Inter-well gas injection and brine discharge structure of salt cavern gas storage
By designing a gas injection and halogen exhaust structure between wells in the salt hole gas storage, and using multiple injection and production wells to provide gas sources for halogen exhaust wells, the problems of limited production time and discontinuity in the traditional gas injection and halogen exhaust structure are solved. , achieved continuous gas injection and halogen exhaust operations throughout the year, and improved efficiency and progress.
Patent Information
- Application Number
- CN202420320367.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-21
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-02-21
AI Technical Summary
The traditional gas injection and halogen exhaust structure of the salt hole gas storage has problems such as limited production time and discontinuous gas injection and halogen exhaust operation, which leads to a long gas injection and halogen exhaust cycle, especially in the non-gas injection conditions, the halogen exhaust well cannot be put into production. .
A gas injection and halogen exhaust structure between the wells of the salt pit gas storage reservoir is designed, including compressor, gas production and gas injection pipe, gas production and gas injection connection pipe, well site pipeline and electric valve, etc., which are allowed to be non-gas injection Injection and discharge of halogen under operating conditions, and the annual production is completed by reserved high-pressure wells, and multiple injection and production wells provide gas sources for halogen discharge wells to improve efficiency.
The gas injection and halogen exhaust operation under no injection and gas extraction conditions has been achieved, the gas injection and halogen exhaust cycle has been shortened, the gas injection and halogen exhaust progress has been accelerated, the production conditions have been exceeded, and the continuous injection has been achieved throughout the year. Gas discharge operation.
Smart Images

Figure CN222084478U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of salt cavern gas storage, in particular to an inter-well gas injection and brine removal structure of a salt cavern gas storage. Background Art
[0002] The traditional gas injection and brine removal of salt cavern gas storage is to use a compressor unit to pressurize natural gas when there is a gas injection task, and then inject high-pressure natural gas into the underground salt cavity, and use high-pressure natural gas to displace the brine in the salt cavern cavity to the ground, and the brine is discharged to the brine receiving station through the brine pipeline. This structure has two disadvantages. First, the production time is limited, and it can only be put into production during the gas injection period. If the cavity well is completed during the gas production period without injection or without production, it must wait until the gas injection period before it can be put into production; secondly, when the gas injection condition is converted to the gas production condition, the gas injection and brine removal must be stopped, resulting in discontinuous gas injection and brine removal operations and a long brine removal cycle.
[0003] The annual gas injection period of salt cavern gas storage is generally from April to October, and the injection time is about 120 days, which is non-continuous. If the gas injection task is small in the year, and the brine drainage cycle and gas injection cycle do not completely overlap, the brine drainage cycle of a single well may even take more than a year. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a salt cavern gas storage well-to-well gas injection and brine removal structure, which can realize the brine removal well production and gas injection and brine removal operations under non-gas injection conditions, i.e. gas production and neither injection nor production conditions, thereby shortening the gas injection and brine removal cycle and accelerating the gas injection and brine removal progress.
[0005] The utility model solves the above-mentioned technical problems with a technical solution as follows: a salt cavern gas storage well-to-well gas injection and brine removal structure, comprising a compressor, wherein the input end of the compressor is connected to a natural gas trunk line, the output end of the compressor is connected to a plurality of gas injection manifolds, and the natural gas trunk line is connected to a plurality of gas production manifolds; the gas production manifolds are connected to a wellsite pipeline via a gas production connecting pipe, the gas injection manifolds are connected to the wellsite pipeline via a gas injection connecting pipe, each of the wellsite pipelines is correspondingly connected to one of the gas production connecting pipes and one of the gas injection connecting pipes, the wellsite pipelines are connected to a plurality of injection and production wells, and at least one of the wellsite pipelines is connected to a brine removal well.
[0006] The beneficial effects of the utility model are: it can change the previous method of simply relying on a compressor to inject gas to remove brine, and can perform gas injection to remove brine under both no injection and no production and gas production conditions; it can break through the limitations of production conditions, and only needs to reserve enough high-pressure wells in advance, without waiting until the gas injection period, and can perform gas injection to remove brine in new wells after the conditions for production are met; it can achieve gas injection and brine removal operations throughout the year, and speed up the production progress of new wells.
[0007] On the basis of the above technical solution, the present invention can also be improved as follows.
[0008] Furthermore, the gas collection connecting pipe is provided with a gas collection electric valve, and the gas injection connecting pipe is provided with a gas injection electric valve.
