High-low span supporting structure near foundation pit support

By adopting a high first and then low construction method and cement soil reinforcement dividing line in the foundation pit enclosure structure, and using reaction piers and steel pipes to support it, the problem of high construction costs across the dividing parts in traditional construction methods is solved, and the problem of high and low construction costs is achieved. Faster and economical construction progress and prevents flooring and cracking.

CN222083570UActive Publication Date: 2024-11-29CHINA CONSTR EIGHTH ENG DIV CORP LTD ZHEJIANG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420196363.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-11-29
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

When the traditional foundation pit enclosure structure is reset to the enclosure structure at high and low cross-border parts, the construction time cost and resource investment are large, and the economy is poor.

Method used

The construction method of high first and low first is adopted, and the cement soil reinforcement dividing line is constructed through the high and low spans, and the reaction piers and steel pipe support are set up using the high span bottom plate to ensure that the low span enclosure structure does not deform and reduce the investment cost of the support structure.

Benefits of technology

The construction progress of high and low cross-construction has been accelerated, resource investment has been reduced, and the base plate has been prevented from settled and cracked by reinforcement of cement soil mixing piles, improving construction efficiency and economicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083570U_ABST
    Figure CN222083570U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-low span support structure near a foundation pit support, which comprises a latticed column, a horizontal concrete support is fixed at the top end of the latticed column, a phi 609 steel pipe is arranged below the horizontal concrete support, the phi 609 steel pipe is fixed on the latticed column, an H-shaped steel is fixed at the left end of the phi 609 steel pipe, and an H-shaped steel is fixed at the right end of the phi 609 steel pipe. A concrete counter-force pier is fixed to the right end of the phi 609 steel pipe, a high-span bottom plate is fixed to the lower portion of the concrete counter-force pier, a low-span bottom plate is fixed to the left side of the high-span bottom plate, cement mixing piles for reinforcement are fixed to the lower portion of the low-span bottom plate, a force transmission belt is fixed to the left side of the low-span bottom plate, and passive soil for reinforcement is fixed to the lower portion of the force transmission belt. Earth excavation and bottom plate construction are carried out in a high-to-low mode, so that bottom sealing of the whole bottom plate is accelerated, cement-soil mixing pile reinforcement is carried out at the boundary of the high span and the low span in advance, and cracking caused by water and soil loss at the bottom of the high-span bottom plate when the low-span bottom plate is excavated is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, in particular to a high and low span supporting structure for foundation pit enclosure. Background Art

[0002] The foundation pit retaining structure mainly bears the water pressure and soil pressure generated by the foundation pit excavation unloading, and transmits this pressure to the support. It is a temporary retaining wall structure for stabilizing the foundation pit. When there is a high-low span structure in the temporary foundation pit retaining structure, the traditional construction method is to re-set the retaining structure at the boundary of the high and low spans, re-support the support structure and connect it to the retaining piles before the low span excavation, and then carry out the low span excavation. Although this method is safe and reliable, the actual construction time cost, manpower, machinery and material cost investment are large, and the economic efficiency is poor.

[0003] Therefore, a high-and-low span supporting structure for foundation pit protection is designed, and the construction is carried out in a high-first-lower manner. During the construction of the high and low spans, the high span is constructed through the high and low span parts. The high span is reinforced with cement soil at the dividing line, and the reaction pier is set on the high span bottom plate. Steel pipe supports are set to support the low span retaining structure to ensure that the low span excavation and retaining is not deformed. One end of the low span support is supported on the reaction pier of the high span bottom plate to transmit force, thereby reducing the investment cost of the low span support structure, speeding up the construction of the high and low spans, and reducing resource investment. Utility Model Content

[0004] The utility model aims to provide a high and low span supporting structure for foundation pit enclosure to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: a high-low span support structure for foundation pit enclosure, comprising lattice columns,

[0006] According to the above technical scheme, a horizontal concrete support is fixed to the top of the lattice column, a φ609 steel pipe is arranged below the horizontal concrete support, the φ609 steel pipe is fixed on the lattice column, an H-shaped steel is fixed to the left end of the φ609 steel pipe, a concrete reaction pier is fixed to the right end of the φ609 steel pipe, a high-span bottom plate is fixed below the concrete reaction pier, a low-span bottom plate is fixed to the left side of the high-span bottom plate, the low-span bottom plate is fixed on the lattice column and is located below the φ609 steel pipe, a cement mixing pile reinforcement is fixed below the low-span bottom plate, a force transmission belt is fixed to the left side of the low-span bottom plate, a cement mixing pile reinforcement (passive soil reinforcement) is fixed below the force transmission belt, a bored cast-in-place pile is fixed to the left side of the H-shaped steel, the cement mixing pile reinforcement (passive soil reinforcement) and the force transmission belt, and a water-stop curtain is fixed to the left side of the bored cast-in-place pile, and a 1:1 slope is fixed to the left side of the top of the water-stop curtain;

[0007] The utility model further illustrates that cement soil mixing piles are reinforced in advance at the boundary between the high-span bottom plate and the low-span bottom plate to prevent soil and water loss at the bottom of the high-span bottom plate when the low-span bottom plate is excavated, causing settlement and cracking of the high-span bottom plate.

