Floor hole plugging structure
By installing hole frames and support members on the floor slabs, the cover plate is flush with the top surface of the floor slab, the tripping problem caused by the protrusion of the hole sealing structure in the prior art is solved, and multiple sets of connecting components and removable designs are used. The structural stability is improved and construction safety and resource conservation are achieved.
Patent Information
- Application Number
- CN202420550998.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-20
AI Technical Summary
The existing floor opening sealing structure protrudes from the ground, which can easily cause construction workers to trip and make it difficult for carts to pass, and can easily lead to concrete cracks during the sealing process.
The hole frame is used to fix it on the concrete floor slab and the connecting components are fixed on the concrete floor slab. The cover plate is supported by the support members to make it flush with the top surface of the floor slab, avoiding the risk of tripping caused by height differences, and multiple sets of connecting components are set in the width direction to improve the Structural stability, installation using removable sleeves and connecting ribs, through holes and fill materials are provided for easy construction and joint filling.
It improves construction safety and convenience of equipment movement, reduces operational difficulties, avoids concrete cracks, and saves construction period and resources.
Smart Images

Figure CN222025505U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of house construction, in particular to a floor opening blocking structure. Background Art
[0002] During the construction of a house, it is usually necessary to open some temporary openings in the floor slab according to the design requirements. That is, starting from the first floor of each building, at least one floor slab opening will be reserved on each floor as a layout hole, which is used to lead the coordinate points of the lower or bottom floor to the upper floor, so that the control points of this floor are the same as those of the lower floor, to ensure the uniformity of the internal wall, door and window structure layout. The floor slab opening will be blocked after the building is capped. The floor slab opening plays a key role in the construction of high-rise buildings. It ensures the accuracy and consistency of the construction process and improves the quality and stability of the building.
[0003] To facilitate construction, floor holes are generally left near stairs, construction elevators and other locations. These locations are also where construction workers and construction carts flow and pass closely. In order to prevent people or objects from falling from buildings, it is usually necessary to temporarily block the floor holes.
[0004] For example, a wiring hole cover plate with Chinese patent publication number CN214996228U includes a bottom cover plate and a hole cover plate, which are hinged to each other, and the hole cover plate can be flipped around one side of the hinge connection. The hole cover plate also includes a folded edge and a fastener, the folded edge is fixed to the concrete slab surface along one side of the wiring hole, the bottom cover plate is fixed to the folded edge, and the fastener is fixed along the other side of the wiring hole, the other side is symmetrical to the side where the folded edge is located, and the edge of the fastener is folded to adapt to the shape of the flipped end of the hole cover plate, the hole cover plate covers the wiring hole, and the flipped end is clamped on the fastener. Although this patent can also seal the openings in the floor slab, the cover plate of this patent is arranged above the concrete slab surface (equivalent to the ground where the floor slab is located), that is, the cover plate protrudes from the ground. When construction workers pass by the opening, they are easily tripped and injured. In addition, when a cart passes by, the unevenness between the cover plate and the ground can easily cause the construction materials on the cart to be bumped and damaged. At the same time, when the openings in the floor slab are sealed at a later stage, since the openings in the floor slab are connected from top to bottom, it is not convenient to plant reinforcement and install formwork, which can easily cause cracks in the newly poured concrete. Utility Model Content
[0005] One of the purposes of the utility model is to provide a floor opening blocking structure to solve the problem that the existing blocking structure protrudes from the ground, which makes it easy for construction workers to trip and get injured when passing through the opening, and it is inconvenient for carts to pass through.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0007] A floor opening sealing structure comprises an opening frame, wherein at least two groups of connection components are arranged at intervals along the height direction of the opening frame, each group of the connection components comprises two connection pieces, each of the connection pieces is located outside the opening frame, and the two connection pieces are arranged opposite to each other; one end of each of the connection pieces is connected and fixed to the opening frame, and the other end of each of the connection pieces is used for fixed connection to a concrete floor;
[0008] A cover plate and two support members, wherein the support members are connected to the inner side of the hole surrounding frame and are arranged opposite to each other; the cover plate is supported on the support members;
[0009] When the opening enclosure frame is used for temporary blocking, in the height direction of the opening enclosure frame, the top of the opening enclosure frame and the cover plate are flush with the top surface of the concrete floor slab;
[0010] When the opening surrounding frame is used for permanent filling, in the height direction of the opening surrounding frame, the bottom of the opening surrounding frame and the cover plate are flush with the bottom surface of the concrete floor slab.
