Tunnel secondary lining passable reworking support structure
By designing a passable rework bracket structure, the pass problem caused by rework during secondary lining construction of tunnels is solved, and the effect of reducing costs and improving efficiency is achieved, providing an economical, efficient and safe bracket solution suitable for tunnel engineering.
Patent Information
- Application Number
- CN202420814199.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-18
AI Technical Summary
During the secondary lining construction of the tunnel, vehicles and personnel are unable to pass due to rework of the full house bracket, which affects the construction progress, and the construction workload is large and the labor intensity is high, which increases the cost and operation difficulty.
A passable rework bracket structure including columns, longitudinal beams, cross beams, scissors braces and formwork is designed. It is supported on the secondary lining by steel pipe frames to provide stable support and can be adjusted to meet different tunnel engineering needs to ensure the vehicle and Passengers pass through, reducing the workload of bracket erecting.
Reduces the cost of reworking materials, reduces the impact on the working points, improves construction efficiency and safety, reduces the labor intensity of workers, and provides a more economical, efficient and safe bracket structure.
Smart Images

Figure CN222084517U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of tunnel secondary lining construction and provides a tunnel secondary lining passable rework bracket structure. Background Art
[0002] During the construction of the secondary lining of the tunnel, it is often the case that the secondary lining of the tunnel is exposed to quality hazards such as voids and insufficient thickness during radar scanning due to the inadequate implementation of processes such as window-by-window material laying, vibration, and grouting with molds. The secondary lining that cannot be remedied by grouting in the later stage will be directly reworked. In order to reduce the rework cost of the secondary lining, the traditional method is to adopt a full-span support structure for rework of the secondary lining. Due to the full-span support structure, vehicles and personnel cannot pass effectively, which will directly affect the construction work of the working point in front of the secondary lining and restrict the construction progress. At the same time, the full-span support erection construction workload is large and the labor intensity of the operators is high. Utility Model Content
[0003] In view of this, the purpose of the utility model is to provide a tunnel secondary lining passable rework bracket structure, aiming to solve the problem that vehicles and personnel cannot pass due to the full bracket of the lining rework and the restriction of the working surface in front of the secondary lining. At the same time, it can reduce the cost of secondary lining rework turnover materials, reduce the workload of bracket erection, and reduce the labor intensity of operators.
[0004] In order to achieve the above object, the utility model provides the following technical solutions:
[0005] The utility model provides a tunnel secondary lining passable rework support structure, including columns, longitudinal beams, cross beams, scissor braces, steel pipe racks and templates. 2N columns are arranged symmetrically side by side along the extension direction of the tunnel, and N is a natural number greater than 1; a common longitudinal beam is arranged on a single row of columns, and a plurality of cross beams distributed at intervals are arranged on two parallel longitudinal beams; scissor braces are arranged between the single row of columns; the template is supported on the secondary lining through a steel pipe rack, and the steel pipe rack is fixedly connected to the columns and cross beams at one end thereof. With the above scheme, the columns play a supporting role, the scissor braces are used to increase the stability between the columns, the longitudinal beams are used to enhance the overall rigidity of the columns, the cross beams are used to increase the stability and strength of the entire structure, and the template is supported on the secondary lining through a steel pipe rack for support during construction and fixation of the template. The advantage of this structure is that it can provide stable support and protection for the tunnel secondary lining, making the construction process safer and more efficient. At the same time, the structure can be adjusted and changed according to actual needs to adapt to different tunnel projects, and allow vehicles and personnel to pass under the support, so as not to restrict the working surface and improve construction efficiency.
