Waste heat recycling device for petrochemical production

By using delayed filter components and serpentine bends in waste heat recovery devices produced by petrochemical industry, the problems of low thermal energy recovery and harmful substance pollution are solved, efficient hot gas recovery and purification are achieved, and the utilization rate of the device is improved. Control accuracy.

CN222048682UActive Publication Date: 2024-11-22NINGBO ZHONGJIN PETROCHEM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420226743.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-11-22
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

The current waste heat recovery device in petrochemical production has low thermal energy recovery rate and a large number of harmful substances are present in the hot gas, resulting in environmental pollution.

Method used

A waste heat recovery device including a conversion box and a heat exchange tube is designed. By providing a delayed filter assembly on the heat exchange tube to intercept the flow rate of the hot air, the residence time of the hot air in the heat exchange tube, and the serpentine bend is extended. The department increases the heat exchange area, combines the hot water tank and the thermometer to achieve automatic control, ensuring the effective utilization of hot water and environmental purification.

Benefits of technology

It improves the recycling rate of hot gas, reduces heat loss and harmful substance pollution, and enhances the control accuracy and flexibility of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222048682U_ABST
    Figure CN222048682U_ABST
Patent Text Reader

Abstract

The utility model discloses a waste heat recycling device for petrochemical industry production, which comprises a conversion box, a conversion cavity is arranged in the conversion box, a heat exchange pipe is connected in the conversion cavity, the conversion cavity is communicated with a water inlet component and a water outlet component, the heat exchange pipe comprises an air inlet pipe group and an air outlet pipe group, and the air inlet pipe group is communicated with the water outlet component. A delay filtering assembly is arranged between the air inlet pipe set and the air outlet pipe set. According to the waste heat recycling device for petrochemical industry production, harmful substances in hot gas can be reduced, the circulation time of the hot gas in the conversion box can be prolonged, and the retention time of the hot gas is prolonged, so that the recycling rate can be effectively increased, the heat loss is reduced, and the use limitation is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of waste heat recovery equipment, in particular to a waste heat recovery and utilization device for petrochemical production. Background Art

[0002] At present, petrochemical production mainly uses oil and natural gas as raw materials for chemical processing. With the development of the economy, petrochemicals have become the backbone industry in the chemical industry and occupy an extremely important position in the national economy. The production and processing of petrochemicals will generate a large amount of heat gas, which is generally reused through waste heat recovery devices to achieve the purpose of energy conservation and emission reduction.

[0003] For example, publication number "CN219160399U" discloses "a device for recovering waste heat from flue gas of a steam injection boiler in an oil field", comprising a smoke inlet box, smoke inlet pipes are installed on both sides of the smoke inlet box, and a connected insulation box is fixedly installed on the upper end of the smoke inlet box, a heating tube group is fixedly installed in the middle of the insulation box, and a smoke exhaust port is arranged at the head of the insulation box, the heating tube group comprises a vortex tube group, a water inlet pipe and a drain pipe, and the water inlet pipe and the drain pipe are arranged at both ends of the vortex tube group, and a circulation component is also fixedly installed on the insulation box, and the two ends of the circulation component are respectively connected to the water inlet pipe and the drain pipe; however, in actual applications, the residence time of the hot gas in the conversion box is short, the heat energy recovery rate is low, and there are a large number of harmful substances in the hot gas, which can easily cause environmental pollution. Summary of the invention

[0004] In view of the problems of low heat recovery rate and harmful substances in hot gas in the prior art mentioned in the background technology, the utility model provides a waste heat recovery and utilization device for petrochemical production, which can reduce harmful substances in hot gas and increase the circulation time of hot gas in the conversion box, thereby increasing the residence time of hot gas, thereby effectively improving the recovery and utilization rate, reducing heat loss, and reducing usage limitations.

[0005] To achieve the above-mentioned purpose, the utility model adopts the following technical solutions.

