Suspension type bottom die dismantling device

By designing a suspended bottom mold removal device with adjustable suspension brackets and safety measures, the problems of low removal efficiency and poor safety in the prior art are solved, and faster construction progress and lower costs are achieved.

CN222065322UActive Publication Date: 2024-11-26CRCC HARBOR & CHANNEL ENG BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420726099.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-11-26
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

In the construction of docks and offshore pipelines, existing hanging basket removal methods and ship removal methods have problems such as low removal efficiency, poor safety and high cost, especially due to weather and equipment restrictions, resulting in low mold removal efficiency.

Method used

A suspension base mold removal device is designed, including an adjustable suspension bracket and a disassembled suspension frame, equipped with multiple scaffolding boards, reinforced links and safety crossbars, which improves removal efficiency through suspension bracket length adjustment and safety measures and Security.

Benefits of technology

Through the adjustability and safety measures of the suspension bracket, the construction preparation and end time is shortened, the accident risk is reduced, the demolition efficiency is improved, material waste and construction costs are reduced, and the safety of the construction site is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065322U_ABST
    Figure CN222065322U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge engineering, in particular to a suspension type bottom formwork dismantling device which comprises a length-adjustable suspension support, suspension frames are symmetrically arranged at the two ends of the suspension support and detachably connected to the suspension support, and a plurality of scaffold boards are arranged between the two suspension frames. The suspension support comprises two supporting cross beams and a plurality of reinforcing connecting rods, the two supporting cross beams are arranged in parallel, the reinforcing connecting rods are sequentially arranged between the two supporting cross beams at intervals, each supporting cross beam comprises a first cross beam body and a second cross beam body, and the first cross beam body and the second cross beam body are detachably connected. And the distance between the first cross beam body and the second cross beam body is adjustable. In the application, the suspension bracket and the suspension frame are arranged, the length of the suspension bracket is adjustable and can be adjusted according to the width of the cross beam and the abutment, the suspension frame is detachably mounted on the suspension bracket, the suspension frame is quickly mounted and dismounted, and the construction preparation and end time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of bridge engineering, and in particular to a suspended bottom formwork removal device. Background Art

[0002] In the construction of docks and offshore pipe galleries, large cast-in-place beams, piers and other bottom formwork supports are mostly in the form of hoop-processed I-steel structures. After the cast-in-place beam concrete reaches the bottom formwork demolition strength, the hoop and I-steel are usually removed by the hanging basket removal method or ship removal method. However, the hanging basket removal method or ship removal method will encounter some technical problems.

[0003] For example, when the basket demolition method is used, the width of the beam is much larger than the width of the pile foundation. Due to the width of the beam, the crane cannot lift the basket to the demolition position. At the same time, the basket operation has poor safety and is inconvenient for personnel to operate. When the ship demolition method is used, after the pouring of the beams of the wharf and offshore pipeline corridor is completed, the height from the beam to the sea level is difficult to meet the requirements of ship entry and exit. At the same time, the use of ships for demolition is affected by weather conditions, resulting in short operating time, low work efficiency and high cost. The above two methods are both affected by various conditions, resulting in low final demolding efficiency. Therefore, further improvements can be made. Summary of the invention

[0004] In order to improve the mold removal efficiency, the present application provides a hanging bottom mold removal device.

[0005] The present application provides a hanging bottom mold removal device that adopts the following technical solution:

[0006] A suspended bottom formwork removal device comprises a suspension bracket with adjustable length, suspension frames are symmetrically arranged at both ends of the suspension bracket, the suspension frames are detachably connected to the suspension bracket, a plurality of scaffolding boards are arranged between two groups of the suspension frames, the suspension bracket comprises two supporting beams and a plurality of reinforcing connecting rods, the two supporting beams are arranged in parallel, the plurality of reinforcing connecting rods are arranged in sequence and at intervals between the two supporting beams, the supporting beams comprise a first beam body and a second beam body, the first beam body and the second beam body are detachably connected, and the spacing between the first beam body and the second beam body is adjustable.

[0007] By adopting the above technical solution, a suspension bracket and a suspension frame are set, and the length of the suspension bracket is adjustable, which can be adjusted according to the width of the beam and the pier to provide suitable support for the suspension frame for installation of the suspension frame. The suspension frame is detachably installed on the suspension bracket, so that the suspension frame can be quickly installed and disassembled, which greatly shortens the time for construction preparation and completion. The reduction in the time for construction preparation and completion means that the construction personnel can finish the high-altitude operation time more quickly after disassembling the bottom formwork, reducing the occurrence of accidental risks.

