Utility tunnel foundation pit support changing device

By pre-embedding steel fixing structures and anchor bars in the side walls of the integrated utility tunnel, the problem of foundation pit deformation caused by the removal of steel supports was solved, achieving structural stability and ease of construction.

CN222044211UActive Publication Date: 2024-11-22WUHAN HANYANG MUNICIPAL CONSTR GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420041927.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-11-22
Estimated Expiration
2034-01-08

AI Technical Summary

Technical Problem

In existing technologies, when the steel support structure is removed after the construction of the integrated utility tunnel foundation pit is completed, it can easily lead to deformation and cracking of the foundation pit structure, affecting the surrounding environment.

Method used

A comprehensive utility tunnel foundation pit support replacement device is adopted, including steel fixing structures and anchor bars pre-embedded in the side walls, which are used to support the side walls. By transferring the lateral earth pressure of the steel support structure to the main structure, deformation caused by the removal of the steel support is avoided.

Benefits of technology

It effectively avoids deformation and cracking of the foundation pit structure, is easy to construct, and can be quickly installed and disassembled, thus improving the safety and stability of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044211U_ABST
    Figure CN222044211U_ABST
Patent Text Reader

Abstract

The utility model discloses a comprehensive pipe gallery foundation pit support changing device which is used for being supported between side walls of a comprehensive pipe gallery and comprises steel fixing structures and steel supports, the steel fixing structures are embedded in the inner sides of the two side walls of the comprehensive pipe gallery correspondingly, and the steel supports are used for being connected with the two steel fixing structures so as to be supported between the side walls of the comprehensive pipe gallery. According to the comprehensive pipe gallery foundation pit support changing device, the lateral soil pressure borne by the steel supporting structure can be transferred to the main body structure of the comprehensive pipe gallery, and foundation pit deformation caused by dismantling of the steel supporting structure is avoided; and construction is convenient, and mounting and dismounting can be rapidly carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of underground structures, for example, tunnels or corridors built in the open air or by destroying the foundation surface of a positioning line, and specifically to a support replacement device for a foundation pit of an integrated pipe gallery. Background Art

[0002] During the construction of the steel sheet pile support of the comprehensive pipe gallery, as the foundation pit is excavated, it is necessary to set up a steel support structure before the construction of the comprehensive pipe gallery. At present, the foundation pit enclosure support system during the foundation pit excavation process is relatively complete, generally including the foundation pit enclosure wall, the surrounding purlin beam and the horizontal support located on the inner side of the surrounding purlin beam, which can often effectively control the deformation of the foundation pit. After the main structure of the pipe gallery is completed, the steel support structure can be removed for backfilling after the concrete strength of the main structure of the pipe gallery reaches 100%. However, when the steel support structure is removed, the instantaneous prestress release will be too large, resulting in local structural deformation and cracking, which usually causes a certain amount of deformation of the foundation pit, resulting in local deformation and cracking of the structure, and even affecting the surrounding environment of the foundation pit project. Summary of the invention

[0003] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model proposes a comprehensive pipe gallery foundation pit support replacement device, and the technical solution adopted includes:

[0004] A support replacement device for a foundation pit of an integrated pipe gallery is used to support between the side walls of the integrated pipe gallery, comprising a steel fixed structure and a steel support. The steel fixed structures are respectively pre-buried on the inner sides of the two side walls of the integrated pipe gallery, and the steel support is used to connect with the two steel fixed structures to support between the side walls of the integrated pipe gallery.

[0005] An embodiment of the utility model adopts a technical solution to solve the technical problem: the steel fixing structure includes an anchor plate pre-buried in the inner wall of the side wall and anchor bars connected to the anchor plate.

[0006] The technical solution adopted by an embodiment of the utility model to solve the technical problem is: the length of the anchor bar is 300 mm.

[0007] A technical solution adopted by an embodiment of the utility model to solve the technical problem is: the size of the anchor plate is 800mm*800mm*20mm.

[0008] An embodiment of the utility model adopts a technical solution to solve its technical problem: the steel fixing structure also includes a head plate installed on the side of the anchor plate away from the anchor bar, and the steel support is connected to the head plate.

[0009] The beneficial effects of the utility model are as follows: in the comprehensive pipe gallery foundation pit support replacement device described in the present application, the lateral earth pressure borne by the steel support structure can be transferred to the main structure of the comprehensive pipe gallery, thereby avoiding deformation of the foundation pit caused by the removal of the steel support structure; and the construction is convenient and can be quickly installed and disassembled. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0011] Figure 1 This is a schematic diagram of the installation structure of the comprehensive pipe gallery foundation pit support replacement device described in the embodiment of the present application;

[0012] Figure 2 This is a schematic diagram of the structure of the steel fixing structure described in the embodiment of the present application;

[0013] Figure 3 It is a side view of the support replacement device for the foundation pit of the comprehensive pipe corridor described in an embodiment of the present application. DETAILED DESCRIPTION

[0014] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.