[0006] A waste heat recovery and utilization device for petrochemical production includes a conversion box, a conversion chamber is included in the conversion box, a heat exchange pipe is connected to the conversion chamber, a water inlet component and a water outlet component are connected to the conversion chamber, the heat exchange pipe includes an air inlet pipe group and an air outlet pipe group, and a delay filter component is arranged between the air inlet pipe group and the air outlet pipe group. In the present application, a delay filter component is arranged on the heat exchange tube to intercept the flow rate of hot air in the heat exchange tube. Due to the interception effect of the delay filter component, the flow rate of hot air in the heat exchange tube is greatly reduced, thereby increasing the residence time of the same volume of hot air in the heat exchange tube, thereby improving the heat exchange utilization rate between the hot air and the clean water in the heat exchange chamber, improving heat recovery, and reducing heat loss. In the present application, a delay filter component is arranged to block the flow rate of hot air. Since there is a filter component in the delay filter component, the filter component can effectively filter the hot air, thereby purifying and adsorbing harmful substances in the hot air. Due to the existence of this step, the hot air will encounter greater resistance when passing through the delay filter component, thereby achieving the purpose of delaying the flow rate of hot air, that is, reducing the pollution of harmful substances to the environment, and at the same time can improve the heat exchange utilization rate, reduce heat loss, and improve the conversion rate.

[0007] Preferably, the heat exchange tube includes a serpentine bend portion arranged in the conversion chamber. The serpentine bend portion is arranged in the heat exchange tube, and the contact area between the heat exchange tube and the conversion chamber can be increased through the serpentine bend portion, and the circulation time of the hot gas in the conversion chamber can be increased, thereby improving the heat exchange recovery rate of the hot gas in the conversion chamber, performing sufficient heat exchange, and improving the conversion rate.

[0008] Preferably, the conversion box also includes a hot water tank, the water outlet assembly is arranged on the hot water tank, and the hot water tank is provided with a hot water delivery valve group. In the present application, a hot water tank is also provided. After the conversion box is provided with the hot water tank, the water outlet assembly is arranged on the hot water tank. There is no connection between the hot water tank and the conversion box, but a hot water delivery valve group is arranged on the hot water tank to connect the hot water tank with the body of the conversion box. By switching the hot water delivery valve group, the water that has completed the heat exchange inside the conversion box body can be injected into the hot water tank. At the same time, there is a height difference between the conversion box and the hot water tank. The volume of the hot water tank is set according to actual needs, or a driving assembly (such as a water pump) is connected to the hot water delivery valve group to solve the transportation problem. After the hot water in the conversion box is injected into the hot water tank for storage, cold water is injected through the water inlet assembly to continue the circulation heat exchange. At this time, the hot water delivery valve group is closed to ensure the storage and insulation effect of the hot water tank for hot water.

[0009] Preferably, the hot water tank and / or the conversion box are connected with a thermometer. A thermometer is provided on the hot water tank or the conversion box, and thermometers can also be provided on both the hot water tank and the conversion box, so as to ensure that the temperature in the conversion box and the hot water tank can be detected in real time. The temperature detection in the hot water tank can detect the temperature of the stored hot water, and then accurately utilize the hot water. The hot water temperature in the conversion box can provide feedback to the staff on the progress of heat exchange, and help determine whether the hot water delivery valve group can be opened to deliver hot water, which has a higher control accuracy for the entire device. The thermometer provided on the conversion box body can be connected to the electrical module and the hot water delivery valve group, so as to realize automatic control of delivering hot water to the hot water tank.

[0010] Preferably, the water outlet assembly includes a hot water pipe, a water outlet valve is connected to the hot water pipe, and a water outlet is connected to the lower side of the hot water pipe. The water outlet assembly includes a hot water pipe, wherein the hot water pipe is communicated with the inside of the hot water tank, a water outlet valve is connected to the hot water pipe, the hot water inside the hot water pipe is controlled by the water outlet valve, and the water outlet is arranged below the hot water pipe to ensure that the hot water flows out of the hot water tank smoothly.

[0011] Preferably, the water inlet assembly is arranged on the upper side of the conversion box, and the water inlet assembly includes a water inlet pipe, and a water pump is connected to the water inlet pipe. By arranging the water pump on the water inlet pipe, the water filling operation in the conversion box can be completed, and the water inlet assembly is arranged on the upper side of the conversion box, which can facilitate water filling into the conversion box and prevent the water inside the conversion box from flowing back on the water inlet pipe and the water pump, thereby ensuring the smoothness of water filling.

