Connecting structure for segmented transportation and field assembly of large zirconium / titanium steel composite plate tower
By using a welded sealing structure of upper flange and lower flange at the tower joint connection of large zirconium/titanium steel composite panel towers, combined with zirconium/titanium cover plate and bolt device, the leakage problem caused by traditional connection methods is solved, and the leakage problem is improved. Sealing reliability and stability.
Patent Information
- Application Number
- CN202420364387.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-27
Smart Images

Figure CN222026095U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of chemical equipment, in particular to a connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation. Background Art
[0002] Due to the requirements of the medium and working conditions, there is a large zirconium / titanium steel composite plate tower. The large zirconium / titanium steel composite plate tower includes a tower body, which is made of a zirconium / titanium steel composite plate made by compounding an outer steel base layer and an inner lining zirconium / titanium coating. The tower body is composed of multiple tower sections. At present, for the convenience of transportation, such large equipment is usually connected by flanges between tower sections. The flange connection is the main channel for leakage. The unreasonable design of the connection structure will cause leakage. The existing structure adopts a connection method of bolted flange filling sealing elements or gaskets. The on-site environment limits the assembly of large flange sealing structures, which may lead to assembly defects. In addition, the bolts become loose due to long-term use of the equipment, which will cause the flange sealing surface and the gasket to be not in close contact, causing leakage. Utility Model Content
[0003] In view of the above-mentioned problems existing in the connection method of bolt flange filling sealing elements or gaskets used in traditional large zirconium / titanium steel composite plate towers, the purpose of the utility model is to provide a connection structure for on-site assembly of large zirconium / titanium steel composite plate towers in sections.
[0004] The purpose of this utility model is achieved through the following technical solutions:
[0005] The utility model comprises an upper flange, a lower flange, an upper flange welding ring, a lower flange welding ring, a bolt device and a zirconium / titanium cover plate. The connecting ends of two adjacent tower sections in a tower body of a composite plate tower are respectively fixedly connected to the upper flange and the lower flange. The upper flange and the lower flange are arranged opposite to each other and are connected by the bolt device. An upper flange welding ring is fixedly connected to the upper flange, and a lower flange welding ring is fixedly connected to the lower flange. The outer sides of the upper flange welding ring and the lower flange welding ring are sealed by welding, and the inner sides of the upper flange welding ring and the lower flange welding ring are sealed by the zirconium / titanium cover plate.
[0006] Wherein: the upper flange and the lower flange are respectively welded to the steel base layer of the outer layer of the zirconium / titanium steel composite plate used to make the tower body; the inner side of the upper flange welding ring is welded and fixed by the upper zirconium / titanium pad and the zirconium / titanium coating of the inner lining of the zirconium / titanium composite plate; the inner side of the lower flange welding ring is welded and fixed by the lower zirconium / titanium pad and the zirconium / titanium coating of the inner lining of the zirconium / titanium composite plate; the inner side of the weld between the upper zirconium / titanium pad, the zirconium / titanium coating and the upper flange welding ring, and the inner side of the weld between the lower zirconium / titanium pad, the zirconium / titanium coating and the lower flange welding ring are all provided with a zirconium / titanium cover plate for protecting the weld.
[0007] The upper end of the upper zirconium / titanium pad is welded to the zirconium / titanium coating of one of the two adjacent tower sections, and the lower end is welded to the inner side of the upper flange welding ring, and the outer side of the weld between the lower end of the upper zirconium / titanium pad and the upper flange welding ring is filled with an upper zirconium / titanium pad to prevent the upper flange from contacting the weld; the lower end of the lower zirconium / titanium pad is welded to the zirconium / titanium coating of the other of the two adjacent tower sections, and the upper end is welded to the inner side of the lower flange welding ring, and the outer side of the weld between the lower end of the lower zirconium / titanium pad and the lower flange welding ring is filled with a lower zirconium / titanium pad to prevent the lower flange from contacting the weld.
