Rope changing system of friction type elevator
By designing the friction hoist rope change system and using the dual friction wheel and rope holder components, the problems of difficulty and cost of changing ropes of the friction hoist are solved, and the convenient replacement of old wire ropes and the safety of the lifting device are improved.
Patent Information
- Application Number
- CN202420891648.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing friction hoist rope replacement method has the problem of complex manual replacement process and high cost, especially the cost of purchasing large mechanical rope replacement vehicles.
A friction hoist rope replacement system is designed, adopting a structure including a rope change winch, a support wheel, a rope holder and other components. The frictional circles of the wire rope are increased through the double friction wheel design, so as to achieve convenient replacement of old wire ropes, and through The rope holder improves the controllability and safety of rope change operations.
It realizes convenient replacement of old lifting wire ropes, reduces construction costs, improves the safety and work efficiency of lifting devices, and avoids the dangers caused by the unexpected decline of new and old wire ropes.
Smart Images

Figure CN222042325U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of mine hoisting, in particular to a friction hoist rope changing system. Background Art
[0002] Friction hoist is a type of hoist, mainly used for mineral lifting, material lowering and personnel lifting in vertical shafts of coal mines, metal mines and non-metallic mines. Therefore, the safety and reliability of the operation of friction hoists are directly related to the safe production of coal mines, metal mines and non-metallic mines. Therefore, the maintenance, care and daily inspection of friction hoists are particularly important. Among them, the lifting wire rope needs to be replaced regularly, and the replacement method is usually manual replacement or large-scale mechanical rope changing vehicle replacement.
[0003] However, practice shows that the existing friction hoist rope changing method has the following problems: first, the manual replacement process is complicated and the construction period is long; second, the cost of purchasing a large mechanical rope changing vehicle is high.
[0004] Therefore be necessary to invent a kind of friction type hoist rope changing system to solve the above-mentioned problem. Utility Model Content
[0005] In order to solve the problems of difficulty and high cost in rope replacement of existing friction hoists, the utility model provides a rope replacement system for a friction hoist.
[0006] The utility model is realized by adopting the following technical solutions:
[0007] A friction hoist rope changing system, comprising a hoist installed above the vertical shaft and the ground, an upper sheave, a lower sheave, and containers I and II installed in the vertical shaft, and also comprising an old hoisting wire rope, wherein the middle section of the old hoisting wire rope is wound on the hoist, the left section of the old hoisting wire rope is wound on the lower sheave, and the left end of the old hoisting wire rope is fixed to the top of container I, the right section of the old hoisting wire rope is wound on the upper sheave, and the right end of the old hoisting wire rope is fixed to the top of container II, a tail rope is connected between the tail ends of containers I and II, and a wire rope reel, a rope changing winch, and a supporting wheel are sequentially arranged from left to right on the ground on the left side of the vertical shaft;
[0008] The rope-changing winch comprises a base, on which are mounted a friction wheel I, a friction wheel II, a coupling, a reducer and a driving motor, the output shaft of the driving motor being connected to the input shaft of the reducer, the output shaft of the reducer being connected to the input shaft of the friction wheel I through a coupling, the friction wheel I and the friction wheel II being arranged in the same row, a new lifting wire rope being wound on the wire rope reel, and the new lifting wire rope being wound around the friction wheel I, the friction wheel II and the supporting wheel in sequence, and the end of the new lifting wire rope being connected to the left section of the old lifting wire rope.
[0009] Furthermore, a rope holder is provided on the ground on the left side of the rope-changing winch, and the rope holder is composed of a linear motor, a hydraulic cylinder, a bracket, and an upper pad seat. The hydraulic cylinder is arranged inside the bracket, and the linear motor is fixed to the top of the bracket. A through hole is opened on the top of the bracket, and the output end of the linear motor is connected to the piston rod of the hydraulic cylinder through the through hole, and the upper pad seat is fixed to the lower end of the hydraulic cylinder.
[0010] Furthermore, an upper pad is fixed on the lower surface of the upper pad seat, and a lower pad is fixed on the inner bottom wall of the bracket.
[0011] Furthermore, a tension spring is installed between the bracket and the upper cushion seat.
[0012] Furthermore, the friction wheel I and the friction wheel II are both sleeved with lining rings, and each lining ring is coaxially provided with a plurality of lifting wire rope grooves distributed along the front and rear.
