Edge protection equipment for foundation pit construction
By designing the matching components of the sliding insert block and the extrusion spring, the rapid installation and disassembly of the foundation pit edge protection equipment is achieved, solving the complex problems of installation and disassembly in the prior art, and improving construction efficiency.
Patent Information
- Application Number
- CN202420651135.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing foundation pit edge protection equipment requires tools when installing and disassembling, which makes it more troublesome to arrange and remove on-site.
An installation component including a connecting plate, a sliding insert, an extrusion spring, a mating member, an auxiliary member and a supporting member is designed. Through the cooperation of the sliding insert and the insertion block, the extrusion spring is used to achieve quick connection and disassembly of the guardrail. The toggle lever and elastic strip are used for easy splicing and removal.
It realizes rapid installation and disassembly between guardrails, reduces the complexity and time of on-site operation and improves construction efficiency.
Smart Images

Figure CN222066382U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to edge protection equipment for foundation pit construction. Background Art
[0002] When constructing a foundation pit, it is generally necessary to set up corresponding protective structures at the edge of the foundation pit to prevent construction workers or outsiders from accidentally falling into the foundation pit.
[0003] Existing mechanisms for protecting the edge of foundation pits are generally composed of guardrails. Some protection mechanisms install multiple guardrails at certain intervals for protection. However, since there is no connection between the guardrails, the overall protection effect is not ideal. Therefore, most protection mechanisms now strengthen the protection of foundation pits by installing and fixing multiple guardrails together.
[0004] However, when the above method is used, when the existing independent guardrail is installed, the two panels on the corresponding sides of the guardrail are generally fixed and installed by bolts. In this way, corresponding tools are required to install and remove the bolts when installing and dismantling the guardrail later, which makes it more troublesome to arrange on site and dismantle the entire protective equipment. Utility Model Content
[0005] The utility model aims to provide an edge protection device for foundation pit construction, which can complete the rapid installation and disassembly between guardrails through the provided components, so that users can splice and dismantle the guardrails more conveniently and quickly on site.
[0006] To achieve the above-mentioned purpose, the utility model provides an edge protection device for foundation pit construction, including a guardrail body and an installation assembly;
[0007] The mounting assembly includes a connecting plate, a sliding block, an extrusion spring, a matching component, an auxiliary component and a supporting component; the connecting plate is rotatably connected to the guardrail body and is located on one side of the guardrail body, the sliding block is slidably connected to the connecting plate and is located on one side of the connecting plate, the two sides of the extrusion spring are respectively connected to the sliding block and the connecting plate, the matching component is connected to the guardrail body, the auxiliary component is connected to the connecting plate, and the supporting component is connected to the guardrail body.
[0008] Wherein, the mating component includes a mating plate and an insertion block, the mating plate is rotatably connected to the guardrail body and is located on one side of the guardrail body; the insertion block is fixedly connected to the mating plate and is located on one side of the mating plate.
[0009] Wherein, the auxiliary component includes a toggle rod and an elastic stop bar, the toggle rod is fixedly connected to the sliding block and is located on one side of the sliding block; the elastic stop bar is fixedly connected to the connecting plate and is located on one side of the connecting plate.
[0010] Among them, the supporting structure includes an extension frame, a support rod, a movable plate, a ground nail and a driving component, the extension frame is fixedly connected to the guardrail body and is located on one side of the guardrail body; the support rod is fixedly connected to the guardrail body and fixedly installed on one side of the extension frame; the movable plate is slidably connected to the extension frame and is located on one side of the extension frame; the ground nail is fixedly connected to the movable plate and passes through the extension frame; the driving component is connected to the movable plate.
[0011] Wherein, the driving component includes a driving screw and a rotating handle, the driving screw is threadedly connected to the movable plate and rotatably installed on one side of the extension frame; the rotating handle is fixedly connected to the driving screw and is located on one side of the driving screw.
