Synthesizer
By designing a material delivery pump and filling device with dual output ports in the synthesis device, the problem of excessive liquid ammonia in the off-season urea is solved, and flexible management of urea and liquid ammonia is achieved, reducing installation costs and time.
Patent Information
- Application Number
- CN202420777365.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-15
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-15
AI Technical Summary
The existing synthetic device is only equipped with one outlet for the output of urea, and it is unable to effectively output the remaining liquid ammonia, resulting in excessive liquid ammonia inventory and increasing project installation time and cost.
A synthetic device is designed, including a material storage container, a material delivery pump and a control mechanism. The material delivery pump has two output ports, one for urea output and the other connected to the filling device to output residual liquid ammonia, through The control mechanism flexibly regulates the output of both to achieve flexible management of urea and liquid ammonia.
The stable output of urea and the effective management of residual liquid ammonia are achieved, the problem of excessive liquid ammonia inventory is solved, and the additional time and cost are reduced from the increase of a separate liquid ammonia output system.
Smart Images

Figure CN222025955U_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of chemical filling, and in particular to a synthesis device. Background Art
[0002] In the synthetic ammonia industry, the synthesis unit is mainly used to produce urea raw materials, and the liquid ammonia it produces is all used in the urea synthesis process. However, the market demand for urea shows a significant seasonal characteristic. The demand for urea is relatively small in winter. At this time, after the synthesis unit completes urea synthesis, there will be a lot of liquid ammonia remaining. These remaining liquid ammonia that cannot be consumed immediately have to be temporarily stored in ammonia tanks. In order to ensure that the synthesis unit can maintain full-load and stable operation throughout the year, it is particularly urgent to effectively solve the problem of excessive liquid ammonia inventory.
[0003] The current synthesis unit is only equipped with one outlet specifically for urea output. If you want to output the remaining liquid ammonia, you need to add an additional liquid ammonia material delivery pump. Such a change will undoubtedly increase the time investment and technical difficulty of engineering installation, and will also increase costs. In view of the actual situation, the design of a single output port limits the flexible disposal and utilization of the remaining liquid ammonia, making the storage and treatment of liquid ammonia a major problem during the urea off-season.
[0004] Therefore, how to provide a synthesis device that can take into account both urea production and residual liquid ammonia output is a problem that urgently needs to be solved. Utility Model Content
[0005] A technical problem to be solved by the present disclosure is that the material output pump of the existing synthesis device has only one output port for outputting urea, and no output port for outputting the remaining liquid ammonia in the synthesis device. If the remaining liquid ammonia is to be output, an additional liquid ammonia material delivery pump needs to be added. Such a change will undoubtedly increase the time investment and technical difficulty of the engineering installation, and will also increase the cost.
[0006] To solve the above problems, an embodiment of the present disclosure provides a synthesis device, including: a material storage container, a material conveying pump and a control mechanism, the material conveying pump is connected to the material storage container, the material conveying pump includes: a first output port, used to output a first material to be output in the material storage container; a second output port, provided with a filling device, the feed port of the output pipeline of the filling device is connected to the second output port, the discharge port of the filling device is connected to the conveying device, used to output the second material to be output in the material storage container to the conveying device; the control mechanism is connected to the material conveying pump signal to regulate and distribute the amount of the first material to be output outputted from the first output port and regulate and distribute the amount of the second material to be output outputted from the second output port.
[0007] In some embodiments, the filling device includes a manual stop valve, which is arranged in the output pipeline to control the flow of the output pipeline.
[0008] In some embodiments, the filling device also includes a detector and a cut-off valve. The detector is used to detect whether there is a gas leakage in the output pipeline; the cut-off valve is arranged in the output pipeline and connected to the detector signal, and is used to control the flow or closure of the output pipeline according to the detection results of the detector.
[0009] In some embodiments, the filling device also includes a valve remote control mechanism connected to the shut-off valve signal for controlling the closing and opening of the shut-off valve.
[0010] In some embodiments, the filling device also includes a material collecting tank and a discharge valve. The material collecting tank is connected to the output pipeline through the discharge pipeline and is located before the cut-off valve and the manual stop valve. The discharge valve is arranged in the discharge pipeline to control the flow of the discharge pipeline.