[0012] Preferably, the water pump is connected with a fixed page, and the end of the fixed page away from the water pump is connected to the conversion box. The fixed page is connected to the water pump, and the fixed page can achieve a fixed constraint effect on the water pump to prevent the water pump from having a large impact on the water inlet pipe during operation, resulting in the breakage of the water inlet pipe. The fixing effect of the conversion box can share the impact effect of the water pump, making the working state of the water pump more stable.

[0013] Preferably, the outlet pipe group includes an outlet pipe, the outlet pipe includes an outlet port, and the outlet pipe is connected to a control component. The outlet pipe is provided with an outlet port, and the hot air is discharged through the outlet port after completing the heat exchange in the conversion box, wherein the outlet pipe is also provided with a control component, and the control component can control whether the hot air is discharged or not, thereby controlling the residence time of the hot air inside the conversion box, and when necessary, can control the hot air to fully exchange heat with the clean water inside the conversion box, thereby controlling the heat exchange process of the hot air, with better adaptability and more flexible control.

[0014] Preferably, the control component includes an outlet valve and an air pressure detection gauge, and a limit rod is arranged between the air pressure detection gauge and the outlet valve. The control component includes an outlet valve and an air pressure detection gauge, wherein the outlet valve can control whether the hot air is discharged from the outlet pipe, and the air pressure detection gauge can detect the air pressure of the internal hot air in real time, so as to avoid damage caused by excessive internal air pressure.

[0015] Preferably, the delay filter assembly includes a filter plate connected to the heat exchange tube, and a hot gas filter element is detachably connected to the filter plate. The delay filter assembly includes a filter plate and a hot gas filter element, wherein the filter plate can be connected and fixed to the heat exchange tube, a filter slot is provided on the filter plate, and the hot gas filter element is detachably connected to the filter plate. The hot gas filter element can perform preliminary filtration and purification on the hot gas to avoid harmful substances in the hot gas and cause environmental pollution. At the same time, due to the filtering effect of the hot gas filter element, the circulation of the hot gas in the heat exchange tube is hindered, thereby delaying the time of the hot gas in the conversion box, thereby improving the waste heat recovery efficiency.

[0016] The beneficial effects of the utility model are as follows:

[0017] (1) It can filter and purify the hot air preliminarily to avoid harmful substances in the hot air and cause environmental pollution. At the same time, it can delay the time of hot air in the conversion box, improve the waste heat recovery efficiency and utilization rate;

[0018] (2) The residence time of hot gas in the conversion box can be extended, the residence time of hot gas can be increased, and the area occupied by the heat exchange tube in the conversion chamber can be increased, thereby effectively improving the recovery efficiency, reducing heat loss, and reducing usage limitations;

[0019] (3) It is capable of real-time detection of the status of internal hot air and hot water, which is convenient for providing feedback to external staff, improving the controllability of the device, and being able to adapt to production needs in a timely manner, with better flexibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is an axonometric drawing of the utility model.

[0021] Figure 2 It is a partial cross-sectional view of the utility model.

[0022] Figure 3 It is a front view of the utility model.

[0023] Figure 4 It is a side view of the utility model.

[0024] Figure 5 yes Figure 3 A partial enlarged view of the control component.

[0025] In the figure:

[0026] 1 conversion box, 11 conversion chamber;

[0027] 2 heat exchange tube, 21 air inlet pipe group, 22 air outlet pipe group, 221 air outlet pipe, 222 air outlet, 223 control component, 2231 air outlet valve, 2232 air pressure detection gauge, 2233 limit rod, 23 serpentine bending part;

[0028] 31 water inlet assembly, 311 water inlet pipe, 312 water pump, 313 fixed page;

[0029] 32 water outlet assembly, 321 hot water pipe, 322 water outlet valve, 323 water outlet;

[0030] 4 delay filter assembly, 41 filter plate, 42 hot air filter element;

[0031] 5 hot water tank, 51 hot water delivery valve group;

[0032] 6Thermometer. DETAILED DESCRIPTION

[0033] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0034] Embodiment 1:

[0035] like Figure 1 , 2 As shown, a waste heat recovery and utilization device for petrochemical production includes a conversion box 1, the conversion box 1 includes a conversion chamber 11, the conversion chamber 11 is connected with a heat exchange tube 2, the conversion chamber 11 is connected with a water inlet component 31 and a water outlet component 32, the heat exchange tube 2 includes an air inlet pipe group 21 and an air outlet pipe group 22, and a delay filter component 4 is arranged between the air inlet pipe group 21 and the air outlet pipe group 22.

