Foundation pit construction structure with freezing treatment system
By using a refrigeration treatment system in foundation pit construction and using brine refrigeration pipe to freeze the pressure-bearing water layer, the problems of excessive depth of the ground connection wall and soil erosion during foundation pit construction are solved, and safe and economical construction results are achieved.
Patent Information
- Application Number
- CN202420552133.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-21
AI Technical Summary
In existing municipal foundation pit projects, the treatment methods for foundation pit pressure water such as the ground connection wall insertion depth is too deep and costly, or the pressure-reducing head solution leads to soil erosion, lacking effective and economical solutions.
The foundation pit construction structure with a refrigeration treatment system is adopted, including a refrigeration station, connecting pipe and brine refrigeration pipe. The brine refrigeration pipe is placed in the pressure-bearing water layer through a long sleeve to form a freezing partition, and the refrigeration treatment system is used to provide pressure-bearing water. The layer is partitioned.
Effectively partition the pressure-bearing water layer, reduce construction costs, reduce soil erosion, maintain environmental stability, convenient construction and low cost.
Smart Images

Figure CN222065526U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of foundation pit engineering, in particular to a foundation pit construction structure with a freezing treatment system. Background Art
[0002] In existing municipal foundation pit projects, for the treatment of foundation pit pressurized water, a retaining structure (for example, a ground-connected wall) is usually used for isolation or a solution of reducing the pressure head is used.
[0003] The use of a partition solution will cause the ground-anchored wall to be inserted too deep, resulting in a high cost; while the solution of reducing the pressure head is often accompanied by greater soil and water loss.
[0004] For this reason, it is urgent to provide a foundation pit construction structure. Utility Model Content
[0005] The main purpose of the utility model is to provide a foundation pit construction structure with a freezing treatment system, hoping to effectively solve the problems in the background technology.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A foundation pit construction structure with a freezing treatment system, characterized in that: the foundation pit construction structure has a freezing treatment system, the freezing treatment system includes a freezing station, a connecting pipe and a plurality of brine freezing pipes; the brine freezing pipe is connected to the freezing station via the connecting pipe; the foundation pit construction structure is provided with a ground connection wall and a crown beam, the ground connection wall is arranged around the underground structure; the ground connection wall and the crown beam are both preset with a full-length casing, a borehole is drilled on the foundation at the bottom end of the full-length casing, and the brine freezing pipe is placed into the borehole of the foundation through the full-length casing.
[0008] While adopting the above technical solutions, the present invention can also adopt or combine the following technical solutions:
[0009] As a preferred technical solution of the utility model: two full-length sleeves are preset on each ground-connected wall unit and crown beam unit.
[0010] As a preferred technical solution of the utility model: the full-length sleeve is arranged in the middle of the ground-connected wall and the crown beam.
[0011] As a preferred technical solution of the present utility model: the diameter of the full-length sleeve is 150 mm.
[0012] As a preferred technical solution of the utility model: the length of the brine freezing pipe covers the thickness of the pressure water layer.
[0013] The utility model provides a foundation pit construction structure with a freezing treatment system, which has the following beneficial effects: the brine freezing treatment system is used to freeze and isolate the pressurized water layer that affects the safety of the foundation pit, thereby solving the problem of pressurized water foundation pit anti-surge, and at the same time, the construction is convenient, the cost is low, the impact on the surrounding environment is small, and the soil and water conservation performance is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A cross-sectional view of a foundation pit construction structure with a freezing treatment system provided by the utility model;
[0015] Figure 2 A top view of a foundation pit construction structure with a freezing treatment system provided by the utility model;
[0016] In the figure: 1-ground-connected wall; 2-brine freezing pipe; 3-freezing station; 4-connecting pipe; 5-underground structure; 6-crown beam; 11-through-length casing. DETAILED DESCRIPTION
[0017] The present invention will be further described in detail with reference to the accompanying drawings and specific embodiments.
