Incineration main power house arrangement structure and incineration plant
By arranging flue gas auxiliary areas and equipment areas in a small incineration factory, abolishing the elevated structure, and using underground garbage pools and conveying devices, the problem of unreasonable layout of small incineration factory buildings is solved, the construction cost is reduced, and the processing efficiency and environment are improved. Cleanliness.
Patent Information
- Application Number
- CN202323533537.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-22
AI Technical Summary
The layout of small incineration factories is unreasonable, resulting in insufficient land use and increasing construction investment costs.
The flue gas auxiliary area and the flue gas equipment area are arranged side by side on both sides of the boiler area, the unloading platform and overhead guide bridge are abolished, and the factory layout is optimized through underground garbage pools and conveying devices.
It effectively reduces the factory floor area and construction investment costs, and improves garbage disposal efficiency and environmental cleanliness.
Smart Images

Figure CN222026942U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of incineration plant construction, and specifically relates to an incineration main plant layout structure and an incineration plant. Background Art
[0002] With the rapid improvement of the harmless treatment capacity of urban domestic waste, domestic waste incineration facilities are becoming increasingly saturated and the market space for growth is limited. The management of domestic waste in counties, towns and villages has gradually been put on the agenda, and pilot projects of small-scale incineration facilities in counties and even towns and villages are gradually being carried out.
[0003] However, there are still many problems in the promotion of small-scale incineration projects. One of the most important problems is the unreasonable layout of the plant. The overall layout of the plant is very narrow and long, and the limited land area cannot be reasonably utilized, resulting in high investment in plant construction. Utility Model Content
[0004] The present application aims to solve at least one of the technical problems existing in the prior art or related art.
[0005] To this end, the present application proposes a main incineration plant layout structure, including: a boiler area, a flue gas equipment area and a flue gas auxiliary area; the flue gas equipment area is arranged on the first side of the boiler area along the length direction of the boiler area; the flue gas auxiliary area is arranged on the second side of the boiler area along the length direction of the boiler area, so that the smoke gas auxiliary area and the smoke gas equipment area are arranged side by side on both sides of the boiler area.
[0006] In addition, a main incineration plant layout structure in the above technical solution provided by this application may also have the following additional technical features:
[0007] In a feasible implementation, the main incineration plant layout structure also includes: a steam turbine room; the steam turbine room is arranged on the side of the flue gas equipment area away from the boiler area, so that the steam turbine room and the flue gas equipment area are arranged side by side.
[0008] In a feasible implementation manner, the main incineration plant layout structure also includes: a garbage pool; the garbage pool is arranged at one end of the boiler area, and the garbage pool is recessed downward so that the garbage pool is lower than the ground level of the plant.
[0009] In a feasible implementation manner, the garbage pool is arranged along the width direction of the boiler area.
[0010] In a feasible implementation, the main incineration plant layout structure also includes: a fence and an input port; the fence is arranged on the ground plane outside the garbage pool along the circumference of the garbage pool to form a garbage room in the plant; the input port is arranged on the fence.
[0011] In a feasible implementation manner, the garbage pool is arranged close to the wall of the factory building.
[0012] In a feasible embodiment, the layout structure of the main incineration plant also includes: a unloading room and a unloading port; the unloading room is arranged at one end of the garbage room, the unloading room is connected with the garbage room through the input port, and the wall of the unloading room opposite to the input port is the first wall of the plant; the unloading port is set on the first wall, and the unloading port is connected with the input port.
[0013] In a feasible implementation manner, the discharge port and the input port are arranged opposite to each other, so that the conveying channel between the discharge port and the input port is perpendicular to the first wall.
[0014] In a feasible implementation, the main incineration plant layout structure also includes: a conveying device; the conveying device is arranged along the conveying channel, and the conveying device is used to transport garbage from outside the plant to the garbage room.
[0015] Another aspect of the present application provides an incineration plant, comprising the main incineration plant layout structure as described above.
