Underground wall structure capable of blocking muddy water

By setting up a reconstituted bamboo frame wall filled with high-plasticity clay and pouring concrete before pipe jacking construction, and applying counterweight to form a mud film, the problems of water and sand inrush in sandy soil areas with high pressure head were solved, achieving economical, efficient and safe construction.

CN222083598UActive Publication Date: 2024-11-29CHINA RAILWAY 24TH BUREAU GROUP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420770045.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2024-11-29
Estimated Expiration
2034-04-15

AI Technical Summary

Technical Problem

In sandy soil areas with high pressure head, the risk of water and sand inrush during pipe jacking is difficult to avoid effectively, and existing soil improvement methods are insufficient in terms of economy and effectiveness.

Method used

The structure uses a hollow frame wall made of reconstituted bamboo, filled with highly plastic clay, and surrounded by fine stone concrete. A counterweight is applied to form a mud film to prevent water and soil from flowing into the well.

Benefits of technology

This approach enables small-scale soil replacement, reduces construction investment, effectively prevents the risks of water and sand inrush, and ensures construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083598U_ABST
    Figure CN222083598U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, in particular to an underground wall structure capable of blocking muddy water, which comprises a hollow frame wall structure made of recombined bamboos, high-plasticity clay is filled inside the hollow frame wall structure, and fine aggregate concrete is poured on the periphery of the frame wall structure. The underground wall has the advantages that the soil body is replaced within a small range, after the jacking pipe penetrates through the underground wall, under the action of the balance weight, a jacking pipe pipeline is tightly attached to high-plasticity clay, a mud film is formed, water and soil outside a reinforced area can be prevented from flowing into a well, and therefore the risks of water gushing and sand gushing are avoided; and the construction investment cost is low, and the risks of water gushing and sand gushing are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to an underground wall structure capable of blocking mud and water. Background Art

[0002] With the rapid development of urbanization, the growing population has put forward higher demands on the infrastructure of most cities in my country. The tap water supply pipeline project is one of the more common projects in municipal engineering, and its construction quality is related to the drinking water problem of people's livelihood. The construction of the jacking project is to design two foundation pits at the starting point and receiving point of the pipeline, and the foundation pit at the receiving point of the pipeline adopts the construction method of sinking the caisson. In water-rich sandy soil areas, there is a general risk of water and sand gushing when the jacking pipe enters the cave. In general, the designer improves the soil in the entrance area during the design, and most of them use deep mixing piles to reinforce the soil. This method has a certain effect in actual engineering. However, when the pipeline is located in the confined water layer, under the action of high confined water head, the water and soil outside the reinforcement area will flow along the gap between the pipe wall and the soil, and flow into the well when the jacking pipe enters the cave. If the water cannot be stopped, it will bring huge economic losses.

[0003] In summary, when the pipe is inserted into the cave in the sandy soil area with high pressure head, the risk of water and sand gushing cannot be completely avoided by unilateral soil improvement. The key problem is that sandy soil will flow with water when it encounters water, and there is no adhesion between the soil bodies of this type. To solve this problem, the soil body is essentially replaced, but the buried position of the pipe is generally deep, and large-scale soil replacement is very uneconomical. Therefore, the development of an underground wall structure that can block mud and water is the key to solving the above technical problems. Summary of the invention

[0004] The purpose of the utility model is to provide an underground wall structure that can block mud and water in accordance with the above-mentioned deficiencies of the prior art. The soil replacement in a small range is achieved by filling a reorganized bamboo frame wall with high plasticity clay inside. When the jacking pipe passes through this underground wall, under the action of the counterweight, the jacking pipe fits tightly with the high plasticity clay and forms a mud film, which can prevent water and soil outside the reinforcement area from flowing into the well, thereby avoiding the risk of water and sand gushing.

