Connecting structure between reinforced concrete prefabricated walls and box-shaped house

By setting connection grooves and steel rings on the wall of the box-shaped house, a casting space is formed and the fixing and welding of the intermediate connecting steel rings and inserts is solved, the strength and construction of the wall connection of the box-shaped house in prefabricated buildings are solved. Efficiency issues achieve an efficient connection structure.

CN222083810UActive Publication Date: 2024-11-29GUANGDONG CAO-GENHOUSE CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323499448.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-11-29
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

In prefabricated buildings, how to conveniently connect the walls of multiple box-shaped house main bodies to ensure the connection strength and improve construction efficiency, especially during the construction process of high-rise buildings.

Method used

The connecting structure between the reinforced concrete prefabricated walls is adopted. By setting connection grooves and steel rings on the wall, a casting space is formed, and the intermediate connecting steel rings and inserts are used for fixing and welding to ensure strong connection between the walls. .

Benefits of technology

It realizes the simplicity of construction and the convenience of operation, while ensuring the connection strength of box-shaped houses, improving the construction efficiency and overall strength of prefabricated buildings, and avoiding the complexity of traditional connection methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083810U_ABST
    Figure CN222083810U_ABST
Patent Text Reader

Abstract

The connecting structure between the reinforced concrete prefabricated walls comprises a first wall body and a second wall body, a first connecting groove is formed in the first wall body, a second connecting groove is formed in the second wall body, and the second connecting groove is used for being correspondingly spliced with the first connecting groove to form a pouring space used for pouring concrete. The first connecting groove is provided with a plurality of first connecting steel bar rings, first vertical inserting holes are formed between the first connecting steel bar rings and the first wall body, the second connecting groove is provided with a plurality of second connecting steel bar rings, and second vertical inserting holes are formed between the second connecting steel bar rings and the second wall body. Middle connecting steel bar rings which are connected to the corresponding first connecting steel bar rings and the second connecting steel bar rings in a bridging mode are arranged in the pouring space, and first joint bars are connected with the middle connecting steel bar rings and the first vertical inserting holes in a penetrating mode. The second joint bars penetrate through the middle connecting steel bar rings and the second vertical inserting holes. According to the box-shaped house, the connecting pain point that a traditional box-shaped house body cannot or can only adopt a complex structure during splicing is effectively overcome.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present application relates to the technical field of prefabricated buildings, and in particular to a connection structure between reinforced concrete prefabricated walls and a box-shaped house. [Background technology]

[0002] With the continuous improvement of economic level and the continuous development of society, different forms of buildings such as apartments, homestays and villas have emerged according to people's living environment needs. In the field of prefabricated construction industry, in order to effectively build buildings such as apartments, homestays and villas to meet people's living needs, box-shaped prefabricated assembled houses have emerged. The box-shaped house body is prefabricated in the factory, and then multiple box-shaped house bodies are assembled and connected at the construction site to build apartments, homestays and villas. However, when building high-rise buildings, how to facilitate the wall connection construction between multiple box-shaped house bodies and ensure the connection strength is a problem that practitioners in the field of prefabricated construction need to effectively overcome. [Utility Model Content]

[0003] In order to ensure the wall connection strength between the main bodies of the box-shaped house and facilitate the construction workers to construct the connection, the present application provides a connection structure between reinforced concrete prefabricated walls and a box-shaped house using the connection structure between reinforced concrete prefabricated walls.

[0004] This application is implemented by the following technical solutions:

[0005] A connection structure between reinforced concrete prefabricated walls, comprising a first wall and a second wall, wherein the first wall is provided with a first connection groove extending vertically, and the second wall is provided with a second connection groove extending vertically, the second connection groove is used to correspond to the first connection groove and be spliced ​​to form a pouring space for pouring concrete, the first connection groove is provided with a plurality of first connection steel bar rings distributed vertically and fixedly connected to the first wall, a first vertical plug hole is formed between the first connection steel bar ring and the first wall, the second connection groove is provided with a plurality of second connection steel bar rings distributed vertically and fixedly connected to the second wall and corresponding to the plurality of first connection steel bar rings, a second vertical plug hole is formed between the second connection steel bar ring and the second wall, an intermediate connection steel bar ring is provided in the pouring space and is bridged over the corresponding first and second connection steel bar rings, the intermediate connection steel bar ring and the first vertical plug hole are connected by a first inserted bar, and the intermediate connection steel bar ring and the second vertical plug hole are connected by a second inserted bar.