[0016] Compared with the prior art, the main incineration plant layout structure and incineration plant of the present application have the following beneficial effects:
[0017] By arranging the flue gas auxiliary area and the flue gas equipment area on both sides of the boiler area respectively, the flue gas auxiliary area and the flue gas equipment area form a parallel arrangement structure with the boiler area, and the flue gas auxiliary area and the flue gas equipment area are used to extend in the width direction of the boiler area, replacing the original series downfield arrangement structure, so that the layout of the plant is more reasonable, which is conducive to reducing the overall floor area of the plant, thereby reducing the investment cost of plant construction.
[0018] By digging an underground garbage pool, it is convenient to dump the garbage directly into the garbage pool from the ground, thereby eliminating the original unloading platform and elevated approach bridge structure, saving the investment in building an unloading platform and elevated approach bridge, and further reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0020] Figure 1 A schematic plan view of a layout structure of a main incineration plant of an embodiment provided in the present application;
[0021] Figure 2 A schematic diagram of the positional relationship between a garbage pool and a boiler area in a layout structure of an incineration main plant in one embodiment of the present application;
[0022] in, Figure 1 to Figure 2The corresponding relationship between the reference numerals and component names in the figure is:
[0023] 10. Factory building; 101. Boiler area; 102. Flue gas equipment area; 103. Flue gas auxiliary area; 104. Steam turbine room; 105. Garbage pool; 106. Fence; 107. Inlet; 108. Unloading room; 109. Unloading port; 120. Conveying device; 121. First wall. DETAILED DESCRIPTION
[0024] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0025] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0026] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0027] The preferred embodiments of the present application are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present application and are not used to limit the present application.
[0028] See also Figure 1-Figure 2As shown, according to an embodiment of the present application, a main incineration plant layout structure includes: a boiler area 101, a flue gas equipment area 102 and a flue gas auxiliary area 103; the flue gas equipment area 102 is arranged on a first side of the boiler area 101 along the length direction of the boiler area 101; the flue gas auxiliary area 103 is arranged on a second side of the boiler area 101 along the length direction of the boiler area 101, so that the flue gas auxiliary area 103 and the flue gas equipment area 102 are arranged side by side on both sides of the boiler area 101.
[0029] The incineration main plant layout structure provided in the embodiment of the present application includes a flue gas auxiliary area 103 and a flue gas equipment area 102 respectively arranged on both sides of the boiler area 101, so that the flue gas auxiliary area 103 and the flue gas equipment area 102 form a parallel arrangement structure with the boiler area 101. The flue gas auxiliary area 103 and the flue gas equipment area 102 are extended in the width direction of the boiler area 101 to replace the original series lower field layout structure, so that the layout of the plant 10 is more reasonable, which is conducive to reducing the overall floor area of the plant 10, thereby reducing the construction investment cost of the plant 10.
[0030] It should be noted that, due to the small distance between boilers, the boiler area 101 itself is long and narrow. The traditional arrangement of the smoke room and the boiler room in series will make the overall plan layout of the plant 10 more long and narrow. By arranging the smoke equipment area 102 and the smoke auxiliary area 103 in parallel instead of arranging the smoke rooms in series, the sum of the widths of the boiler area 101, the smoke equipment area 102 and the smoke auxiliary area 103 is made equivalent to the length of the boiler area 101, which can effectively improve the problem of unreasonable layout of the plant 10.
[0031] like Figure 1 As shown, in a feasible implementation, the turbine room 104 is disposed on a side of the flue gas equipment area 102 away from the boiler area 101 , so that the turbine room 104 and the flue gas equipment area 102 are arranged side by side.
[0032] In this technical solution, the turbine room 104 needs to be located near the flue gas equipment area 102. By arranging the flue gas equipment area 102 and the boiler area 101 side by side, and then arranging the turbine room 104 and the flue gas equipment area 102 side by side, instead of arranging the turbine room 104 at the end of the flue gas equipment area 102, it is beneficial to shorten the overall length of the plant 10 and make the layout of the plant 10 more reasonable.
