Bubbling auxiliary device for N-type crystalline silicon battery wet groove type reworking machine
By designing a uniform air outlet device for the bubble generator head assembly and auxiliary head on the N-type crystalline silicon battery wet tank rework machine, combining the ladder-type ventilation pipe and threaded connecting pipe, the problem of uneven gas outlet is solved and the silicon wafer is improved The adequacy of the reaction and the yield of the rework tablet extend the service life of the device.
Patent Information
- Application Number
- CN202420471950.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-12
AI Technical Summary
The bubble design of the existing N-type crystalline silicon battery wet tank rework machine leads to uneven gas effluent, affecting the sufficient reaction of the silicon wafer, resulting in reduced production quality and low yield of the rework wafer.
Design a bubble auxiliary device, including a bubble generator head assembly and an auxiliary head, uniformly discharge the air through the cooperation of the first and second air holes, and adopts a ladder-type ventilation pipe and threaded connecting pipe to increase ventilation channels and facilitate installation and removal , use a diaphragm valve to ensure one-way flow of gas.
It improves the uniformity of gas effluent, reduces the problems of insufficient reaction and abnormal silicon wafer patches, improves the yield and processing efficiency of the reworked sheets, and extends the service life of the device.
Smart Images

Figure CN222029097U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of solar cells, in particular to a bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank-type rework machine. Background Art
[0002] With the development of photovoltaic technology, especially the development of crystalline silicon technology, the quality requirements for N-type monocrystalline cells are getting higher and higher, and the production capacity requirements are getting higher and higher. It is particularly important to improve the technical performance of products.
[0003] At present, the liquid flow required for chemical reaction of reworked silicon wafers in the tank body is becoming more and more important for the wet-process tank rework machine of N-type crystalline silicon cells. The bubblers of the existing wet-process tank rework machine of N-type crystalline silicon cells are two pipes distributed on both sides of the tank body. Therefore, since the coverage area is mainly concentrated on both sides, the gas outlet uniformity is relatively poor, which is not conducive to the full reaction of the silicon wafer. The uneven gas will lead to insufficient reaction and abnormalities such as silicon wafer bonding, which greatly reduces the overall production quality. The poor treatment of N-type crystalline silicon rework wafers greatly reduces the yield of the rework wafers.
[0004] In view of the above problems, it is urgently necessary to carry out innovative design based on the original bubbling auxiliary device for N-type crystalline silicon battery wet trough rework machine. Therefore, we proposed a bubbling auxiliary device for N-type crystalline silicon battery wet trough rework machine which can well solve the above problems. Utility Model Content
[0005] The purpose of the utility model is to provide a bubbling auxiliary device for an N-type crystalline silicon cell wet-process trough rework machine, so as to solve the problem raised by the above-mentioned background technology that the liquid flow required for the chemical reaction of the reworked silicon wafers in the trough body of the N-type crystalline silicon cell wet-process trough rework machine on the market is becoming more and more important, and the bubbler of the existing N-type crystalline silicon cell wet-process trough machine is two pipes distributed on both sides of the trough body. Therefore, since the covered area is mainly concentrated on both sides, the gas outlet uniformity is relatively poor, which is not conducive to the full reaction of the silicon wafer, and the uneven gas will lead to insufficient reaction and abnormalities such as silicon wafer pasting, which greatly reduces the overall production quality, and the treatment of the N-type crystalline silicon rework wafers is poor, which greatly reduces the yield of the rework wafers.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank rework machine, comprising a vent pipe provided;
[0007] A bubble generating head assembly is installed on the vent pipe, and a first air hole is opened on the bubble generating head assembly;
[0008] An auxiliary head is threadedly connected to the upper surface of the bubble generating head assembly, and a second air hole is opened on the auxiliary head, and the air is evenly discharged through the cooperation of the first air hole and the second air hole.
[0009] Preferably, the ventilation pipe is arranged in a ladder shape, and the ventilation pipe arranged in a ladder shape can provide a larger ventilation channel, so that the air circulation is smoother.
[0010] Preferably, a first air inlet is formed at one end of the ventilation pipe.
[0011] Preferably, a second air inlet is opened at the other end of the ventilation pipe, and the first air inlet and the second air inlet are arranged to cooperate with each other for air intake. Air intake at both ends simultaneously makes the overall air intake more balanced, facilitates uniform air outlet operation in the later stage, and greatly improves the later treatment effect.