[0011] In some embodiments, the filling device also includes a first pressure gauge and a flow regulating valve. The first pressure gauge is arranged at one end of the output pipeline near the discharge port, and is used to monitor the pressure of the output pipeline; the flow regulating valve is arranged between the first pressure gauge and the feed port and is connected to the signal of the first pressure gauge, and is used to adjust the flow rate of the second material to be output in the output pipeline according to the pressure value measured by the first pressure gauge.
[0012] In some embodiments, the filling device also includes a first replacement valve and a first replacement mechanism, the first replacement valve is arranged in the output pipeline, and the first replacement valve has at least one inlet and at least one discharge port; the inflation port of the first replacement mechanism is connected to at least one inlet of the first replacement valve, and is used to transport replacement gas into the output pipeline to discharge the gas to be replaced in the output pipeline from at least one discharge port of the first replacement valve.
[0013] In some embodiments, the filling device also includes a pressure relief pipeline, the air inlet of the pressure relief pipeline is connected to the conveying device, and the air outlet of the pressure relief pipeline is connected to the gas storage container, which is used to transport the gas generated in the conveying device to the gas storage container.
[0014] In some embodiments, the filling device also includes a second pressure gauge and a pressure relief cut-off valve. The second pressure gauge is arranged in the pressure relief pipeline to monitor the pressure of the pressure relief pipeline. The pressure relief cut-off valve is arranged in the pressure relief pipeline and is located between the gas storage container and the second pressure gauge, and is used to control the circulation and closing of the pressure relief pipeline according to the pressure value measured by the second pressure gauge.
[0015] In some embodiments, the filling device also includes a second replacement valve and a second replacement mechanism, the second replacement valve is arranged in the pressure relief pipeline, and the second replacement valve has at least one inlet and at least one discharge port; the inflation port of the second replacement mechanism is connected to at least one inlet of the second replacement valve, and is used to transport replacement gas into the pressure relief pipeline to discharge the gas to be replaced in the pressure relief pipeline from at least one discharge port of the second replacement valve.
[0016] Through the above technical scheme, the present disclosure provides a synthesis device, which includes a material storage container, a material delivery pump and a control mechanism. The first output port of the material delivery pump is used to deliver urea, the second output port of the material delivery pump is connected to the feed port of the output pipeline of the filling device, and the output port of the output pipeline is connected to the conveying device, which is used to output the liquid ammonia remaining after synthesizing urea. The overall output capacity of the material delivery pump is constant, and the operator can flexibly adjust and control the amount of urea delivered by the first output port through the control mechanism, and then adjust the second output port accordingly according to the remaining capacity, so as to effectively deliver the liquid ammonia in the material storage container to the conveying device, and then deliver it to the sales location for sale. Therefore, the synthesis device not only realizes the delivery of urea, but also effectively manages and dispatches the output of the remaining liquid ammonia, thereby solving the problem of excessive liquid ammonia inventory caused by seasonal supply and demand imbalance, and at the same time reducing the additional time and cost burden caused by the addition of a separate liquid ammonia output system. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0018] Figure 1 It is a schematic diagram of the partial structure of a synthesis device disclosed in an embodiment of the present disclosure.
[0019] Description of reference numerals:
[0020] 1. Output pipeline; 11. Feed inlet; 12. Discharge outlet; 2. Pressure relief pipeline; 21. Air inlet; 22. Air outlet; 3. Manual stop valve; 4. Detector; 5. Shut-off valve; 6. Valve remote control mechanism; 7. Material collection tank; 8. Discharge valve; 9. First pressure gauge; 10. Flow regulating valve; 13. First displacement valve; 14. Second pressure gauge; 15. Pressure relief shut-off valve; 16. Second displacement valve; 17. Crane pipe; 18. Discharge pipeline; 19. Third pressure gauge; 20. Gas storage container. DETAILED DESCRIPTION
[0021] The following is a further detailed description of the embodiments of the present disclosure in conjunction with the accompanying drawings and examples. The detailed description of the following embodiments and the accompanying drawings are used to exemplarily illustrate the principles of the present disclosure, but cannot be used to limit the scope of the present disclosure. The present disclosure can be implemented in many different forms and is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.