[0009] The beneficial effect of adopting the above further solution is that the arrangement of the gas extraction electric valve and the gas injection electric valve can realize remote control of the opening and closing of the gas extraction connecting pipe and the gas injection connecting pipe as required.
[0010] Furthermore, a check valve is provided on the gas collection connecting pipe.
[0011] The beneficial effect of adopting the above further solution is that the provision of the check valve can prevent the natural gas in the injection and production wells and the brine drainage wells from flowing back to the natural gas trunk line.
[0012] Furthermore, the wellsite pipelines are all provided with wellsite electric valves.
[0013] The beneficial effect of adopting the above further solution is that the setting of the well site electric valve can conveniently remotely control the opening and closing of the well site pipeline as needed.
[0014] Further, the gas production manifold includes a first gas production manifold and a plurality of second gas production manifolds, the gas injection manifold includes a first gas injection manifold and a plurality of second gas injection manifolds, the wellsite pipeline includes a first wellsite pipeline, a second wellsite pipeline and a third wellsite pipeline, the injection and production wells include a first injection and production well, a second injection and production well and a third injection and production well, the first gas production manifold is connected to the first wellsite pipeline through the gas production connecting pipe, the first gas injection manifold is connected to the first wellsite pipeline through the gas injection manifold, the first wellsite pipeline connects the brine drainage well and a plurality of the first injection and production wells; the second wellsite pipeline is connected to the first gas production manifold through the gas production connecting pipe, respectively, and the second wellsite pipeline is connected to the first gas injection manifold through the gas injection connecting pipe, respectively; a plurality of the second gas production manifolds are connected to the third wellsite pipeline through the gas production connecting pipe, respectively, the second gas injection manifold is connected to a plurality of the third wellsite pipelines through the gas injection connecting pipe, respectively, the second wellsite pipeline connects to a plurality of the second injection and production wells, respectively, and the third wellsite pipeline connects to a plurality of the third injection and production wells, respectively.
[0015] The beneficial effect of adopting the above further scheme is: by setting up the first injection and production well and the second injection and production well, a gas source can be reserved for the brine removal well. Different injection and production wells can be used as gas sources under different working conditions to improve the efficiency of brine removal and speed up the progress of gas injection and brine removal.
[0016] Furthermore, the number of the first well site pipelines is one or more.
[0017] The beneficial effect of adopting the above further scheme is that different injection and production wells can be used as brine removal gas sources for multiple brine removal wells as needed, thereby improving the brine removal efficiency of the brine removal wells and accelerating the progress of gas injection and brine removal.
[0018] Furthermore, the number of the first gas production manifolds is one or more.
[0019] The beneficial effects of adopting the above further scheme are: improving the brine drainage efficiency of the brine drainage well and accelerating the progress of gas injection and brine drainage.
[0020] Furthermore, a wellsite hydraulic valve is provided on the wellsite pipeline.
[0021] The beneficial effect of adopting the above further solution is that the setting of the well site hydraulic valve facilitates the control of the opening and closing of the well site pipeline, which can improve the safety of the well site pipeline.
[0022] Furthermore, the cavity of the brine drainage well is connected to a salinization enterprise or a salt lake through a pipeline.
[0023] The beneficial effect of adopting the above further scheme is that it is convenient to utilize the brine in the brine drainage well.
[0024] Furthermore, it also includes a pressure detection instrument for detecting the pressure of the injection and production well cavity.
[0025] The beneficial effect of adopting the above further solution is that the provision of the pressure detection instrument can facilitate the monitoring of the gas pressure in the injection and production well, and facilitate the control of the pressure of the injection and production well as required. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the structure of the utility model;
[0027] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0028] 1. Compressor; 2. Natural gas trunk line; 3. Gas production connecting pipe; 4. Gas injection connecting pipe; 5. Brine drainage well; 6. Gas production electric valve; 7. Gas injection electric valve; 8. Check valve; 9. Wellsite electric valve; 10. First gas production manifold; 11. Second gas production manifold; 12. First gas injection manifold; 13. Second gas injection manifold; 14. First wellsite pipeline; 15. Second wellsite pipeline; 16. Third wellsite pipeline; 17. First injection-production well; 18. Second injection-production well; 19. Third injection-production well; 20. Wellsite hydraulic valve; 21. Salt chemical enterprise; 22. Salt lake. DETAILED DESCRIPTION
[0029] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0030] Embodiment 1
[0031] This embodiment includes a compressor 1, the input end of the compressor 1 is connected to a natural gas trunk line 2, the output end of the compressor 1 is connected to a plurality of gas injection manifolds, and the natural gas trunk line 2 is connected to a plurality of gas production manifolds; the gas production manifold is connected to the well site pipeline via a gas production connecting pipe 3, and the gas injection manifold is connected to the well site pipeline via a gas injection connecting pipe 4. A gas production electric valve 6 and a check valve 8 are provided on the gas production connecting pipe 3. The setting of the gas production electric valve 6 can realize remote control of the opening and closing of the gas production connecting pipe 3 as needed. The gas injection connecting pipe 4 is provided with a gas injection electric valve 7. The setting of the gas injection electric valve 7 can realize remote control of the opening and closing of the gas injection connecting pipe 4 as needed.
