.

[0022] In the figure: 1. Support base plate; 11. Vertical anchor rod; 12. Inclined anchor rod; 121. Threaded section; 2. Jack; 3. Support plate; 31. Support block; 32. Connecting sleeve; 4. Limit plate; 41. Adjustment plate; 411. Waist-shaped groove; 42. Locking bolt; 43. Locking nut. DETAILED DESCRIPTION

[0023] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.

[0024] In the description of the present utility model, it is necessary to understand that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, features defined as "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0025] The utility model discloses a temporary supporting structure for adding an invert arch to an existing tunnel.

[0026] Reference Figures 1 to 4 A temporary support structure for adding an invert to an existing tunnel includes a support base plate 1 and a jack 2 fixedly connected to the support base plate 1, the output end of the jack 2 is connected to a support plate 3, and the support plate 3 is suitable for supporting the tunnel. A limit plate 4 is provided on the support plate 3, and two limit plates 4 are provided. The two limit plates 4 are arranged on both sides of the bottom of one end of the tunnel along the width direction of the tunnel. During construction, the tunnel is temporarily supported by the jack 2 to reduce the possibility of collapse of the existing tunnel. At the same time, the support plate 3 and the limit plate 4 cooperate to reduce the possibility of separation of the support plate 3 from the tunnel while supporting the tunnel, thereby further ensuring the stability and safety of the construction.

[0027] Specifically, a connecting sleeve 32 is welded to the bottom of the support plate 3, and the connecting sleeve 32 is sleeved on the output end of the jack 2. The connecting sleeve 32 is fixedly connected to the output end of the jack 2 by bolts, and there are multiple bolts along the circumferential array of the connecting sleeve 32 to ensure the reliability of the connection between the connecting sleeve 32 and the output end of the jack 2.

[0028] Furthermore, an adjustment plate 41 is integrally formed at the bottom of the limiting plate 4, and a waist-shaped groove 411 is opened on the adjusting plate 41 along the width direction of the tunnel. A locking bolt 42 is fixedly connected to the bottom of the supporting plate 3, and the locking bolt 42 passes through the waist-shaped groove 411 and is threadedly connected with a locking nut 43. The locking nut 43 is in contact with the bottom surface of the adjusting plate 41 to achieve relative fixation of the adjusting plate 41 and the supporting plate 3, and the waist-shaped groove 411 facilitates the adjustment of the position of the limiting plate 4.

[0029] In addition, a plurality of support blocks 31 are fixedly connected to the support plate 3, and the plurality of support blocks 31 are arranged at intervals. The support blocks 31 are made of rubber, and can compensate for the unevenness of the bottom surface of the tunnel while supporting the tunnel, thereby improving the uniformity of the force on the support plate 3.

[0030] Specifically, the support base plate 1 is fixedly connected with a vertical anchor rod 11, which is driven into the soil. The support base plate 1 is also provided with an inclined anchor rod 12, and the bottom of the inclined anchor rod 12 is arranged toward the outside of the support base plate 1. The inclined anchor rod 12 is provided with a threaded section 121, which is threadedly connected with the support base plate 1. During construction, the head of the inclined anchor rod 12 is first driven into the soil, and then the threaded section 121 cooperates with the support base plate 1, so that the inclined anchor rod 12 can be driven into the deeper soil more easily.

[0031] It should be noted that there are four inclined anchor rods 12, and the projections of the four inclined anchor rods 12 along the vertical direction are staggered with the jack 2. In actual construction, the above temporary support structure is provided with several groups, each group is arranged at intervals along the length direction of the tunnel, and each group of support structures is provided with two along the width direction of the tunnel, corresponding to the two bottoms of the tunnel.

[0032] Working principle: The jack 2 is used to temporarily support the tunnel to reduce the possibility of collapse of the existing tunnel. At the same time, the support plate 3 and the limit plate 4 are used to support the tunnel while reducing the possibility of separation of the support plate 3 from the tunnel. The vertical anchor rod 11 and the inclined anchor rod 12 are provided to improve the stability of the support bottom plate 1, thereby improving the stability of the tunnel support.

[0033] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A temporary support structure for adding an invert to an existing tunnel, characterized in that: It comprises a supporting base plate (1) and a jack (2) arranged on the supporting base plate (1), wherein the output end of the jack (2) is connected to a supporting plate (3), and the supporting plate (3) is suitable for supporting a tunnel; A limiting plate (4) is provided on the support plate (3), and two limiting plates (4) are provided. The two limiting plates (4) are arranged on both sides of the bottom of one end of the tunnel along the width direction of the tunnel.

2. The temporary support structure for adding an invert to an existing tunnel according to claim 1, characterized in that: A connecting sleeve (32) is provided at the bottom of the support plate (3), and the connecting sleeve (32) is sleeved on the output end of the jack (2). The connecting sleeve (32) is fixedly connected to the output end of the jack (2) by means of bolts.

3. The temporary support structure for adding an invert to an existing tunnel according to claim 1, characterized in that: The bottom of the limiting plate (4) is connected to an adjusting plate (41), and a waist-shaped groove (411) is provided on the adjusting plate (41) along the width direction of the tunnel. The bottom of the supporting plate (3) is fixedly connected to a locking bolt (42), and the locking bolt (42) passes through the waist-shaped groove (411) and is connected to a locking nut (43).

4. The temporary support structure for adding an invert to an existing tunnel according to claim 1, characterized in that: The support plate (3) is provided with a plurality of support blocks (31), and the plurality of support blocks (31) are arranged at intervals.

5. The temporary support structure for adding an invert to an existing tunnel as claimed in claim 4, characterized in that: The supporting block (31) is made of rubber.

6. The temporary support structure for adding an invert to an existing tunnel as claimed in claim 1, characterized in that: The supporting base plate (1) is provided with a vertical anchor rod (11), and the vertical anchor rod (11) is driven into the soil.

7. The temporary support structure for adding an invert to an existing tunnel as claimed in claim 1, characterized in that: The supporting base plate (1) is provided with an inclined anchor rod (12), and the bottom of the inclined anchor rod (12) is arranged toward the outside of the supporting base plate (1).

8. The temporary support structure for adding an invert to an existing tunnel as claimed in claim 7, characterized in that: The inclined anchor rod (12) is provided with a threaded section (121), and the threaded section (121) is threadedly connected to the supporting base plate (1).

9. The temporary support structure for adding an invert to an existing tunnel as claimed in claim 7, characterized in that: The projection of the inclined anchor rod (12) in the vertical direction is staggered with the jack (2).