[0022] The present disclosure provides these embodiments to make the present disclosure thorough and complete, and to fully express the scope of the present disclosure to those skilled in the art. It should be noted that unless otherwise specifically stated, the relative arrangement of the parts and steps, the composition of the materials, the numerical expressions and the numerical values set forth in these embodiments should be interpreted as being merely exemplary, and not as limiting.
[0023] It should be noted that, in the description of the present disclosure, unless otherwise specified, the meaning of "multiple" is greater than or equal to two; the terms "upper", "lower", "left", "right", "inner", "outer", etc., indicating the orientation or positional relationship, are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present disclosure. When the absolute position of the object being described changes, the relative positional relationship may also change accordingly.
[0024] In addition, the words "first", "second" and similar words used in the present disclosure do not indicate any order, quantity or importance, but are only used to distinguish different parts. "Vertical" does not mean vertical in the strict sense, but is within the tolerance range. "Parallel" does not mean parallel in the strict sense, but is within the tolerance range. "Include" or "comprising" and similar words mean that the elements before the word include the elements listed after the word, and do not exclude the possibility of including other elements.
[0025] It should also be noted that in the description of the present disclosure, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to the specific circumstances. When a specific device is described as being located between a first device and a second device, there may or may not be an intermediate device between the specific device and the first device or the second device.
[0026] All terms used in the present disclosure have the same meanings as those understood by those of ordinary skill in the art to which the present disclosure belongs, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries, for example, should be interpreted as having meanings consistent with their meanings in the context of the relevant technology, and should not be interpreted in an idealized or extremely formal sense, unless explicitly defined as such herein.
[0027] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.
[0028] At present, the liquid ammonia filling system is a key equipment in the industrial field. The synthetic ammonia plant is designed without a liquid ammonia sales system. After the synthetic ammonia releases its production capacity, the liquid ammonia produced will be left over after meeting the ammonia demand for urea. This part of the liquid ammonia can only be temporarily stored in the ammonia tank. In order to ensure full-load long-term operation, the remaining liquid ammonia needs to be removed from the system, otherwise the production load will be forced to be reduced. If you want to transport the remaining liquid ammonia from the liquid ammonia storage tank of the synthetic plant, you need to add a new pump or reassemble it, which is time-consuming, labor-intensive and increases costs. The inventor wants to add a material output port to the original material delivery pump and connect a filling device to solve the above problem.
[0029] The disclosed embodiment provides a synthesis device, comprising: a material storage container, a material conveying pump and a control mechanism, wherein the material conveying pump is connected to the material storage container, and the material conveying pump comprises: a first output port, for outputting a first material to be output in the material storage container; a second output port, provided with a filling device, wherein a feed port 11 of an output pipeline 1 of the filling device is connected to the second output port, and a discharge port 12 of the filling device is connected to a conveying device, for outputting a second material to be output in the material storage container to the conveying device; the control mechanism is connected to the material conveying pump signal to regulate and distribute the amount of the first material to be output outputted from the first output port and regulate and distribute the amount of the second material to be output outputted from the second output port.
[0030] Specifically, Figure 1 As shown, the material storage container has at least two independent accommodating spaces, which are used to accommodate the synthesized urea and liquid ammonia raw materials respectively. The material delivery pump is connected to the material storage container. The material delivery pump is connected to the control mechanism by signal. The control mechanism can be a computer. The signal connection here can be a wired connection or a wireless connection. The operator can use the control mechanism to allocate the output capacity of the material delivery pump to the first output port and the second output port. In addition, the type and output capacity of the material delivery pump are not specifically limited here, and can be set according to actual production needs.
[0031] The present disclosure provides a synthesis device, which includes a material storage container, a material delivery pump and a control mechanism. The first output port of the material delivery pump is used to deliver urea, the second output port of the material delivery pump is connected to the feed port 11 of the output pipeline 1 of the filling device, and the output port 12 of the output pipeline 1 is connected to the conveying device for outputting the liquid ammonia remaining after synthesizing urea. The overall output capacity of the material delivery pump is constant. The operator can flexibly adjust the amount of urea delivered by the first output port through the control mechanism, and then adjust the second output port accordingly according to the remaining capacity, so as to effectively deliver the liquid ammonia in the material storage container to the conveying device, and then deliver it to the place of sale for sale. The synthesis device not only realizes the delivery of urea, but also effectively manages and schedules the output of the remaining liquid ammonia, thereby solving the problem of excessive liquid ammonia inventory caused by seasonal imbalance in supply and demand, while reducing the additional time and cost burden caused by the addition of a separate liquid ammonia output system.
