Assembly type cable working well
Through the modular design and the rapid connection of prefabricated components, the problems of long production cycle and low construction efficiency of existing cable work wells are solved, and fast and efficient construction and good waterproofing performance are achieved, reducing costs.
Patent Information
- Application Number
- CN202420651173.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-01
AI Technical Summary
The existing cable work well has a long production cycle, low construction efficiency and high cost, making it difficult to meet the needs of modern urban cable construction.
Modular design and prefabricated components are adopted to form a stable three-dimensional spatial structure through the connection of embedded sleeves and high-strength bolts, simplifying the construction process, shortening the construction period, and setting waterproof grooves at the connections to ensure waterproof performance.
It realizes rapid on-site assembly, shortens construction cycle, improves construction efficiency, and reduces costs through modular design, ensuring the stability and waterproof performance of the work well.
Smart Images

Figure CN222044276U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled buildings, in particular to an assembled cable working well. Background Art
[0002] With the acceleration of urban modernization construction and the increasing shortage of urban space, underground cables have become a demand and trend for the effective use of land and space resources. At present, most domestic cable working wells are cast-in-place concrete, which have problems such as long production cycle, large on-site operation area and high construction cost. Modular design and full-process mechanized construction are the direction of technical development. Therefore, it is of great practical significance to carry out research on key technologies of assembled cable working wells.
[0003] Therefore, developing an assembled cable working shaft with modular design to reduce costs and improve efficiency is of great significance for achieving sustainable development of power infrastructure. Utility Model Content
[0004] The utility model aims to provide an assembled cable working shaft, reduce the cost and difficulty of component processing and installation, shorten the construction time, and solve the technical problems of long production cycle and low construction efficiency of cast-in-place concrete assembled working shafts in the prior art.
[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solution, an assembled cable working well, comprising: a prefabricated bottom plate, a prefabricated side wall plate, a prefabricated end wall plate, a prefabricated cover plate and a prefabricated manhole plate:
[0006] The prefabricated bottom plate, the prefabricated side wall plate and the prefabricated end wall plate are connected to each other through embedded sleeves and high-strength bolts to form a stable three-dimensional space structure;
[0007] The prefabricated cover plate and the prefabricated manhole plate are embedded in the cover plate installation groove at the upper part of the prefabricated wall panel;
[0008] A waterproof groove is provided at the connection between the prefabricated bottom plate, the prefabricated wall plate and the prefabricated cover plate;
[0009] The prefabricated end wall panel is provided with an end wall panel manhole for allowing the cable to pass through;
[0010] The prefabricated manhole plate is provided with a manhole for people to enter and exit.
[0011] Furthermore, the prefabricated base plate is a plate-like structure, a base plate tongue and groove step is provided in the middle of the prefabricated base plate, and embedded threaded sleeves are distributed on the periphery of the base plate tongue and groove step; waterproof grooves are provided on the prefabricated base plate and the base plate tongue and groove step.
[0012] Furthermore, the prefabricated side wall panels are vertically arranged and installed on both sides of the width direction of the prefabricated bottom plate; the top of the prefabricated side wall panels is provided with cover plate installation grooves for installing the prefabricated cover plate and the prefabricated manhole plate, and a row of embedded sleeves with anti-corrosion grooves penetrating the prefabricated side wall panels are respectively provided on both sides of the length direction of the prefabricated side wall panels; high-strength bolts pass through the embedded sleeves with anti-corrosion grooves and are screwed into the embedded threaded sleeves on the prefabricated end wall panels, thereby connecting the prefabricated side wall panels with the prefabricated end wall panels;
[0013] The prefabricated side wall panel is provided with a wall panel tongue and groove boss near the bottom; the wall panel tongue and groove boss is provided with a bolt mounting hole; the wall panel tongue and groove boss cooperates with the bottom plate tongue and groove step on the prefabricated bottom plate, and the high-strength bolt passes through the bolt mounting hole and is screwed into the embedded threaded sleeve on the prefabricated bottom plate, thereby vertically connecting the prefabricated side wall panel and the prefabricated bottom plate together.
[0014] Furthermore, the prefabricated end wall panels are arranged on both sides of the prefabricated bottom plate in the length direction, and a cover plate mounting groove is arranged on the top of the prefabricated end wall panels; embedded threaded sleeves and waterproof grooves are arranged on the two sides of the prefabricated end wall panels close to the prefabricated side wall panels; a wall panel tongue and groove boss is arranged near the bottom of the prefabricated end wall panels; bolt mounting holes are arranged on the wall panel tongue and groove boss; the wall panel tongue and groove boss cooperates with the bottom plate tongue and groove step on the prefabricated bottom plate.