[0011] According to the above technical scheme, the utility model installs the opening frame on the concrete floor slab through a connecting component, so that the opening frame is used as a layout hole, which is convenient for construction layout to ensure the uniformity of the internal wall, door and window structure layout; by installing the support member on the inner side of the opening frame, it is used to support the cover plate. When the cover plate is placed on the support member, the upper surface of the cover plate is flush with the top surface of the concrete floor slab. The flush ground reduces the risk of tripping caused by height difference, improves walking safety, and avoids the risk of construction workers being tripped and injured when passing by the opening; at the same time, it also facilitates the movement and installation of equipment, reduces the operating difficulties caused by uneven ground, and makes it more convenient for carts to pass through.
[0012] Furthermore, at least two groups of connection components are provided at intervals along the width direction of the hole surrounding frame.
[0013] According to the above technical solution, multiple groups of connection components are arranged at intervals in the width direction of the opening frame, and the multiple groups of connection components are connected to the opening frame to improve the connection firmness of the opening frame and improve the stability of the structure.
[0014] Furthermore, the hole surrounding frame is provided with through holes corresponding to the respective connecting members.
[0015] According to the above technical solution, by setting a through hole on the hole enclosure frame, it is convenient for the connecting parts to pass through the through hole. In the actual construction process, the installation of the connecting parts is convenient, which improves the construction progress.
[0016] Furthermore, each of the connecting parts includes a sleeve and a connecting rib, the connecting rib is detachably mounted on the sleeve, and the sleeve is inserted into the through hole and fixedly connected to the hole surrounding frame.
[0017] According to the above technical solution, the connecting ribs and sleeves are designed to be detachable, which is flexible to install and convenient to disassemble and assemble, effectively reducing resource waste and improving material utilization.
[0018] Furthermore, it also includes a fastener, and the support member is fixed to the sleeve through the fastener.
[0019] According to the above technical solution, the fastener can pass through the through hole to fix the support member on the sleeve, and the fastener plays a role in connecting the support member and the sleeve.
[0020] Furthermore, the support member is in an L-shaped structure;
[0021] When the opening enclosure frame is used for temporary blocking, the top of the support member is not higher than the top surface of the concrete floor slab in the height direction of the opening enclosure frame;
[0022] When the opening surrounding frame is permanently filled and used, in the height direction of the opening surrounding frame, the bottom of the support member is not lower than the bottom surface of the concrete floor slab.
[0023] According to the above technical solution, when the hole opening frame is used as a temporary blockage, the top of the support is not higher than the top surface of the concrete floor slab, so that the support will not protrude from the ground, so that the ground remains level, avoiding the risk of construction workers being tripped and injured when passing through the hole opening; at the same time, it also facilitates the movement and installation of equipment, reduces the operational difficulties caused by uneven ground, and makes it more convenient for carts to pass through.
[0024] Furthermore, the sleeve and the connecting rib are connected in the form of a threaded connection.
[0025] According to the above technical solution, the sleeve and the connecting rib are connected in the form of threaded connection, which is convenient for disassembly and construction, and improves construction efficiency.
[0026] Furthermore, the opening surrounding frame includes four channel steel plates, and the channel steel plates are together enclosed to form the opening surrounding frame.
[0027] According to the above technical solution, four channel steel plates are combined to form a hole frame. Channel steel plates are common building materials in the construction industry, are easy to obtain, and have high economic benefits.
[0028] Furthermore, it also includes reinforcing ribs, and the reinforcing ribs are located inside the hole surrounding frame.