[0008] Optionally, an adjustment beam is provided between the first beam body and the second beam body, and the adjustment beam can be inserted into the first beam body and the second beam body. The top surface and the bottom surface of the adjustment beam are provided with a plurality of first connecting holes evenly spaced along the length direction thereof. The top surface and the bottom surface of the first beam body and the second beam body are provided with second connecting holes, and bolts are inserted into the second connecting holes, and the bolts can be inserted into the first connecting holes. Nuts are provided at the bottom of the first beam body and the second beam body.

[0009] By adopting the above technical solution, a first beam body, a second beam body and an adjustable beam are provided, and the length of the hanging bracket can be adjusted so that it can be reused, thereby reducing material waste due to inappropriate size, helping to reduce construction costs, and reducing the floor space occupied during transportation, facilitating transportation, and saving storage space at the construction site.

[0010] Optionally, a gasket is provided between the bolt and the second connecting hole.

[0011] By adopting the above technical solution, a gasket is provided, and the gasket is used to disperse the pressure between the spiral and the second connection hole, so as to prevent the material around the second connection hole from being deformed or damaged due to excessive local pressure, thereby extending the service life of the material. The gasket can also improve the stability and strength of the connection between the bolt and the second connection hole, increase the bearing capacity of the second connection hole, and ensure the reliability of its connection.

[0012] Optionally, the suspension frame includes an upper suspension horizontal column and a lower suspension horizontal column, the upper suspension horizontal column and the lower suspension horizontal column are arranged parallel to each other, the upper suspension horizontal column can be detachably installed on the suspension bracket, and the two ends of the upper suspension horizontal column are connected to suspension connecting columns, and the suspension connecting columns at both ends extend vertically downward and are respectively connected to the two ends of the lower suspension horizontal column.

[0013] By adopting the above technical solution, the parallel upper suspension columns and lower suspension columns form a stable horizontal support structure. This layout helps to disperse the load and improve the stability and bearing capacity of the overall frame. The suspension connecting column serves as a connecting piece, further enhancing the rigidity of the structure and ensuring stability when subjected to force.

[0014] Optionally, a first safety cross bar is provided between the suspension connection columns at both ends, and the first safety cross bar is used to improve construction safety.

[0015] By adopting the above technical solution, a first safety cross bar is set up, which can be used as a protective measure. During the process of demolding, since construction workers are working in the air, the first safety cross bar is used to prevent construction workers from falling from a height due to loss of balance or slipping, thereby significantly reducing the risk of accidents.

[0016] Optionally, upper hanging nose rings are provided at both ends of the supporting crossbeam, a lower hanging nose ring is provided on the hanging lower cross column, and a hand-pulled hoist connector is connected between the upper hanging nose ring and the lower hanging nose ring.

[0017] By adopting the above technical solution, a hand winch connector is set up, and the hand winch connector is used as another safety guarantee for construction workers working in the air. In the process of shaking, emergency grasping and support can be carried out to prevent safety accidents.

[0018] Optionally, the hand hoist connecting piece includes an upper hook, a lower hook, and a safety chain, and the two ends of the safety chain are respectively connected to the upper hook and the lower hook, the upper hook is connected to the upper nose ring, and the lower hook is connected to the lower nose ring.

[0019] By adopting the above technical solution, a safety chain is set up. As an additional protection measure, the safety chain can prevent tools, equipment or personnel from falling from heights in the event of an accident. It can be used as an emergency grip or fixing point to provide a lifeline at a critical moment. The safety chain can be used as an additional fixing point to fix safety nets, safety belts or other safety equipment to enhance the safety of operators.

[0020] Optionally, a second safety cross bar is provided between the suspension frames at both ends of the suspension bracket, and the second safety cross bar is detachably installed between the suspension frames.