[0032] In some embodiments, the filling device includes a manual stop valve 3 , which is disposed in the output pipeline 1 to control the flow of the output pipeline 1 .
[0033] Specifically, Figure 1 As shown, in order to enable the on-site staff to quickly and conveniently close or open the flow of the second output port, the output pipeline 1 of the filling device connected to the second output port is also provided with a manual stop valve 3, which can be specifically arranged at a position close to the feed port 11 of the output pipeline 1. The purpose of such a design is to quickly cut off the flow of liquid ammonia in an emergency state, effectively prevent liquid ammonia from further flowing into the output pipeline 1, thereby greatly reducing the amount of liquid ammonia accumulated in the output pipeline 1 in the shutdown state. The manual stop valve 3 here can specifically be a gate valve, a ball valve, a butterfly valve, etc., and the specific type of the manual stop valve 3 is not limited here.
[0034] In some embodiments, the filling device also includes a detector 4 and a cut-off valve 5. The detector 4 is used to detect whether there is a gas leakage in the output pipeline 1; the cut-off valve 5 is arranged on the output pipeline 1 and is connected to the signal of the detector 4, and is used to control the flow or closure of the output pipeline 1 according to the detection result of the detector 4.
[0035] Specifically, Figure 1As shown, in order to increase the safety and automation of the filling device, the filling device also includes a detector 4, which can be set at the key nodes or potential weak links of the output pipeline 1 that are prone to leakage, such as near the joints, flanges, etc. The cut-off valve 5 can be specifically set at the front end pipeline or the rear end pipeline of the manual cut-off valve 3. The cut-off valve 5 is connected to the detector 4 by signal. The signal connection here can be specifically wireless connection or wired connection. The cut-off valve 5 contains a control unit inside, which can accurately interpret and quickly respond to the feedback signal from the detector 4. When the detector 4 detects that there is gas leakage nearby, such as ammonia, it will immediately trigger an alarm and transmit this state information to the cut-off valve 5 in the form of an electrical signal, and the cut-off valve 5 will immediately cut off the circulation of the output pipeline 1. The cut-off valve 5 and the manual cut-off valve 3 are set at the same time. The purpose of this design is that the filling device can ensure the controllability and safety of the output pipeline 1 whether in normal operation or in abnormal state, reduce various risks caused by gas leakage, and realize comprehensive, flexible and reliable dual protection measures.
[0036] In some embodiments, the filling device further includes a valve remote control mechanism 6 , which is connected to the shut-off valve 5 by signal and is used to control the closing and opening of the shut-off valve 5 .
[0037] Specifically, Figure 1 As shown, in order to realize the remote control of the shut-off valve 5, the filling device is also provided with a valve remote control mechanism 6, and the valve remote control mechanism 6 is connected to the shut-off valve 5 by signal, and the signal connection here can be specifically a wired connection or a wireless connection. The valve remote control mechanism 6 also includes a signal acquisition module, which is responsible for collecting various parameters in the filling process, such as pressure, flow, etc., and comparing these parameters with preset reference values. When an abnormal situation is found, a command can be quickly issued to the shut-off valve 5 to cut off the flow of the output pipeline 1. When there is no abnormal situation, the shut-off valve 5 can be controlled by the control mechanism to allow the output pipeline 1 to flow. Through such a design, the filling device achieves automated, intelligent and remotely controllable safe operation.
[0038] In some embodiments, the filling device also includes a material collecting tank 7 and a discharge valve 8. The material collecting tank 7 is connected to the output pipeline 1 through the discharge pipeline 18 and is located before the cut-off valve 5 and the manual stop valve 3. The discharge valve 8 is arranged in the discharge pipeline 18 to control the circulation of the discharge pipeline 18.