[0012] The utility model discloses an edge protection device for foundation pit construction. The assembly of the guardrail bodies on both sides is completed by the cooperation of the sliding plug block on the connecting plate and the insertion block on the matching plate. During the assembly, the user only needs to make the insertion block of the matching plate cooperate with the insertion groove on the connecting plate through the guidance of the elastic stop bar. After the insertion block is completed, the sliding plug block can complete the limit locking of the insertion block under the action of the extrusion spring, so that the connection of the corresponding two guardrail bodies can be completed. Subsequently, the corresponding two guardrail bodies can be continuously spliced in the above manner, so as to form a fence that can protect the edge of the foundation pit. When the user needs to disassemble two adjacent guardrail bodies, the sliding plug block can be driven downward by the toggle rod by squeezing the toggle rod, and then the side can be selected according to the actual situation or the insertion block can be directly pulled out from the insertion groove of the connecting plate, so that the rapid disassembly of the two guardrail bodies can be completed, and the rapid installation and disassembly between the guardrails can be completed by the provided components, so that the user can splice and dismantle the guardrails more conveniently and quickly on site. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0014] Figure 1 It is a schematic diagram of the overall structure of the edge protection equipment for foundation pit construction according to the first embodiment of the utility model.
[0015] Figure 2It is a schematic diagram of the installation structure of the toggle lever of the first embodiment of the utility model.
[0016] Figure 3 It is a schematic structural diagram of the cooperation between the sliding plug block and the insert block in the first embodiment of the utility model.
[0017] Figure 4 The first embodiment of the utility model Figure 3 Enlarged view of point A.
[0018] Figure 5 It is a schematic diagram of the overall structure of the edge protection equipment for foundation pit construction according to the second embodiment of the utility model.
[0019] In the figure: 101-guardrail body, 102-connecting plate, 103-sliding plug, 104-extrusion spring, 105-matching plate, 106-insertion block, 107-toggle rod, 108-elastic stop bar, 201-extension frame, 202-support rod, 203-movable plate, 204-ground nail, 205-driving screw, 206-rotating handle. DETAILED DESCRIPTION
[0020] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0021] The first embodiment of the present application is:
[0022] See also Figures 1 to 4 ,in Figure 1 It is a schematic diagram of the overall structure of the edge protection equipment used for foundation pit construction. Figure 2 1 is a schematic diagram of the installation structure of the toggle lever 107. Figure 3 is a schematic diagram of the structure of the cooperation between the sliding block 103 and the inserting block 106, Figure 4 yes Figure 3 Enlarged view of point A.
[0023] The utility model provides an edge protection device for foundation pit construction: it includes a guardrail body 101 and an installation component, the installation component includes a connecting plate 102, a sliding plug block 103, an extrusion spring 104, a matching component, an auxiliary component and a supporting component, the matching component includes a matching plate 105 and an insertion block 106, and the auxiliary component includes a toggle rod 107 and an elastic retaining strip 108. The above-mentioned scheme solves the problem that when the existing independent guardrail is installed, the two panels on the corresponding sides of the guardrail are generally fixed and installed by bolts, so when the guardrail is installed and disassembled later, corresponding tools are needed to install and disassemble the bolts, which makes it more troublesome to arrange on site and dismantle the entire protective equipment.
[0024] In this embodiment, the guardrail body 101 is an existing guardrail for shielding and protection, and the guardrail body 101 is mainly composed of a corresponding frame and railings. Since the guardrail body 101 is a very mature existing technology, this solution will not elaborate on its specific structure.