[0015] Furthermore, the prefabricated cover plate is a rectangular plate-shaped structure, and the size of the prefabricated cover plate matches the cover plate mounting grooves set on the tops of the prefabricated side wall panels and the prefabricated end wall panels; the prefabricated cover plate is embedded in the cover plate mounting grooves to protect the internal structure of the working well from external influences.
[0016] Furthermore, the prefabricated manhole plate is a rectangular plate structure, and the size of the prefabricated manhole plate matches the cover plate mounting grooves set on the tops of the prefabricated side wall panels and the prefabricated end wall panels; the prefabricated manhole plate is embedded in the cover plate mounting grooves; and a manhole for people to enter and exit is opened on the prefabricated manhole plate.
[0017] Furthermore, a water collection pit is provided on the bottom plate tongue and groove step.
[0018] Beneficial Effects
[0019] The various components of the assembled cable working well of the utility model are connected by bolts, and can be quickly assembled on site, which greatly shortens the construction period and improves the construction efficiency.
[0020] The connection between the prefabricated bottom plate, the prefabricated wall plate and the prefabricated cover plate of the utility model is provided with a waterproof groove, thus ensuring the stability and waterproof performance of the working well. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention.
[0022] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0023] Figure 2 It is a plan view of the utility model;
[0024] Figure 3 It is a front view of the utility model;
[0025] Figure 4 It is a side view of the utility model;
[0026] Figure 5 It is the AA cross-sectional view of the utility model;
[0027] Figure 6 It is a BB cross-sectional view of the utility model;
[0028] Figure 7 It is a three-dimensional structural schematic diagram of the prefabricated base plate;
[0029] Figure 8 It is a three-dimensional structural schematic diagram of the prefabricated side wall panel;
[0030] Fig. 9 It is a three-dimensional structural schematic diagram of the prefabricated end wall panel;
[0031] Fig.10 It is the node diagram of the connection scheme 1 between the prefabricated bottom plate and the prefabricated wall panel;
[0032] Fig.11 This is the node diagram of the second connection scheme between the prefabricated base plate and the prefabricated wall panel.
[0033] In the figure, 1. prefabricated base plate, 101. base plate tongue and groove step, 102. sump, 2. prefabricated side wall panel, 3. prefabricated end wall panel, 4. prefabricated cover plate, 5. prefabricated manhole plate, 501. manhole, 6. end wall panel manhole, 7. embedded threaded sleeve, 8. waterproof groove, 9. wall panel tongue and groove boss, 10. bolt mounting hole, 11. embedded sleeve with anti-corrosion groove, 12. cover plate mounting groove, 13. high-strength bolt, 14. embedded sleeve, 15. self-compacting concrete, 16. waterproof rubber strip, 17. waterproof slurry, 18. external waterproof membrane, 19. high-strength screw, 20. nut. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0035] See also Figure 1-11 As shown, an assembled cable working shaft includes: a prefabricated bottom plate 1, a prefabricated side wall plate 2, a prefabricated end wall plate 3, a prefabricated cover plate 4 and a prefabricated manhole plate 5: these components are all prefabricated in the factory and are quickly connected on site through embedded sleeves 14 and high-strength bolts 13 to form a stable and waterproof three-dimensional spatial structure, which improves construction efficiency, speeds up construction, greatly shortens construction period, and does not require pouring operations.
[0036] The prefabricated bottom plate 1 is connected to the prefabricated side wall plate 2 and the prefabricated end wall plate 3 by embedded sleeves 14 and high-strength bolts 13 to form a stable three-dimensional space structure;
[0037] The prefabricated cover plate 4 and the prefabricated manhole plate 5 are embedded in the cover plate installation groove 12 on the upper part of the prefabricated side wall plate 2; the connection between the prefabricated bottom plate 1, the prefabricated wall plate and the prefabricated cover plate 4 is provided with a waterproof groove 8 and a waterproof rubber strip 16 for providing a waterproof function;
[0038] The prefabricated end wall panel 3 is provided with an end wall panel manhole 6 for allowing the cable to pass through;
[0039] The prefabricated manhole plate 5 is provided with a manhole 501 for people to enter and exit.
