Protective fence of construction platform of excavation trolley
By designing inclined guardrails and sliding pedals on the tunnel construction comprehensive trolley, the problem of the risk of sliding and falling of construction personnel is solved, and the safety and operation convenience of the construction platform are improved.
Patent Information
- Application Number
- CN202420689851.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The guardrail design of the existing tunnel construction comprehensive trolley makes it easy for construction workers to slip during operation, increasing the risk of safety accidents for knee impact and fall.
A construction platform guardrail for excavation trolley was designed. Through the hinge structure of the installation arm and the A guardrail, the combination of pins and pin holes, the inclined fixation of the A guardrail is achieved, and the sliding design of the L-shaped pedal and pulley is enhanced. The stability of the pedal surface is enhanced by the support of the B guardrail and reinforcement rod.
It effectively reduces the risk of construction workers slipping, reduces the occurrence of safety accidents, and improves the flexibility and safety of the construction platform.
Smart Images

Figure CN222084504U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tunnel construction equipment, in particular to a guardrail of a construction platform of an excavation trolley. Background Art
[0002] A tunnel is an engineering building buried in the ground. The structure of a tunnel consists of two parts: the main building and the ancillary equipment. The main building consists of the tunnel body and the tunnel portal. The ancillary equipment includes a car shelter, fire-fighting facilities, emergency communications and drainage facilities. Long tunnels also have special ventilation and lighting equipment. In order to facilitate construction, comprehensive trolleys are usually used, such as waterproof board trolleys, secondary lining steel bar trolleys, excavation and arch installation trolleys, etc.
[0003] The Chinese utility model patent (authorization announcement number: CN211819406U name: a comprehensive trolley for tunnel construction) includes a base, a first bracket and a fixed plate. A fastening mechanism is fixed at a symmetrical position on the base. The fastening mechanism includes a T-shaped screw, a fixed seat and a bottom plate. The lower end of the T-shaped screw is fixedly connected to the upper end of the bottom plate. The first bracket is provided with a first cross bar and a second cross bar at left and right symmetrical positions respectively. Rubber sleeves are fixed on the first cross bar and the second cross bar, and protrusions are provided on the rubber sleeves. A protective net is fixed on the upper end of the fixed plate, and a sliding mechanism is fixed on the upper end of the fixed plate. A rope is installed on the sliding mechanism. The rope passes through a through hole provided on the fixed plate, and a hook is fixed on the lower end of the rope. The utility model solves the problems of the existing integrated trolley being difficult to carry construction tools, being time-consuming and labor-intensive, having poor anti-skid effect and being easy to slip when climbing, through rubber sleeves, protrusions, sliding mechanisms, ropes and hooks. The construction of geotextile waterproofing boards and the binding of secondary lining steel bars are usually performed manually by workers. The closer the construction platform is to the tunnel wall, the more convenient the operation for the workers. However, due to the differences in height and arm span of construction workers, some construction workers will step on the guardrails to lift themselves for work when binding steel bars. The guardrails of the above-mentioned utility model are vertically fixed, and the risk of slipping when construction workers step on them is relatively large, which can easily cause safety accidents such as knee injuries or falls. Utility Model Content
[0004] The utility model aims to provide a guardrail for a construction platform of an excavation trolley to overcome the shortcomings of the prior art.
[0005] The purpose of the utility model is achieved through the following technical solutions: A guardrail for a construction platform of an excavation trolley, comprising a pair of mounting arms and an A guardrail, the mounting arms being used to mount the A guardrail on the construction platform, a mounting groove being provided at the end of the mounting arm, the A guardrail being hinged in the mounting groove, a pin hole being provided on the inner wall of the mounting groove, the number of the pin holes in the same mounting groove being no less than three, the pin holes in the same mounting groove being distributed in an arc shape around the rotating axis of the A guardrail, the inner arc of the arc facing away from the construction platform, a pin being provided on the A guardrail located in the mounting groove, and the A guardrail being fixed by inserting the pin into the corresponding pin hole.
[0006] Preferably, a plurality of L-shaped pedals are slidably mounted on the A guardrail, the sliding direction of the pedals is parallel to the rotating shaft of the A guardrail, and the pedals are divided into two groups, which are respectively located at the upper and lower parts of the A guardrail.
[0007] Preferably, the construction platform includes a trolley frame, A steel mesh and channel steel, the channel steel is fixed to the side of the trolley frame, the channel steel is a pair and the notches are arranged facing each other, the A steel mesh is fixed on the upper side wall of the channel steel, a pulley is installed on the lower inner wall of the channel steel, the mounting arm is cylindrical and inserted into the corresponding channel steel, the pulley is used to support the mounting arm, and a B steel mesh is fixed between the pair of mounting arms.
