Energy-saving ventilation system for Z-shaped tunnel construction
By fixedly installing air compressors and high-pressure air supply ducts, combined with the design of jet fans and local fans, the problem of poor ventilation effect in Z-type tunnel construction is solved, efficient ventilation and rapid discharge of polluted air flow is achieved, and construction safety is improved efficiency.
Patent Information
- Application Number
- CN202420671348.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-03
AI Technical Summary
During the construction of Z-type tunnels, poor air flow due to their structure leads to poor ventilation results, which affects the progress of the project and the health of construction personnel.
The air supply equipment and high-pressure air supply ducts are used to directly transport the construction air to the palm surface, and a jet fan is installed in the linear section of the Z-shaped structure tunnel and a local fan is installed in the S-bend or Z-bend section. An effective gas flow path is formed to accelerate the discharge of polluted air flow.
It realizes efficient ventilation in Z-type tunnel construction, reduces air pollution in the tunnel, simplifies pipeline connections, improves ventilation effect, reduces production costs, and ensures the health and safety of construction workers.
Smart Images

Figure CN222025805U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of energy-saving ventilation for Z-type tunnel construction, and in particular to an energy-saving ventilation system for Z-type tunnel construction. Background Art
[0002] "Face" is a term used in the construction of a pit or tunnel, which refers to the working face that continuously moves forward during tunnel excavation. It is not a fixed face. The excavation face includes the face, side wall and vault face. To be precise, it is the working face that continuously moves forward facing the operating workers.
[0003] Tunnel dust is a tiny particle generated during the excavation of the tunnel face. The particle size is usually less than micrometers and can easily enter the human body and cause respiratory diseases such as pneumoconiosis. In addition, dust particles entering mechanical equipment will accelerate the wear of mechanical equipment, cause equipment damage, and increase production costs; and high dust concentrations have the risk of causing dust explosions. In addition, there are harmful gases in the tunnel, which directly affect the health of construction workers.
[0004] In view of the existing tunnel dust and harmful gases, the tunnel needs to be ventilated during the construction process. The purpose of ventilation is to transport enough fresh air from outside the tunnel to the inside of the tunnel, and to discharge the dust and harmful gases generated by blasting and transportation in the tunnel, so as to ultimately ensure the fresh air needs of workers and machinery in the tunnel, and make the air in the tunnel meet the standards specified by the state and the industry.
[0005] For Z-type tunnels, since their structure itself has bends, the gas flowability is poorer than that of H-type tunnels. Therefore, efficient tunnel ventilation design is particularly important. The quality of ventilation in Z-type tunnel construction directly affects the progress of the project and the health of the workers.
[0006] Therefore, in view of the above problems, there is an urgent need for an energy-saving ventilation system for Z-type tunnel construction. Utility Model Content
[0007] In view of this, the utility model provides an energy-saving ventilation system for Z-type tunnel construction, which can effectively solve the above-mentioned problems existing in the prior art.
[0008] In order to achieve the above purpose, the technical solution of the utility model is to provide
[0009] An energy-saving ventilation system for Z-type tunnel construction, comprising air supply equipment and air supply ducts,
[0010] The air supply equipment is fixedly installed at the opening to supply air, and cooperates with the air supply pipeline to directly transport the construction air to the tunnel face;
[0011] The air supply duct comprises an air supply duct main pipe and a local air supply duct. One end of the air supply duct main pipe is connected to the air supply equipment, and the other end is connected to the local air supply duct.
[0012] Furthermore, the main air supply pipe is laid along the tunnel wall using a DN150 galvanized steel pipe to a distance of 40-60m from the tunnel face, and the local air supply pipe is connected to the main air supply pipe using a DN50 steel wire hose and is directly delivered to the tunnel face.
[0013] Furthermore, it also includes jet fans, and several of the jet fans are installed at the straight section of the Z-shaped structure tunnel.
[0014] Furthermore, it also includes relay fans, and several of the relay fans are installed between the main air supply ducts and between the main air supply ducts and local air supply ducts.
[0015] Furthermore, wind belts with hard frames are used at both ends of the relay wind turbine, and the length of the wind belts at both ends of the relay wind turbine is 40-60m.
[0016] Furthermore, the hard skeleton is a steel ring structure.
[0017] Furthermore, it also includes local fans, and several of the local fans are arranged in the middle of the S-bend or Z-bend section close to the wall.