[0039] Specifically, Figure 1As shown, when the output pipeline 1 stops outputting liquid ammonia, in order to discharge the remaining liquid ammonia in the output pipeline 1, the filling device also includes a material collection tank 7 and a discharge valve 8. The size and material of the material collection tank 7 can be set as needed, and the shape of the material collection tank 7 can be any shape, such as: a rectangular parallelepiped, a cylinder, etc. The material collection tank 7 is connected to the output pipeline 1 through the discharge pipeline 18. The specific installation position of the material collection tank 7 can be a position close to the feed port 11 of the output pipeline 1 or located in the middle position of the output pipeline 1, which is not specifically limited here. In addition, in order to enable the remaining liquid ammonia in the output pipeline 1 to be discharged into the material collection tank 7, the material collection tank 7 can be set at the lowest point of the output pipeline 1. The discharge valve 8 is used to control the circulation of the discharge pipeline 18. The specific position of the discharge valve 8 can be set at a position of the discharge pipeline 18 close to the interface between the discharge pipeline 18 and the output pipeline 1. The purpose of this is to prevent the liquid ammonia in the output pipeline 1 from flowing to the discharge pipeline 18 when no discharge is performed. The discharge valve 8 here can be specifically a gate valve, a ball valve, a butterfly valve, etc., and the specific type of the discharge valve 8 is not limited here. In addition, a third pressure gauge 19 can be arranged near the discharge pipeline 18 to detect the pressure condition near the discharge pipeline 18.
[0040] In some embodiments, the filling device also includes a first pressure gauge 9 and a flow regulating valve 10. The first pressure gauge 9 is arranged at one end of the discharge port 12 close to the output pipeline 1, and is used to monitor the pressure of the output pipeline 1; the flow regulating valve 10 is arranged between the first pressure gauge 9 and the feed port 11 and is connected to the signal of the first pressure gauge 9, and is used to adjust the flow rate of the second material to be output in the output pipeline 1 according to the pressure value measured by the first pressure gauge 9.
[0041] Specifically, Figure 1 As shown, the discharge port 12 is connected to the conveying device, and the first pressure gauge 9 is arranged at one end of the output pipeline 1 near the discharge port 12, so that when the first pressure gauge 9 measures the pressure of the output pipeline 1, it can also measure the pressure in the storage tank of the conveying device. The specific location of the flow control valve 10 can be selected according to actual needs, and no specific limitation is made here. The first pressure gauge 9 is connected to the flow control valve 10 by signal, and the signal connection here can be specifically a wireless connection or a wired connection. When the first pressure gauge 9 detects that the pressure in the output pipeline 1 is too high, the flow control valve 10 will reduce its opening according to the measured pressure information. When the first pressure gauge 9 detects that the pressure in the output pipeline 1 is too low, the flow control valve 10 will increase its opening according to the measured pressure information. Such a design can prevent safety hazards caused by pressure fluctuations. At the same time, the operator can also manually adjust the opening of the flow control valve 10, making the entire filling process more flexible and controllable, effectively improving the operating efficiency and safety of the filling device.
[0042] In some embodiments, the filling device also includes a first replacement valve 13 and a first replacement mechanism. The first replacement valve 13 is arranged in the output pipeline 1, and the first replacement valve 13 has at least one inlet and at least one discharge port; the inflation port of the first replacement mechanism is connected to at least one inlet of the first replacement valve 13, and is used to transport replacement gas into the output pipeline 1 to discharge the gas to be replaced in the output pipeline 1 from at least one discharge port of the first replacement valve 13.
[0043] Specifically, Figure 1 As shown, the first displacement valve 13 can be specifically arranged at the middle position of the output pipeline 1 or at the position of the output pipeline 1 near the feed port 11. The position of the first displacement valve 13 is not specifically limited here and can be arranged according to actual needs. The number of the inlet and discharge port of the first displacement valve 13 and the charging port of the first displacement mechanism can be 1, 2 or 3, etc. The first displacement mechanism includes a container tank for storing the displacement gas, and the displacement gas can be specifically nitrogen. The type of the displacement gas is not specifically limited here and can be arranged according to actual needs. The charging port of the first displacement mechanism is connected to the inlet of the first displacement valve 13. When the output pipeline 1 needs to be inspected and repaired, the first displacement mechanism is opened to inflate the output pipeline 1, and the ammonia in the output pipeline 1 is squeezed out from the discharge port to achieve the purpose of displacement, thereby ensuring the safety of the maintenance personnel.