[0018] like Figure 1-2 As shown, a foundation pit construction structure with a freezing treatment system, the foundation pit construction structure has a freezing treatment system, the freezing treatment system includes a freezing station 3, a connecting pipe 4 and a plurality of brine freezing pipes 2; the brine freezing pipe 2 is connected to the freezing station 3 via the connecting pipe 4;
[0019] The foundation pit construction structure is provided with a ground-connected wall 1 and a crown beam 6. The ground-connected wall 1 is arranged around the underground structure 5. A full-length casing 11 is preset on the ground-connected wall 1 and the crown beam 6. A borehole is drilled on the foundation at the bottom end of the full-length casing 11, and the brine freezing pipe 2 is placed into the borehole of the foundation through the full-length casing 11.
[0020] Two full-length sleeves 11 are preset on each ground-connected wall 1 unit and crown beam 6 unit.
[0021] The full-length sleeve 11 is arranged in the middle of the ground-connected wall 1 and the crown beam 6 .
[0022] The diameter of the full-length sleeve 11 is 150 mm.
[0023] The length of the brine freezing pipe 2 covers the thickness of the pressure water layer.
[0024] Specifically, the above foundation pit construction structure with a freezing treatment system is implemented in the following manner:
[0025] 1) During normal construction of the ground-connected wall 1 structure, two full-length sleeves 11 with a diameter of 150 mm are reserved in the middle of the ground-connected wall 1 and the crown beam 6;
[0026] 2) After the ground-connected wall 1 reaches the designed strength, a core drill is used to drill a hole through the full-length casing 11 to the pressure water isolation depth;
[0027] 3) Place the full-length casing 11 of the brine freezing pipe 2 into the borehole to the depth of the pressurized water cutoff, so that the length of the brine freezing pipe 2 covers the thickness of the pressurized water layer, and each brine freezing pipe 2 is connected to the freezing station 3 through the connecting pipe 4 to form a freezing treatment system, and implement freezing treatment;
[0028] 4) After the freezing treatment is completed, the foundation pit is excavated and the underground structure 5 is constructed;
[0029] 5) After the underground structure 5 is completed and covered with soil, the brine freezing pipe 2 is recovered;
[0030] 6) Grouting is performed on the full-length casing 11 to complete the construction.
[0031] The above-mentioned specific implementation methods are used to explain the present invention and are only preferred embodiments of the present invention, rather than limiting the present invention. Any modifications, equivalent substitutions, improvements, etc. made to the present invention within the spirit of the present invention and the protection scope of the claims shall fall within the protection scope of the present invention.
Claims
1. A foundation pit construction structure with a freezing treatment system, characterized in that: The foundation pit construction structure has a freezing treatment system, which comprises a freezing station (3), a connecting pipe (4) and a plurality of brine freezing pipes (2); the brine freezing pipes (2) are connected to the freezing station (3) via the connecting pipe (4); The foundation pit construction structure is provided with a ground-connected wall (1) and a crown beam (6), wherein the ground-connected wall (1) is arranged around the underground structure (5); a through-length sleeve (11) is preset on the ground-connected wall (1) and the crown beam (6), a borehole is drilled on the foundation at the bottom end of the through-length sleeve (11), and the brine freezing pipe (2) is placed into the borehole of the foundation through the through-length sleeve (11).
2. The foundation pit construction structure with a freezing treatment system according to claim 1, characterized in that: Two full-length sleeves (11) are preset on each ground-connected wall (1) unit and / or crown beam (6) unit.
3. The foundation pit construction structure with a freezing treatment system according to claim 1 or 2, characterized in that: The full-length sleeve (11) is arranged in the middle of the ground-connected wall (1) and the crown beam (6).
4. The foundation pit construction structure with a freezing treatment system according to any one of claims 1 to 3, characterized in that: The diameter of the full-length sleeve (11) is 150 mm.
5. The foundation pit construction structure with a freezing treatment system according to claim 1, characterized in that: The length of the brine freezing pipe (2) covers the thickness of the pressure water layer.