[0036] In the present application, by setting a delay filter component 4 on the heat exchange tube 2, the flow rate of hot air in the heat exchange tube 2 can be intercepted. Due to the interception effect of the delay filter component 4, the flow rate of hot air in the heat exchange tube 2 is greatly reduced, thereby increasing the residence time of the same volume of hot air in the heat exchange tube 2, thereby increasing the heat exchange utilization rate between the hot air and the clean water in the heat exchange chamber, improving heat recovery, and reducing heat loss. In the present application, the flow rate of hot air is blocked by setting a delay filter component 4, wherein the delay filter component 4 has a filter component, which can effectively filter the hot air, thereby purifying and adsorbing harmful substances in the hot air. Due to the existence of this step, the hot air will encounter greater resistance when passing through the delay filter component 4, thereby achieving the purpose of delaying the flow rate of hot air, that is, reducing the pollution of harmful substances to the environment, and at the same time can improve the heat exchange utilization rate, reduce heat loss, and improve the conversion rate.

[0037] Embodiment 2:

[0038] like Figure 1 As shown, the present embodiment also includes the following technical features: the conversion box 1 also includes a hot water tank 5, the water outlet assembly 32 is arranged on the hot water tank 5, the hot water tank 5 is provided with a hot water delivery valve group 51, and the hot water tank 5 and the conversion box 1 are connected with a thermometer 6.

[0039] In the present embodiment, a hot water tank 5 is also provided. After the conversion box 1 is provided with the hot water tank 5, the water outlet assembly 32 is provided on the hot water tank 5. Meanwhile, a hot water delivery valve group 51 is provided on the hot water tank 5 to connect the hot water tank 5 with the main body of the conversion box 1. By switching the hot water delivery valve group 51, the water that has completed the heat exchange inside the main body of the conversion box 1 can be injected into the hot water tank 5. Meanwhile, there is a height difference between the conversion box 1 and the hot water tank 5. The volume of the hot water tank 5 is set according to actual needs, or a driving assembly (such as a water pump) is connected to the hot water delivery valve group 51 to solve the transportation problem. After the hot water in the conversion box 1 is injected into the hot water tank 5 for storage, cold water is injected through the water inlet assembly to continue the circulation of heat exchange. At this time, the hot water delivery valve group 51 is closed to ensure the storage and insulation effect of the hot water tank 5 for the hot water; in this embodiment, a thermometer 6 is provided on the hot water tank 5 and the conversion box 1 at the same time, so as to ensure that the temperature in the conversion box 1 and the hot water tank 5 can be detected in real time, and the temperature detection in the hot water tank 5 can detect the temperature of the stored hot water, and then accurately utilize the hot water, and the hot water temperature in the conversion box 1 can feedback the heat exchange progress of the staff, and help determine whether the hot water delivery valve group 51 can be opened to deliver hot water, which has a higher control accuracy for the entire device, and the thermometer 6 provided on the conversion box 1 body can be connected to the electrical module and the hot water delivery valve group 51, so as to realize automatic control to deliver hot water to the hot water tank 5.

[0040] like Figure 3 , 4 As shown, the water outlet assembly 32 includes a hot water pipe 321, to which a water outlet valve 322 is connected, and a water outlet 323 is connected at the lower side of the hot water pipe 321. The water inlet assembly 31 is arranged on the upper side of the conversion box 1, and the water inlet assembly 31 includes a water inlet pipe 311, to which a water pump 312 is connected, and the water pump 312 is connected to a fixed page 313, and the fixed page 313 is connected to the conversion box 1 at one end away from the water pump 312.

[0041] The water outlet assembly 32 includes a hot water pipe 321, wherein the hot water pipe 321 is connected to the inside of the hot water tank 5, and a water outlet valve 322 is connected to the hot water pipe 321. The hot water inside the hot water pipe 321 is controlled by the water outlet valve 322. The water outlet 323 is arranged below the hot water pipe 321 to ensure that the hot water flows out of the hot water tank 5 smoothly. By arranging a water pump 312 on the water inlet pipe 311, the water filling operation in the conversion box 1 can be completed. At the same time, the water inlet assembly 31 is arranged on the upper side of the conversion box 1, which can be convenient for Water is injected into the conversion box 1, and at the same time, the water inside the conversion box 1 is prevented from flowing back on the water inlet pipe 311 and the water pump 312 to ensure the smoothness of water injection. A fixed page 313 is connected to the water pump 312, and the fixed page 313 has a fixed constraint effect on the water pump 312 to prevent the water pump 312 from having a large impact on the water inlet pipe 311 during operation, causing the water inlet pipe 311 to break. The fixing effect of the conversion box 1 is used to share the impact effect of the water pump 312, so that the working state of the water pump 312 is more stable.