[0013] The utility model has a reasonable and reliable structural design and is easy to operate. It realizes the convenient replacement of the old lifting wire rope without the need for large machinery, thus reducing the construction cost. The structural design of the double friction wheels formed by the friction wheel I and the friction wheel II not only increases the number of friction circles wound around the new lifting wire rope, and improves the safety of the lifting device composed of the hoist, the upper sheave, the lower sheave, the old lifting wire rope, the container I, the container II, and the tail rope during the lifting process, but also can replace multiple old lifting wire ropes at the same time, effectively improving the work efficiency. The rope holding device can respond quickly and effectively hold the sliding new lifting wire rope or the old lifting wire rope during the rope changing process, which greatly improves the controllability and safety of the rope changing operation, thereby avoiding the danger and construction difficulty caused by the accidental sliding of the new lifting wire rope or the old lifting wire rope. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the utility model.
[0015] Figure 2 It is a structural schematic diagram of a rope-changing winch of the utility model.
[0016] Figure 3 This is a schematic diagram of the structure of the rope holding device of the utility model Figure 1 .
[0017] Figure 4 This is a schematic diagram of the structure of the rope holding device of the utility model Figure 2 .
[0018] In the figure: 1-hoist, 2-upper sheave, 3-lower sheave, 4-old lifting wire rope, 5-container I, 6-container II, 7-tail rope, 8-wire rope reel, 9-supporting wheel, 10-base, 11-friction wheel I, 12-friction wheel II, 13-coupling, 14-reducer, 15-drive motor, 16-new lifting wire rope, 17-rope holder, 18-linear motor, 19-hydraulic cylinder, 20-bracket, 21-upper pad seat, 22-upper pad, 23-lower pad, 24-tension spring, 25-pad ring. DETAILED DESCRIPTION
[0019] A friction hoist rope changing system, as shown in the attached Figure 1 ~Attached Figure 2 As shown, it includes a hoist 1, an upper sheave 2, a lower sheave 3 installed above the shaft and the ground, and containers Ⅰ5 and Ⅱ6 installed in the shaft, and also includes an old hoisting wire rope 4, the middle section of the old hoisting wire rope 4 is wound on the hoist 1, the left section of the old hoisting wire rope 4 is wound on the lower sheave 3, and the left end of the old hoisting wire rope 4 is fixed to the top of the container Ⅰ5, the right section of the old hoisting wire rope 4 is wound on the upper sheave 2, and the right end of the old hoisting wire rope 4 is fixed to the top of the container Ⅱ6, a tail rope 7 is connected between the tail ends of the containers Ⅰ5 and Ⅱ6, and a wire rope reel 8, a rope changing winch, and a supporting wheel 9 are arranged on the ground on the left side of the shaft from left to right in sequence;
[0020] The rope-changing winch includes a base 10, on which are mounted a friction wheel Ⅰ11, a friction wheel Ⅱ12, a coupling 13, a reducer 14, and a drive motor 15. The output shaft of the drive motor 15 is connected to the input shaft of the reducer 14, and the output shaft of the reducer 14 is connected to the input shaft of the friction wheel Ⅰ11 through the coupling 13. The friction wheel Ⅰ11 and the friction wheel Ⅱ12 are arranged in the same row. A new lifting wire rope 16 is wound around the wire rope reel 8, and the new lifting wire rope 16 is wound around the friction wheel Ⅰ11, the friction wheel Ⅱ12, and the supporting wheel 9 in sequence. The end of the new lifting wire rope 16 is connected to the left section of the old lifting wire rope 4.
[0021] The lifting wire rope reel 8, the rope changing winch, the supporting wheel 9 cooperate with the structural design of the lifting device composed of the hoist 1, the upper wheel 2, the lower wheel 3, the old lifting wire rope 4, the container Ⅰ5, the container Ⅱ6, and the tail rope 7 in the utility model to realize the convenient replacement of the old lifting wire rope 4. The operation is simple. Only by starting the rope changing winch, the new lifting wire rope 16 can obtain sufficient friction and guidance through the friction wheel Ⅰ11 and the friction wheel Ⅱ12, and gradually release it through the supporting wheel 9 and dock with the old lifting wire rope 4, so as to cooperate with the lifting device to replace the old lifting wire rope 4; the structural design of the double friction wheels formed by the friction wheel Ⅰ11 and the friction wheel Ⅱ12 increases the number of friction circles wound around the new lifting wire rope 16, improves the safety of the lifting device during the lifting process, and does not require large machinery, reducing the construction cost; the structural design of the reducer 14 reduces the speed of the drive motor 15 and increases the torque to meet the low-speed and high-torque requirements of the rope changing work, thereby ensuring the safety and efficiency of the rope changing process.