[0008] Preferably, it also includes a pair of B guardrails, which are respectively fixed on the side walls of the corresponding channel steel located above, and the A guardrail and the pair of B guardrails are distributed in a gate shape.
[0009] Preferably, a reinforcing rod is fixed on the trolley frame, and the reinforcing rod is used to support the channel steel.
[0010] Preferably, there are multiple pulleys in the same channel steel and they are evenly distributed along the extension direction of the channel steel.
[0011] Preferably, an oblong through hole is opened on the upper side wall of the channel steel, the extension direction of the oblong through hole is parallel to the extension direction of the channel steel, a limit pin is slidably installed in the oblong through hole, and the limit pin is inserted into the mounting arm.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] By inserting pins into different pin holes, guardrail A is tilted toward the construction platform, making it easier for construction workers to step on it to lift themselves for work. The inclined tread surface reduces the risk of slipping for construction workers and reduces the occurrence of safety accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The structure of the utility model is shown in FIG. Figure 1 ;
[0015] Figure 2 The structure of the utility model is shown in FIG. Figure 2 ;
[0016] Figure 3 for Figure 1 A local enlarged schematic diagram of the middle A;
[0017] Figure 4 for Figure 1 A partial enlarged schematic diagram of point B in the middle;
[0018] In the figure, 1-mounting arm, 2-A guardrail, 3-mounting slot, 4-pin hole, 5-pin, 6-pedal, 7-trolley frame, 8-A steel mesh, 9-channel steel, 10-pulley, 11-B steel mesh, 12-B guardrail, 13-reinforcement rod, 14-oblong through hole, 15-limit pin. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0020] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0021] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features thereof may be combined with each other.
[0022] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0023] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the utility model product is usually placed when in use, or the positions or positional relationships commonly understood by those skilled in the art, which are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0024] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] like Figure 1 and 3 As shown, a guardrail for a construction platform of an excavation trolley comprises a pair of mounting arms 1 and an A guardrail 2. The mounting arm 1 is used to mount the A guardrail 2 on the construction platform. A mounting groove 3 is provided at the end of the mounting arm 1. The A guardrail 2 is hinged in the mounting groove 3. A pin hole 4 is provided on the inner wall of the mounting groove 3. The number of the pin holes 4 in the same mounting groove 3 is not less than three. The pin holes 4 in the same mounting groove 3 are distributed in an arc shape around the rotation axis of the A guardrail 2. The inner arc of the arc faces away from the construction platform. A pin 5 is provided on the A guardrail 2 located in the mounting groove 3. The A guardrail 2 is fixed by the pin 5 is inserted into the corresponding pin hole 4 for fixing. By inserting the pin 5 into different pin holes 4, the A guardrail 2 is tilted to the construction platform, which is convenient for construction workers to step on to lift themselves for work, and the inclined tread surface reduces the risk of construction workers' slipping and reduces the occurrence of safety accidents. At the same time, before construction, by flipping the A guardrail 2 to the bottom of the construction platform, it is convenient to carry construction tools and materials to the platform. After the tools and materials are carried, the A guardrail 2 is flipped to the top of the construction platform to protect the construction workers. The structure is simple and easy to use.
[0026] In this embodiment, if Figure 1 and 2As shown, a plurality of L-shaped pedals 6 are slidably installed on the A guardrail 2, and the sliding direction of the pedals 6 is parallel to the rotating shaft of the A guardrail 2. The pedals 6 are divided into two groups, and the two groups of pedals 6 are respectively located at the upper and lower parts of the A guardrail 2. Anti-slip grooves are arranged on the treading surface of the pedals 6, and a steel pipe is welded to the bottom of the pedals 6. The steel pipe can be slid on the A guardrail 2, and bolts are screwed on the steel pipe. The pedals 6 can be locked on the A guardrail 2 by tightening the bolts. The construction workers step on the L-shaped pedals 6 to work, which further reduces the risk of slipping.
[0027] In this embodiment, if Figure 1 and 2 As shown, the construction platform includes a trolley frame 7, A steel mesh 8 and channel steel 9. Channel steel 9 is fixed on the side of the trolley frame 7. The channel steel 9 is a pair and the notches are arranged facing each other. The A steel mesh 8 is fixed on the side wall of the channel steel 9 located above. A pulley 10 is installed on the inner wall of the channel steel 9 located below. The installation arm 1 is cylindrical and inserted into the corresponding channel steel 9. The pulley 10 is used to support the installation arm 1. A B steel mesh 11 is fixed between the pair of installation arms 1. Since the construction of geotextile waterproofing board and the binding of secondary lining steel bars are usually performed manually by workers, the construction platform must be close to the cave wall for the construction of geotextile waterproofing board and the binding of secondary lining steel bars. By pulling the installation arm 1 out of the channel steel 9 to increase the distance of the construction platform, the problem that the working platform of the existing structural tunnel construction trolley is fixed in distance and cannot adapt to tunnels of different sizes, resulting in difficult construction operations and low construction efficiency is solved.