[0006] Optionally, an open groove for placing the longitudinal beam is provided at the top of the column, and the bottom end of the column is provided on the inverted arch filling surface of the tunnel through a fixed base. The fixed base is composed of a steel plate, a stiffening plate, and an anchor bolt. The steel plate is fixed to the bottom of the column, and a plurality of radially arranged stiffening plates are provided between the steel plate and the column to increase the stability and strength of the connection. The anchor bolt passes through the steel plate and is inserted into the inverted arch filling surface of the tunnel; the function of the anchor bolt is to provide additional support and stability. The length, width and thickness of the steel plate are: 800*800*10mm, and the thickness of the stiffening plate is 12mm. Through the above structure, the bottom of the column can be firmly fixed on the inverted arch filling surface of the tunnel, so that the entire support structure is stable and reliable. At the same time, the setting of the steel plate and the stiffening plate can increase the strength and stability of the base, ensuring that the support can withstand the corresponding load.
[0007] Optionally, the columns are made of steel pipes with a diameter of 600mm, a wall thickness of 10mm, and a height of 5m, and the spacing between single-row columns is set to 3-4m; the depth of the open groove is 15cm. Such a design can provide sufficient support and stability, while ensuring that the spacing between the columns is reasonable and the steel pipe has high strength and bearing capacity. The design structure of the open groove can ensure that the longitudinal beam can be firmly placed on the column and provide sufficient support.
[0008] Optionally, the number of columns is determined according to the rework length of the secondary lining of the tunnel. When the rework length is less than 7m, the value of N is 4, that is, four symmetrical columns will be arranged along the extension direction of the tunnel; and when the rework length is 7m<L<10m, the value of N is 6, that is, six symmetrical columns will be arranged along the extension direction of the tunnel. By adjusting the number of columns according to the rework length, the stability and adaptability of the support structure can be ensured to meet the requirements of different rework lengths.
[0009] Optionally, the longitudinal beams are made of i32a I-beams, and the longitudinal beams of the double structure are used on the single-row columns, that is, the two longitudinal beams are connected together to increase the stability and strength of the overall structure; the length of the longitudinal beam is 20cm longer than the relining length of the secondary lining to ensure that the longitudinal beam can completely cover the relining length and provide sufficient support; the cross beams are made of i22a I-beams, and the length is 6.9m. The spacing between two adjacent cross beams is determined according to the relining length of the secondary lining, which is 70-110cm. This can ensure the uniform distribution of the cross beams and increase the stability and bearing capacity of the structure.
[0010] Optionally, the scissors brace adopts 20a channel steel, and the scissors brace between the single row of columns is set to a Z-shaped structure. By setting the scissors brace, the stability and rigidity of the entire support structure can be increased, ensuring that the support can withstand the corresponding load and reducing the impact on the passage space.
[0011] Optionally, the steel pipe rack uses seamless steel pipes with a diameter of 42mm and a wall thickness of 3.5mm; the steel pipe rack is composed of radial steel pipes, vertical steel pipes, horizontal steel pipes, floor steel pipes, diagonal bracing steel pipes and sweeping steel pipes, and each steel pipe is connected by fasteners; the longitudinal spacing of the vertical steel pipes on the crossbeam is 90cm, and the transverse spacing of the horizontal steel pipes on the vertical steel pipes is 90cm; the installation spacing of the horizontal steel pipes close to the template is increased to 75cm; the floor steel pipes are arranged on the outside of the columns, and the longitudinal spacing between adjacent floor steel pipes is 90cm; the radial steel pipes are evenly distributed along the secondary lining of the tunnel in the radial direction, and the circumferential spacing is 30cm; the diagonal bracing steel pipes are used to connect the vertical steel pipes, horizontal steel pipes and floor steel pipes; the sweeping steel pipes are connected to the floor steel pipes. Through the above structural design, the steel pipe rack can provide stable support and connection to ensure the stability and reliability of the support structure.
[0012] Optionally, the steel pipe rack also includes radial reinforcing steel pipes and transverse connecting steel pipes. A single row of columns is provided with multiple rows of transverse connecting steel pipes spaced from bottom to top. The radial reinforcing steel pipes are fixed on the transverse connecting steel pipes and the ground-mounted steel pipes to reinforce the radial steel pipes. In order to further increase the stability and rigidity of the entire support structure, a ladder is set up on the steel pipe rack to facilitate the vertical movement and passage of workers on the support.