[0040] For further information, see Figure 7 As shown, the prefabricated bottom plate 1 serves as the foundation of the entire working pit, bears the weight of the upper structure, and provides a stable supporting plane; the prefabricated bottom plate 1 is a plate-like structure, a bottom plate tongue and groove step 101 is provided in the middle of the prefabricated bottom plate 1, and embedded threaded sleeves 7 are distributed on the periphery of the bottom plate tongue and groove step 101; waterproof grooves 8 are provided on the prefabricated bottom plate 1 and the bottom plate tongue and groove step 101, and the waterproof grooves 8 provide a waterproof function.
[0041] For further information, see Figure 8As shown, the prefabricated side wall panels 2 are vertically arranged and installed on both sides of the width direction of the prefabricated bottom plate 1; the top of the prefabricated side wall panel 2 is provided with a cover plate installation groove 12 for installing the prefabricated cover plate 4 and the prefabricated manhole 501 plate, and a row of embedded sleeves 11 with anti-corrosion grooves penetrating the prefabricated side wall panel 2 are respectively provided on both sides of the length direction; the high-strength bolts 13 pass through the embedded sleeves 11 with anti-corrosion grooves and are screwed into the embedded threaded sleeves 7 on the prefabricated end wall panel 3 , thereby connecting the prefabricated side wall panel 2 and the prefabricated end wall panel 3 together; a wall panel tongue and groove boss 9 is provided near the bottom of the prefabricated side wall panel 2; a bolt mounting hole 10 is provided on the wall panel tongue and groove boss 9; the wall panel tongue and groove boss 9 cooperates with the bottom plate tongue and groove step 101 on the prefabricated bottom plate 1, and the high-strength bolt 13 passes through the bolt mounting hole 10 and is screwed into the embedded threaded sleeve 7 on the prefabricated bottom plate 1, thereby vertically connecting the prefabricated side wall panel 2 and the prefabricated bottom plate 1 together.
[0042] For further information, see Fig. 9 As shown, the prefabricated end wall panels 3 are arranged on both sides of the prefabricated bottom plate 1 in the length direction, and the top of the prefabricated end wall panels 3 is provided with a cover plate installation groove 12; the two sides of the prefabricated end wall panels 3 close to the prefabricated side wall panels 2 are provided with embedded threaded sleeves 7 and waterproof grooves 8; the embedded threaded sleeves 7 connect the prefabricated end wall panels 3 and the prefabricated side wall panels 2 through high-strength bolts 13; the prefabricated end wall panels 3 are provided with a wall panel tongue and groove boss 9 near the bottom; the wall panel tongue and groove boss 9 is provided with bolt installation holes 10;
[0043] The high-strength bolts 13 pass through the bolt mounting holes 10 and are screwed into the embedded threaded sleeves 7 on the prefabricated base plate 1 , thereby vertically connecting the prefabricated end wall panel 3 and the prefabricated base plate 1 together.
[0044] For further information, see Figure 1-2 As shown, the prefabricated cover plate 4 is a rectangular plate-shaped structure, and the size of the prefabricated cover plate 4 matches the cover plate mounting groove 12 set on the top of the prefabricated side wall panel 2 and the prefabricated end wall panel 3; the prefabricated cover plate 4 is embedded in the cover plate mounting groove 12 to protect the internal structure of the working shaft from external influences.
[0045] Furthermore, the prefabricated manhole plate 5 is a rectangular plate-shaped structure, and the size of the prefabricated manhole plate 5 matches the cover plate mounting groove 12 set on the top of the prefabricated side wall panel 2 and the prefabricated end wall panel 3; the prefabricated manhole plate 5 is embedded in the cover plate mounting groove 12; and a manhole 501 for people to enter and exit is opened on the prefabricated manhole plate 5.
[0046] Furthermore, a sump 102 is provided on the bottom plate tongue and groove step 101 for collecting the accumulated water inside the working well.
[0047] Working principle:
[0048] The assembled cable working shaft realizes fast and efficient on-site assembly through the modular design of prefabricated components. The main components such as the prefabricated bottom plate 1, the prefabricated side wall plate 2, the prefabricated end wall plate 3, the prefabricated cover plate 4 and the prefabricated manhole 501 plate are prefabricated in the factory with precise size and quality control. These components are connected by embedded sleeves 14 and high-strength bolts 13 to form a stable three-dimensional spatial structure that can withstand the pressure and load of the underground working environment. The design of the waterproof groove 8 ensures the waterproof performance of the assembled cable working shaft and prevents the intrusion of groundwater. The setting of the sump 102 helps to collect the accumulated water inside the working shaft and keep the inside dry.