[0006] In the connection structure between the reinforced concrete prefabricated walls as described above, the first dowel bar is fixedly connected to the middle connecting steel bar ring.

[0007] In the connection structure between the reinforced concrete prefabricated walls as described above, the first dowel bar is fixed to the middle connecting steel bar ring by welding.

[0008] In the connection structure between reinforced concrete prefabricated walls as described above, the first connection groove is arranged on the end or side of the first wall; the second connection groove is arranged on the end or side of the second wall.

[0009] In the connection structure between reinforced concrete prefabricated walls as described above, the middle connecting steel bar ring is located above the corresponding first connecting steel bar ring and the second connecting steel bar ring.

[0010] In the connection structure between the reinforced concrete prefabricated walls as described above, a third dowel bar located outside the first vertical insertion hole and the second vertical insertion hole is provided in the casting space, and the third dowel bar is fixedly connected to the middle connecting steel bar ring.

[0011] The present application also provides a box-shaped house, comprising a connection structure between the reinforced concrete prefabricated walls as described above.

[0012] The present application also provides a method for constructing a connection structure between reinforced concrete prefabricated walls, comprising the following steps:

[0013] Splicing: Splicing the first connecting groove of the first wall and the second connecting groove of the second wall to form a casting space, and making the first connecting steel bar ring on the first connecting groove and the second connecting steel bar ring on the second connecting groove corresponding to each other, forming a first vertical plug hole between the first connecting steel bar ring and the first wall, and forming a second vertical plug hole between the second connecting steel bar ring and the second wall;

[0014] Inserting reinforcement: moving the middle connecting reinforcement ring to a position spanning the corresponding first connecting reinforcement ring and the second connecting reinforcement ring, and making the first inserted reinforcement pass through the first vertical insertion hole and the middle connecting reinforcement ring, and making the second inserted reinforcement pass through the second vertical insertion hole and the middle connecting reinforcement ring;

[0015] Pouring: Pouring concrete in the pouring space.

[0016] The method for constructing a connection structure between prefabricated reinforced concrete walls as described above further includes the following steps before the splicing step:

[0017] Pre-installation: placing the intermediate connecting steel bar ring on the first connecting steel bar ring, and then passing the first dowel bar through the intermediate connecting steel bar ring and the first vertical insertion hole, and fixing the first dowel bar with the intermediate connecting steel bar ring;

[0018] The step of inserting the reinforcing bars also includes the following steps:

[0019] The first inserted reinforcing bar inserted into the first vertical insertion hole is rotated to move the middle connecting reinforcing steel ring to a position spanning the corresponding first connecting reinforcing steel ring and the second connecting reinforcing steel ring.

[0020] The method for constructing a connection structure between prefabricated reinforced concrete walls as described above, in the step of inserting reinforcement, comprises the following steps:

[0021] The middle connecting steel bar ring is fixed on the third inserted bar outside the first vertical insertion hole and the second vertical insertion hole, and then the third inserted bar together with the middle connecting steel bar ring is inserted into the casting space and translated to move the middle connecting steel bar ring to a position bridging the corresponding first connecting steel bar ring and the second connecting steel bar ring.

[0022] Compared with the prior art, this application has the following advantages:

[0023] 1. The present application forms a concrete pouring space between the first wall and the second wall by splicing the first connecting groove and the second connecting groove. At the same time, a first connecting steel bar ring, a second connecting steel bar ring, an intermediate connecting steel bar ring spanning the corresponding first connecting steel bar ring and the second connecting steel bar ring, a first dowel bar passing through the intermediate connecting steel bar ring and the first connecting steel bar ring, and a second dowel bar passing through the intermediate connecting steel bar ring and the second connecting steel bar ring are provided in the pouring space to form a reinforced concrete connection structure between the first wall and the second wall. The construction is simple, the operation is convenient, and the connection strength is guaranteed. Therefore, the present application is applied in the field of assembly and construction of box-shaped prefabricated assembled houses, and can ensure the strength of the assembled buildings at a high construction efficiency.