[0013] Optionally, the front end of the radial steel pipe is provided with a double longitudinal steel pipe for supporting the formwork, and the front end of the radial steel pipe is a telescopic jacking structure. The double longitudinal steel pipe is connected by two longitudinal steel pipes through a connector to increase the stability and strength of the structure. The jacking structure can be telescopically adjusted as needed to meet the needs of supporting formworks of different heights.
[0014] Optionally, the template uses a wooden template with a length, width and thickness of 240*120*1.5cm. The size of such a wooden template can be adjusted according to actual needs to meet the requirements of the secondary lining of the tunnel.
[0015] The beneficial effects of the utility model are:
[0016] 1. Reduce the cost of circulating materials for rework of secondary lining: Through reasonable support structure design, the amount of circulating materials required for rework can be reduced, thereby reducing costs.
[0017] 2. Reduce the construction impact on the working point in front of the secondary lining: Through this support structure, the rework support is separated from the working point in front of the secondary lining, reducing the impact on the working point and improving the construction efficiency.
[0018] 3. Reduce the workload of scaffolding erection: The scaffolding structure is reasonably designed and easy to erect, which reduces the workload of scaffolding erection and improves construction efficiency.
[0019] 4. Reduce the labor intensity of operators: Due to the reduction of the workload of scaffolding erection, the labor intensity of operators is also reduced accordingly, which improves the comfort and safety of work.
[0020] In summary, by achieving the above effects, the utility model provides a more economical, efficient and safe support structure for secondary lining rework, bringing practical benefits to the construction of tunnel projects.
[0021] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and will be apparent to those skilled in the art based on the following examination and research, or can be taught from the practice of the present invention to some extent. The objectives and other advantages of the present invention can be achieved and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be described in detail below in conjunction with the accompanying drawings, in which:
[0023] Figure 1 It is a front view schematic diagram of a passable rework support structure for secondary lining of a tunnel according to the utility model;
[0024] Figure 2 for Figure 1 AA section view in;
[0025] Figure 3 This is a schematic diagram of the fixed base structure of the utility model tunnel secondary lining passable rework support structure;
[0026] Figure 4 for Figure 1 A magnified schematic diagram of part B in FIG.
[0027] Figure numerals: column 1, longitudinal beam 2, cross beam 3, scissors brace 4, steel pipe frame 5, formwork 6, open groove 7, steel plate 8, stiffening plate 9, anchor bolt 10, ladder 11, secondary lining 12, inverted arch filling surface 13; radial steel pipe 51, vertical steel pipe 52, horizontal steel pipe 53, floor-standing steel pipe 54, diagonal bracing steel pipe 55, sweeping steel pipe 56, radial reinforcement steel pipe 57, double-jointed longitudinal steel pipe 58, transverse connecting steel pipe 59. DETAILED DESCRIPTION
[0028] The utility model is further described below in conjunction with specific implementation methods. The drawings are only used for exemplary descriptions, and are only schematic diagrams, not actual pictures, and cannot be understood as limitations on this patent; in order to better illustrate the embodiments of the utility model, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0029] like Figure 1-4 As shown, the utility model of the tunnel secondary lining passable rework support structure comprises a column 1, a longitudinal beam 2, a cross beam 3, a scissor brace 4, a steel pipe frame 5 and a template 6. 2N columns 1 are arranged symmetrically side by side along the extension direction of the tunnel, and N is a natural number greater than 1, that is, the number of columns 1 is determined according to the rework length of the tunnel secondary lining 12. For example, when the rework length is less than 7m, the value of N is 4, and when the rework length is 7m<L<10m, the value of N is 6; a common longitudinal beam 2 is arranged on a single row of columns 1, and a plurality of cross beams 3 are arranged at intervals on two parallel longitudinal beams 2; a scissor brace 4 is arranged between the single row of columns 1; the template 6 is supported on the secondary lining 12 by the steel pipe frame 5, and the steel pipe frame 5 is fixedly connected to the secondary lining 12 at one end close to the column 1 and the cross beam 3; an open groove 7 for placing the longitudinal beam 2 is arranged at the top of the column 1, and the bottom end of the column 1 is arranged on the invert filling surface 13 of the tunnel through a fixed base.