[0044] In some embodiments, the filling device also includes a pressure relief pipeline 2, the air inlet 21 of the pressure relief pipeline 2 is connected to the conveying device, and the air outlet 22 of the pressure relief pipeline 2 is connected to the gas storage container 20, which is used to transport the gas generated in the conveying device to the gas storage container 20.
[0045] Specifically, Figure 1 As shown, when liquid ammonia is continuously transported to the storage tank of the transport device, the storage tank of the transport device will continuously produce ammonia gas to increase the pressure in the storage tank. In order to release the pressure in the storage tank, the filling device is also provided with a pressure relief pipeline 2, the air inlet 21 of the pressure relief pipeline 2 is connected to the storage tank of the transport device, and the air outlet 22 of the pressure relief pipeline 2 is connected to the gas storage container 20, so as to release the gas in the storage tank into the gas storage container 20.
[0046] In some embodiments, the filling device also includes a second pressure gauge 14 and a pressure relief cut-off valve 15. The second pressure gauge 14 is arranged in the pressure relief pipeline 2 to monitor the pressure of the pressure relief pipeline 2; the pressure relief cut-off valve 15 is arranged in the pressure relief pipeline 2 and is located between the gas storage container 20 and the second pressure gauge 14, and is used to control the circulation and closing of the pressure relief pipeline 2 according to the pressure value measured by the second pressure gauge 14.
[0047] Specifically, Figure 1As shown, the second pressure gauge 14 can be specifically arranged at the middle position of the pressure relief pipeline 2 or at a position close to the air inlet 21, and the position of the first pressure gauge 9 can be set according to actual needs. The pressure relief cut-off valve 15 can be specifically arranged at a position close to the air outlet 22 of the pressure relief pipeline 2, and the position of the pressure relief cut-off valve 15 can be set according to actual needs. The pressure relief cut-off valve 15 and the second pressure gauge 14 can be respectively connected to the control mechanism signal, and the second pressure gauge 14 transmits the measured pressure value to the control mechanism, and the operator remotely controls the pressure relief cut-off valve 15 according to the pressure value to select whether to release the pressure of the storage tank.
[0048] In some embodiments, the filling device also includes a second replacement valve 16 and a second replacement mechanism, the second replacement valve 16 is arranged in the pressure relief pipeline 2, and the second replacement valve 16 has at least one inlet and at least one discharge port; the inflation port of the second replacement mechanism is connected to at least one inlet of the second replacement valve 16, and is used to transport replacement gas into the pressure relief pipeline 2 to discharge the gas to be replaced in the pressure relief pipeline 2 from at least one discharge port of the second replacement valve 16.
[0049] Specifically, Figure 1 As shown, the second displacement valve 16 can be specifically arranged in the middle position of the pressure relief pipeline 2 or in the position of the pressure relief pipeline 2 near the air inlet 21. The position of the second displacement valve 16 is not specifically limited here and can be arranged according to actual needs. The number of the inlet and discharge port of the second displacement valve 16 and the charging port of the second displacement mechanism can be 1, 2 or 3, etc. The second displacement mechanism includes a container tank for storing the replacement gas. The replacement gas can be nitrogen. The type of replacement gas is not specifically limited here and can be arranged according to actual needs. The charging port of the second displacement mechanism is connected to the inlet of the second displacement valve 16. When the pressure relief pipeline 2 needs to be inspected and repaired, the second displacement mechanism is opened to inflate the pressure relief pipeline 2, and the remaining ammonia in the pressure relief pipeline is squeezed out from the discharge port to achieve the purpose of replacement, thereby ensuring the safety of the maintenance personnel.
[0050] In addition, in order to prevent gas or liquid leakage from the connecting port, a pump pipe 17 may be connected between the air inlet of the pressure relief pipeline and the storage of the conveying device, where the pump pipe 17 may be a gas pump pipe, and a pump pipe 17 may be set between the discharge port of the output pipeline and the storage of the conveying device, where the pump pipe 17 may be a liquid pump pipe.
[0051] So far, various embodiments of the present disclosure have been described in detail. In order to avoid obscuring the concept of the present disclosure, some details known in the art are not described. Based on the above description, those skilled in the art can fully understand how to implement the technical solution disclosed here.