[0018] Furthermore, the jet fan and the local fan are arranged on the other side of the cave wall opposite to the air supply duct.
[0019] Furthermore, the air supply equipment adopts an air compressor.
[0020] The advantages and beneficial effects of the utility model are:
[0021] (1) Use a fixed air compressor at the tunnel entrance to supply air, and use a high-pressure air supply pipeline to deliver construction air directly to the tunnel face. This air supply method can not only reduce air pollution in the tunnel, but also facilitate the connection of pipelines, avoiding the inconvenience caused by the mobile air compressor being moved every time the blasting equipment is moved.
[0022] (2) In order to discharge the polluted air more quickly, a jet fan can be installed in the straight section of the Z-shaped tunnel.
[0023] (3) According to the structural characteristics of the Z-shaped tunnel itself, a ventilation design method is adopted in which local fans are added to the special S-bend or Z-bend. At the same time, in order to maximize the power of the local fans to meet the energy-saving requirements, the local fans should be installed in the middle of the S-bend or Z-bend section close to the wall, so as to achieve the best ventilation effect and form an energy-saving and effective gas flow path.
[0024] (4) The utility model fixes the air supply equipment at the tunnel opening for air supply, and cooperates with the air supply duct to directly deliver the construction air to the face; in order to discharge the polluted air more quickly, a jet fan can be set in the straight section of the Z-shaped tunnel structure, and a local fan can be added in the special S-bend or Z-bend. Under the action of the jet fan and the local fan, a polluted airflow is formed, and the discharge of the polluted airflow is accelerated by the jet fan and the local fan. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of an energy-saving ventilation system for Z-type tunnel construction described in the utility model;
[0026] Figure 2 This is a schematic diagram of an energy-saving ventilation system for Z-type tunnel construction described in the utility model;
[0027] Air supply equipment 1, air supply duct 2, air supply duct main pipe 21, local air supply duct 22, palm face 3, jet fan 4, local fan 5, relay fan 6, air belt 7. DETAILED DESCRIPTION
[0028] The following is a further description of the specific implementation of the present invention in conjunction with the accompanying drawings and embodiments. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0029] like Figure 1-2 As shown, an energy-saving ventilation system for Z-type tunnel construction includes an air supply device 1 and an air supply pipeline 2.
[0030] The air supply device 1 is fixedly installed at the opening of the tunnel for supplying air, and cooperates with the air supply pipeline 2 to directly transport the construction air to the tunnel face 3;
[0031] The air supply duct 2 includes an air supply duct main pipe 21 and a local air supply duct 22 . One end of the air supply duct main pipe 21 is connected to the air supply device 1 , and the other end is connected to the local air supply duct 22 .
[0032] According to the characteristics of the wind position and load distribution in the Z-type tunnel excavation and support construction, and due to the ultra-long distance construction of the tunnel and the ordinary drilling and blasting section, in order to reduce the air pollution in the tunnel and the ventilation pressure of the tunnel, the tunnel entrance fixed electric air compressor is used to supply air, and the high-pressure air supply pipeline is used to directly transport the construction air to the face. This form of air supply can not only reduce the air pollution in the tunnel, but also facilitate the connection of the pipeline, avoiding the inconvenience caused by the mobile air compressor due to the relocation of the blasting equipment each time.
[0033] As a preferred embodiment of the above technical solution, the air supply pipe main 21 is laid along the tunnel wall using a DN150 galvanized steel pipe to a distance of 40-60m from the tunnel face, and the local air supply pipe 22 is connected to the air supply pipe main 21 using a DN50 steel wire hose and directly delivered to the tunnel face 3.
[0034] As a preferred embodiment of the above technical solution, it also includes a jet fan 4, and a number of the jet fans 4 are installed at the straight section of the Z-shaped structure tunnel.
[0035] In order to discharge the polluted air more quickly, a jet fan can be installed in the straight section of the Z-shaped structure tunnel.
[0036] As a preferred embodiment of the above technical solution, it also includes a relay fan 6 , and a plurality of the relay fans 6 are installed between the main air supply duct 21 and between the main air supply duct 21 and the local air supply duct 22 .
[0037] As a preferred embodiment of the above technical solution, wind belts 7 with hard frames are used at both ends of the relay fan 6, and the length of the wind belts at both ends of the relay fan 6 is 40-60m.
[0038] As a preferred embodiment of the above technical solution, the hard skeleton is a steel ring structure.