[0030] Specifically, the fixed base is composed of a steel plate 8, a stiffening plate 9, and an anchor bolt 10. The steel plate 8 is fixed to the bottom of the column 1, and a plurality of radially arranged stiffening plates 9 are arranged between the steel plate 8 and the column 1. The anchor bolt 10 passes through the steel plate 8 and is inserted into the invert filling surface 13 of the tunnel. The length, width and thickness of the steel plate 8 are: 800*800*10mm, and the thickness of the stiffening plate 9 is 12mm. The column 1 adopts a steel pipe with a diameter of 600mm, a wall thickness of 10mm, and a height of 5m, and the spacing between the single-row columns 1 is set to 3-4m; the depth of the opening groove 7 is 15cm.
[0031] The longitudinal beam 2 is made of i32a I-beam, and the single-row column 1 is made of a double-structured longitudinal beam 2; the length of the longitudinal beam 2 is 20cm longer than the relining length of the secondary lining 12; the crossbeam 3 is made of i22a I-beam, and the length is 6.9m, and the spacing between two adjacent crossbeams is determined according to the relining length of the secondary lining 12, which is 70-110cm. The scissor brace 4 is made of 20a channel steel, and the scissor brace 4 between the single-row columns 1 is set to a Z-shaped structure.
[0032] The steel pipe frame 5 is made of seamless steel pipes with a diameter of 42 mm and a wall thickness of 3.5 mm; the steel pipe frame 5 is composed of radial steel pipes 51, vertical steel pipes 52, horizontal steel pipes 53, floor steel pipes 54, diagonal bracing steel pipes 55, sweeping steel pipes 56, radial reinforcement steel pipes 57, double longitudinal steel pipes 58 and transverse connecting steel pipes 59, and each steel pipe is connected by fasteners; the longitudinal spacing of the vertical steel pipes 52 arranged on the beam 3 is 90 cm, and the transverse spacing of the horizontal steel pipes 53 arranged on the vertical steel pipes 52 is 90 cm; the installation spacing of the horizontal steel pipes near the template 6 is encrypted to 75 cm; the floor steel pipes 54 are arranged on the outside of the column 1, and the adjacent floor steel pipes are connected. The longitudinal spacing between the tubes 54 is 90cm; the radial steel tubes 51 are evenly distributed along the secondary lining 12 of the tunnel in the radial direction, and the circumferential spacing is 30cm; the diagonal bracing steel tubes 55 are used to connect the vertical steel tubes 52, the horizontal steel tubes 53 and the ground steel tubes 54; the sweeping steel tubes 56 are connected to the ground steel tubes 54; the single-row columns 1 are provided with multiple rows of transverse connecting steel tubes 59 distributed from bottom to top, and the radial reinforcement steel tubes 57 are fixed on the transverse connecting steel tubes 59 and the ground steel tubes 54 to reinforce the radial steel tubes 51; the front end of the radial steel tube 51 is provided with a double longitudinal steel tube 58 for supporting the template 6, and the front end of the radial steel tube 51 is a telescopic top support structure. A ladder 11 for people to climb is set up on the steel tube frame 5.
[0033] The template 6 is a wooden template with a length, width and thickness of 240*120*1.5cm, and the number can meet the actual pouring area on site.