[0029] According to the above technical solution, when the hole needs to be permanently sealed, reinforcing ribs are provided to increase the structural strength of the concrete at the hole, thereby improving the strength and rigidity of the concrete product.
[0030] Furthermore, it also includes a filling material, and the filling material is filled in the gap formed between the hole surrounding frame and the cover plate.
[0031] According to the above technical solution, the filling material can fill the uneven gaps to make the building surface smoother and more beautiful, and at the same time can prevent slag and gravel from entering the gaps during the construction process.
[0032] Beneficial effects of the utility model:
[0033] The utility model installs the hole opening frame on the concrete floor slab through the connecting component, so that the hole opening frame is used as a layout hole, which is convenient for construction layout and ensures the uniformity of the structural layout of internal walls, doors and windows; the support member can be connected to the connecting component, so that the support member is fixedly installed on the inner side of the hole opening frame to support the cover plate. When the cover plate is placed on the support member, the upper surface of the cover plate is flush with the top surface of the concrete floor slab. The flush ground reduces the risk of tripping caused by height difference, improves walking safety, and avoids the risk of construction workers being tripped and injured when passing by the hole opening; at the same time, it also facilitates the movement and installation of equipment, reduces the operating difficulty caused by uneven ground, and makes it more convenient for carts to pass through.
[0034] In the utility model, when the cover plate is used as a temporary blockage, the support plate remains flush with the ground, which is convenient for pedestrians and carts to pass by; the cover plate can also be used as a permanent blockage. At this time, the cover plate can also be installed at the bottom of the hole opening frame as a concrete bottom formwork, and then the hole opening frame is filled with concrete to achieve the blocking of the hole. Compared with the prior art, when used as a bottom formwork, the cover plate of the utility model can be kept at the bottom of the hole opening all the time, and there is no need to remove the formwork, which saves construction time. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 This is a structural schematic diagram of the utility model when the floor opening blocking structure is flush with the top surface of the floor;
[0036] Figure 2 This is a structural schematic diagram of the utility model when the floor opening blocking structure is flush with the bottom surface of the floor;
[0037] Figure 3 A structural schematic diagram of the installation of reinforcing ribs for the floor opening blocking structure of the utility model;
[0038] Figure 4 It is a top view of the floor opening blocking structure of the utility model;
[0039] Figure 5It is a cross-sectional view of the structural groove steel plate of the floor opening blocking structure of the utility model.
[0040] Among them, there are concrete floor 1, opening frame 2, channel steel plate 21, through hole 211, connection assembly 3, connection part 31, sleeve 311, connection rib 312, cover plate 4, support part 5, fastener 6, reinforcement rib 7, and filling material 8. DETAILED DESCRIPTION
[0041] The following will describe the implementation of the present invention with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention, not for limiting the scope of protection of the present invention.
[0042] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed at will, and the component layout may also be more complicated.
[0043] This embodiment provides a floor opening blocking structure for installation on a concrete floor 1. Figure 1 and Figure 2 As shown, it includes an opening frame 2, a cover plate 4 and two support members 5. At least two groups of connection components 3 are arranged at intervals along the height direction of the opening frame 2. Each group of connection components 3 includes two connection members 31. Each connection member 31 is located on the outside of the opening frame 2, and the two connection members 31 are arranged opposite to each other; one end of each connection member 31 is connected and fixed to the opening frame 2, and the other end of each connection member 31 is used to be connected and fixed to the concrete floor slab 1.
[0044] like Figure 1 As shown, the support member 5 is connected to the inner side of the hole frame 2, and the support members 5 are arranged oppositely; the cover plate 4 is installed on the support member 5, and the support member 5 is used to support the cover plate 4;
[0045] When the cover plate 4 is covered on the hole enclosure frame 2 for temporary blocking, along the height direction of the hole enclosure frame 2, such as Figure 1 As shown, the top of the opening frame 2 and the cover plate 4 are flush with the top surface of the concrete floor slab 1;
[0046] When the hole enclosure 2 is used for permanent filling, along the height direction of the hole enclosure 2, such as Figure 2As shown, the bottom of the opening frame 2 and the cover plate 4 are flush with the bottom surface of the concrete floor slab 1.