[0005] The purpose of this utility model is achieved by the following technical solutions:

[0006] An underground wall structure capable of blocking mud and water is arranged in front of a reserved hole in a caisson, and is characterized in that the underground wall structure comprises a hollow frame wall structure composed of reconstituted bamboo, the interior of the hollow frame wall structure is filled with high-plasticity clay, and the periphery of the frame wall structure is poured with fine stone concrete.

[0007] A counterweight is arranged above the high plasticity clay.

[0008] A plurality of the counterweights are arranged at intervals above the high plasticity clay.

[0009] The depth of the underground wall structure is a certain distance below the bottom of the reserved opening of the caisson.

[0010] The advantages of the utility model are: the soil is replaced in a small range, and when the jacking pipe passes through this underground wall, under the action of the counterweight, the jacking pipe fits tightly with the high-plastic clay and forms a mud film, which can prevent water and soil outside the reinforcement area from flowing into the well, thereby avoiding the risk of water and sand gushing; the construction investment cost is relatively small, and the risk of water and sand gushing is avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 This is a layout elevation diagram of the utility model;

[0012] Figure 2 It is the layout plan of the utility model. DETAILED DESCRIPTION

[0013] The following is a further detailed description of the features of the present invention and other related features through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:

[0014] like Figure 1-2 As shown, the marks 1-6 in the figure respectively represent: reconstituted bamboo 1, high plasticity clay 2, caisson 3, reserved holes 4, fine stone concrete 5, counterweight 6.

[0015] Example: Figure 1 and Figure 2 As shown, the main body of the underground wall structure capable of blocking mud and water in this embodiment is a hollow frame wall structure made of reconstituted bamboo, which has a cavity inside, and the thickness of the reconstituted bamboo walls on both sides is not less than 200mm. The interior is filled with high plasticity clay 2, and the filling width is 1-2m; at this time, the reconstituted bamboo is lightweight and has good mechanical and physical properties. It has a certain degree of self-sustainability and can restrain the high plasticity clay 2. The depth of the underground wall is not less than 3m below the bottom of the reserved hole 4 of the caisson 3, and the width is 6-8m. The wall body of the underground wall is located in front of the reserved hole 4 of the caisson 3, close to the caisson 3. During construction, the prefabricated underground wall is placed in the groove section completed in advance, and then low-grade fine stone concrete 5 with water-stopping effect is poured around the prefabricated underground wall. After the pile is formed, several counterweights 6 arranged at intervals are loaded on the top of the underground wall.

[0016] When this embodiment is in use, an underground wall is built in front of the reserved hole 4 of the caisson 3 to replace the soil at this position. After the jacking pipe passes through this underground wall, under the action of the counterweight 6, the jacking pipe and the filled high-plastic clay 2 are tightly attached to form a mud film, which can prevent water and soil outside the reinforcement area from flowing into the well, thereby avoiding the risk of water and sand gushing.

[0017] Although the above embodiments have described the concepts and embodiments of the purpose of the utility model in detail with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and modifications can still be made to the utility model without departing from the scope of the claims, so they are not described one by one here.

Claims

1. An underground wall structure capable of blocking mud and water, arranged in front of a reserved hole in a caisson, characterized in that: The underground wall structure comprises a hollow frame wall structure made of reconstituted bamboo, the interior of the hollow frame wall structure is filled with high-plasticity clay, and the periphery of the frame wall structure is poured with fine stone concrete.

2. The underground wall structure capable of blocking mud and water according to claim 1, characterized in that: A counterweight is arranged above the high plasticity clay.

3. The underground wall structure capable of blocking mud and water according to claim 2, characterized in that: A plurality of the counterweights are arranged at intervals above the high plasticity clay.

4. The underground wall structure capable of blocking mud and water according to claim 1, characterized in that: The depth of the underground wall structure is a certain distance below the bottom of the reserved hole of the caisson.

Citation Information

Cited By

  • Construction method of underground wall capable of blocking muddy water

    CN118065346A

  • A method of constructing a barrier to mud and water underground wall

    CN118065346B