[0008] Compared with the prior art, the beneficial effects achieved by the utility model are as follows: the utility model uses the bottom plate reaction pier as the fixed end of the bottom plate support, and carries out earth excavation and bottom plate construction in a high-first-lower manner, thereby accelerating the bottom sealing of the overall bottom plate, and cement-soil mixing piles are reinforced in advance at the boundary between the high and low spans to prevent soil and water loss at the bottom of the high-span bottom plate when the low-span bottom plate is excavated, causing settlement and cracking of the high-span bottom plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0010] Figure 1 It is a schematic diagram of the overall front cross-sectional structure of the utility model;

[0011] In the figure: 001, lattice column; 002, horizontal concrete support; 003, concrete reaction pier; 004, high-span base plate; 005, φ609 steel pipe; 006, cement mixing pile reinforcement; 007, low-span base plate; 008, passive soil reinforcement; 009, bored piles; 010, water-stop curtain; 011, force transfer belt; 012, H-shaped steel; 013, 1:1 slope. DETAILED DESCRIPTION

[0012] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0013] See also Figure 1The utility model provides a technical solution: a high-low span 1 supporting structure for foundation pit enclosure, including a lattice column 001, a horizontal concrete support 002 is fixed on the top of the lattice column 001, a φ609 steel pipe 005 is arranged below the horizontal concrete support 002, the φ609 steel pipe 005 is fixed on the lattice column 001, an H-shaped steel 012 is fixed to the left end of the φ609 steel pipe 005, a concrete reaction pier 003 is fixed to the right end of the φ609 steel pipe 005, a high-span bottom plate 004 is fixed below the concrete reaction pier 003, and the left side of the high-span bottom plate 004 is fixed A low-span base plate 007 is provided, which is fixed on the lattice column 001 and located below the φ609 steel pipe 005. A cement mixing pile reinforcement 006 is fixed below the low-span base plate 007. A force transfer belt 011 is fixed on the left side of the low-span base plate 007. Passive soil reinforcement 008 is fixed below the force transfer belt 011. Bored cast-in-place piles 009 are fixed on the left side of the H-shaped steel 012, the passive soil reinforcement 008 and the force transfer belt 011. A water-stop curtain 010 is fixed on the left side of the bored cast-in-place piles 009. A 1:1 slope 013 is fixed on the left side of the top of the water-stop curtain 010.

[0014] Working principle: After the foundation pit support construction is completed, the workers will carry out passive soil reinforcement 008 on the passive area, and carry out cement mixing pile reinforcement 006 at the boundary between the high and low spans. The reinforcement area is from the bottom of the high span bottom plate 004 to 5m below. Then the construction of the horizontal concrete support 002 is completed. After the concrete support reaches the designed strength, the earthwork is excavated. After the earthwork is excavated to the bottom of the high span bottom plate 004, the high span bottom plate 004 is constructed. Concrete reaction pier 003 is constructed on the high span bottom plate 004. The concrete reaction pier 003 and the high span bottom plate 004 are poured at the same time. The concrete reaction pier 003 reaches After the design strength is reached, steel pipe supports φ609 steel pipes 005 are installed, and then the low-span bottom plate 007 is excavated, and the force transmission belt 011 is constructed simultaneously. After the construction of the low-span bottom plate 007 is completed and the design strength is reached, the support is removed to carry out the next step of vertical component construction. In this way, by using the bottom plate reaction pier as the fixed end of the bottom plate support, the earth excavation and bottom plate construction are carried out in a high-to-low manner, which speeds up the bottom sealing of the overall bottom plate, and cement mixing pile reinforcement 006 is carried out in advance at the boundary between high and low spans to prevent soil erosion at the bottom of the high-span bottom plate 004 when the low-span bottom plate 007 is excavated, causing the high-span bottom plate 004 to settle and crack.

[0015] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0016] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A high-low span support structure for foundation pit enclosure, comprising a lattice column (001), characterized in that: A horizontal concrete support (002) is fixed to the top of the lattice column (001), a φ609 steel pipe (005) is arranged below the horizontal concrete support (002), the φ609 steel pipe (005) is fixed on the lattice column (001), an H-shaped steel (012) is fixed to the left end of the φ609 steel pipe (005), a high-span bottom plate (004) is fixed below the right end of the φ609 steel pipe (005), a low-span bottom plate (007) is fixed to the left side of the high-span bottom plate (004), the low-span bottom plate (007) is fixed on the lattice column (001) and is located below the φ609 steel pipe (005), a power transmission belt (011) is fixed to the left side of the low-span bottom plate (007), and a passive soil reinforcement (008) is fixed below the power transmission belt (011).

2. The high and low span support structure for foundation pit protection according to claim 1 is characterized in that: A concrete reaction pier (003) is fixed to the right end of the φ609 steel pipe (005), and the concrete reaction pier (003) is fixed on the high-span bottom plate (004).

3. The high and low span support structure for foundation pit protection according to claim 2 is characterized in that: The boundary between the high-span bottom plate (004) and the low-span bottom plate (007) is reinforced with cement mixing piles (006) in advance.

4. The high and low span support structure for foundation pit protection according to claim 3 is characterized in that: A bored cast-in-place pile (009) is fixed on the left side of the H-shaped steel (012), the passive soil reinforcement (008) and the force transmission belt (011).

5. The high and low span support structure for foundation pit protection according to claim 4 is characterized in that: A water-stop curtain (010) is fixed on the left side of the bored pile (009), and a 1:1 slope (013) is fixed on the left side of the top of the water-stop curtain (010).