[0047] In this embodiment, the opening frame 2 is installed on the concrete floor 1 through the connecting component 3. The connecting component 3 serves to connect the opening frame 2, so that the opening frame 2 is used as a wiring hole, which is convenient for construction layout and ensures the uniformity of the internal wall, door and window structure layout; by installing the support member 5 on the inner side of the opening frame 2, it is used to support the cover plate 4 as a temporary blockage. When the cover plate 4 is placed on the support member 5, the upper surface of the cover plate 4 is flush with the top surface of the concrete floor 1. The flush ground reduces the risk of tripping due to height difference, improves walking safety, and avoids the risk of construction workers being tripped and injured when passing by the opening; it also facilitates the movement and installation of equipment, reduces the operating difficulties caused by uneven ground, and makes it more convenient for carts to pass through.
[0048] When the layout work of the construction (or the roofing work of the house) is completed, it is often necessary to seal the opening. When sealing, the cover plate 4 and the support member 5 are installed at the bottom of the opening frame 2, so that the bottom of the opening frame 2 and the cover plate 4 are flush with the bottom surface of the concrete floor slab 1, and then the opening frame 2 is filled with concrete. After curing, the sealing work of the opening frame 2 is completed. The cover plate 4 and the support member 5 are left to the bottom of the frame, and there is no need to consider the step of removing the formwork, which is convenient for construction and saves construction time.
[0049] like Figure 4 As shown, at least two groups of connection components 3 are arranged at intervals along the width direction of the opening frame 2; as a preferred embodiment, there are three groups of connection components 3 in this embodiment; by arranging multiple groups of connection components 3 at intervals in the width direction of the opening frame 2, the multiple groups of connection components 3 are connected to the opening frame 2, so as to improve the connection firmness of the opening frame 2 and improve the stability of the structure.
[0050] Furthermore, if Figure 5 As shown, a through hole 211 is opened on the hole enclosure 2 corresponding to each connecting member 31; by setting the through hole 211 on the hole enclosure 2, it is convenient for the connecting member 31 to pass through the through hole 211. In the actual construction process, no additional drilling work is required, which facilitates the installation of the connecting member 31 and improves the construction progress.
[0051] like Figure 2As shown, the connecting member 31 includes a sleeve 311 and a connecting rib 312. The connecting rib 312 is detachably mounted on the sleeve 311. The sleeve 311 is inserted into the through hole 211 and fixedly connected to the opening frame 2. Specifically, the sleeve 311 and the connecting rib 312 are connected in the form of a threaded connection, which is convenient for disassembly and construction, and improves construction efficiency. In this embodiment, the connecting rib 312 is preferably a steel bar. The connecting rib 312 and the sleeve 311 of this embodiment are detachable, flexible in installation, convenient for disassembly and assembly, and improves material utilization. Figure 1 and Figure 2 As shown, it also includes a fastener 6, and the support member 5 is fixed to the sleeve 311 through the fastener 6; the fastener 6 can pass through the through hole 211 to fix the support member 5 on the sleeve 311, and the fastener 6 plays a role in connecting the support member 5 and the sleeve 311. In this embodiment, the fastener 6 is preferably a bolt.
[0052] As a preferred embodiment, Figure 1 and Figure 2 As shown, the support member 5 is in an L-shaped structure; when the hole opening frame 2 is used for temporary blocking, the top of the support member 5 is not higher than the top surface of the concrete floor 1 in the height direction of the hole opening frame 2; so that the support member 5 will not protrude from the ground (or the top surface of the concrete floor 1), so that the ground remains level, avoiding the risk of construction workers being tripped and injured when passing by the hole opening; at the same time, it also facilitates the movement and installation of equipment, reduces the operating difficulties caused by uneven ground, and makes it more convenient for carts to pass through.
