Fabricated toilet partition wall
Through the combined structure and locking number of anchor blocks and protrusions and grooves, the problems of water vapor penetration and structural instability caused by large gaps in the connection structure of the prefabricated bathroom partition wall are solved, and higher stability and safety are achieved. And provide an easy way to disassemble.
Patent Information
- Application Number
- CN202420627095.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The connecting structure gaps of the prefabricated bathroom partition walls are large, resulting in water vapor penetration, mold, corrosion and structural damage, affecting aesthetics and hygiene, and may also lead to safety risks of shaking, loosening or even collapse.
A combined structure of anchor block, projection and groove is designed. Through the projection on the anchor block, the vertical insertion of the bump and the vertical insertion of the bump and groove is restricted, and the vertical and horizontal movement of the partition wall is enhanced, and structural stability is enhanced. It also enables easy unlocking and disassembly through locking elements and spring tensioning rods, combining rubber pads and magnetic rubber pads to improve waterproof, mildew resistance and connection stability.
It effectively reduces gaps, improves the stability and sound insulation performance of partition walls, enhances resistance to lateral impacts, provides easy disassembly, reduces safety risks, and extends the service life of partition walls.
Smart Images

Figure CN222044592U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled buildings, in particular to an assembled toilet partition wall. Background Art
[0002] Prefabricated partitions are a modern construction technology that allows wall panels to be prefabricated in the factory and assembled on site to achieve rapid construction and highly customizable indoor space separation. Especially in bathroom applications, prefabricated partitions not only provide effective separation of dry and wet areas to ensure spatial privacy, but also optimize sanitary conditions through easy-to-clean materials and structures. At the same time, they can also cooperate with the layout of pipes and wires inside the bathroom to provide a clean and safe use environment.
[0003] The bathroom is a high-humidity environment. Although the existing prefabricated partition walls are simple and easy to build in terms of connection structure, they have large gaps, which can lead to water vapor penetration, mildew, corrosion or structural damage. The existence of gaps, in addition to mildew, not only affects the appearance, but may also become a breeding ground for bacteria and dirt, affecting the overall hygiene of the bathroom. In addition, it may not provide sufficient sound insulation performance, affecting the privacy and comfort of users. Of course, the use environment of the bathroom is relatively complex. If the prefabricated partition wall is not reasonably designed or not installed properly, there will be risks of shaking, loosening or even collapse. Utility Model Content
[0004] The utility model aims to solve or alleviate the problems of large gaps in the connection structure of the assembled partition wall in the bathroom, easy mold growth, and poor stability leading to shaking.
[0005] The utility model is realized by the following technical solutions:
[0006] An opening is provided on one side of the main partition wall close to the secondary partition wall, and an anchor block I is slidably provided in the opening, and two protrusions are provided on the anchor block I; a groove I matching the protrusions is provided on one side of the secondary partition wall; a protrusion is also provided on the secondary partition wall, and the protrusion is provided between the two protrusions; a groove II is provided on the protrusion; an anchor block II matching its shape is provided in the groove II, an opening corresponding to the groove II is provided on the main partition wall, and the anchor block II is connected to a locking unit for connecting the anchor block I and the anchor block II as a whole.
[0007] As an advanced construction technology, prefabricated partition walls can effectively realize the rapid and customized separation of indoor spaces by prefabricating wall panels in factories and quickly assembling them on site. In the bathroom, this technology not only separates dry and wet areas to ensure privacy, but its easy-to-clean materials and carefully designed structure also optimize sanitary conditions. At the same time, it is integrated with the internal pipe and wire layout to ensure safe use and clean space. However, in high-humidity environments such as bathrooms, there are problems with the connection structure of prefabricated partition walls. Large gaps can easily cause water vapor penetration, mildew, corrosion, and even structural damage, which not only damages the appearance but also becomes a potential breeding ground for bacteria and dirt, affecting overall hygiene. In addition, its possible insufficient sound insulation performance will infringe on user privacy and comfort. In addition, if the partition wall structure is improperly designed or installed, it may cause shaking, loosening, or even collapse in a complex use environment, posing a safety hazard.