[0049] Specific use process:
[0050] After the components are produced in the factory, they are transported to the site for assembly. After the foundation trench construction is completed on site, the prefabricated bottom plate 1 is first hoisted, and the waterproof strip 16 is installed at the waterproof groove 8 on the bottom plate tongue and groove step 101 (the waterproof strip 16 can be an elastic rubber waterproof strip 16, a water-swellable waterstop strip, or a butyl putty composite strip). The waterproof strip 16 protrudes from the surface of the waterproof groove 8 by 10 to 20 mm. After the prefabricated end wall panel 3 and the prefabricated side wall panel 2 are installed, the waterproof strip 16 is squeezed and compacted, which plays a role in strengthening the structural connection and waterproofing.
[0051] After the prefabricated bottom plate 1 is installed, the prefabricated end wall plate 3 is installed. There are two construction schemes for installing the prefabricated end wall plate 3 on the prefabricated bottom plate 1:
[0052] Option 1: Fig.10 As shown, an embedded sleeve 14 is arranged in the tongue and groove boss 9 of the wall panel. During the hoisting and falling process of the prefabricated end wall panel 3, the position of the embedded sleeve 14 of the prefabricated end wall panel 3 corresponds to the embedded threaded sleeve 7 on the prefabricated bottom plate 1. After the prefabricated end wall panel 3 is in place, the high-strength bolts 13 are installed in the bolt mounting holes 10 to realize the vertical connection between the prefabricated bottom plate 1 and the prefabricated end wall panel 3.
[0053] Option 2: Fig.11 As shown, when the prefabricated base plate 1 and the prefabricated end wall panel 3 are installed, the high-strength screw 19 can also be pre-installed in the embedded threaded sleeve 7 of the prefabricated base plate 1 before the wall panel is installed. During the hoisting process of the prefabricated end wall panel 3, the high-strength screw 19 extending outward from the prefabricated base plate 1 passes through the embedded sleeve 14 at the corresponding position of the prefabricated end wall panel 3, and the high-strength screw 19 is locked in the bolt mounting hole 10 with a gasket and a nut 20 to achieve the vertical connection between the prefabricated base plate 1 and the prefabricated end wall panel 3. The high-strength screw 19 pre-installed in the second scheme plays a positioning and guiding role when the prefabricated end wall panel 3 is installed downward, so that the prefabricated end wall panel 3 is connected to the prefabricated base plate 1 according to the predetermined orientation.
[0054] When the prefabricated bottom plate 1 and the prefabricated end wall plate 3 are assembled, each joint can be waterproofed, and the waterproof groove 8 can be embedded with a waterproof adhesive strip 16, sealed with a waterproof slurry 17 or treated with glue. In order to enhance the waterproof effect, a waterproof membrane 18 can also be attached to the outside of the joint.
[0055] After the prefabricated end wall panels 3 are installed, the prefabricated side wall panels 2 can be installed according to the method of solution one or solution two.
[0056] The prefabricated side wall panels 2 and the prefabricated end wall panels 3 are also connected by high-strength bolts 13. The high-strength bolts 13 pass through the pre-embedded sleeves 11 with anti-corrosion grooves embedded in the side wall panels and are screwed into the pre-embedded threaded sleeves 7 embedded in the side of the end wall panels to achieve the connection of the components. Waterproof grooves 8 are provided on both sides of the prefabricated end wall panels 3. After the wall panels are assembled, each joint is waterproofed. The waterproof grooves 8 can be embedded with waterproof strips 16 and waterproof slurry 17 for sealing, or waterproof membranes 18 can be attached to the outside of the joints.
[0057] After the prefabricated side wall panels 2 and the prefabricated end wall panels 3 are installed, the prefabricated cover panels 4 and the prefabricated manhole panels 501 are installed on the upper part. The prefabricated cover panels 4 and the prefabricated manhole panels 501 are overlapped and installed in the cover panel installation groove 12 on the upper part of the wall panels.
[0058] After the high-strength bolts 13 at various locations are installed, the installation holes should be sealed with self-compacting concrete 15 to provide corrosion protection for the steel components.
[0059] Finally, the prefabricated cover plate 4 and the prefabricated manhole 501 are embedded in the cover plate installation groove 12 on the upper part of the prefabricated side wall plate 2 to complete the construction.