[0042] like Figure 3 , 5 As shown, the air outlet pipe group 22 includes an air outlet pipe 221, the air outlet pipe 221 includes an air outlet 222, the air outlet pipe 221 is connected to a control component 223, the control component 223 includes an air outlet valve 2231 and an air pressure detection gauge 2232, and a limit rod 2233 is set between the air pressure detection gauge 2232 and the air outlet valve 2231.

[0043] An outlet port 222 is provided on the outlet pipe 221. After the hot air completes the heat exchange in the conversion box 1, the hot air is discharged through the outlet port 222. A control component 223 is also provided on the outlet pipe 221. The control component 223 can control whether the hot air is discharged or not, thereby controlling the residence time of the hot air inside the conversion box 1. When necessary, the hot air can be controlled to fully exchange heat with the clean water inside the conversion box 1, thereby controlling the heat exchange process of the hot air, with better adaptability and more flexible control. The control component 223 includes an outlet valve 2231 and an air pressure detection gauge 2232. The outlet valve 2231 can control whether the hot air is discharged from the outlet pipe 221, and the air pressure detection gauge 2232 can detect the air pressure of the internal hot air in real time, thereby avoiding damage caused by excessive internal air pressure.

[0044] In addition to the above technical features, the present embodiment also includes a conversion box 1, the conversion box 1 includes a conversion chamber 11, the conversion chamber 11 is connected to a heat exchange tube 2, the conversion chamber 11 is connected to a water inlet assembly 31 and a water outlet assembly 32, the heat exchange tube 2 includes an air inlet pipe group 21 and an air outlet pipe group 22, and a delay filter assembly 4 is arranged between the air inlet pipe group 21 and the air outlet pipe group 22; wherein in the present embodiment, by arranging the delay filter assembly 4 on the heat exchange tube 2, the flow rate of the hot air in the heat exchange tube 2 can be intercepted, and due to the interception effect of the delay filter assembly 4, the flow rate of the hot air in the heat exchange tube 2 is greatly reduced, thereby improving the same volume of hot air in the heat exchange tube 2. The residence time in the heat exchange chamber is increased, thereby improving the heat exchange utilization rate between the hot air and the clean water in the heat exchange chamber, improving heat recovery, and reducing heat loss. In the present application, a delay filter component 4 is set to block the flow rate of the hot air. Since there is a filter component in the delay filter component 4, the filter component can effectively filter the hot air, thereby purifying and adsorbing harmful substances in the hot air. Due to the existence of this step, the hot air will encounter greater resistance when passing through the delay filter component 4, thereby achieving the purpose of delaying the flow rate of the hot air, that is, reducing the pollution of harmful substances to the environment, while being able to improve the heat exchange utilization rate, reduce heat loss, and improve the conversion rate.

[0045] Embodiment 3:

[0046] like Figure 2 As shown, the present embodiment also includes the following technical features: the heat exchange tube 2 includes a serpentine bending portion 23 arranged in the conversion chamber 11, the delay filter assembly 4 includes a filter plate 41 connected to the heat exchange tube 2, and a hot gas filter element 42 is detachably connected to the filter plate 41.

[0047] A serpentine bending portion 23 is provided in the heat exchange tube 2. The serpentine bending portion 23 can increase the contact area between the heat exchange tube 2 and the conversion chamber 11, and at the same time can increase the circulation time of the hot air in the conversion chamber 11, thereby improving the heat exchange recovery rate of the hot air in the conversion chamber 11, performing sufficient heat exchange, and improving the conversion rate. The delay filter component 4 includes a filter plate 41 and a hot air filter element 42, wherein the filter plate 41 can be connected and fixed to the heat exchange tube 2, and a filter groove is provided on the filter plate 41. The hot air filter element 42 is detachably connected to the filter plate 41, and the hot air filter element 42 can perform preliminary filtering and purification on the hot air to avoid the presence of harmful substances in the hot air and cause environmental pollution. At the same time, due to the filtering effect of the hot air filter element 42, the circulation of the hot air in the heat exchange tube 2 is hindered, thereby delaying the time of the hot air in the conversion box 1, thereby improving the waste heat recovery efficiency.