[0008] The protrusion on the anchor block can be inserted into groove I. Because it is inserted horizontally, it can limit the movement of the partition wall in the vertical direction, make the partition wall connection stable, and improve the stability of the overall structure; the protrusion cooperates with the groove II in the vertical direction to limit the movement of the partition wall in the horizontal direction; the vertically inserted protrusion and groove can effectively resist lateral force, enhance the partition wall's resistance to lateral impact, and ensure safe use; the function of the locking unit is to separate the anchor block II from the groove II, and it is also necessary to separate the anchor block I from the groove I, so as to complete the unlocking of this connection structure in the vertical and horizontal directions.
[0009] Preferably, the locking unit includes a first spring and a tension rod; an internal threaded hole is provided on the projection along the axial direction of the tension rod; the tension rod passes through the opening and the internal threaded hole in sequence and then is connected to the anchor block II; the first spring is sleeved on the tension rod and is located between the anchor block II and the projection; an external threaded section is provided on the outer wall of the end of the tension rod close to the anchor block II; when the anchor block II is completely fitted with the groove, a part of the external threaded section cooperates with the internal threaded hole. The first spring in the locking unit plays the role of returning the tension rod to its original position and allowing the anchor block II to press the groove II. When in use, the main partition wall and the secondary partition wall can be docked normally; when unlocking the connection structure, first pull the tension rod so that the tension rod drives the anchor block II to disengage from the groove II, and then continue to pull until the external thread on the tension rod abuts against the surface of the projection, and then rotate the tension rod so that the internal and external threads are meshed with each other, so that the tension rod and the projection are fixedly connected together, and then push the tension rod so that the projection is separated from the groove I, thereby completing the unlocking process.
[0010] Preferably, a coupling rod and a second spring are provided on the side of the anchor block I away from the protrusion. The coupling rod is provided on the inner wall of the opening. The second spring is sleeved on the coupling rod and its two ends are respectively connected to the inner wall of the opening and the anchor block I. A positioning groove matching the coupling rod is provided on the anchor block I. By providing the coupling rod and the second spring, the adjustability and elasticity of the anchor block I are further increased, so that the partition wall system can have a certain elastic response when subjected to external forces, which increases the durability and stability of the system.
[0011] Preferably, a rectangular groove is provided on the end surface of the anchor block I facing the main partition wall, and a matching ball is provided in the rectangular groove; a matching rubber pad is provided at the bottom of the groove I. The rectangular groove and ball on the anchor block I and the rubber pad at the bottom of the groove I not only increase the stability of the structure, but also provide additional waterproof and mildew-proof functions through the rubber pad. At the same time, the design of the ball simplifies the installation process and improves the installation efficiency.
[0012] Preferably, the width of the protrusion gradually decreases as the protrusion faces the groove. The design of the protrusion gradually decreasing in width toward the groove can make the engagement between the protrusion and the groove tighter, improve the stability of the connection, and also facilitate docking and adjustment during installation.
[0013] Preferably, the anchor block II is ball-connected to the tension rod. The ball-connected design of the anchor block II improves the connection flexibility between the tension rod and the anchor block, making the overall structure more stable when facing forces in different directions, and reducing the risk of damage caused by stress concentration.
[0014] Preferably, the rubber pad is a magnetic rubber pad, and the end surface of the anchor block I is provided with a magnetic layer that attracts the rubber pad. The use of the magnetic rubber pad not only enhances the waterproof and mildew-proof capabilities, but also provides additional connection stability through the magnetic layer. This design simplifies the installation process and also facilitates subsequent maintenance, because the magnetic connection is easy to disassemble and reinstall.