[0025] The connecting plate 102 is rotatably connected to the guardrail body 101 and is located on one side of the guardrail body 101. The sliding plug 103 is slidably connected to the connecting plate 102 and is located on one side of the connecting plate 102. Both sides of the extrusion spring 104 are respectively connected to the sliding plug 103 and the connecting plate 102. The matching member is connected to the guardrail body 101, the auxiliary member is connected to the connecting plate 102, the supporting member is connected to the guardrail body 101, and the matching plate 105 is rotatably connected to the guardrail body 101 and is located on one side of the guardrail body 101. The insertion block 106 is fixedly connected to the matching plate 105 and is located on one side of the matching plate 105. The connecting plate 102 and the matching plate 105 are respectively rotated on both sides of the guardrail body 101. A plurality of groups of sliding blocks 103 are provided on the connecting plate 102. The connecting plate 102 is provided with an insertion groove for matching the insertion block 106 on the matching plate 105 on the outer side of each group of sliding blocks 103. The side of the insertion groove on the connecting plate 102 is in an open state, so that the user can directly complete the matching plate 105 from the side when disassembling the two groups of the guardrail bodies 101. The insertion block 106 is provided with a through groove matching the sliding block 103 in the middle, and the extrusion spring 104 is provided between the bottom of the sliding block 103 and the bottom wall of the sliding groove for sliding the sliding block 103 provided on the connecting plate 102. When the user splices the two groups of the guardrail bodies 101, he only needs to match the insertion block 106 on the matching plate 105 on the side of one group of the guardrail bodies 101 with the corresponding insertion groove on the connecting plate 102 on the side of the other group of the guardrail bodies 101. The extrusion of the insertion block 106 will cause the sliding block 103 to squeeze the The extrusion spring 104 is deformed, causing the sliding block 103 to move downward. When the insertion block 106 is fully matched with the insertion groove of the connecting plate 102, the sliding block 103 will be reset under the action of the extrusion spring 104, thereby allowing the sliding block 103 to match with the through groove provided on the insertion block 106, so that the splicing of the matching plate 105 and the connecting plate 102 can be completed. After the splicing is completed, the guardrail bodies 101 on both sides can also be adjusted in position through corresponding rotation, so that the placement angle of the corresponding guardrail body 101 after the entire splicing can be freely adjusted.
[0026] Secondly, the toggle rod 107 is fixedly connected to the sliding block 103 and is located on one side of the sliding block 103; the elastic strip 108 is fixedly connected to the connecting plate 102 and is located on one side of the connecting plate 102, and the toggle rod 107 is fixed to all the outer bosses of the sliding blocks 103, so that the user can press the toggle rod 107 to drive the sliding block 103 to move downward, thereby facilitating the extraction of the insertion block 106 of the matching plate 105 from the insertion slot of the connecting plate 102, and the elastic strip 108 is arranged on one side of the opening of the insertion slot of the connecting plate 102 On the side, the elastic stop bar 108 cooperates with the side of the unopened side of the insertion groove on the connecting plate 102 to guide the insertion block 106 more stably. When the user needs to remove the insertion block 106 from the side of the insertion groove, since the elastic stop bar 108 is elastic, it will not affect the side removal of the insertion block 106 when the insertion block 106 is subjected to a certain external force. In this way, not only can the insertion block 106 be guided to make the cooperation between the insertion block 106 and the sliding block 103 more convenient, but also it will not cause excessive interference to the disassembly of the side of the insertion block 106.
[0027] When the edge protection device for foundation pit construction of the present embodiment is in use, the assembly of the guardrail bodies 101 on both sides is completed by the cooperation of the sliding plug block 103 on the connecting plate 102 and the insertion block 106 on the matching plate 105. When assembling, the user only needs to cooperate the insertion block 106 of the matching plate 105 with the insertion groove on the connecting plate 102 through the guidance of the elastic stop bar 108. After the insertion block 106 is matched, the sliding plug block 103 can complete the limit locking of the insertion block 106 under the action of the extrusion spring 104, so that the connection of the corresponding two guardrail bodies 101 can be completed. The two guardrail bodies 101 can be continuously spliced in the above manner to form a fence that can protect the edge of the foundation pit. When the user needs to disassemble two adjacent guardrail bodies 101, the user can squeeze the toggle rod 107 to drive the sliding plug block 103 to move downward through the toggle rod 107, and then select the side according to the actual situation or directly pull the insertion block 106 out of the insertion groove of the connecting plate 102. In this way, the two guardrail bodies 101 can be quickly disassembled, and the guardrails can be quickly installed and disassembled through the provided components, making it more convenient and quick for users to splice and dismantle the guardrails on site.
[0028] Second embodiment:
[0029] See also Figure 5 , Figure 5This is a schematic diagram of the overall structure of the edge protection equipment for foundation pit construction of the second embodiment. The support structure provided by the utility model includes an extension frame 201, a support rod 202, a movable plate 203, a ground nail 204 and a driving component, and the driving component includes a driving screw 205 and a rotating handle 206.