[0021] By adopting the above technical solution and setting a second safety bar, workers may feel nervous or panic when working at height. The existence of the second safety bar can provide psychological comfort and support to workers, making them feel safer and more confident, so that they can better focus on the work at hand. When workers feel safe, their work efficiency is usually higher. The setting of the second safety bar can reduce workers' concerns about safety, allowing them to focus more on their work, thereby improving overall construction efficiency.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. Set up the suspension bracket and the suspension frame. The length of the suspension bracket is adjustable. It can be adjusted according to the width of the beam and the pier to provide appropriate support for the suspension frame for installation. The suspension frame is detachably installed on the suspension bracket, so that the suspension frame can be quickly installed and disassembled, which greatly shortens the time for construction preparation and completion. The reduction in construction preparation and completion time means that construction workers can finish the high-altitude operation time more quickly after disassembling the bottom formwork, reducing the occurrence of accidental risks;

[0024] 2. The first crossbeam body, the second crossbeam body and the adjustment crossbeam are arranged, and the length of the hanging bracket can be adjusted so that the crossbeam can be reused, thereby reducing the waste of materials due to inappropriate size, helping to reduce construction costs, and reducing the floor space during transportation, facilitating transportation, and saving storage space at the construction site;

[0025] 3. Set up the first safety cross bar. The first safety cross bar can be used as a protective measure. During the process of demolding, since the construction workers are working in the air, the first safety cross bar can be used to prevent the construction workers from falling from a height due to loss of balance or slipping, thereby significantly reducing the risk of accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of this application.

[0027] Figure 2 It is a schematic diagram of the structure of the supporting beam part of this application.

[0028] Figure 3 It is a schematic diagram of the side view structure of the supporting beam part of this application.

[0029] Description of reference numerals:

[0030] 1. Suspension bracket; 11. Support beam; 111. First beam body; 112. Second beam body; 12. Reinforcement connecting rod; 13. Adjustment beam; 14. First connecting hole; 15. Second connecting hole; 16. Bolt; 17. Gasket; 18. Nut; 19. Third connecting column; 2. Suspension frame; 21. Suspension upper column; 22. Suspension lower column; 23. Suspension connecting column; 24. Third connecting hole; 25. Fixing hoist; 3. Reinforcement rib; 4. First safety cross bar; 5. Second safety cross bar; 6. Upper hanging nose ring; 7. Lower hanging nose ring; 8. Hand winch connector; 81. Upper hook; 82. Lower hook; 83. Safety chain; 9. Scaffolding board. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1-3 This application is described in further detail.

[0032] The embodiment of the present application discloses a suspended bottom mold removal device.

[0033] Reference Figure 1 , 2 3. A suspended bottom formwork removal device comprises a suspension bracket 1 with adjustable length. Suspension frames 2 are symmetrically arranged at both ends of the suspension bracket 1. The suspension frames 2 are detachably installed on the suspension bracket 1. Two groups of suspension frames 2 are arranged in parallel, and a plurality of scaffolding boards 9 are arranged between them. The scaffolding boards 9 are utilized to increase the operating space for construction workers.

[0034] The suspension bracket 1 includes two supporting beams 11 and a plurality of reinforcing connecting rods 12 . The two supporting beams 11 are arranged in parallel, and the plurality of reinforcing connecting rods 12 are evenly spaced and arranged between the two supporting beams 11 along the length direction of the supporting beams 11 .

[0035] The supporting crossbeam 11 includes a first crossbeam body 111 and a second crossbeam body 112. An adjusting crossbeam 13 is arranged between the first crossbeam body 111 and the second crossbeam body 112. The adjusting crossbeam 13 can be inserted into the first crossbeam body 111 and the second crossbeam body 112, so that the distance between the first crossbeam body 111 and the second crossbeam body 112 can be adjusted. The top surface and the bottom surface of the adjusting crossbeam 13 are evenly spaced along the length direction thereof. Correspondingly, the top surface and the bottom surface of the first crossbeam body 111 and the second crossbeam body 112 are both provided with second connecting holes 15. Bolts 16 with gaskets 17 are inserted into the second connecting holes 15. When the adjusting crossbeam 13 is inserted into the first crossbeam body 111 and the second crossbeam body 112 to adjust the distance, the bolts 16 can be inserted and passed through the first connecting hole 14 and the second connecting hole 15. The passing part is connected by nuts 18, and the bolts 16 cooperate with the nuts 18 to achieve a detachable connection.