[0015] Compared with the prior art, the utility model has the following advantages and beneficial effects:
[0016] 1. The utility model is designed with limiting functions in parallel and vertical directions, so that the adjacently installed main partition walls and auxiliary partition walls have a higher connection tightness; limit the movement of the partition walls in the vertical direction, make the partition wall joints stable, and improve the stability of the overall structure; limit the movement of the partition walls in the horizontal direction; the vertically inserted protrusions and grooves can effectively resist lateral forces, enhance the resistance of the partition walls to lateral impacts, and ensure safe use.
[0017] 2. The utility model is provided with a locking unit to separate the anchor block II from the groove II, and also to separate the anchor block I from the groove I, so as to complete the unlocking of the connection structure in the vertical and horizontal directions. The connection between the partition boards can be easily unlocked, which is convenient for the disassembly of the partition wall; it is very useful for scenes that need to reconfigure the space layout, and provides a high degree of flexibility; the traditional disassembly method may require the use of force or tools, which is easy to cause damage to the partition board or the connection structure; it provides a more gentle and controlled disassembly method.
[0018] 3. The connection structure of the utility model is tightly connected at the joints, and the gap is small, which will not cause water vapor penetration, mildew, corrosion or structural damage.
[0019] 4. The anchor block I of the utility model is provided with a coupling rod and a second spring on the side away from the protrusion. The coupling rod is provided on the inner wall of the opening, and the second spring is sleeved on the coupling rod and connects the inner wall of the opening and the anchor block I. A positioning groove matching the coupling rod is provided on the anchor block I. When the coupling rod is inserted into the positioning groove, the accurate position of the relevant components can be ensured, thereby improving the stability and safety of the overall structure. A notch is provided on the side of the anchor block I that contacts the opening, and a ball bearing matching the notch is provided in the notch; a rubber pad matching the notch is provided at the bottom of the groove; the ball bearing can effectively reduce the friction between the direct contact surfaces, and the rubber pad is used to buffer the vibration of the anchor block I when it is inserted. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings described herein are used to provide a further understanding of the embodiments of the present utility model, constitute a part of this application, and do not constitute a limitation of the embodiments of the present utility model.
[0021] In the attached picture:
[0022] Figure 1 This is a schematic diagram of the installation of the partition wall of the utility model in the bathroom;
[0023] Figure 2 for Figure 1 The enlarged view of point A is a schematic diagram of the connection between the main partition wall and the auxiliary partition wall of the utility model;
[0024] Figure 3 for Figure 2 Enlarged view of point B.
[0025] The reference numerals represent:
[0026] 1-main partition wall, 11-joining rod, 12-second spring, 2-auxiliary partition wall, 21-bump, 3-anchor block I, 31-ball, 32-rubber pad, 33-protrusion, 4-tension rod, 41-knob, 42-anchor block II, 43-first spring. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical scheme and advantages of the embodiment of the utility model clearer, the technical scheme of the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings of the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the described embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. The schematic implementation mode of the utility model and its description are only used to explain the utility model and are not intended to limit the utility model. It should be noted that the utility model is already in the actual research and development and use stage.
[0028] Unless otherwise defined, the technical terms or scientific terms used in this utility model shall have the usual meanings understood by people with ordinary skills in the field to which this utility model belongs. The words "first", "second" and similar words used in this utility model do not indicate any order, quantity or importance, but are only used to distinguish different components. The words "include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects.