[0012] Preferably, a connecting seat is installed at the bottom of the bubble generating head assembly.
[0013] Preferably, a threaded connection pipe is provided at the bottom of the connection seat, and the threaded connection pipe is threadedly connected to the surface of the ventilation pipe. The threaded connection pipe is convenient for installation and disassembly, so that the entire device is easy to disassemble and replace, which greatly improves the service life of the device.
[0014] Preferably, a diaphragm valve is installed inside the connecting seat, and the diaphragm valve is a gas one-way diaphragm valve. The use of the diaphragm valve can ensure the one-way flow of gas, thereby improving the overall processing efficiency and the yield of the reworked sheets.
[0015] Compared with the prior art, the utility model has the following beneficial effects: the bubbling auxiliary device for the wet process tank rework machine of the N-type crystalline silicon battery, the bubble generating head assembly is installed on the vent pipe through the threaded connecting pipe, and the gas can be discharged evenly through the first air hole on the bubble generating head assembly and the second air hole on the auxiliary head, so that the uniformity of the overall gas discharge is greatly improved, which is convenient for the silicon wafer to fully react, and reduces the problems of insufficient reaction and abnormal silicon wafer patching caused by the uneven gas. The specific contents are as follows:
[0016] (1) The first air hole on the bubble generating head assembly and the second air hole on the auxiliary head are used to vent gas, so that there are more air holes per unit area, which greatly improves the uniformity of the overall gas outlet, greatly reduces the problems of insufficient reaction and abnormal silicon wafer bonding caused by uneven gas, thereby improving the yield of reworked wafers;
[0017] (2) The auxiliary head is installed and disassembled through threads on the bubble generating head assembly, making it easy to disassemble and replace the auxiliary head as needed, thereby greatly improving the efficiency and quality of the overall processing, thereby improving the yield rate of the reworked wafers;
[0018] (3) The installed ventilation pipe is arranged in a ladder shape, which can provide a larger ventilation channel, making the air flow smoother, improving the ventilation efficiency, facilitating the uniform air outlet operation in the later stage, and greatly reducing the problem of quality reduction caused by uneven air outlet;
[0019] (4) The threaded connection pipe can be threadedly installed on the bubble generating head assembly, so that the whole can be effectively adjusted according to the needs, and the whole can be easily disassembled and replaced, which greatly improves the service life of the device;
[0020] (5) The diaphragm valve inside the connecting seat is a gas one-way diaphragm valve, which can transport gas in one direction, reducing the gas reflux problem caused by unstable gas pressure, thereby improving the overall processing efficiency and greatly improving the yield of reworked wafers. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0022] Figure 2 This is a schematic diagram of the internal cutaway structure of the ventilation pipe of the utility model;
[0023] Figure 3 This is a schematic diagram of the structure of the bubble generating head assembly of the utility model;
[0024] Figure 4 This is a schematic diagram of the internal cross-section structure of the bubble generating head assembly of the utility model;
[0025] Figure 5 This is a schematic diagram of the surface structure of the bubble generating head assembly of the utility model;
[0026] Figure 6 This is a schematic diagram of the auxiliary head splitting structure of the utility model.
[0027] In the figure: 1. ventilation pipe; 2. first air inlet; 3. second air inlet; 4. bubble generating head assembly; 5. connecting seat; 6. threaded connecting pipe; 7. diaphragm valve; 8. first air hole; 9. auxiliary head; 10. second air hole. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] Embodiment 1:
[0030] In this embodiment, in order to improve the quality of the overall treatment, the bubble generating head assembly 4 is provided for gas outlet, the purpose of which is to reduce the problem of poor treatment caused by poor uniformity of gas outlet, such as Figure 1 and Figure 3-Figure 6 The technical solution shown includes a vent pipe 1, on which a bubble generating head assembly 4 is installed, on which a first air hole 8 is provided, and on which an auxiliary head 9 is threadedly connected on the upper surface of the bubble generating head assembly 4, on which a second air hole 10 is provided, and uniform gas is discharged through the cooperation of the first air hole 8 and the second air hole 10, and the first air hole 8 on the bubble generating head assembly 4 facilitates uniform gas discharge, so that the uniformity of the overall gas discharge is greatly improved, and it is convenient for the silicon wafer to fully react, and at this time, the auxiliary head 9 is threadedly connected to the bubble generating head assembly 4, so that the auxiliary head 9 can be installed and disassembled by thread, so that the practicality of the overall device is greatly improved, and at this time, the second air hole 10 on the auxiliary head 9 is used for gas discharge, so that there are more air holes per unit area, the gas discharge is more uniform, and the problems of insufficient reaction and abnormal silicon wafer bonding due to gas unevenness are reduced, thereby greatly improving the efficiency and quality of the overall processing and greatly improving the yield rate of reworked wafers.