[0022] As attached Figure 1 , Attachment Figure 3 ~Attached Figure 4 As shown, a rope holder 17 is arranged on the ground on the left side of the rope changing winch. The rope holder 17 is composed of a linear motor 18, a hydraulic cylinder 19, a bracket 20, and an upper cushion seat 21. The hydraulic cylinder 19 is arranged inside the bracket 20, and the linear motor 18 is fixed to the top of the bracket 20. A through hole is opened on the top of the bracket 20. The output end of the linear motor 18 is connected to the piston rod of the hydraulic cylinder 19 through the through hole, and the upper cushion seat 21 is fixed to the lower end of the hydraulic cylinder 19.
[0023] As attached Figure 3 ~Attached Figure 4 As shown, an upper pad 22 is fixed to the lower surface of the upper pad seat 21 , and a lower pad 23 is fixed to the inner bottom wall of the bracket 20 .
[0024] As attached Figure 3 As shown, a tension spring 24 is installed between the bracket 20 and the upper cushion seat 21 .
[0025] The structural design of the rope holding device 17 can respond quickly and effectively hold the sliding new lifting wire rope 16 or the old lifting wire rope 4 during the rope changing process, which greatly improves the controllability and safety of the rope changing operation, thereby avoiding the danger and construction difficulties caused by the accidental sliding of the new lifting wire rope 16 or the old lifting wire rope 4.
[0026] During the entire rope changing process, if the new lifting wire rope 16 or the old lifting wire rope 4 slides, the linear motor 18 of the rope holding device 17 is started, and the linear motor 18 will drive the hydraulic cylinder 19 to move the upper pad seat 21 downward, and hold the new lifting wire rope 16 or the old lifting wire rope 4 through the upper pad 22 and the lower pad 23, thereby preventing it from continuing to slide, so as to ensure the safety and stability of the rope changing process; when it is necessary to loosen the rope, the linear motor 18 drives the upper pad seat 21 to move upward, and the rope is loosened with the help of the restoring force of the tension spring 24.
[0027] As attached Figure 2 As shown, the friction wheel Ⅰ11 and the friction wheel Ⅱ12 are both sleeved with a liner ring 25, and each liner ring 25 is coaxially provided with a plurality of lifting wire rope grooves distributed along the front and rear.
[0028] The structural design of the gasket ring 25 enhances the anti-slip performance of the friction wheel I11 and the friction wheel II12, effectively reducing the safety hazard caused by slipping when replacing the old lifting wire rope 4. At the same time, the structural design of several circles of lifting wire rope grooves realizes the simultaneous replacement of multiple old lifting wire ropes 4, effectively improving work efficiency.
[0029] The present invention is further described in detail below through specific embodiments. It should be noted that the present invention is not limited to the following embodiments.
[0030] The utility model is implemented by the following steps when working:
[0031] Step 1: As attached Figure 1 As shown, a set of rope-changing winches, a set of supporting wheels 9, two steel wire rope reels 8 distributed along the front and back, and two rope holders 17 distributed along the front and back are installed on the ground on the left side of the vertical shaft according to the designated position to ensure that the equipment is stable and reliable. At the same time, after preparing the manual hoist, rope clamp and other necessary construction tools and safety protection facilities, the container I5 is first lowered to 100 meters away from the wellhead, and two new lifting steel wire ropes 16 are respectively drawn out from the two steel wire rope reels 8, and passed through the two rope holders 17 one by one, and then are successively wound around the friction wheel I11, the friction wheel II12 and the supporting wheel 9, and then the ends of the two new lifting steel wire ropes 16 are connected and fixed to the left sections of the two old lifting steel wire ropes 4 that need to be replaced one by one;
[0032] Step 2: Start the main hoist 1 and the rope-changing winch, so that each new hoisting wire rope 16 is sequentially passed through the lower sheave 3, the main hoist 1, and the upper sheave 2 and then transmitted to the wellhead on the right side, and each new hoisting wire rope 16 is untied from the rope end at the connection with the corresponding old hoisting wire rope 4 and temporarily fixed to the wellhead on the right side through a manual hoist;
[0033] Step 3: Reversely rotate the main hoist 1 to lift the container II 6 to the wellhead on the right side, and connect the two new hoisting wire ropes 16 temporarily fixed at the wellhead on the right side to the corresponding old hoisting wire ropes 4 that need to be replaced at the container II 6 with rope clamps;