[0048] In addition to the above technical features, the present embodiment also includes a conversion box 1, the conversion box 1 includes a conversion chamber 11, the conversion chamber 11 is connected with a heat exchange tube 2, the conversion chamber 11 is connected with a water inlet assembly 31 and a water outlet assembly 32, the heat exchange tube 2 includes an air inlet pipe group 21 and an air outlet pipe group 22, a delay filter assembly 4 is arranged between the air inlet pipe group 21 and the air outlet pipe group 22, the conversion box 1 also includes a hot water tank 5, the water outlet assembly 32 is arranged on the hot water tank 5, a hot water delivery valve group 51 is arranged on the hot water tank 5, a thermometer 6 is connected to the hot water tank 5 and the conversion box 1, the water outlet assembly 32 includes a hot water pipe 321, a water outlet valve 322 is connected to the hot water pipe 321, and a water outlet 323 is connected to the lower side of the hot water pipe 321, the water inlet assembly 31 is arranged on the upper side of the conversion box 1, the water inlet assembly 31 includes a water inlet pipe 311, and a water pump 312 is connected to the water inlet pipe 311. A fixed page 313 is connected to the water pump 312, and one end of the fixed page 313 away from the water pump 312 is connected to the conversion box 1. The air outlet pipe group 22 includes an air outlet pipe 221, and the air outlet pipe 221 includes an air outlet 222. The air outlet pipe 221 is connected to a control component 223, and the control component 223 includes an air outlet valve 2231 and an air pressure detection gauge 2232. A limit rod 2233 is set between the air pressure detection gauge 2232 and the air outlet valve 2231.

[0049] In the present application, by setting a delay filter assembly 4 on the heat exchange tube 2, the flow rate of the hot air in the heat exchange tube 2 can be intercepted. Due to the interception effect of the delay filter assembly 4, the flow rate of the hot air in the heat exchange tube 2 is greatly reduced, thereby increasing the residence time of the same volume of hot air in the heat exchange tube 2, thereby increasing the heat exchange utilization rate between the hot air and the clean water in the heat exchange chamber, improving heat recovery, and reducing heat loss. In the present application, the flow rate of the hot air is blocked by setting a delay filter assembly 4, wherein the delay filter assembly 4 has a filter component, and the filter component can effectively filter the hot air, thereby purifying and adsorbing harmful substances in the hot air. Due to the existence of this step, the hot air passes through the delay filter assembly When the conversion box 1 is provided with the hot water tank 5, the water outlet assembly 32 is arranged on the hot water tank 5, and a hot water delivery valve group 51 is also arranged on the hot water tank 5, and the hot water tank 5 is connected with the main body of the conversion box 1. By switching the hot water delivery valve group 51, the water in the main body of the conversion box 1 that has completed the heat exchange can be injected into the hot water tank 5. At the same time, there is a height difference between the conversion box 1 and the hot water tank 5. The volume of the hot water tank 5 is set according to actual needs, or a driving assembly (such as a water pump) is connected to the hot water delivery valve group 51, so as to solve the delivery problem. The problem is that after the hot water in the conversion box 1 is injected into the hot water tank 5 for storage, cold water is injected through the water inlet component to continue the circulation and heat exchange. At this time, the hot water delivery valve group 51 is closed to ensure the storage and insulation effect of the hot water in the hot water tank 5. In this embodiment, a thermometer 6 is provided on the hot water tank 5 and the conversion box 1 at the same time, so as to ensure that the temperature in the conversion box 1 and the hot water tank 5 can be detected in real time. The temperature detection in the hot water tank 5 can detect the temperature of the stored hot water, and then the hot water can be used accurately. The hot water temperature in the conversion box 1 can feedback the heat exchange progress of the staff, and help determine whether the hot water delivery valve group 51 can be opened to deliver hot water. The control accuracy of the entire device is higher, and the thermometer 6 provided on the conversion box 1 body can be connected to the electrical module and the hot water delivery valve group 51. The valve group 51 realizes automatic control to transport hot water to the hot water tank 5; the water outlet assembly 32 includes a hot water pipe 321, wherein the hot water pipe 321 is connected to the inside of the hot water tank 5, and a water outlet valve 322 is connected to the hot water pipe 321. The hot water inside the hot water pipe 321 is controlled by the water outlet valve 322. The water outlet 323 is arranged below the hot water pipe 321 to ensure that the hot water can flow out of the hot water tank 5 smoothly; by arranging a water pump 312 on the water inlet pipe 311, the water adding operation in the conversion box 1 can be completed. At the same time, the water inlet assembly 31 is arranged on the upper side of the conversion box 1, which can facilitate the water injection into the conversion box 1, and prevent the water inside the conversion box 1 from flowing back on the water inlet pipe 311 and the water pump 312, thereby ensuring the smoothness of the water injection;A fixing page 313 is connected to the water pump 312, and the fixing page 313 realizes a fixed constraint effect on the water pump 312 to prevent the water pump 312 from having a large impact on the water inlet pipe 311 during operation, resulting in the breakage of the water inlet pipe 311. The impact effect of the water pump 312 is shared by the fixing effect of the conversion box 1, so that the working state of the water pump 312 is more stable; an air outlet 222 is provided on the air outlet pipe 221, and the hot air is discharged through the air outlet 222 after completing the heat exchange in the conversion box 1, wherein a control component 223 is also provided on the air outlet pipe 221, and the control component 22 3 can control whether the hot air is discharged or not, thereby controlling the residence time of the hot air inside the conversion box 1. When necessary, the hot air can be controlled to fully exchange heat with the clean water inside the conversion box 1, thereby controlling the heat exchange process of the hot air, with better adaptability and more flexible control; the control component 223 includes an outlet valve 2231 and an air pressure detection meter 2232, wherein the outlet valve 2231 can control whether the hot air is discharged from the outlet pipe 221, and the air pressure detection meter 2232 can detect the air pressure of the internal hot air in real time, thereby avoiding damage caused by excessive internal air pressure. ;