[0033] like Figure 1 and Figure 2 As shown, in a feasible implementation manner, the garbage pool 105 is arranged at one end of the boiler area 101 , and the garbage pool 105 is recessed downward so that the garbage pool 105 is lower than the ground level of the plant 10 .
[0034] In this technical solution, an underground garbage pool 105 is excavated to facilitate dumping of garbage directly from the ground into the garbage pool 105, thereby eliminating the original unloading platform and elevated approach bridge structure, saving the investment in building an unloading platform and an elevated approach bridge, and further reducing construction costs.
[0035] It should be noted that the traditional waste incineration plant 10 requires the construction of an elevated approach bridge and a 7-8 meter high unloading platform. Garbage trucks are used to drive from the elevated approach bridge to the unloading platform, and then the garbage is dumped into the garbage pit. However, the excavated underground garbage pool 105 can be used by the garbage conveying device 120 to directly dump the garbage into the garbage pool 105 on the ground, which can fully meet the needs of garbage pit stacking.
[0036] like Figure 1 As shown, in a feasible implementation manner, the garbage pool 105 is arranged along the width direction of the boiler area 101 .
[0037] In this technical solution, by arranging the garbage pool 105 along the width direction of the boiler area 101 and making the length of the garbage pool 105 equal to the sum of the widths of the boiler room, the flue gas equipment area 102 and the flue gas auxiliary area 103 which are arranged in parallel, the overall floor space of the plant 10 can be further reduced and the construction investment cost can be reduced.
[0038] like Figure 1 As shown, in a feasible embodiment, a fence 106 is arranged on the ground plane outside the garbage pool 105 along the circumference of the garbage pool 105 to form a garbage room in the factory building 10; and an input port 107 is arranged on the fence 106.
[0039] In this technical solution, a garbage room is formed inside the factory building 10 by setting a wall 106 outside the garbage pool 105, ensuring that garbage can only be transported into the garbage pool 105 through the input port 107, thereby preventing the garbage from generating bacteria and odor, which is beneficial to maintaining a clean environment in other workrooms in the factory building 10.
[0040] like Figure 1 As shown, in a feasible implementation manner, the garbage pool 105 is arranged close to the wall of the factory building 10 .
[0041] In this technical solution, the garbage pool 105 is placed close to the wall of the factory building 10 to shorten the distance between the garbage pool 105 and the outside of the factory building 10, thereby shortening the distance of garbage transportation to improve the efficiency of garbage transportation. At the same time, shortening the transportation distance can reduce the cost of garbage transportation, which is conducive to reducing operating costs.
[0042] like Figure 1As shown, in a feasible embodiment, the unloading room 108 is arranged at one end of the garbage room, the unloading room 108 is connected to the garbage room through the input port 107, and the wall opposite to the unloading room 108 and the input port 107 is the first wall of the factory building 10; the unloading port 109 is set on the first wall, and the unloading port 109 is connected to the input port 107.
[0043] In this technical solution, an unloading room 108 is set between the garbage pool 105 and the first wall of the factory building 10 so that the unloading room 108 is directly connected to the garbage room. The garbage unloaded from the garbage truck is temporarily stored in the unloading room 108 to avoid the garbage truck staying for too long, which is conducive to ensuring the continuity of the incineration operation.
[0044] like Figure 1 As shown, in a feasible implementation manner, the discharge port 109 is arranged opposite to the input port 107 so that the conveying channel between the discharge port 109 and the input port 107 is perpendicular to the first wall.
[0045] In this technical solution, the conveying channel formed by the discharge port 109 and the input port 107 being arranged opposite to each other is perpendicular to the first wall, so that the conveying channel is arranged in a straight line perpendicular to the first wall 121, so as to shorten the length of the conveying channel, thereby shortening the transportation path of the garbage in the factory 10, which is beneficial to improving the garbage disposal efficiency.