[0036] In actual use, the suspension bracket 1 and the suspension frame 2 are set. The length of the suspension bracket 1 is adjustable due to the plug-in relationship between the first beam body 111, the second beam body 112 and the adjustment beam 13. It can be adjusted according to the width of the beam and the pier to provide suitable support for the suspension frame 2 for the installation of the suspension frame 2. The suspension frame 2 is detachably installed on the suspension bracket 1, so that the suspension frame 2 can be quickly installed and disassembled, which greatly shortens the time for construction preparation and completion. The reduction in the time for construction preparation and completion means that the construction personnel can finish the high-altitude operation time more quickly after disassembling the bottom formwork, reducing the occurrence of accidental risks.

[0037] refer to Figure 1 , 2 3. Specifically, in the present embodiment, the suspension frame 2 includes a suspension upper cross column 21, a suspension lower cross column 22, and a suspension connecting column 23. The suspension upper cross column 21 is detachably mounted on the first cross beam body 111 and the second cross beam body 112. The suspension connecting column 23 is located at both ends of the suspension upper cross column 21, and the top of the suspension connecting column 23 is fixedly connected to the suspension upper cross column 21. The suspension lower cross column 22 is arranged in parallel with the suspension upper cross column 21 at intervals. The suspension connecting column 23 is located at both ends of the suspension lower cross column 22, and the bottom of the suspension connecting column 23 is fixedly connected to the suspension lower cross column 22.

[0038] In order to connect the upper suspension cross bar with the first beam body 111 and the second beam body 112, a third connecting hole 24 is provided on the top and bottom surfaces of the upper suspension cross bar. Correspondingly, third connecting columns 19 are provided on the top surfaces at both ends of the first beam body 111 and the second beam body 112. The third connecting columns 19 can be passed through the third connecting holes 24, and reinforcing ribs 3 are provided inside the first beam body 111 and the second beam body 112 below the third connecting columns 19 to strengthen the connection strength of the third connecting columns 19.

[0039] In actual use, the parallel upper suspension crossbars 21 and lower suspension crossbars 22 form a stable horizontal support structure, which helps to disperse the load and improve the stability and bearing capacity of the overall frame. The suspension connecting column 23 serves as a connecting piece to further enhance the rigidity of the structure and ensure stability when subjected to force.

[0040] refer to Figure 1 Specifically, in this embodiment, a fixing hoop 25 is provided on the suspension connecting column 23, and a first safety cross bar 4 is provided between the two suspension connecting columns 23 on the same side by fixed welding. The suspension connecting columns 23 located at both ends of the suspension bracket 1 are detachably installed with a second safety cross bar 5 through the fixing hoop 25. The first safety cross bar 4 is located above the second safety cross bar 5, and the first safety cross bar 4 and the second safety cross bar 5 are vertically arranged.

[0041] In actual use, the first safety cross bar 4 and the second safety cross bar 5 are set. The first safety cross bar 4 and the second safety cross bar 5 can be used as protective measures. During the demolding process, since the construction workers are working in the air, the first safety cross bar 4 and the second safety cross bar 5 are used to prevent the construction workers from falling from a height due to loss of balance or slipping, thereby significantly reducing the risk of accidents. At the same time, when working at high altitudes, workers may feel nervous or panic. The presence of the first safety cross bar 4 and the second safety cross bar 5 can provide psychological comfort and support to the workers, making them feel safer and more confident, so that they can better focus on the work at hand. When workers feel safe, their work efficiency is usually higher. The setting of the first safety cross bar 4 and the second safety cross bar 5 can reduce workers' concerns about safety, allowing them to focus more on their work, thereby improving overall construction efficiency.

[0042] refer to Figure 1 , 2Specifically, in this embodiment, both ends of the first crossbeam body 111 and the second crossbeam body 112 are provided with an upper nose ring 6, and a lower nose ring 7 is provided on the suspension lower cross column 22, and a hand chain hoist connector 8 is connected between the upper nose ring 6 and the lower nose ring 7. The hand chain hoist connector 8 includes an upper hook 81, a lower hook 82, and a safety chain 83, and both ends of the safety chain 83 are connected to the upper hook 81 and the lower hook 82 respectively, the upper hook 81 is connected to the upper nose ring 6, and the lower hook 82 is connected to the lower nose ring 7.