[0030] Among them, the extension frame 201 is fixedly connected to the guardrail body 101 and is located on one side of the guardrail body 101; the support rod 202 is fixedly connected to the guardrail body 101 and fixedly installed on one side of the extension frame 201; the moving plate 203 is slidably connected to the extension frame 201 and is located on one side of the extension frame 201; the ground nail 204 is fixedly connected to the moving plate 203 and passes through the extension frame 201; the driving component is connected to the moving plate 203, and the driving screw 205 is threadedly connected to the moving plate 203 and rotatably installed on one side of the extension frame 201; the rotating handle 206 is fixedly connected to the driving screw 205 and is located on one side of the driving screw 205, the extension frame 201 is fixed to the bottom of the guardrail body 101, and the extension frame 201 and the guardrail body 101 are connected by the support rod 2 02 for reinforcement support, the movable plate 203 is slidably installed on the connecting boss provided on the extension frame 201, and two ground nails 204 are fixed at the bottom of the movable plate 203, and the movable plate 203 is also provided with a threaded hole matching the driving screw 205, and the driving screw 205 is fixed with the rotating handle on the top, so that the user can drive the driving screw 205 to rotate by shaking the rotating handle, and then drive the movable plate 203 and the ground nail 204 to move by the driving screw 205, so that the ground nail 204 can be inserted into the soil, and when disassembling, the movable plate 203 can also be driven to pull out the ground nail 204 by rotating the rotating handle 206, so that after the guardrail body 101 is installed, the protection strength of the entire protection mechanism can be strengthened by driving the provided extension frame 201 and the ground nail 204.
[0031] When using the edge protection equipment for foundation pit construction of this embodiment, the driving screw 205 can be driven to rotate by the rotating handle 206, and then the movable plate 203 and the ground nail 204 can be driven to move by the driving screw 205, thereby completing the driving of the ground nail 204, so that the guardrail body 101 can be placed more stably on the ground after splicing is completed, thereby enhancing the protection effect of the entire mechanism and greatly enhancing the practicality of the entire device.
[0032] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. An edge protection device for foundation pit construction, comprising a guardrail body, characterized in that: Also included are mounting components; The mounting assembly includes a connecting plate, a sliding block, an extrusion spring, a matching component, an auxiliary component and a supporting component; the connecting plate is rotatably connected to the guardrail body and is located on one side of the guardrail body, the sliding block is slidably connected to the connecting plate and is located on one side of the connecting plate, the two sides of the extrusion spring are respectively connected to the sliding block and the connecting plate, the matching component is connected to the guardrail body, the auxiliary component is connected to the connecting plate, and the supporting component is connected to the guardrail body.
2. The edge protection device for foundation pit construction according to claim 1, characterized in that: The matching component includes a matching plate and an insertion block. The matching plate is rotatably connected to the guardrail body and is located on one side of the guardrail body; the insertion block is fixedly connected to the matching plate and is located on one side of the matching plate.
3. The edge protection device for foundation pit construction according to claim 1, characterized in that: The auxiliary component includes a toggle rod and an elastic stop bar. The toggle rod is fixedly connected to the sliding block and is located on one side of the sliding block; the elastic stop bar is fixedly connected to the connecting plate and is located on one side of the connecting plate.
4. The edge protection device for foundation pit construction according to claim 1, characterized in that: The supporting structure includes an extension frame, a support rod, a movable plate, a ground nail and a driving component. The extension frame is fixedly connected to the guardrail body and is located on one side of the guardrail body; the support rod is fixedly connected to the guardrail body and fixedly installed on one side of the extension frame; the movable plate is slidably connected to the extension frame and is located on one side of the extension frame; the ground nail is fixedly connected to the movable plate and passes through the extension frame; the driving component is connected to the movable plate.
5. The edge protection device for foundation pit construction according to claim 4, characterized in that: The driving component includes a driving screw and a rotating handle. The driving screw is threadedly connected to the movable plate and is rotatably mounted on one side of the extension frame. The rotating handle is fixedly connected to the driving screw and is located on one side of the driving screw.
Citation Information
Cited By
A house building foundation deep foundation pit excavation construction protection structure
CN224859338U