[0052] Although some specific embodiments of the present disclosure have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present disclosure. It should be understood by those skilled in the art that the above embodiments may be modified or some technical features may be replaced by equivalents without departing from the scope and spirit of the present disclosure. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there is no structural conflict.
Claims
1. A synthesis device, characterized in that: include: Material storage containers; Control agencies; and A material delivery pump is connected to the material storage container, and the material delivery pump includes: A first output port, used for outputting the first material to be output in the material storage container; The second output port is provided with a filling device, the feed port (11) of the output pipeline (1) of the filling device is connected to the second output port, and the discharge port (12) of the filling device is connected to the conveying device for outputting the second material to be output in the material storage container to the conveying device; The control mechanism is connected to the material delivery pump signal to regulate the amount of the first material to be outputted from the first output port and the amount of the second material to be outputted from the second output port.
2. The synthesis device according to claim 1, characterized in that The filling device comprises: A manual stop valve (3) is provided on the output pipeline (1) and is used to control the flow of the output pipeline (1).
3. The synthesis device according to claim 2, characterized in that The filling device also includes: A detector (4) for detecting whether there is gas leakage in the output pipeline (1); and A cut-off valve (5) is provided on the output pipeline (1) and is connected to the detector (4) signal, and is used to control the flow or closing of the output pipeline (1) according to the detection result of the detector (4).
4. The synthesis device according to claim 3, characterized in that The filling device also includes: The valve remote control mechanism (6) is connected to the cut-off valve (5) via a signal and is used to control the closing and opening of the cut-off valve (5).
5. The synthesis device according to claim 3, characterized in that The filling device also includes: a material collecting tank (7) connected to the output pipeline (1) through a discharge pipeline (18) and located before the shut-off valve (5) and the manual shut-off valve (3); and A discharge valve (8) is provided on the discharge pipeline (18) and is used to control the flow of the discharge pipeline (18).
6. The synthesis device according to claim 1, characterized in that The filling device also includes: a first pressure gauge (9), disposed at one end of the output pipeline (1) near the discharge port (12), for monitoring the pressure of the output pipeline (1); and A flow regulating valve (10) is provided between the first pressure gauge (9) and the feed port (11) and is connected to the signal of the first pressure gauge (9), and is used to adjust the flow rate of the second material to be output in the output pipeline (1) according to the pressure value measured by the first pressure gauge (9).
7. The synthesis device according to claim 1, characterized in that The filling device also includes: a first displacement valve (13) disposed in the output pipeline (1), wherein the first displacement valve (13) has at least one inlet and at least one discharge port; and A first displacement mechanism, wherein the gas filling port of the first displacement mechanism is connected to the at least one inlet port of the first displacement valve (13), and is used for conveying displacement gas into the output pipeline (1) so as to discharge the gas to be replaced in the output pipeline (1) from the at least one discharge port of the first displacement valve (13).
8. The synthesis device according to claim 1, characterized in that The filling device also includes: A pressure relief pipeline (2), wherein the air inlet (21) of the pressure relief pipeline (2) is connected to the conveying device, and the air outlet (22) of the pressure relief pipeline (2) is connected to the gas storage container (20), and is used to convey the gas generated in the conveying device to the gas storage container (20).
9. The synthesis device according to claim 8, characterized in that The filling device also includes: a second pressure gauge (14), provided on the pressure relief pipeline (2), for monitoring the pressure of the pressure relief pipeline (2); and A pressure relief shut-off valve (15) is provided in the pressure relief pipeline (2) and located between the gas storage container (20) and the second pressure gauge (14), and is used to control the flow and closing of the pressure relief pipeline (2) according to the pressure value measured by the second pressure gauge (14).
10. The synthesis device according to claim 8, characterized in that The filling device also includes: a second displacement valve (16) disposed on the pressure relief line (2), the second displacement valve (16) having at least one inlet and at least one discharge port; and A second displacement mechanism, wherein the gas filling port of the second displacement mechanism is connected to the at least one inlet port of the second displacement valve (16), and is used for conveying displacement gas into the pressure relief pipeline (2) so as to discharge the gas to be replaced in the pressure relief pipeline (2) from the at least one discharge port of the second displacement valve (16).