[0024] 2. The present application adopts a structure in which the first dowel is fixedly connected to the middle connecting steel bar ring. Before the two box-shaped house bodies are brought close to each other, the middle connecting steel bar ring can be placed on the first connecting steel bar ring of the first wall in advance, fixed with the first dowel, and placed at an angle so that the two box-shaped house bodies will not collide when they are close to each other. When the two box-shaped house bodies are in place, the first dowel can be rotated so that the middle connecting steel bar ring rotates together to form a concentric hole with the second connecting steel bar ring of the second wall, which is convenient for inserting the second dowel. When the second dowels are in place, concrete is poured in the casting space of the two box-shaped house bodies to form a reliable connection structure for the two box-shaped house bodies, effectively overcoming the pain point that traditional box-shaped house bodies cannot or can only use complex structures to achieve the connection of the two box-shaped house bodies when splicing.

Brief Description of the Drawings

[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for describing the embodiments.

[0026] Figure 1This is a schematic diagram of a house using a connection structure between reinforced concrete prefabricated walls in Example 1 of the present application;

[0027] Figure 2 yes Figure 1 A magnified schematic diagram of part A;

[0028] Figure 3 is a top view of the connection structure between reinforced concrete prefabricated walls in Example 1 of the present application;

[0029] Figure 4 It is a flow chart of the construction method of this application;

[0030] Figure 5 This is a schematic diagram of the connection structure between reinforced concrete prefabricated walls in the construction process of the first embodiment of the present application. Figure 1 ;

[0031] Figure 6 yes Figure 5 An enlarged schematic diagram of part B;

[0032] Figure 7 This is a schematic diagram of the connection structure between reinforced concrete prefabricated walls in the construction process of the first embodiment of the present application. Figure 2 ;

[0033] Figure 8 yes Figure 7 An enlarged schematic diagram of part C of FIG.

[0034] Fig. 9 This is a schematic diagram of a connection structure between reinforced concrete prefabricated walls in an embodiment of the present application, in which a first connection groove is arranged on an end face of a first wall, and a second connection groove is arranged on a side face of a second wall;

[0035] Fig.10 This is a schematic diagram of a connection structure between reinforced concrete prefabricated walls in a first embodiment of the present application, in which a first connection groove is provided on an end surface of a first wall, and a second connection groove is provided on an end surface of a second wall;

[0036] Fig.11 It is a schematic diagram of the connection structure between reinforced concrete prefabricated walls in Example 2 of the present application. [Specific implementation method]

[0037] In order to make the technical problems, technical solutions and beneficial effects solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0038] When the embodiments of the present application mention ordinal numbers such as "first" and "second", unless they do express the meaning of order according to the context, they should be understood as being merely for the purpose of distinction.

[0039] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0040] Embodiment 1: This embodiment provides Figure 1 A box-shaped house as shown, comprising Figure 2 and Figure 3 The connection structure between the reinforced concrete prefabricated walls shown in the figure comprises a first wall 1 and a second wall 2, wherein the first wall 1 is provided with a first connecting groove 31 extending vertically, and the second wall 2 is provided with a second connecting groove 32 extending vertically, wherein the second connecting groove 32 is used to form a pouring space 3 for pouring concrete corresponding to the first connecting groove 31, and the first connecting groove 31 is provided with a plurality of first connecting steel bar rings 4 distributed vertically and fixedly connected to the first wall 1, and a first connecting steel bar ring 4 is formed between the first connecting steel bar ring 4 and the first wall 1. A vertical socket 41, a plurality of second connecting steel bar rings 5 ​​are vertically distributed and fixedly connected to the second wall 2 and corresponding to the plurality of first connecting steel bar rings 4 are provided on the second connecting groove 32, a second vertical socket 51 is formed between the second connecting steel bar ring 5 and the second wall 2, an intermediate connecting steel bar ring 6 is provided in the casting space 3 and is bridged over the corresponding first connecting steel bar ring 4 and second connecting steel bar ring 5, the intermediate connecting steel bar ring 6 and the first vertical socket 41 are connected by a first dowel rod 7; the intermediate connecting steel bar ring 6 and the second vertical socket 51 are connected by a second dowel rod 8. In this embodiment, a concrete pouring space 3 is formed between the first wall and the second wall by splicing the first connecting groove 31 and the second connecting groove 32. At the same time, a first connecting steel bar ring 4, a second connecting steel bar ring 5, an intermediate connecting steel bar ring 6 spanning the corresponding first connecting steel bar ring 4 and the second connecting steel bar ring 5, a first inserted steel bar 7 passing through the intermediate connecting steel bar ring 6 and the first connecting steel bar ring 4, and a second inserted steel bar 8 passing through the intermediate connecting steel bar ring 6 and the second connecting steel bar ring 5 are provided in the pouring space 3 to form a reinforced concrete connection structure between the first wall 1 and the second wall 2. The construction is simple, the operation is convenient, and the connection strength is guaranteed. Therefore, it is applied in the field of assembly and construction of box-shaped prefabricated assembled houses, and can ensure the strength of the assembled buildings at a high construction efficiency.