[0050] The assembly and working process of the waste heat recovery and utilization device for petrochemical production in this embodiment are as follows: In this embodiment, it includes a conversion box 1 (in this embodiment, the conversion box 1 is the conversion box body, and is an independent entity between the hot water tank), wherein a hot water tank 5 is arranged on the side of the conversion box 1, a hot water delivery valve group 51 is connected between the hot water tank 5 and the conversion box 1, the hot water tank 5 is connected to the water outlet component 32, the hot water pipe 321 is connected to the hot water tank 5, the outlet valve 322 is arranged below the hot water pipe 321, and the outlet valve 322 is arranged at the pipe mouth of the hot water pipe 321. A thermometer 6 is also arranged on the hot water tank 5 and the conversion box 1, and a water inlet component 31 is connected above the conversion box 1, and the water inlet component 31 includes a water inlet pipe 311 and a water pump 312. The pump 312 is connected to the water inlet pipe 311, and a fixed page 313 is also connected to the water pump 312. One end of the fixed page 313 is connected to the water pump 312, and the other end is connected to the conversion box 1. An air inlet pipe group 21 and an air outlet pipe group 22 are arranged on the front and rear sides of the conversion box 1. The air inlet pipe group 21, the air outlet pipe group 22 and the serpentine bending part 23 located inside the conversion chamber 11 constitute the heat exchange tube 2, wherein the air outlet pipe group 22 includes an air outlet pipe 221, wherein an air outlet valve 2231 is arranged on the air outlet pipe 221, and a control component 223 is arranged on the upper side of the air outlet valve 2231. The control component 223 includes an air outlet valve 2231 and an air pressure detection gauge 2232, wherein a limit rod 2233 is also arranged between the air outlet valve 2231 and the air pressure detection gauge 2232. The working process is as follows: In this embodiment, a large amount of heat gas generated in the production and processing of petrochemical industry is first introduced into the air inlet pipe group 21 of the heat exchange tube 2. A large amount of clean water is installed in the conversion box 1. The water pump 312 can add water to the conversion box 1. A large amount of hot air can be introduced into the heat exchange tube 2. The serpentine bend 23 in the heat exchange tube 2 can prolong the residence time of the hot air in the conversion box 1, thereby increasing the residence time of the hot air, thereby effectively improving the recovery rate, reducing the heat loss, and reducing the limitation of use. Then, a delay filtering device is provided on the serpentine bend 23. The delay filtering device can perform preliminary filtering on the hot air and delay the passage time of the hot air. When the hot water heat exchange inside the conversion box 1 reaches the specified standard, the hot water delivery valve group 51 is opened to supply the hot water tank. 5 transports the hot water after heat exchange, and the hot water tank 5 is the storage position of the heated hot water. The thermometer 6 can detect the water temperature inside the hot water tank 5 and the conversion box 1. The thermometer 6 can easily control the internal water temperature change, meet the needs of different water temperatures, and judge the appropriate opening of the hot water delivery valve group 51 for timely use. Finally, the delay filtering device includes a filter plate 41 and a hot air filter element 42. The filter plate 41 is the main supporting structure of the hot air delay filtering device. A large amount of hot air passes through the serpentine bending part 23. A large amount of water is contained in the conversion box 1. The hot air passes through the serpentine bending part 23, and the heat is transferred. The filter plate 41 and the hot air filter element 42 are set up. The hot air filter element 42 can perform preliminary filtration and purification on the hot air to avoid harmful substances in the hot air and cause environmental pollution.At the same time, it can delay the time of hot gas in the conversion box 1, improve the waste heat recovery rate, and improve the utilization rate.