[0032] Each of the well field pipelines is connected to a corresponding gas production connecting pipe 3 and a gas injection connecting pipe 4, and the well field pipelines are connected to a plurality of injection and production wells. At least one of the well field pipelines is connected to a brine drainage well 5, and the cavity of the brine drainage well 5 is connected to a salinization enterprise 21 or a salt lake 22 through a pipeline.
[0033] In this embodiment, the wellsite pipeline is provided with a wellsite electric valve 9 and a wellsite hydraulic valve 20. The setting of the wellsite electric valve 9 can conveniently remotely control the opening and closing of the wellsite pipeline as needed. The setting of the wellsite hydraulic valve 20 is convenient for controlling the opening and closing of the wellsite pipeline. It can still control the opening and closing of the wellsite pipeline under the premise that the electrical connection of the wellsite electric valve 9 fails, which can improve the safety of the wellsite pipeline.
[0034] In this embodiment, a pressure detection instrument for detecting the pressure of the injection and production well cavity is also included. The setting of the pressure detection instrument can facilitate monitoring the pressure in the injection and production well, and conveniently control the pressure of the injection and production well as needed.
[0035] Embodiment 2
[0036] like Figure 1As shown, this embodiment makes the following improvements on the basis of the first embodiment: the gas production manifold includes a first gas production manifold 10 and a plurality of second gas production manifolds 11, the number of the first gas production manifold 10 is one or more, the gas injection manifold includes a first gas injection manifold 12 and a second gas injection manifold 13, the well site pipeline includes a first well site pipeline 14, a second well site pipeline 15 and a third well site pipeline 16, the number of the first well site pipeline 14 is one or more, the injection and production wells include a first injection and production well 17, a second injection and production well 18 and a third injection and production well 19, the first gas production manifold 10 is connected to the first well site pipeline 14 through the gas production connecting pipe 3, the first gas injection manifold 12 is connected to the first well site pipeline 14 through the gas injection manifold It is connected to the first well-site pipeline 14, which connects the brine drainage well 5 and several of the first injection and production wells 17; the second well-site pipeline 15 is connected to the first gas production manifold 10 through the gas production connecting pipe 3, and the second well-site pipeline 15 is connected to the first gas injection manifold 12 through the gas injection connecting pipe 4; several of the second gas production manifolds 11 are connected to the third well-site pipeline 16 through the gas production connecting pipe 3, and the second gas injection manifold 13 is connected to several of the third well-site pipelines 16 through the gas injection connecting pipe 4, the second well-site pipeline 15 is connected to several second injection and production wells 18, and the third well-site pipeline 16 is connected to several third injection and production wells 19.
[0037] The pipelines connecting the well site pipeline and each injection and production well are provided with injection and production valves, which are used to close the injection and production wells after high-pressure natural gas is injected into each injection and production well, so that the high-pressure natural gas is retained in each injection and production well.
[0038] By setting the first injection and production well 17, the second injection and production well 18 and the third injection and production well 19, the gas source for brine removal of the brine removal well 5 can be reserved. Different injection and production wells can be used as gas sources under different working conditions to improve the efficiency of brine removal and extend the time of brine removal. Different injection and production wells can be used as the brine removal gas source for multiple brine removal wells 5 as needed to improve the brine removal efficiency of the brine removal well 5 and speed up the progress of gas injection and brine removal.