[0008] The zirconium / titanium cover plate comprises an upper zirconium / titanium cover plate, an intermediate zirconium / titanium cover plate and a lower zirconium / titanium cover plate. The upper zirconium / titanium cover plate is located on the inner side of the upper zirconium / titanium pad. The upper end of the upper zirconium / titanium cover plate is welded to the zirconium / titanium coating of one of the two adjacent tower sections, and the lower end is welded to the inner side of the upper flange welding ring. The weld between the upper zirconium / titanium pad and the upper flange welding ring and the weld between the upper zirconium / titanium pad and the zirconium / titanium coating of one of the two adjacent tower sections are covered by the upper zirconium / titanium cover plate. The lower zirconium / titanium cover plate is located on the inner side of the upper zirconium / titanium pad. On the inner side of the pad, the upper end of the lower zirconium / titanium cover plate is welded to the inner side of the lower flange welding ring, and the upper end is welded to the zirconium / titanium cladding of the other tower section in the two adjacent tower sections. The weld between the lower zirconium / titanium pad and the lower flange welding ring and the weld between the lower zirconium / titanium cover plate and the zirconium / titanium cladding of the other tower section in the two adjacent tower sections are covered by the lower zirconium / titanium cover plate; the middle zirconium / titanium cover plate is located on the inner side of the upper zirconium / titanium cover plate and the lower zirconium / titanium cover plate, and the upper and lower ends of the middle zirconium / titanium cover plate are respectively welded to the upper zirconium / titanium cover plate and the lower zirconium / titanium cover plate.
[0009] The gap between the upper zirconium / titanium cover plate and the lower zirconium / titanium cover plate is filled with an intermediate gasket.
[0010] The upper flange and the lower flange are both provided with leak detection holes for checking whether there are leaks in the welding. One end of the leak detection hole is opened to the outer side surface of the upper flange or the lower flange, and the other end of the leak detection hole is divided into two paths, one extending to the upper zirconium / titanium cover plate or the lower zirconium / titanium cover plate, and the other extending to the upper flange welding ring or the lower flange welding ring.
[0011] The upper flange welding ring and the lower flange welding ring are respectively provided with a plurality of conical through holes evenly opened in the circumferential direction, each of the conical through holes is provided with a screw for connecting and fixing with the upper flange or the lower flange, and the screws in each of the conical through holes are welded and then processed to be flat.
[0012] The bolt device includes a stud and a nut. Through holes are respectively opened in the axial direction on the upper flange and the lower flange. The stud passes through the through holes on the upper flange and the lower flange, and both ends are threadedly connected to the nut.
[0013] The advantages and positive effects of the utility model are:
[0014] 1. The utility model can reduce the difficulty of on-site assembly and welding by adopting a bolt flange plus sealing welding structure.
[0015] 2. The utility model adopts welding to seal between the upper and lower flanges, which greatly improves the sealing reliability compared with the traditional method of filling sealing elements or gaskets. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 for Figure 1 A partial enlarged cross-sectional view at position I in the middle;
[0018] Figure 3 for Figure 2 A partial enlarged cross-sectional view of position II in the middle;
[0019] Among them: 1 is steel base layer, 2 is zirconium / titanium coating, 3 is upper zirconium / titanium pad, 4 is upper flange, 5 is stud, 6 is lower flange, 7 is screw, 8 is lower zirconium / titanium pad, 9 is nut, 10 is lower zirconium / titanium cover plate, 11 is lower zirconium / titanium pad, 12 is lower flange welding ring, 13 is middle pad, 14 is upper flange welding ring, 15 is middle zirconium / titanium cover plate, 16 is upper zirconium / titanium pad, 17 is upper zirconium / titanium cover plate, 18 is leak detection hole. DETAILED DESCRIPTION
[0020] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0021] like Figures 1 to 3 As shown, the large zirconium / titanium steel composite plate tower includes a tower body, which is made of a zirconium / titanium steel composite plate composited with an outer steel base layer 1 and an inner lining zirconium / titanium coating 2, and the tower body is composed of a plurality of tower sections, which are connected by bolt flanges and sealed welded structures (i.e., the connection structure of the present invention) arranged thereon.
[0022] The utility model comprises an upper flange 4, a lower flange 6, an upper flange welding ring 14, a lower flange welding ring 12, a bolt device and a zirconium / titanium cover plate. The connecting ends of two adjacent tower sections in the tower body of the composite plate tower are respectively fixedly connected to the upper flange 4 and the lower flange 6. The upper flange 4 and the lower flange 6 are arranged opposite to each other and are connected by a bolt device. The upper flange welding ring 14 is fixedly connected to the upper flange 4, and the lower flange welding ring 12 is fixedly connected to the lower flange 6. The outer sides of the upper flange welding ring 14 and the lower flange welding ring 12 are sealed by welding, and the inner sides of the upper flange welding ring 14 and the lower flange welding ring 12 are sealed by the zirconium / titanium cover plate.
[0023] In this embodiment, a plurality of conical through holes are evenly opened in the circumferential direction on the upper flange welding ring 14 and the lower flange welding ring 12, and a screw 7 is arranged in each conical through hole. The upper flange welding ring 14 and the lower flange welding ring 12 are respectively connected and fixed to the upper flange 4 and the lower flange 6 by the screws 7 arranged in the conical through holes; surfacing is performed on the screws 7 in each conical through hole, and the product is smoothed after welding.