[0029] Prefabricated partition walls represent an innovative technology in modern architecture. Their design allows wall panels to be prefabricated in factories and quickly assembled on site to achieve rapid separation and highly personalized design of indoor spaces. This technology is particularly effective in bathrooms. It can not only effectively divide dry and wet areas to ensure the privacy of the space, but also enhance sanitary conditions by using easy-to-clean materials and sophisticated structural design. In addition, prefabricated partition walls can also integrate the bathroom's pipe and wiring systems to ensure a clean and safe environment. However, in the high-humidity bathroom environment, the existing prefabricated partition walls have large gaps in their connecting parts despite their simple construction, which can easily lead to water vapor penetration, causing mildew, corrosion or structural damage. These gaps not only make the wall vulnerable to damage, but also may become a hiding place for bacteria and dirt, affecting the overall cleanliness of the bathroom. In addition, these partition walls may not perform well in terms of sound insulation, affecting the privacy and comfort experience of users. It is also important to note that the complex use environment of the bathroom requires the partition wall system to have a reasonable structural design and precise installation, otherwise there may be safety risks such as shaking, loosening, or even collapse.
[0030] Embodiment 1:
[0031] An assembled bathroom partition wall comprises a main partition wall 1 and a secondary partition wall 2 arranged adjacent to each other. An opening is provided on one side of the main partition wall 1 close to the secondary partition wall 2, and an anchor block I3 is slidably provided in the opening, and two protrusions 33 are provided on the anchor block I3; a groove I matching the protrusions 33 is provided on one side of the secondary partition wall 2; a protrusion 21 is also provided on the secondary partition wall 2, and the protrusion 21 is arranged between the two protrusions 33; a groove II is provided on the protrusion 21; an anchor block II42 matching its shape is provided in the groove II, an opening corresponding to the groove II is provided on the main partition wall 1, and the anchor block II42 is connected to a locking unit for connecting the anchor block I3 and the anchor block II42 as a whole.
[0032] It should be noted that the application of the utility model also depends on other components, such as ground rails or fixed rails, etc., because it is a prior art, there is no need to elaborate. Generally speaking, the installation process is to mark the specific position of the partition wall, including vertical and horizontal lines, to ensure that the partition wall is upright and aligned. Fix the ground rail to the ground and the top rail to the ceiling; ensure that the track is horizontal and firm to support the weight of the partition board; install the prefabricated partition boards on the track in sequence according to the design plan; use special connectors and fasteners to ensure that each partition board is firmly connected and well sealed; install the door frame at the predetermined position to ensure that it is vertical and stable; hang the door leaf and adjust it to the appropriate position to ensure smooth opening and closing; seal the joints between the partition boards and the contact points between the partition wall and the ground and wall using waterproof sealants.
[0033] It should be noted that the protrusion 33 on the anchor block Ⅰ3 can be inserted into the groove Ⅰ. Because it is inserted horizontally, the movement of the partition wall in the vertical direction can be limited, so that the connection of the partition wall is stable and the stability of the overall structure is improved; and the horizontal insertion method simplifies the assembly steps and makes the installation process faster; through the precise matching of the protrusion 33 and the groove, the gap can be reduced and the waterproof performance can be improved to a certain extent, which is particularly suitable for humid environments such as bathrooms.
[0034] In addition, the protrusion 21 cooperates with the groove II in the vertical direction to limit the movement of the partition wall in the horizontal direction; the vertically inserted protrusion 21 and groove can resist lateral force, enhance the resistance of the partition wall to lateral impact, and ensure safe use; this design can disperse and evenly transfer the load, improve the strength and durability of the connection, and extend the service life of the partition wall; the vertically inserted protrusion 33 and groove make the connection tighter, which helps to improve the sealing of the space and prevent the penetration of sound, odor or other elements.
[0035] The locking unit includes a first spring 43 and a tensioning rod 4; an internal threaded hole is provided on the protrusion 33 along the axial direction of the tensioning rod 4; the tensioning rod 4 passes through the opening and the internal threaded hole in turn and is connected to the anchor block Ⅱ42; the first spring 43 is sleeved on the tensioning rod 4 and is located between the anchor block Ⅱ42 and the protrusion 33; an external threaded section is provided on the outer wall of the end of the tensioning rod 4 close to the anchor block Ⅱ42; when the anchor block Ⅱ42 is completely fitted with the groove, a part of the external threaded section cooperates with the internal threaded hole.