[0039] Working principle:
[0040] 1. Gas injection conditions:
[0041] (1) Gas injection and brine removal are still directly performed through the compressor group 1. Specifically, the compressor 1 compresses the natural gas in the natural gas trunk line 2, and the compressed natural gas is injected into the brine removal well 5 through the first gas injection manifold 12, the gas injection connecting pipe 4, and the first well field pipeline 14 in sequence. Under the action of the natural gas pressure, the brine in the brine removal well 5 is discharged from the pipeline to the salt chemical enterprise 21 or the salt lake 22;
[0042] (2) giving priority to injecting high-pressure natural gas into the first injection-production well 17;
[0043] (3) Secondly, injecting high-pressure natural gas into the second injection and production well 18;
[0044] (4) finally injecting high-pressure natural gas into the third injection and production well 19;
[0045] (5) The injection and production wells that inject high-pressure natural gas serve as reserved wells for future inter-well brine drainage.
[0046] 2. Gas production conditions:
[0047] (1) In the initial stage of gas production, the first injection and production well 18 is used preferentially for inter-well brine drainage. At this time, the valve 6 needs to be closed, and the high-pressure gas from the injection and production well 8 is injected into the brine drainage well 5 through the gas injection manifold 4.
[0048] (2) At the end of gas production, due to the reduction of the inventory of the previous gas production well, the first injection and production well 18 needs to be used for gas production. In this stage, the high-pressure natural gas connected to the first injection and production well 17 is used for inter-well brine drainage. By opening the injection and production valve connected to the first injection and production well 17, the high-pressure natural gas in the first injection and production well 17 enters the brine drainage well 5, thereby achieving brine drainage from the brine drainage well 5. At this time, the well field electric valve 9 or the well field hydraulic valve 20 on the first well field pipeline 14 needs to be closed so as not to affect gas production in other wells.
[0049] 3. No injection and no mining conditions:
[0050] The high-pressure natural gas with a pressure greater than 12.5 MPa in the reserved injection and production well is used to replace the compressor 1 and transported to the brine drainage well 5 for gas injection and brine drainage. The second injection and production well 18 can be used for inter-well brine drainage, and the first injection and production well 17 can also be used for inter-well brine drainage.
[0051] The actual application and effect of this application:
[0052] From July 2022 to July 2023, the technical solution of this application has been successfully applied in four wells of Jintan Gas Storage, namely JK10-3, JK7-2, JK7-3, and JK3-4. The gas injection and production of Jintan Gas Storage from July 2022 to July 2023 are as follows: injection period from July 27 to November 30, 2022 (non-continuous), gas production period from December 5 to February 18, 2023 (non-continuous), no injection and no production from February 19 to March 17, and gas injection period from March 18 to July 31.
[0053] The gas injection and brine removal cycle of JK10-3 well is from July 2022 to October 2022. The actual total brine removal days are 81 days, with continuous gas injection and brine removal. The corresponding injection and production conditions of 81 days are 66 days of gas injection conditions, 4 days of no injection and no production conditions, and 11 days of gas production conditions. The days of inter-well brine removal are 15 days, accounting for 18% of the total brine removal days.
[0054] The gas injection and brine removal cycle of JK7-3 well is from September 2022 to January 2023. The actual total brine removal days are 125 days, with continuous gas injection and brine removal. The corresponding injection and production conditions of 125 days are 78 days of gas injection, 39 days of no injection and no production, and 8 days of gas production. The days of inter-well brine removal are 47 days, accounting for 38% of the total brine removal days.
[0055] The gas injection and brine removal period of JK7-2 well is from September 2022 to February 2023. There were 14 days without brine removal from October 12 to October 25. The actual total brine removal days were 155 days. The corresponding injection and production conditions of 155 days were 64 days of gas injection conditions, 24 days of no injection and no production conditions, and 67 days of gas production conditions. The days of inter-well brine removal were 91 days, accounting for 59% of the total brine removal days.
[0056] The gas injection and brine removal period of JK3-4 well is from September 2022 to July 2023. There was no brine removal from November 18 to April 28, 2023. The actual total brine removal days were 120 days. The corresponding injection and production conditions of 120 days were 95 days of gas injection conditions, 22 days of no injection and no production conditions, and 3 days of gas production conditions. The days of inter-well brine removal were 25 days, accounting for 21% of the total brine removal days.
[0057] For the wells that started gas injection and brine removal after September, the gas storage will soon face gas production conditions, and the time for inter-well brine removal will be longer, accounting for more than 50% of the total brine removal days.