[0024] In this embodiment, the upper end of the upper flange 4 and the lower end of the lower flange 6 are respectively welded and fixed to the steel base 1 of the outer layer of the zirconium / titanium steel composite plate of the tower body, the upper flange welding ring 14 is connected to the lower end of the upper flange 4, and the lower flange welding ring 12 is connected to the upper end of the lower flange 6. The inner side of the upper flange welding ring 14 is welded and fixed to the zirconium / titanium cladding 2 of the inner lining of the zirconium / titanium composite plate through the upper zirconium / titanium pad 3, and the inner side of the lower flange welding ring 12 is welded and fixed to the zirconium / titanium cladding 2 of the inner lining of the zirconium / titanium composite plate through the lower zirconium / titanium pad 8; the inner side of the weld between the upper zirconium / titanium pad 3 and the zirconium / titanium cladding 2 and the upper flange welding ring 14, and the inner side of the weld between the lower zirconium / titanium pad 8 and the zirconium / titanium cladding 2 and the lower flange welding ring 12 are all provided with a zirconium / titanium cover plate for protecting the weld.
[0025] The upper end of the upper zirconium / titanium pad 3 of this embodiment is welded to the zirconium / titanium coating 2 of one of the two adjacent tower sections, and the lower end is welded to the inner upper end face of the upper flange welding ring 14. The outer side of the weld between the lower end of the upper zirconium / titanium pad 3 and the upper flange welding ring 14 is filled with an upper zirconium / titanium pad 16 to prevent the upper flange 4 from contacting the weld. The lower end of the lower zirconium / titanium pad 8 is welded to the zirconium / titanium coating 2 of the other of the two adjacent tower sections, and the upper end is welded to the inner lower end face of the lower flange welding ring 12. The outer side of the weld between the lower end of the lower zirconium / titanium pad 8 and the lower flange welding ring 12 is filled with a lower zirconium / titanium pad 11 to prevent the lower flange 6 from contacting the weld. If zirconium / titanium contacts the steel during welding, it will not be welded, affecting the welding; therefore, the utility model fills the upper zirconium / titanium pad 16 on the outside of the weld between the upper zirconium / titanium pad 3 and the upper flange welding ring 14, and fills the lower zirconium / titanium pad 11 on the outside of the weld between the lower zirconium / titanium pad 8 and the lower flange welding ring 12. However, the butt welding between the upper zirconium / titanium pad 3 and the zirconium / titanium cladding 2 and between the lower zirconium / titanium pad 8 and the zirconium / titanium cladding 2 cannot be filled with pads, so only the non-penetration welding method can be used to ensure that the steel base 1 does not contact the weld.
[0026] The zirconium / titanium cover plate of the present embodiment comprises an upper zirconium / titanium cover plate 17, an intermediate zirconium / titanium cover plate 15 and a lower zirconium / titanium cover plate 10. The upper zirconium / titanium cover plate 17 is located on the inner side of the upper zirconium / titanium pad 3. The upper end of the upper zirconium / titanium cover plate 17 is welded to the zirconium / titanium coating 2 of one of the two adjacent tower sections, and the lower end is welded to the inner side of the upper flange welding ring 14. The weld between the upper zirconium / titanium pad 3 and the upper flange welding ring 14 and the weld between the upper zirconium / titanium pad 3 and the zirconium / titanium coating 2 of one of the two adjacent tower sections are covered by the upper zirconium / titanium cover plate 17. The lower zirconium / titanium cover plate 10 is located on the inner side of the lower zirconium / titanium pad 8. The upper end of the lower zirconium / titanium cover plate 10 is welded to the lower flange welding ring 14. The inner side of the welding ring 12 and the upper end are welded to the zirconium / titanium coating 2 of the other tower section in the two adjacent tower sections. The weld between the lower zirconium / titanium pad 8 and the lower flange welding ring 12 and the weld with the zirconium / titanium coating 2 of the other tower section in the two adjacent tower sections are all covered by the lower zirconium / titanium cover plate 10; the middle zirconium / titanium cover plate 15 is located on the inner side of the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10, and the upper and lower ends of the middle zirconium / titanium cover 15 are respectively welded to the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10, thereby realizing the inner side sealing of the flange; the gap between the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10 is filled with the middle gasket 13. The upper zirconium / titanium pad 3 is welded to the upper flange welding ring 14 and the zirconium / titanium coating 2, and the lower zirconium / titanium pad 8 is welded to the lower flange welding ring 12 and the zirconium / titanium coating 2. The upper flange welding ring 14 and the lower flange welding ring 12 have been welded to the zirconium / titanium coating 2 of the two adjacent tower sections, respectively. Then, the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10 are covered. The upper zirconium / titanium cover plate 17 is welded to the zirconium / titanium coating 2, the upper zirconium / titanium pad 3 and the upper flange welding ring. The ring 14 is provided with secondary protection, and the lower zirconium / titanium cover plate 10 provides secondary protection for the zirconium / titanium cladding 2, the lower zirconium / titanium pad 8 and the lower flange welding ring 12; finally, the intermediate pad 13 is filled between the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10 on site, and then the upper flange welding ring 14 and the lower flange welding ring 12 are sealed by welding the intermediate zirconium / titanium cover plate 15 to the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10 respectively.