[0036] The function of the locking unit is to separate the anchor block II 42 from the groove II, and also to separate the anchor block I 3 from the groove I, so as to unlock the connection structure in the vertical and horizontal directions; the locking unit allows the connection between the partition boards to be easily unlocked, making it convenient for the partition wall to be disassembled. It is very useful for scenarios that require reconfiguration of the space layout (such as office adjustments or home decoration), providing a high degree of flexibility; traditional disassembly methods may require the use of force or tools, which can easily cause damage to the partition board or the connection structure. The locking unit provides a more gentle and controlled disassembly method, reducing damage to the material and extending the service life of the partition wall.
[0037] It should be noted that the first spring 43 in the locking unit serves to return the tension rod 4 to its original position and to allow the anchor block II 42 to press the groove II.
[0038] Working principle:
[0039] When in use, the main partition wall 1 and the secondary partition wall 2 can be normally connected; when unlocking the connection structure, first pull the tensioning rod 4 so that the tensioning rod 4 drives the anchor block II 42 to disengage from the groove II, and then continue to pull until the external thread section on the tensioning rod 4 abuts against the surface of the protrusion 33, and then rotate the tensioning rod 4 to allow the internal and external threads to engage with each other, so that the tensioning rod 4 and the protrusion 33 are fixedly connected together, and then push the tensioning rod 4 to separate the protrusion 33 from the groove I, thereby completing the unlocking process.
[0040] As a further optimization of this embodiment, a coupling rod 11 and a second spring 12 are provided on the side of the anchor block Ⅰ3 away from the protrusion 33. The coupling rod 11 is provided on the inner wall of the opening, and the second spring 12 is sleeved on the coupling rod 11 and connects the inner wall of the opening and the anchor block Ⅰ3; a positioning groove matching the coupling rod 11 is provided on the anchor block Ⅰ3.
[0041] The use of the positioning slot and the engagement rod 11 can achieve accurate component alignment and fixation. When the engagement rod 11 is inserted into the positioning slot, the accurate position of the relevant components can be ensured, and the stability and safety of the overall structure can be improved; the spring outside the engagement rod 11 provides a certain elasticity for the connection structure, absorbs the impact caused by vibration, and reduces the pressure on the connection point; the presence of the spring allows the engagement rod 11 to automatically adjust its position within a certain range, compensates for minor deformation caused by manufacturing errors or long-term use, and maintains the tightness of the connection.
[0042] As a further optimization of this embodiment, a rectangular groove is provided on the end surface of the anchor block I3 facing the main partition wall 1, and a matching ball 31 is provided in the rectangular groove; a matching rubber pad 32 is provided at the bottom of the groove I.
[0043] The ball 31 can be used as a rolling bearing in the notch. When the anchor block I3 slides inside the main partition wall 1, the ball 31 can effectively reduce the friction between the direct contact surfaces, making the sliding smoother, reducing the operating force, and also reducing the wear of the structural parts; the presence of the ball 31 allows the anchor block to remain stable during the sliding process, reduces the bounce or offset caused by inconsistent friction, and improves the positioning accuracy and stability of the overall structure; compared with traditional methods, the ball 31 can significantly reduce the noise generated during sliding, and is suitable for places such as bathrooms that require a quiet environment; the role of the rubber pad is to buffer the vibration of the anchor block I3 during insertion and increase the life of the connection structure.
[0044] Embodiment 2:
[0045] As an optimization of the above embodiment, the width of the protrusion 33 gradually decreases as the protrusion 33 faces the groove. The protrusion 33 is designed to automatically guide the two connection parts to align when inserted into the groove, simplifying the installation process, ensuring the correct and accurate docking of the connection parts, and reducing the possibility of installation errors; the conical protrusion 33 will produce a self-tightening effect during the insertion of the groove. As the depth increases, the tightness of the connection will also increase, reducing the need for additional fixing structures (such as screws or adhesives), and making the installation process easier.