[0046] like Figure 1 As shown, in a feasible implementation manner, the conveying device 120 is arranged along the conveying channel, and the conveying device 120 is used to convey garbage from outside the factory building 10 to the garbage room.
[0047] In this technical solution, a conveying device 120 is provided in the conveying passage, and the conveying device 120 is used to directly convey the garbage in the unloading room 108 to the garbage pool 105 through the input port 107 .
[0048] Furthermore, the conveying device 120 is a conveyor belt, and a discharge port 109 is installed on the conveyor belt to facilitate the garbage truck to directly dump the garbage into the conveying device 120, thereby improving the continuity of garbage transportation.
[0049] According to a second aspect of the present application, an incineration plant is proposed, comprising a main incineration plant layout structure as described in any one of the above technical solutions.
[0050] The incineration plant provided in the present application includes the main incineration plant layout structure of any one of the above-mentioned technical solutions. Therefore, the incineration plant includes all the beneficial effects of the above-mentioned main incineration plant layout structure, which will not be repeated here.
[0051] Specifically, the incineration plant may include a small-scale waste incineration plant.
[0052] It is easy for those skilled in the art to understand that, under the premise of no conflict, the above-mentioned advantageous methods can be freely combined and superimposed.
[0053] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present application shall be included in the protection scope of the present application. The above are only preferred implementations of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and variations can be made without departing from the technical principles of the present application, and these improvements and variations should also be regarded as the protection scope of the present application.
Claims
1. A layout structure of the main incineration plant, It is characterized in that The main incineration plant layout structure includes: boiler area; a flue gas equipment area, wherein the flue gas equipment area is arranged on a first side of the boiler area along a length direction of the boiler area; A flue gas auxiliary zone is arranged on the second side of the boiler zone along the length direction of the boiler zone, so that the flue gas auxiliary zone and the flue gas equipment zone are arranged side by side on both sides of the boiler zone.
2. According to claim 1, a main incineration plant layout structure, It is characterized in that The main incineration plant layout structure also includes: The steam turbine room is arranged on a side of the flue gas equipment area away from the boiler area, so that the steam turbine room and the flue gas equipment area are arranged side by side.
3. The main incineration plant layout structure according to claim 1, It is characterized in that The main incineration plant layout structure also includes: A garbage pool is arranged at one end of the boiler area and is sunken downward so that the garbage pool is lower than the ground level of the plant.
4. The main incineration plant layout structure according to claim 3, Features: The garbage pool is arranged along the width direction of the boiler area.
5. The main incineration plant layout structure according to claim 3, It is characterized in that The main incineration plant layout structure also includes: A fence, the fence being arranged on the ground plane outside the garbage pool along the circumference of the garbage pool to form a garbage room in the factory building; An input port is arranged on the enclosure wall.
6. The main incineration plant layout structure according to claim 5, Features: The garbage pool is arranged close to the wall of the factory building.
7. The main incineration plant layout structure according to claim 6, It is characterized in that The main incineration plant layout structure also includes: An unloading room, the unloading room is arranged at one end of the garbage room, the unloading room is connected with the garbage room through the input port, and the wall of the unloading room opposite to the input port is the first wall of the factory building; A discharge port, wherein the discharge port is arranged on the first wall and is communicated with the input port.
8. The main incineration plant layout structure according to claim 7, Features: The discharge port and the input port are arranged opposite to each other, so that the conveying channel between the discharge port and the input port is perpendicular to the first wall.
9. The main incineration plant layout structure according to claim 8, It is characterized in that The main incineration plant layout structure also includes: A conveying device is arranged along the conveying passage, and is used to convey garbage from outside the factory building to the garbage room.
10. An incineration plant, It is characterized in that It comprises the main incineration plant layout structure as described in any one of claims 1 to 9.
Citation Information
Cited By
Integrated waste incineration power plant layout structure
CN120701979A