[0041] Further, in order to simplify the construction steps, in this embodiment, the first dowel bar 7 is fixedly connected to the middle connecting steel bar ring 6. Preferably, the first dowel bar 7 is fixedly connected to the middle connecting steel bar ring 6 by welding. The first dowel bar 7 is fixedly connected to the middle connecting steel bar ring 6, which can facilitate the construction personnel to rotate the middle connecting steel bar ring 6 by rotating the first dowel bar 7 during the construction process, so as to move the middle connecting steel bar ring 6 to a position suitable for construction. The present embodiment adopts a structure in which the first dowel rod 7 is fixedly connected to the middle connecting steel bar ring 6. Before the two box-shaped house bodies are brought close to each other, the middle connecting steel bar ring 6 can be placed on the first connecting steel bar ring 4 of the first wall 1 in advance, fixed with the first dowel rod 7, and placed at an angle so that the two box-shaped house bodies will not collide when they are close to each other. When the two box-shaped house bodies are in place, the first dowel rod 7 can be rotated to make the middle connecting steel bar ring 6 rotate together and form a connecting hole structure that is connected with the second connecting steel bar ring 5 of the second wall 2, so as to facilitate the insertion of the second dowel rod 8. When the second dowel rod 8 is in place, concrete is poured in the casting space 3 of the two box-shaped house bodies to form a reliable connection structure for the two box-shaped house bodies, effectively overcoming the pain point that the traditional box-shaped house bodies cannot or can only use a complex structure to achieve the connection of the two box-shaped house bodies when splicing.

[0042] Furthermore, in order to enhance the versatility of the wall connection structure, the first connection groove 31 is provided on the end or side of the first wall 1; the second connection groove 32 is provided on the end or side of the second wall 2. This makes it convenient to splice the first wall 1 and the second wall 2 side by side or vertically.

[0043] Furthermore, in order to facilitate the construction and ensure the effectiveness of the construction, the middle connecting steel bar ring 6 is located above the corresponding first connecting steel bar ring 4 and second connecting steel bar ring 5 .

[0044] Furthermore, in order to stably fix the first connecting steel bar ring 4 on the first wall 1 and the second connecting steel bar ring 5 on the second wall 2, a plurality of first support tubes 10 are provided in the first wall 1 and are distributed at intervals along the width direction of the first wall 1, and the first connecting steel bar ring 4 extends into the first wall 1 and is fixedly connected to one of the first support tubes 10; a plurality of second support tubes 11 are provided in the second wall 2 and are distributed at intervals along the width direction of the second wall 2, and the second connecting steel bar ring 5 extends into the second wall 2 and is fixedly connected to one of the second support tubes 11.

[0045] This embodiment also provides a construction method for connecting the reinforced concrete prefabricated walls. Figures 4 to 8 As shown, the following steps are included:

[0046] S1, pre-installation: placing the middle connecting steel bar ring 6 on the first connecting steel bar ring 4, and then passing the first dowel bar 7 through the middle connecting steel bar ring 6 and the first vertical insertion hole 41, and fixing the first dowel bar 7 and the middle connecting steel bar ring 6.

[0047] S2. Splicing: Splice the first connecting groove 31 of the first wall 1 and the second connecting groove 32 of the second wall 2 to form a casting space 3, and arrange the first connecting steel bar ring 4 on the first connecting groove 31 and the second connecting steel bar ring 5 on the second connecting groove 32 in corresponding positions, form a first vertical socket 41 between the first connecting steel bar ring 4 and the first wall 1, and form a second vertical socket 51 between the second connecting steel bar ring 5 and the second wall 2.

[0048] S3, inserting reinforcement: move the middle connecting reinforcement ring 6 to a position spanning the corresponding first connecting reinforcement ring 4 and second connecting reinforcement ring 5, and make the first inserted reinforcement 7 pass through the first vertical insertion hole 41 and the middle connecting reinforcement ring 6, and make the second inserted reinforcement 8 pass through the second vertical insertion hole 51 and the middle connecting reinforcement ring 6.