[0060] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. An assembled cable working well, characterized in that: include: Prefabricated bottom plate (1), prefabricated side wall plate (2), prefabricated end wall plate (3), prefabricated cover plate (4) and prefabricated manhole plate (5): The prefabricated bottom plate (1), the prefabricated side wall plate (2) and the prefabricated end wall plate (3) are connected to each other via embedded sleeves (14) and high-strength bolts (13), forming a stable three-dimensional space structure; The prefabricated cover plate (4) and the prefabricated manhole plate (5) are embedded in the cover plate installation groove (12) on the upper part of the prefabricated side wall plate (2); A waterproof groove (8) is provided at the connection between the prefabricated bottom plate (1) and the prefabricated wall plate and the prefabricated cover plate (4); The prefabricated end wall panel (3) is provided with an end wall panel manhole (6) for allowing cables to pass through; The prefabricated manhole plate (5) is provided with a manhole (501) for people to enter and exit.
2. The assembled cable working well according to claim 1, characterized in that: The prefabricated base plate (1) is a plate-shaped structure. A base plate tongue-and-groove step (101) is provided in the middle of the prefabricated base plate (1). Pre-embedded threaded sleeves (7) are distributed around the periphery of the base plate tongue-and-groove step (101). Waterproof grooves (8) are provided on both the prefabricated base plate (1) and the base plate tongue-and-groove step (101).
3. The assembled cable working well according to claim 2, characterized in that: The prefabricated side wall panels (2) are vertically arranged and installed on both sides of the width direction of the prefabricated bottom plate (1); a cover plate installation groove (12) is arranged on the top of the prefabricated side wall panels (2), and a row of embedded sleeves (11) with anti-corrosion grooves penetrating the prefabricated side wall panels (2) are arranged on both sides of the length direction of the prefabricated side wall panels (2); high-strength bolts (13) pass through the embedded sleeves (11) with anti-corrosion grooves and are screwed into the embedded threaded sleeves (7) on the prefabricated end wall panels (3), thereby connecting the prefabricated side wall panels (2) and the prefabricated end wall panels (3) together; The prefabricated side wall panel (2) is provided with a wall panel groove boss (9) near the bottom; the wall panel groove boss (9) is provided with a bolt mounting hole (10); the wall panel groove boss (9) cooperates with a bottom panel groove step (101) on the prefabricated bottom panel (1), and a high-strength bolt (13) passes through the bolt mounting hole (10) and is screwed into a pre-buried threaded sleeve (7) on the prefabricated bottom panel (1), thereby vertically connecting the prefabricated side wall panel (2) and the prefabricated bottom panel (1).
4. The assembled cable working well according to claim 3 is characterized in that: The prefabricated end wall panels (3) are arranged on both sides of the prefabricated bottom plate (1) in the length direction, and the top of the prefabricated end wall panels (3) is provided with a cover plate installation groove (12); the two side surfaces of the prefabricated end wall panels (3) close to the prefabricated side wall panels (2) are provided with embedded threaded sleeves (7) and waterproof grooves (8); the position of the prefabricated end wall panels (3) close to the bottom is provided with a wall panel tongue and groove boss (9); the wall panel tongue and groove boss (9) is provided with a bolt installation hole (10); the wall panel tongue and groove boss (9) is matched with the bottom plate tongue and groove step (101) on the prefabricated bottom plate (1).
5. The assembled cable working well according to claim 1, characterized in that: The prefabricated cover plate (4) is a rectangular plate-shaped structure, and the size of the prefabricated cover plate (4) matches the cover plate installation groove (12) arranged on the top of the prefabricated side wall plate (2) and the prefabricated end wall plate (3); the prefabricated cover plate (4) is embedded in the cover plate installation groove (12) to protect the internal structure of the working pit from external influences.
6. The assembled cable working well according to claim 1, characterized in that: The prefabricated manhole plate (5) is a rectangular plate-shaped structure. The size of the prefabricated manhole plate (5) matches the cover plate installation groove (12) arranged on the top of the prefabricated side wall plate (2) and the prefabricated end wall plate (3). The prefabricated manhole plate (5) is embedded in the cover plate installation groove (12). The prefabricated manhole plate (5) is provided with a manhole (501) for people to enter and exit.
7. The assembled cable working well according to claim 2, characterized in that: A water collection pit (102) is also provided on the bottom plate tongue-and-groove step (101).
Citation Information
Cited By
Anti-seepage structure, pumped storage power station anti-seepage bottom plate and construction method
CN120990062A