[0027] In this embodiment, the upper flange 4 and the lower flange 6 are both provided with a leak detection hole 18 for checking whether there is leakage in the welding. One end of the leak detection hole 18 is opened to the outer side surface of the upper flange 4 or the lower flange 6, and the other end of the leak detection hole 18 is divided into two paths, one extending to the upper zirconium / titanium cover plate 17 or the lower zirconium / titanium cover plate 10, and the other extending to the upper flange welding ring 14 or the lower flange welding ring 12.
[0028] The bolt device of this embodiment includes a stud 5 and a nut 9. Through holes are respectively opened in the upper flange 4 and the lower flange 6 along the axial direction. The stud 5 passes through the through holes on the upper flange 4 and the lower flange 6, and both ends are threadedly connected to the nut 9.
[0029] The manufacturing process of the utility model is:
[0030] In the equipment manufacturing plant, the upper flange welding ring 14 and the lower flange welding ring 12 are fixed to the upper flange 4 and the lower flange 6 respectively through the screws 7 set in the conical through holes, and the screws 7 in the conical through holes are welded and processed flat after welding. The upper end of the upper flange welding ring 14 and the upper flange 4 are sealed by silver brazing, and the lower end of the lower flange welding ring 12 and the lower flange 6 are sealed by silver brazing, and then the steel base 1 is welded and fixed to the upper flange 4 and the lower flange 6 respectively; the zirconium / titanium cladding 2 and the upper flange welding ring 14 and the lower flange welding ring 12 are welded and sealed by the upper zirconium / titanium pad 3 and the lower zirconium / titanium pad 8, and then the weld is protected by the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10. The upper zirconium / titanium pad 16 is used for welding isolation between the upper zirconium / titanium pad 3 and the upper flange welding ring 14, and the lower zirconium / titanium pad 11 is used for welding isolation between the lower zirconium / titanium pad 8 and the lower flange welding ring 12.
[0031] After the equipment is transported to the installation site in sections, first use some bolt devices to fix the adjacent upper and lower tower sections, and weld the fixed lower end of the outer side of the upper flange welding ring 14 and the upper end of the outer side of the lower flange welding ring 12. After welding, install all the bolt devices; fill the middle gasket 13 in the gap between the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10, and finally seal and weld the middle zirconium / titanium cover plate 15 to the upper zirconium / titanium cover plate 17 and the lower zirconium / titanium cover plate 10 respectively, and the installation can be completed after passing the flaw detection.
[0032] The technical solutions disclosed in the present utility model are not limited to the technical solutions disclosed in the above-mentioned implementation modes, but also include technical solutions composed of any combination of the above-mentioned technical features. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present utility model, and these improvements and modifications are also regarded as the protection scope of the present utility model.
Claims
1. A connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in sections, characterized in that: The invention comprises an upper flange (4), a lower flange (6), an upper flange welding ring (14), a lower flange welding ring (12), a bolt device and a zirconium / titanium cover plate. The connecting ends of two adjacent tower sections in the tower body of the composite plate tower are respectively fixedly connected to the upper flange (4) and the lower flange (6). The upper flange (4) and the lower flange (6) are arranged opposite to each other and are connected by the bolt device. The upper flange welding ring (14) is fixedly connected to the upper flange (4), and the lower flange welding ring (12) is fixedly connected to the lower flange (6). The outer sides of the upper flange welding ring (14) and the lower flange welding ring (12) are sealed by welding, and the inner sides of the upper flange welding ring (14) and the lower flange welding ring (12) are sealed by the zirconium / titanium cover plate.