[0034] Step 4: Rotate the main hoist 1 forward to make the new hoisting wire rope 16 run downward along the container Ⅱ 6. Fix the new hoisting wire rope 16 and the corresponding old hoisting wire rope 4 with a rope clamp every 20m or so until the container Ⅱ 6 stops at the bottom of the shaft. At this time, the container Ⅰ 5 is just mentioned at the wellhead. Fix the container Ⅰ 5 at the wellhead and the container Ⅱ 6 at the well bottom, so that the two old hoisting wire ropes 4 are in a relaxed state. Remove the rope heads of the two old hoisting wire ropes 4 from the containers Ⅰ 5 and Ⅱ 6 respectively, connect and fix the two new hoisting wire ropes 16 to the containers Ⅰ 5 and Ⅱ 6 respectively, and cut off the redundant rope heads of the new hoisting wire ropes 16. At this time, release the fixation of the containers Ⅰ 5 and Ⅱ 6, temporarily fix the right rope heads of the two old hoisting wire ropes 4 on the container Ⅱ 6, and pull the left rope heads of the two old hoisting wire ropes 4 to the left side of the shaft head;
[0035] Step 5: Reversely rotate the main hoist 1 to lift the container II 6, and use the rope-changing winch to wind the left ends of the two old lifting steel wire ropes 4 onto the two steel wire rope reels 8 one by one for fixing, reversely rotate the steel wire rope reels 8 and the main hoist 1, and untie a rope clamp every time the container II 6 is lifted by 20m, until the two old lifting steel wire ropes 4 are completely withdrawn, thereby completing the replacement of the two new lifting steel wire ropes 16;
[0036] Step 6: Repeat steps 1 to 5 to replace the remaining old lifting wire ropes 4 two at a time, thereby completing the work of the rope replacement system; overcoming the problems of difficult and costly rope replacement for existing friction hoists.
[0037] In the description of the present invention, it is necessary to understand that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A friction hoist rope changing system, comprising a hoist (1) installed in a vertical shaft and above the ground, an upper sheave (2), a lower sheave (3), and a container I (5) and a container II (6) installed in the vertical shaft, Features: It also includes an old lifting wire rope (4), wherein the middle section of the old lifting wire rope (4) is wound on the hoist (1), the left section of the old lifting wire rope (4) is wound on the lower sheave (3), and the left end of the old lifting wire rope (4) is fixed to the top of container I (5), the right section of the old lifting wire rope (4) is wound on the upper sheave (2), and the right end of the old lifting wire rope (4) is fixed to the top of container II (6), a tail rope (7) is connected between the tail ends of container I (5) and container II (6), and a wire rope reel (8), a rope changing winch, and a supporting wheel (9) are arranged on the ground on the left side of the shaft from left to right in sequence; The rope-changing winch comprises a base (10), on which a friction wheel I (11), a friction wheel II (12), a coupling (13), a reducer (14), and a driving motor (15) are mounted. The output shaft of the driving motor (15) is connected to the input shaft of the reducer (14), and the output shaft of the reducer (14) is connected to the input shaft of the friction wheel I (11) through the coupling (13). The friction wheel I (11) and the friction wheel II (12) are arranged in the same row. A new lifting wire rope (16) is wound around the wire rope reel (8), and the new lifting wire rope (16) is wound around the friction wheel I (11), the friction wheel II (12), and the supporting wheel (9) in sequence. The end of the new lifting wire rope (16) is connected to the left section of the old lifting wire rope (4).
2. A friction hoist rope changing system according to claim 1, Features: A rope holder (17) is arranged on the ground on the left side of the rope-changing winch. The rope holder (17) is composed of a linear motor (18), a hydraulic cylinder (19), a bracket (20), and an upper cushion seat (21). The hydraulic cylinder (19) is arranged inside the bracket (20). The linear motor (18) is fixed to the top of the bracket (20). A through hole is opened on the top of the bracket (20). The output end of the linear motor (18) is connected to the piston rod of the hydraulic cylinder (19) through the through hole. The upper cushion seat (21) is fixed to the lower end of the hydraulic cylinder (19).
3. A friction hoist rope changing system according to claim 2, Features: An upper pad (22) is fixed on the lower surface of the upper pad seat (21), and a lower pad (23) is fixed on the inner bottom wall of the bracket (20).
4. A friction hoist rope changing system according to claim 2, Features: A tension spring (24) is installed between the bracket (20) and the upper cushion seat (21).
5. A friction hoist rope changing system according to claim 1, Features: The friction wheel I (11) and the friction wheel II (12) are both sleeved with a gasket ring (25), and each gasket ring (25) is coaxially provided with a plurality of lifting wire rope grooves distributed along the front and rear.