[0015] In the description of the present utility model, the meaning of "more than" is more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0016] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0017] In the present invention, unless otherwise clearly defined, the words "set", "install", "connect" and the like should be understood in a broad sense, for example, they can be directly connected or indirectly connected through an intermediate medium; they can be fixedly connected or detachably connected or integrally formed; they can be mechanically connected; they can be the internal connection of two elements or the interaction relationship between two elements. Those skilled in the art can reasonably determine the specific meanings of the above words in the present invention in combination with the specific content of the technical solution.

[0018] Reference Figure 1-3 , an embodiment of the present application is proposed, in which the comprehensive pipe gallery foundation pit support replacement device described in this embodiment is used to support between the side walls 10 of the comprehensive pipe gallery, and includes a steel fixed structure 20 and a steel support 30. The steel fixed structures 20 are respectively pre-buried on the inner sides of the two side walls 10 of the comprehensive pipe gallery, and the steel support 30 is used to connect with the two steel fixed structures 20 to be supported between the side walls 10 of the comprehensive pipe gallery.

[0019] There are three steel support structures in the foundation pit. During the construction of the main structure of the corridor, the first steel support structure is first dismantled, and then the bottom plate of the main structure of the corridor is constructed and poured. After the strength of the bottom plate of the main structure of the corridor reaches the preset strength, the steel fixed structure 20 is installed in the side wall 10 of the main structure of the corridor, and the side wall 10 of the main structure of the corridor is poured for the second time. After the concrete strength of the side wall 10 reaches 80% of the design strength, the two ends of the steel support 30 are respectively installed on the two steel fixed structures 20 on the inner side of the side wall 10 and the prestress is applied, the second steel support structure can be dismantled to complete the support replacement of the comprehensive corridor.

[0020] If the second steel support structure conflicts with the main structure of the corridor, after the side wall 10 of the main structure of the corridor is cast for the second time to the lower part of the second steel support structure, when the concrete strength of the side wall 10 reaches 80% of the design strength, the two ends of the steel support 30 are respectively installed on the two steel fixed structures 20 on the inner side of the side wall 10 and the prestress is applied, the second steel support structure is removed, and the side wall 10 of the main structure of the corridor is continued to be cast to complete the construction and support replacement of the comprehensive corridor.

[0021] In the comprehensive pipeline corridor foundation pit support replacement device described in the present application, the lateral earth pressure borne by the steel support structure can be transferred to the main structure of the comprehensive pipeline corridor, avoiding deformation of the foundation pit caused by the removal of the steel support structure; and the construction is convenient and can be installed quickly.

[0022] The steel fixed structure 20 includes an anchor plate 21 pre-buried in the side wall 10 of the integrated pipe gallery and anchor bars 22 connected to the anchor plate 21 .

[0023] In this embodiment, the length of the anchor bar 22 is 300 mm; the size of the anchor plate 21 is 800 mm*800 mm*20 mm, see the attached Figure 2 The diagram shows the dimensions of the anchor plate 21 and the dimensions and distribution of the anchor bars 22 in the embodiment of the present application; the embedded anchor plate 21 is uniformly made of Q235B grade steel, the thickness t of the anchor plate 21 is determined through force calculation and shall not be less than 60% of the diameter of the anchor bar 22; the anchor bar 22 shall be made of HRB400 or HPB300 steel bars, and cold-processed steel bars shall not be used.

[0024] The embedded anchor plate 21 and the steel bar should adopt arc welding T-shaped joint, which can be fillet welding and perforation plug welding. When the anchor bar 22 is HPB300 steel bar, the fillet weld angle size K shall not be less than 50% of the diameter of the anchor bar 22; when the anchor bar 22 is HPB400 steel bar, the weld angle size K shall not be less than 60% of the diameter of the anchor bar 22.

[0025] Furthermore, the steel fixing structure 20 also includes a head plate 23 installed on a side of the anchor plate 21 away from the anchor bar 22 , and the steel support 30 is connected to the head plate 23 .

[0026] Of course, the present invention is not limited to the above-mentioned embodiments, and technicians familiar with the field may make equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications and substitutions are all included in the scope defined by the claims of this application.

Claims

1. A comprehensive pipe gallery foundation pit support replacement device, It is characterized in that The utility model is used for supporting between the side walls (10) of the integrated pipe gallery, and comprises a steel fixed structure (20) and a steel support (30). The inner sides of the two side walls (10) of the integrated pipe gallery are respectively pre-buried with the steel fixed structures (20). The steel support (30) is used for connecting with the two steel fixed structures (20) to support between the side walls (10) of the integrated pipe gallery.

2. The comprehensive pipe gallery foundation pit support replacement device according to claim 1, It is characterized in that The steel fixing structure (20) comprises an anchor plate (21) pre-buried in the inner wall of the side wall (10) and anchor bars (22) connected to the anchor plate (21).

3. The comprehensive pipe gallery foundation pit support replacement device according to claim 2, It is characterized in that The length of the anchor bar (22) is 300 mm.

4. The comprehensive pipe gallery foundation pit support replacement device according to claim 2, It is characterized in that The size of the anchor plate (21) is 800mm*800mm*20mm.

5. The comprehensive pipe gallery foundation pit support replacement device according to claim 2, It is characterized in that The steel fixing structure (20) further comprises a head plate (23) installed on a side of the anchor plate (21) away from the anchor bar (22), and the steel support (30) is connected to the head plate (23).