2. According to claim 1, the connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation is characterized by: The upper flange (4) and the lower flange (6) are respectively welded to the steel base layer (1) of the outer layer of the zirconium / titanium steel composite plate used to form the tower body; the inner side of the upper flange welding ring (14) is welded and fixed to the zirconium / titanium coating (2) of the inner lining of the zirconium / titanium composite plate through the upper zirconium / titanium pad (3); the inner side of the lower flange welding ring (12) is welded and fixed to the zirconium / titanium coating (2) of the inner lining of the zirconium / titanium composite plate through the lower zirconium / titanium pad (8); the inner side of the weld between the upper zirconium / titanium pad (3) and the zirconium / titanium coating (2) and the upper flange welding ring (14), and the inner side of the weld between the lower zirconium / titanium pad (8) and the zirconium / titanium coating (2) and the lower flange welding ring (12) are all provided with a zirconium / titanium cover plate for protecting the weld.
3. The connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation according to claim 2 is characterized in that: The upper end of the upper zirconium / titanium pad (3) is welded to the zirconium / titanium coating (2) of one of the two adjacent tower sections, and the lower end is welded to the inner side of the upper flange welding ring (14); the outer side of the weld between the lower end of the upper zirconium / titanium pad (3) and the upper flange welding ring (14) is filled with an upper zirconium / titanium pad (16) for preventing the upper flange (4) from contacting the weld; the lower end of the lower zirconium / titanium pad (8) is welded to the zirconium / titanium coating (2) of the other of the two adjacent tower sections, and the upper end is welded to the inner side of the lower flange welding ring (12); the outer side of the weld between the lower end of the lower zirconium / titanium pad (8) and the lower flange welding ring (12) is filled with a lower zirconium / titanium pad (11) for preventing the lower flange (6) from contacting the weld.
4. According to claim 2, the connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation is characterized by: The zirconium / titanium cover plate comprises an upper zirconium / titanium cover plate (17), an intermediate zirconium / titanium cover plate (15) and a lower zirconium / titanium cover plate (10); the upper zirconium / titanium cover plate (17) is located on the inner side of the upper zirconium / titanium pad (3); the upper end of the upper zirconium / titanium cover plate (17) is welded to the zirconium / titanium coating (2) of one of the two adjacent tower sections, and the lower end of the upper zirconium / titanium cover plate (17) is welded to the inner side of the upper flange welding ring (14); the weld between the upper zirconium / titanium pad (3) and the upper flange welding ring (14) and the weld between the upper zirconium / titanium pad (3) and the zirconium / titanium coating (2) of one of the two adjacent tower sections are covered by the upper zirconium / titanium cover plate (17); the lower zirconium / titanium cover plate (10) is located on the lower zirconium / titanium pad (8), the upper end of the lower zirconium / titanium cover plate (10) is welded to the inner side of the lower flange welding ring (12), and the upper end is welded to the zirconium / titanium coating (2) of the other tower section among the two adjacent tower sections, and the weld between the lower zirconium / titanium pad (8) and the lower flange welding ring (12) and the zirconium / titanium coating (2) of the other tower section among the two adjacent tower sections are covered by the lower zirconium / titanium cover plate (10); the intermediate zirconium / titanium cover plate (15) is located on the inner side of the upper zirconium / titanium cover plate (17) and the lower zirconium / titanium cover plate (10), and the upper and lower ends of the intermediate zirconium / titanium cover plate (15) are respectively welded to the upper zirconium / titanium cover plate (17) and the lower zirconium / titanium cover plate (10).
5. The connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation according to claim 4 is characterized in that: The gap between the upper zirconium / titanium cover plate (17) and the lower zirconium / titanium cover plate (10) is filled with an intermediate gasket (13).
6. The connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation according to claim 2 is characterized in that: The upper flange (4) and the lower flange (6) are both provided with a leak detection hole (18) for checking whether there is any leakage in the welding. One end of the leak detection hole (18) is opened to the outer side surface of the upper flange (4) or the lower flange (6), and the other end of the leak detection hole (18) is divided into two paths, one path extending to the upper zirconium / titanium cover plate (17) or the lower zirconium / titanium cover plate (10), and the other path extending to the upper flange welding ring (14) or the lower flange welding ring (12).
7. The connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation according to claim 1 is characterized in that: The upper flange welding ring (14) and the lower flange welding ring (12) are respectively provided with a plurality of tapered through holes evenly arranged along the circumferential direction, each of the tapered through holes is provided with a screw (7) for connecting and fixing with the upper flange (4) or the lower flange (6), and the screw (7) in each of the tapered through holes is welded and then processed to be flat.
8. The connection structure for on-site assembly of a large zirconium / titanium steel composite plate tower in segmented transportation according to claim 1 is characterized in that: The bolt device comprises a stud (5) and a nut (9); through holes are respectively provided on the upper flange (4) and the lower flange (6) along the axial direction; the stud (5) passes through the through holes on the upper flange (4) and the lower flange (6), and both ends are threadedly connected to the nut (9).