[0046] The anchor block II 42 is ball-connected to the tension rod 4; the end of the tension rod 4 is provided with an anti-skid knob 41. The rubber pad is a magnetic rubber pad, and the end surface of the anchor block I 3 is provided with a magnetic layer that attracts the rubber pad 32. In order to make the tension rod 4 rotate more smoothly, the anchor block II 42 can be rotatably connected to the tension rod 4, and an anti-skid knob 41 is provided at the end of the tension rod 4 to further increase the convenience of operation. Magnet materials with opposite polarities can ensure a tighter connection.
[0047] The above embodiments are only used to illustrate the technical solutions of the present disclosure, rather than to limit them; although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the various embodiments of the present disclosure. The following points need to be explained: In the accompanying drawings of the embodiments of the present utility model, only the structures involved in the embodiments of the present utility model are involved, and other structures can refer to the usual design. In the absence of conflict, the features in the same embodiment and different embodiments of the present utility model can be combined with each other. The above is only an exemplary implementation of the present utility model, and is not used to limit the scope of protection of the present utility model. The scope of protection of the present utility model is determined by the attached claims.
Claims
1. An assembled toilet partition wall, comprising a main partition wall (1) and a secondary partition wall (2) arranged adjacent to each other, It is characterized in that An opening is provided on one side of the main partition wall (1) close to the secondary partition wall (2), an anchor block I (3) is slidably provided in the opening, and two protrusions (33) are provided on the anchor block I (3); A groove I matching the protrusion (33) is provided on one side of the secondary partition wall (2); a protrusion (21) is also provided on the secondary partition wall (2), and the protrusion (21) is provided between the two protrusions (33); a groove II is provided on the protrusion (21); an anchor block II (42) matching its shape is provided in the groove II, an opening corresponding to the groove II is provided on the main partition wall (1), and the anchor block II (42) is connected to a locking unit for connecting the anchor block I and the anchor block II as a whole.
2. The assembled toilet partition wall according to claim 1, It is characterized in that The locking unit comprises a first spring (43) and a tensioning rod (4); an internal threaded hole is provided on the protrusion (33) along the axial direction of the tensioning rod (4); the tensioning rod (4) passes through the opening and the internal threaded hole in sequence and is connected to the anchor block II (42); the first spring (43) is sleeved on the tensioning rod (4) and is located between the anchor block II (42) and the protrusion (33); an external threaded section is provided on the outer wall of the end of the tensioning rod (4) close to the anchor block II (42); when the anchor block II (42) is completely fitted with the groove, a part of the external threaded section cooperates with the internal threaded hole.
3. The assembled toilet partition wall according to claim 2, It is characterized in that A side of the anchor block I (3) away from the protrusion (33) is provided with a coupling rod (11) and a second spring (12); the coupling rod (11) is provided on the inner wall of the opening; the second spring (12) is sleeved on the coupling rod (11) and its two ends are respectively connected to the inner wall of the opening and the anchor block I (3); a positioning groove matching the coupling rod (11) is provided on the anchor block I (3).
4. The assembled toilet partition wall according to claim 3, It is characterized in that A rectangular groove is provided on the end surface of the anchor block I (3) facing the main partition wall (1), and a matching ball (31) is provided in the rectangular groove; a matching rubber pad is provided at the bottom of the groove I.
5. The assembled toilet partition wall according to claim 4, It is characterized in that In the direction in which the protrusion (33) faces the groove, the width of the protrusion (33) gradually decreases.
6. The assembled toilet partition wall according to claim 4, It is characterized in that The anchor block II (42) is spherically connected to the tension rod (4).
7. The assembled toilet partition wall according to claim 6, It is characterized in that The rubber pad is a magnetic rubber pad, and the end surface of the anchor block I (3) is provided with a magnetic attraction layer that attracts the rubber pad.