[0031] Embodiment 2:
[0032] In this embodiment, in order to improve the overall flow efficiency, the gas is transported through the provided ventilation pipe 1, the purpose of which is to reduce the problem of poor air flow caused by the narrowness of the existing pipeline. Figure 1 and Figure 2 As shown, the ventilation pipe 1 is arranged in a ladder shape, a first air inlet 2 is provided at one end of the ventilation pipe 1, and a second air inlet 3 is provided at the other end of the ventilation pipe 1. The original two single pipes are dismantled and replaced with the ventilation pipe 1, and the ventilation pipe 1 is arranged in a ladder shape. The ladder-shaped ventilation pipe 1 can provide a larger ventilation channel, so that the air circulation is smoother, thereby improving the ventilation efficiency, and the first air inlet 2 and the second air inlet 3 are arranged to cooperate with each other for air intake. The simultaneous air intake at both ends makes the overall air intake more balanced, which is convenient for the later uniform air outlet operation, and greatly improves the later processing effect.
[0033] Embodiment three:
[0034] In this embodiment, in order to improve the overall stability, the gas is transported through the provided diaphragm valve 7, the purpose of which is to reduce the problem of gas reflux caused by unstable gas pressure. Figure 3 and Figure 4As shown, a connecting seat 5 is installed at the bottom of the bubble generating head assembly 4, and a threaded connecting pipe 6 is arranged at the bottom of the connecting seat 5. The threaded connecting pipe 6 is threadedly connected to the surface of the ventilation pipe 1, and a diaphragm valve 7 is installed inside the connecting seat 5. The diaphragm valve 7 is a gas one-way diaphragm valve 7. The bubble generating head assembly 4 is installed on a single air hole of the original structure through the threaded connecting pipe 6. The threaded connecting pipe 6 is convenient for installation and disassembly, so that the device as a whole is convenient for disassembly and replacement, which greatly improves the service life of the device. At this time, the gas can be transported through the diaphragm valve 7 inside the connecting seat 5. The diaphragm valve 7 is a gas one-way diaphragm valve 7, and its main function is to prevent the gas from flowing back due to unstable air pressure, causing the liquid to be sucked into the device, which causes the problem of inconvenience in overall processing. Therefore, the use of the diaphragm valve 7 can ensure the one-way flow of the gas, thereby improving the overall processing efficiency and the yield of the reworked sheets. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0035] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A bubbling auxiliary device for an N-type crystalline silicon cell wet process tank rework machine, comprising a vent pipe (1); It is characterized in that Also includes: The vent pipe (1) is provided with a bubble generating head assembly (4), and the bubble generating head assembly (4) is provided with a first air hole (8); The upper surface of the bubble generating head assembly (4) is threadedly connected with an auxiliary head (9), and a second air hole (10) is provided on the auxiliary head (9), and uniform air discharge is achieved through the cooperation of the first air hole (8) and the second air hole (10).
2. The bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank rework machine according to claim 1, characterized in that: The ventilation pipe (1) is arranged in a ladder shape.
3. The bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank rework machine according to claim 1, characterized in that: A first air inlet (2) is provided at one end of the ventilation pipe (1).
4. The bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank rework machine according to claim 1, characterized in that: The other end of the ventilation pipe (1) is provided with a second air inlet (3).
5. The bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank rework machine according to claim 1, characterized in that: A connecting seat (5) is installed at the bottom of the bubble generating head assembly (4).
6. The bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank rework machine according to claim 5, characterized in that: A threaded connection pipe (6) is provided at the bottom of the connection seat (5), and the threaded connection pipe (6) is threadedly connected to the surface of the ventilation pipe (1).
7. The bubbling auxiliary device for an N-type crystalline silicon cell wet-process tank rework machine according to claim 5, characterized in that: A diaphragm valve (7) is installed inside the connection seat (5), and the diaphragm valve (7) is a gas one-way diaphragm valve (7).