[0049] In this step, the first inserted steel bar 7 inserted into the first vertical insertion hole 41 is rotated to move the middle connecting steel bar ring 6 to a position bridging the corresponding first connecting steel bar ring 4 and the second connecting steel bar ring 5. This facilitates construction workers to construct and effectively improves construction efficiency.

[0050] S4. Pouring: pouring concrete in the pouring space.

[0051] The working principle of this embodiment is as follows:

[0052] In this embodiment, a concrete pouring space 3 is formed between the first wall and the second wall by splicing the first connecting groove 31 and the second connecting groove 32. At the same time, a first connecting steel bar ring 4, a second connecting steel bar ring 5, an intermediate connecting steel bar ring 6 spanning the corresponding first connecting steel bar ring 4 and the second connecting steel bar ring 5, a first inserted steel bar 7 passing through the intermediate connecting steel bar ring 6 and the first connecting steel bar ring 4, and a second inserted steel bar 8 passing through the intermediate connecting steel bar ring 6 and the second connecting steel bar ring 5 are provided in the pouring space 3 to form a reinforced concrete connection structure between the first wall 1 and the second wall 2. The construction is simple, the operation is convenient, and the connection strength is guaranteed. Therefore, it is applied in the field of assembly and construction of box-shaped prefabricated assembled houses, and can ensure the strength of the assembled buildings at a high construction efficiency. The present embodiment adopts a structure in which the first dowel rod 7 is fixedly connected to the middle connecting steel bar ring 6. Before the two box-shaped house bodies are brought close to each other, the middle connecting steel bar ring 6 can be placed on the first connecting steel bar ring 4 of the first wall 1 in advance, fixed with the first dowel rod 7, and placed at an angle so that the two box-shaped house bodies will not collide when they are close to each other. When the two box-shaped house bodies are in place, the first dowel rod 7 can be rotated to make the middle connecting steel bar ring 6 rotate together and form a connecting hole structure that is connected with the second connecting steel bar ring 5 of the second wall 2, so as to facilitate the insertion of the second dowel rod 8. When the second dowel rod 8 is in place, concrete is poured in the casting space 3 of the two box-shaped house bodies to form a reliable connection structure for the two box-shaped house bodies, effectively overcoming the pain point that the traditional box-shaped house bodies cannot or can only use a complex structure to achieve the connection of the two box-shaped house bodies when splicing.

[0053] Embodiment 2: This embodiment differs from Embodiment 1 in that Fig.11 As shown, the casting space 3 is provided with a third dowel 9 located outside the first vertical insertion hole 41 and the second vertical insertion hole 51, and the third dowel 9 is fixedly connected to the intermediate connecting steel bar ring 6. The first dowel 7 may not be fixedly connected to the intermediate connecting steel bar ring 6. If the casting space 3 is large, the construction personnel can directly insert the third dowel 9 with the intermediate connecting steel bar ring 6 into the casting space 3, and directly translate the intermediate connecting steel bar ring 6 to the position that straddles the corresponding first connecting steel bar ring 4 and the second connecting steel bar ring 5, so as to facilitate the insertion and installation of the first dowel 7 and the second dowel 8. This embodiment is mainly used in the use scenario where there is a large working space between the two box-shaped house bodies when they are connected, so that the third dowel 9 together with the intermediate connecting steel bar ring 6 can be inserted between the two box-shaped house bodies after the two box-shaped house bodies are close to each other and spliced ​​in place.

[0054] This embodiment also provides a construction method for a connection structure between reinforced concrete prefabricated walls, comprising the following steps:

[0055] S1. Splicing: Splice the first connecting groove 31 of the first wall 1 and the second connecting groove 32 of the second wall 2 to form a casting space 3, and arrange the first connecting steel bar ring 4 on the first connecting groove 31 and the second connecting steel bar ring 5 on the second connecting groove 32 in corresponding positions, form a first vertical socket 41 between the first connecting steel bar ring 4 and the first wall 1, and form a second vertical socket 51 between the second connecting steel bar ring 5 and the second wall 2.

[0056] S2, inserting reinforcement: move the middle connecting reinforcement ring 6 to a position spanning the corresponding first connecting reinforcement ring 4 and second connecting reinforcement ring 5, and make the first inserted reinforcement 7 pass through the first vertical insertion hole 41 and the middle connecting reinforcement ring 6, and make the second inserted reinforcement 8 pass through the second vertical insertion hole 51 and the middle connecting reinforcement ring 6.