[0039] The relay fan adopts a variable-speed multi-speed fan, and the relay fan model is SDDY-III-NO12.5A. In addition, considering the large wind pressure in small sections, wind belts with hard frames are used 50m before and after the relay fan in the main tunnel to avoid the air inlet being sucked flat and the air outlet pressure being too high causing the pipe to burst, so as to ensure normal ventilation.
[0040] As a preferred embodiment of the above technical solution, it also includes local fans 5, and a plurality of the local fans 5 are arranged in the middle of the S-bend or Z-bend section close to the wall.
[0041] According to the structural characteristics of the Z-type tunnel itself, a ventilation design method of adding local fans in special S-bends or Z-bends is adopted. Different local fan models should be used according to the concentration category of harmful gases and the different excavation locations. The outlet speed of the local fan should be controlled between 10 and 33 m / s, and the construction ventilation should be adjusted according to the on-site implementation effect. According to the air flow conditions, the local fan layout meets the normal operation requirements and cannot block the normal operation of construction machinery such as trolleys and cranes. At the same time, it meets the energy-saving requirements to maximize the power of the local fans. The local fan layout should be set in the middle of the S-bend or Z-bend section close to the wall. In this way, the best ventilation effect can be achieved and an energy-saving and effective gas flow path can be formed.
[0042] As a preferred embodiment of the above technical solution, the jet fan 4 and the local fan 5 are arranged on the other side of the cave wall opposite to the air supply duct 2.
[0043] As a preferred embodiment of the above technical solution, the air supply device 1 adopts an air compressor.
[0044] The implementation principle of the utility model is as follows:
[0045] like Figure 1 and 2 As shown, the air supply equipment 1 is fixedly installed at the tunnel entrance for air supply, and cooperates with the air supply duct 2 to directly transport the construction air to the tunnel face 3; in order to discharge the polluted air more quickly, a jet fan can be set in the straight section of the Z-shaped structure tunnel, and a ventilation design method of adding a local fan in the special S-bend or Z-bend can be adopted. Under the action of the jet fan and the local fan, a polluted airflow is formed, and the discharge of the polluted airflow is accelerated by the jet fan and the local fan.
[0046] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. An energy-saving ventilation system for Z-type tunnel construction, It is characterized in that It comprises an air supply device (1) and an air supply pipeline (2). The air supply device (1) is fixedly installed at the opening of the tunnel for supplying air, and cooperates with the air supply pipeline (2) to directly transport construction air to the tunnel face (3); The air supply duct (2) comprises an air supply duct main pipe (21) and a local air supply duct (22); one end of the air supply duct main pipe (21) is connected to the air supply device (1), and the other end is connected to the local air supply duct (22).
2. An energy-saving ventilation system for Z-type tunnel construction according to claim 1, It is characterized in that The air supply pipe main pipe (21) is a DN150 galvanized steel pipe laid along the tunnel wall to a distance of 40-60m from the tunnel face (3), and the local air supply pipe (22) is connected to the air supply pipe main pipe (21) using a DN50 steel wire hose and directly delivered to the tunnel face (3).
3. The energy-saving ventilation system for Z-type tunnel construction according to claim 1, It is characterized in that It also includes jet fans (4), and a plurality of the jet fans (4) are installed at the straight section of the Z-shaped structure tunnel.
4. The energy-saving ventilation system for Z-type tunnel construction according to claim 1, It is characterized in that It also includes a relay fan (6), and a plurality of the relay fans (6) are installed between the main air supply duct (21) and between the main air supply duct (21) and the local air supply duct (22).
5. An energy-saving ventilation system for Z-type tunnel construction according to claim 4, It is characterized in that Wind belts with hard frames are used at both ends of the relay fan (6), and the length of the wind belts at both ends of the relay fan (6) is 40-60m.
6. The energy-saving ventilation system for Z-type tunnel construction according to claim 5, It is characterized in that The hard frame is a steel ring structure.
7. The energy-saving ventilation system for Z-type tunnel construction according to claim 3, It is characterized in that It also includes local fans (5), and a plurality of the local fans (5) are arranged in the middle of the S-bend or Z-bend section close to the wall surface.
8. The energy-saving ventilation system for Z-type tunnel construction according to claim 7, It is characterized in that The jet fan (4) and the local fan (5) are arranged on the other side of the cave wall opposite to the air supply duct (2).
9. The energy-saving ventilation system for Z-type tunnel construction according to claim 1, It is characterized in that The air supply device (1) adopts an air compressor.