Claims

1. A waste heat recovery and utilization device for petrochemical production, characterized in that: The invention comprises a conversion box (1), wherein the conversion box (1) comprises a conversion chamber (11), wherein the conversion chamber (11) is connected to a heat exchange tube (2), wherein the conversion chamber (11) is connected to a water inlet assembly (31) and a water outlet assembly (32), wherein the heat exchange tube (2) comprises an air inlet pipe group (21) and an air outlet pipe group (22), and wherein a delay filter assembly (4) is arranged between the air inlet pipe group (21) and the air outlet pipe group (22).

2. The waste heat recovery and utilization device for petrochemical production according to claim 1, characterized in that: The heat exchange tube (2) comprises a serpentine bending portion (23) arranged in the conversion chamber (11).

3. The waste heat recovery and utilization device for petrochemical production according to claim 1, characterized in that: The conversion box (1) also includes a hot water tank (5), the water outlet assembly (32) is arranged on the hot water tank (5), and the hot water tank (5) is provided with a hot water delivery valve group (51).

4. The waste heat recovery and utilization device for petrochemical production according to claim 3, characterized in that: The hot water tank (5) and / or the conversion tank (1) are connected to a thermometer (6).

5. A waste heat recovery and utilization device for petrochemical production according to any one of claims 1 to 4, characterized in that: The water outlet assembly (32) comprises a hot water pipe (321), the hot water pipe (321) is connected to a water outlet valve (322), and the lower side of the hot water pipe (321) is connected to a water outlet (323).

6. A waste heat recovery and utilization device for petrochemical production according to any one of claims 1 to 4, characterized in that: The water inlet assembly (31) is arranged on the upper side of the conversion box (1), and the water inlet assembly (31) comprises a water inlet pipe (311), and a water pump (312) is connected to the water inlet pipe (311).

7. The waste heat recovery and utilization device for petrochemical production according to claim 6, characterized in that: The water pump (312) is connected to a fixing page (313), and one end of the fixing page (313) away from the water pump (312) is connected to the conversion box (1).

8. A waste heat recovery and utilization device for petrochemical production according to any one of claims 1 to 4, characterized in that: The air outlet pipe group (22) comprises an air outlet pipe group, the air outlet pipe group comprises an air outlet (222), and a control component (223) is connected to the air outlet pipe group.

9. The waste heat recovery and utilization device for petrochemical production according to claim 8, characterized in that: The control component (223) comprises an air outlet valve (2231) and an air pressure detection gauge (2232), and a limit rod (2233) is provided between the air pressure detection gauge (2232) and the air outlet valve (2231).

10. A waste heat recovery and utilization device for petrochemical production according to any one of claims 1 to 4, characterized in that: The delayed filtering assembly (4) comprises a filter plate (41) connected to the heat exchange tube (2), and a hot gas filter element (42) is detachably connected to the filter plate (41).