[0057] In this step, the middle connecting steel bar ring 6 is fixed on the third inserted steel bar 9 outside the first vertical insertion hole 41 and the second vertical insertion hole 51, and then the third inserted steel bar 9 and the middle connecting steel bar ring 6 are inserted into the casting space 3 and translated to move the middle connecting steel bar ring 6 to a position that straddles the corresponding first connecting steel bar ring 4 and second connecting steel bar ring 5. This facilitates construction workers to construct and effectively improves construction efficiency.

[0058] S4. Pouring: pouring concrete in the pouring space.

[0059] As described above, multiple implementation methods are provided in combination with specific contents, and the specific implementation of this embodiment is not limited to these descriptions. Any method, structure, etc. similar to or identical to this embodiment, or some technical deductions or replacements made based on the concept of this embodiment, shall be considered as the protection scope of this embodiment.

Claims

1. A connection structure between reinforced concrete prefabricated walls, characterized in that: The invention comprises a first wall (1) and a second wall (2), wherein the first wall (1) is provided with a first connecting groove (31) extending vertically, and the second wall (2) is provided with a second connecting groove (32) extending vertically, the second connecting groove (32) being used to form a pouring space (3) for pouring concrete by correspondingly splicing with the first connecting groove (31), the first connecting groove (31) is provided with a plurality of first connecting steel bar rings (4) distributed vertically and fixedly connected to the first wall (1), a first vertical insertion hole (41) is formed between the first connecting steel bar rings (4) and the first wall (1), and the second connecting groove (32) is provided with a plurality of first connecting steel bar rings (4) distributed vertically and fixedly connected to the first wall (1), a first vertical insertion hole (41) is formed between the first connecting steel bar rings (4) and the first wall (1), and a first connecting steel bar ring (4) is provided on the second connecting groove (32). A plurality of second connecting steel bar rings (5) are provided which are distributed vertically and fixedly connected to the second wall (2) and correspond to the plurality of first connecting steel bar rings (4); a second vertical insertion hole (51) is formed between the second connecting steel bar rings (5) and the second wall (2); an intermediate connecting steel bar ring (6) is provided in the casting space (3) and is bridged over the corresponding first connecting steel bar rings (4) and second connecting steel bar rings (5); the intermediate connecting steel bar ring (6) and the first vertical insertion hole (41) are connected through a first inserted bar (7); and the intermediate connecting steel bar ring (6) and the second vertical insertion hole (51) are connected through a second inserted bar (8).

2. The connection structure between reinforced concrete prefabricated walls according to claim 1, characterized in that: The first inserted reinforcement (7) is fixedly connected to the middle connecting reinforcement ring (6).

3. The connection structure between reinforced concrete prefabricated walls according to claim 2, characterized in that: The first inserted reinforcement (7) is fixed to the middle connecting reinforcement ring (6) by welding.

4. The connection structure between reinforced concrete prefabricated walls according to claim 1, characterized in that: The first connection groove (31) is arranged on the end or side of the first wall (1); and the second connection groove (32) is arranged on the end or side of the second wall (2).

5. The connection structure between reinforced concrete prefabricated walls according to claim 1, characterized in that: The intermediate connecting steel bar ring (6) is located above the corresponding first connecting steel bar ring (4) and second connecting steel bar ring (5).

6. The connection structure between reinforced concrete prefabricated walls according to claim 1, characterized in that: A third inserted steel bar (9) located outside the first vertical inserted hole (41) and the second vertical inserted hole (51) is provided in the casting space (3), and the third inserted steel bar (9) is fixedly connected to the middle connecting steel bar ring (6).

7. The connection structure between reinforced concrete prefabricated walls according to claim 1, characterized in that: The first wall (1) is provided with a plurality of first support tubes (10) spaced apart along the width direction of the first wall (1), and the first connecting steel bar ring (4) extends into the first wall (1) and is fixedly connected to one of the first support tubes (10); the second wall (2) is provided with a plurality of second support tubes (11) spaced apart along the width direction of the second wall (2), and the second connecting steel bar ring (5) extends into the second wall (2) and is fixedly connected to one of the second support tubes (11).

8. Box-shaped house, characterized in that: It comprises a connection structure between reinforced concrete prefabricated walls as described in any one of claims 1 to 7.