[0028] In this embodiment, if Figure 1 As shown, it also includes a pair of B guardrails 12, which are respectively fixed on the side walls above the corresponding channel steels 9. The A guardrail 2 and the pair of B guardrails 12 are distributed in a door shape. The guardrails are used to protect workers during construction to avoid the risk of accidental falls.
[0029] In this embodiment, if Figure 1 and 2 As shown, a reinforcing rod 13 is fixed on the trolley frame 7, and the reinforcing rod 13 is used to support the channel steel 9, thereby enhancing the load-bearing capacity of the channel steel 9 and making the construction platform more stable and safe.
[0030] In this embodiment, if Figure 2 As shown, there are a plurality of pulleys 10 in the same channel steel 9 and they are evenly distributed along the extending direction of the channel steel 9, so that the sliding of the mounting arm 1 is smoother and more labor-saving.
[0031] In this embodiment, if Figure 4As shown, an oblong through hole 14 is opened on the upper side wall of the channel steel 9, and the extension direction of the oblong through hole 14 is parallel to the extension direction of the channel steel 9. A limit pin 15 is slidably installed in the oblong through hole 14, and the limit pin 15 is inserted into the installation arm 1 to prevent the installation arm 1 from accidentally slipping out of the channel steel 9 during the transportation of the construction platform, causing it to fall and injure people below.
[0032] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A guardrail for a construction platform of an excavation trolley, comprising a pair of mounting arms (1) and an A guardrail (2), wherein the mounting arms (1) are used to mount the A guardrail (2) on the construction platform, and characterized in that: The end of the mounting arm (1) is provided with a mounting groove (3), the A guardrail (2) is hinged in the mounting groove (3), and a pin hole (4) is provided on the inner wall of the mounting groove (3). The number of the pin holes (4) in the same mounting groove (3) is not less than three, and the pin holes (4) in the same mounting groove (3) are distributed in an arc shape around the rotation axis of the A guardrail (2), with the inner arc of the arc facing away from the construction platform. A pin (5) is provided on the A guardrail (2) located in the mounting groove (3), and the A guardrail (2) is fixed by inserting the pin (5) into the corresponding pin hole (4).
2. The guardrail of the construction platform of the excavation trolley according to claim 1, characterized in that: A plurality of L-shaped pedals (6) are slidably mounted on the A guardrail (2); the sliding direction of the pedals (6) is parallel to the rotation axis of the A guardrail (2); the pedals (6) are divided into two groups, and the two groups of pedals (6) are respectively located at the upper part and the lower part of the A guardrail (2).
3. The guardrail of the construction platform of the excavation trolley according to claim 1, characterized in that: The construction platform comprises a trolley frame (7), a steel mesh A (8) and a channel steel (9); the channel steel (9) is fixed to the side of the trolley frame (7); the channel steel (9) is a pair and the notches are arranged facing each other; the steel mesh A (8) is fixed to the upper side wall of the channel steel (9); a pulley (10) is installed on the lower inner side wall of the channel steel (9); the mounting arm (1) is cylindrical and inserted into the corresponding channel steel (9); the pulley (10) is used to support the mounting arm (1); and a steel mesh B (11) is fixed between the pair of mounting arms (1).
4. The guardrail of the construction platform of the excavation trolley according to claim 3 is characterized by: It also comprises a pair of B guardrails (12), wherein the pair of B guardrails (12) are respectively fixed to the side walls of the corresponding channel steel (9) located above, and the A guardrail (2) and the pair of B guardrails (12) are arranged in a gate shape.
5. The guardrail of the construction platform of the excavation trolley according to claim 3, characterized in that: A reinforcing rod (13) is fixed to the trolley frame (7), and the reinforcing rod (13) is used to support the channel steel (9).
6. The guardrail of the construction platform of the excavation trolley according to claim 3, characterized in that: There are a plurality of pulleys (10) in the same channel steel (9) and the pulleys (10) are evenly distributed along the extension direction of the channel steel (9).
7. A guardrail for a construction platform of an excavation trolley according to any one of claims 3 to 6, characterized in that: An oblong through hole (14) is provided on the upper side wall of the channel steel (9), the extension direction of the oblong through hole (14) being parallel to the extension direction of the channel steel (9), a limit pin (15) being slidably installed in the oblong through hole (14), and the limit pin (15) being inserted into the mounting arm (1).