[0058] The beneficial effects of the utility model are: it can change the previous method of simply relying on the compressor 1 for gas injection and brine removal, and gas injection and brine removal can be carried out under both no injection and no production and gas production conditions; it can break through the limitations of production conditions, and only needs to reserve enough high-pressure wells in advance, without waiting until the gas injection period, and gas injection and brine removal can be carried out in new wells after the conditions for production are met; it can achieve gas injection and brine removal operations throughout the year, and speed up the production progress of new wells.
[0059] In the description of the present invention, it should be understood that the terms "center", "length", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "inside", "outside", "peripheral", "circumferential" and the like indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred system or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0060] In the description of the present invention, "plurality" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0061] In the present invention, unless otherwise clearly defined and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be a connection between two elements or an interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0062] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0063] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A salt cavern gas storage well gas injection and brine removal structure, characterized in that: The invention comprises a compressor (1), wherein the input end of the compressor (1) is connected to a natural gas trunk line (2), the output end of the compressor (1) is connected to a plurality of gas injection manifolds, and the natural gas trunk line (2) is connected to a plurality of gas production manifolds; the gas production manifolds are connected to a well site pipeline via a gas production connecting pipe (3), and the gas injection manifolds are connected to the well site pipeline via a gas injection connecting pipe (4), each well site pipeline is correspondingly connected to one gas production connecting pipe (3) and one gas injection connecting pipe (4), the well site pipeline is connected to a plurality of injection and production wells, and at least one well site pipeline is connected to a brine drainage well (5).
2. The inter-well gas injection and brine removal structure of a salt cavern gas storage according to claim 1 is characterized in that: The gas collection connecting pipe (3) is provided with a gas collection electric valve (6), and the gas injection connecting pipe (4) is provided with a gas injection electric valve (7).
3. The inter-well gas injection and brine removal structure of a salt cavern gas storage according to claim 1 is characterized in that: The gas collection connecting pipe (3) is provided with a check valve (8).
4. The inter-well gas injection and brine removal structure of a salt cavern gas storage according to claim 1 is characterized in that: The wellsite pipelines are all provided with wellsite electric valves (9).
5. A salt cavern gas storage inter-well gas injection and brine removal structure according to any one of claims 1 to 4, characterized in that: The gas production manifold comprises a first gas production manifold (10) and a plurality of second gas production manifolds (11); the gas injection manifold comprises a first gas injection manifold (12) and a plurality of second gas injection manifolds (13); the well site pipeline comprises a first well site pipeline (14), a second well site pipeline (15) and a third well site pipeline (16); the injection and production wells comprise a first injection and production well (17), a second injection and production well (18) and a third injection and production well (19); the first gas production manifold (10) is connected to the first well site pipeline (14) via the gas production connecting pipe (3); the first gas injection manifold (12) is connected to the first well site pipeline (14) via the gas injection manifold; the first well site pipeline (14) is connected to the brine drainage well (5) and a plurality of the first injection and production wells (17); the second well field pipeline (15) is connected to the first gas production manifold (10) through the gas production connecting pipe (3), and the second well field pipeline (15) is connected to the first gas injection manifold (12) through the gas injection connecting pipe (4); a plurality of the second gas production manifolds (11) are connected to the third well field pipeline (16) through the gas production connecting pipe (3), and the second gas injection manifold (13) is connected to a plurality of the third well field pipelines (16) through the gas injection connecting pipe (4); the second well field pipeline (15) is connected to a plurality of second injection and production wells (18), and the third well field pipeline (16) is connected to a plurality of third injection and production wells (19).
6. The inter-well gas injection and brine removal structure of a salt cavern gas storage according to claim 5 is characterized in that: The number of the first well site pipeline (14) is one or more.
7. The inter-well gas injection and brine removal structure of a salt cavern gas storage according to claim 5 is characterized in that: The number of the first gas collection manifolds (10) is one or more.
8. A salt cavern gas storage inter-well gas injection and brine removal structure according to any one of claims 1 to 4, characterized in that: A wellsite hydraulic valve (20) is provided on the wellsite pipeline.
9. A salt cavern gas storage inter-well gas injection and brine removal structure according to any one of claims 1 to 4, characterized in that: The interior of the cavity of the brine drainage well (5) is connected to a salt chemical enterprise (21) or a salt lake (22) via a pipeline.
10. A salt cavern gas storage inter-well gas injection and brine removal structure according to any one of claims 1 to 4, characterized in that: It also includes a pressure detection instrument for detecting the pressure of the injection and production well cavity.