[0043] In actual use, the safety chain 83 is set as an additional protection measure to prevent tools, equipment or personnel from falling from a height in the event of an accident. It can be used as an emergency grip or fixing point to provide a lifeline at a critical moment. The safety chain 83 can be used as an additional fixing point to fix a safety net, a safety belt or other safety equipment to enhance the safety of the operator.

[0044] The implementation principle of a suspended bottom form removal device in the embodiment of the present application is as follows: a suspension bracket 1 and a suspension frame 2 are provided, and the length of the suspension bracket 1 is adjustable, and can be adjusted according to the width of the beam and the pier to provide suitable support for the suspension frame 2 for the installation of the suspension frame 2. The suspension frame 2 is detachably installed on the suspension bracket 1, so that the suspension frame 2 can be quickly installed and disassembled, which greatly shortens the time for construction preparation and completion. The reduction in the time for construction preparation and completion means that the construction personnel can finish the high-altitude operation time more quickly after disassembling the bottom form, reducing the occurrence of accidental risks.

[0045] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A hanging bottom mold removal device, characterized in that: The invention comprises a suspension bracket (1) with adjustable length, wherein the two ends of the suspension bracket (1) are symmetrically provided with suspension frames (2), the suspension frames (2) are detachably connected to the suspension bracket (1), a plurality of scaffolding boards (9) are arranged between two groups of the suspension frames (2), the suspension bracket (1) comprises two supporting beams (11) and a plurality of reinforcing connecting rods (12), the two supporting beams (11) are arranged in parallel, the plurality of reinforcing connecting rods (12) are sequentially arranged between the two supporting beams (11), the supporting beam (11) comprises a first beam body (111) and a second beam body (112), the first beam body (111) and the second beam body (112) are detachably connected, and the spacing between the first beam body (111) and the second beam body (112) is adjustable.

2. A hanging bottom mold removal device according to claim 1, characterized in that: An adjusting crossbeam (13) is arranged between the first crossbeam body (111) and the second crossbeam body (112), and the adjusting crossbeam (13) can be inserted into the first crossbeam body (111) and the second crossbeam body (112). The top surface and the bottom surface of the adjusting crossbeam (13) are evenly spaced along the length direction thereof to form a plurality of first connecting holes (14). The top surface and the bottom surface of the first crossbeam body (111) and the second crossbeam body (112) are both provided with second connecting holes (15). Bolts (16) are inserted into the second connecting holes (15), and the bolts (16) can be inserted into the first connecting holes (14). Nuts (18) are arranged at the bottom of the first crossbeam body (111) and the second crossbeam body (112).

3. A hanging bottom mold removal device according to claim 2, characterized in that: A gasket (17) is provided between the bolt (16) and the second connecting hole (15).

4. The hanging bottom mold removal device according to claim 1 is characterized in that: The suspension frame (2) comprises an upper suspension crossbar (21) and a lower suspension crossbar (22), wherein the upper suspension crossbar (21) and the lower suspension crossbar (22) are arranged parallel to each other, and the upper suspension crossbar (21) can be detachably mounted on the suspension bracket (1), and the two ends of the upper suspension crossbar (21) are connected to suspension connecting columns (23), and the suspension connecting columns (23) at the two ends both extend vertically downward and are respectively connected to the two ends of the lower suspension crossbar (22).

5. A hanging bottom mold removal device according to claim 4, characterized in that: A first safety cross bar (4) is provided between the suspension connection columns (23) at both ends, and the first safety cross bar (4) is used to improve construction safety.

6. A hanging bottom mold removal device according to claim 4, characterized in that: Upper nose rings (6) are provided at both ends of the supporting crossbeam (11), a lower nose ring (7) is provided on the hanging lower cross column (22), and a hand chain hoist connector (8) is connected between the upper nose ring (6) and the lower nose ring (7).

7. A hanging bottom mold removal device according to claim 6, characterized in that: The hand chain hoist connecting piece (8) comprises an upper hook (81), a lower hook (82), and a safety chain (83). The two ends of the safety chain (83) are respectively connected to the upper hook (81) and the lower hook (82). The upper hook (81) is connected to the upper nose ring (6), and the lower hook (82) is connected to the lower nose ring (7).

8. The hanging bottom mold removal device according to claim 1, characterized in that: A second safety cross bar (5) is provided between the suspension frames (2) at both ends of the suspension bracket (1), and the second safety cross bar (5) is detachably installed between the suspension frames (2).