[0053] When the opening frame 2 is used for permanent filling, the bottom of the support member 5 is not lower than the bottom surface of the concrete floor 1 in the height direction of the opening frame 2, thereby avoiding unevenness on the top of the next floor and facilitating subsequent decoration and wall painting work on the next roof.
[0054] like Figure 4 As shown, the opening enclosure frame 2 includes four channel steel plates 21, and the channel steel plates 21 are enclosed together to form the opening enclosure frame 2; the channel steel plates 21 are common building materials in the construction industry, which are easy to obtain and have high economic benefits.
[0055] Furthermore, if Figure 3 As shown, when the hole enclosure frame 2 is used for permanent filling, it also includes a reinforcing rib 7, which is located inside the hole enclosure frame 2. The reinforcing rib 7 is provided to improve the structural strength after the concrete is filled, so that the strength and rigidity of the concrete product can be improved; the reinforcing rib 7 is preferably a threaded steel bar; specifically, as Figure 3 As shown, there are multiple reinforcing ribs 7 , wherein one end of the reinforcing rib 7 can extend into the sleeve 311 and be fixed to the sleeve 311 , and the other end of the reinforcing rib 7 overlaps with the next section of reinforcing rib 7 .
[0056] During construction and installation, a gap is formed between the opening frame 2 and the cover plate 4, and the gap is filled with filling material 8, which is preferably made of rubber; the filling material 8 can fill the uneven structure between the gaps, making the building surface smoother and more beautiful, and at the same time preventing slag and gravel from entering the gaps during construction.
[0057] Four channel steel plates 21 are spliced together to form the outline of the opening, so that they are enclosed together to form the opening enclosure frame 2, and the sleeve 311 is connected to the connecting rib 312. After the connection is completed, the multiple sleeves 311 are respectively passed through the corresponding through holes 211 on the opening enclosure frame 2, and the sleeves 311 are fixed to the opening enclosure frame 2; the assembly process can be prefabricated during the production process of the manufacturer, and can also be assembled on site;
[0058] In specific implementation, before the reinforcement of the concrete floor 1 is tied, the position of the opening to be opened is determined according to the actual site, and the reinforcement of the concrete floor 1 is tied to reserve a specified size for the opening, and then the prefabricated opening frame 2 and its connecting components 3 are placed; after the opening frame 2 and the connecting components 3 are placed, the reinforcement of the concrete floor 1 and the connecting bars 312 are overlapped, and after the overlap is completed, concrete is poured to form the opening frame 2 and the concrete floor 1 as a whole, so that the opening frame 2 is fixed on the concrete floor 1 and the construction is completed, and the opening frame 2 is used as a layout hole to facilitate the construction layout. When the staff is working on the concrete floor 1 of the floor, in order to ensure the construction safety, the hole frame 2 needs to be temporarily blocked; specifically, the fastener 6 is used to pass through the through hole 211 of the hole frame 2, the sleeve 311 is connected to the support member 5, the upper end of the support member 5 is aligned with the upper end of the flange of the channel steel plate 21 (i.e. the top surface of the concrete floor 1), the fastener 6 is tightened to fix the support member 5 on the inner side of the hole frame 2, and the cover plate 4 is placed on the support member 5 so that the upper surface of the cover plate 4 is flush with the top surface of the concrete floor 1 (i.e. the ground of the floor), thereby avoiding the risk of construction workers being tripped and injured when passing through the hole; at the same time, it is also convenient to move and install the equipment, reduce the difficulty of operation caused by uneven ground, and make it more convenient for the cart to pass through; then fill the gap formed between the hole frame 2 and the cover plate 4 with filling material 8 to avoid collision damage or sound of the cover plate 4. When the line laying work is required, it is only necessary to lift the cover plate 4, which has a compact structure and strong practicality.
[0059] When the layout work of the construction (or the roofing work of the house) is completed, when the opening is sealed, the support members 5 and the cover plate 4 are installed at the bottom of the opening frame 2, and then the reinforcing ribs 7 are installed inside the opening frame 2 to improve the structural strength after filling with concrete, which can improve the strength and rigidity of concrete products; prevent cracks, water leakage and other problems in the concrete at a later stage; fill the opening frame 2 with concrete, and complete the sealing after curing, and the support members 5 and the cover plate 4 are left to the bottom of the opening frame 2, without removing the formwork, saving construction time.
[0060] The above embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Any equivalent substitution or modification made by a person skilled in the art based on the present invention is within the protection scope of the present invention.
Claims
1. A floor opening blocking structure, used for installation on a concrete floor (1), characterized in that: include: An opening enclosure frame (2), wherein at least two groups of connection components (3) are arranged at intervals along the height direction of the opening enclosure frame (2), each group of the connection components (3) comprises two connection members (31), each of the connection members (31) is located outside the opening enclosure frame (2), and the two connection members (31) are arranged opposite to each other; one end of each of the connection members (31) is connected and fixed to the opening enclosure frame (2), and the other end of each of the connection members (31) is used for fixed connection to a concrete floor slab (1); A cover plate (4) and two support members (5), wherein the support members (5) are connected to the inner side of the hole surrounding frame (2) and the support members (5) are arranged opposite to each other; the cover plate (4) is supported on the support members (5); When the opening enclosure frame (2) is used for temporary blocking, in the height direction of the opening enclosure frame (2), the top of the opening enclosure frame (2) and the cover plate (4) are flush with the top surface of the concrete floor slab (1); When the opening surrounding frame (2) is used for permanent filling, in the height direction of the opening surrounding frame (2), the bottom of the opening surrounding frame (2) and the cover plate (4) are flush with the bottom surface of the concrete floor slab (1).
2. The floor opening blocking structure according to claim 1, characterized in that: At least two groups of connection components (3) are arranged at intervals along the width direction of the hole surrounding frame (2).
3. The floor opening blocking structure according to claim 1, characterized in that: The hole surrounding frame (2) is provided with a through hole (211) corresponding to each of the connecting members (31).
4. The floor opening blocking structure according to claim 3, characterized in that: Each of the connecting members (31) comprises a sleeve (311) and a connecting rib (312), wherein the connecting rib (312) is detachably mounted on the sleeve (311), and the sleeve (311) is inserted into the through hole (211) and fixedly connected to the hole surrounding frame (2).
5. The floor opening blocking structure according to claim 4, characterized in that: It also includes a fastener (6), and the support member (5) is fixed to the sleeve (311) via the fastener (6).
6. The floor opening blocking structure according to claim 1, characterized in that: The support member (5) is in an L-shaped structure; When the opening enclosure frame (2) is used for temporary blocking, the top of the support member (5) is not higher than the top surface of the concrete floor slab (1) in the height direction of the opening enclosure frame (2); When the opening surrounding frame (2) is permanently filled and used, in the height direction of the opening surrounding frame (2), the bottom of the support member (5) is not lower than the bottom surface of the concrete floor slab (1).
7. The floor opening blocking structure according to claim 4, characterized in that: The sleeve (311) and the connecting rib (312) are connected in the form of a threaded connection.
8. The floor opening blocking structure according to claim 7, characterized in that: The hole surrounding frame (2) comprises four channel steel plates (21), and the channel steel plates (21) are together enclosed to form the hole surrounding frame (2).
9. The floor opening blocking structure according to claim 1, characterized in that: It also includes reinforcing ribs (7), and the reinforcing ribs (7) are located inside the hole surrounding frame (2).
10. The floor opening blocking structure according to claim 1, characterized in that: It also comprises a filling material (8), wherein the filling material (8) is filled in a gap formed between the hole surrounding frame (2) and the cover plate (4).
Citation Information
Cited By
Template system for temporary construction hole plugging and pouring and construction method
CN120100181A
A formwork system and construction method for plugging and pouring temporary construction openings
CN120100181B