[0034] During construction, after the rework of the second lining is chiseled out, the position of the steel pipe column is measured and set out, the steel pipe column is installed, and the invert filling surface is fixed and reinforced with anchor bolts, the channel steel scissor brace is welded, the steel longitudinal beam and steel cross beam are installed, and the steel pipe rack is installed at appropriate intervals, the formwork is installed, the formwork is fixed by adjusting the top support, the diagonal brace and the sweeping brace are installed, and the installation of the steel pipe rack is inspected for safety. After meeting the requirements, concrete pouring can be carried out. This rework support structure has been subjected to force calculation and used in actual processes. The structure is stable, has small deformation, and meets the requirements of the specification.
[0035] With the above solution, the columns play a supporting role, the scissors brace is used to increase the stability between the columns, the longitudinal beam is used to enhance the overall rigidity of the columns, the cross beam is used to increase the stability and strength of the entire structure, and the formwork is supported on the secondary lining through a steel pipe rack, which is used for support during construction and fixation of the formwork. The advantage of this structure is that it can provide stable support and protect the secondary lining of the tunnel, making the construction process safer and more efficient. At the same time, the structure can be adjusted and changed according to actual needs to adapt to different tunnel projects, and vehicles and personnel can pass under the bracket, so as not to restrict the working surface and improve construction efficiency.
[0036] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the utility model.
Claims
1. A tunnel secondary lining passable rework support structure, characterized in that: The invention comprises columns (1), longitudinal beams (2), transverse beams (3), scissor braces (4), a steel pipe frame (5) and a formwork (6), wherein 2N columns (1) are arranged symmetrically in parallel along the extension direction of the tunnel, and N is a natural number greater than 1; a common longitudinal beam (2) is arranged on a single row of columns (1), and a plurality of transverse beams (3) are arranged at intervals on two parallel longitudinal beams (2); the scissor braces (4) are arranged between the columns (1) in a single row; the formwork (6) is supported on the secondary lining (12) through the steel pipe frame (5), and the steel pipe frame (5) is fixedly connected to the columns (1) and the transverse beam (3) at one end thereof.
2. The tunnel secondary lining passable rework support structure according to claim 1 is characterized in that: The top of the column (1) is provided with an open groove (7) for placing the longitudinal beam (2); the bottom of the column (1) is arranged on the inverted arch filling surface (13) of the tunnel through a fixed base; the fixed base is composed of a steel plate (8), a stiffening plate (9), and an anchor bolt (10); the steel plate (8) is fixed to the bottom of the column (1), and a plurality of stiffening plates (9) arranged radially are arranged between the steel plate and the column; the anchor bolt (10) passes through the steel plate (8) and is inserted into the inverted arch filling surface (13) of the tunnel; the length, width and thickness of the steel plate (8) are 800*800*10 mm, and the thickness of the stiffening plate (9) is 12 mm.
3. The tunnel secondary lining passable rework support structure according to claim 2 is characterized in that: The columns (1) are made of steel pipes with a diameter of 600 mm, a wall thickness of 10 mm and a height of 5 m, and the spacing between the columns (1) in a single row is set to 3-4 m; the depth of the opening groove (7) is 15 cm.
4. The tunnel secondary lining passable rework support structure according to claim 1 is characterized in that: The number of the columns (1) is determined according to the rework length of the secondary lining of the tunnel. When the rework length is less than 7m, the value of N is 4, and when the rework length is 7m<L<10m, the value of N is 6.
5. The tunnel secondary lining passable rework support structure according to claim 1 is characterized in that: The longitudinal beam (2) is made of i32a I-beam, and a double-structured longitudinal beam (2) is used on a single row of columns (1); the length of the longitudinal beam (2) is 20 cm longer than the relining length of the secondary lining (12); the cross beam (3) is made of i22a I-beam, and has a length of 6.9 m. The spacing between two adjacent cross beams is determined according to the relining length of the secondary lining (12), and is 70-110 cm.
6. The tunnel secondary lining passable rework support structure according to claim 1 is characterized in that: The scissor struts (4) are made of 20a channel steel, and the scissor struts (4) between the single-row columns (1) are arranged in a Z-shaped structure.
7. The tunnel secondary lining passable rework support structure according to claim 1 is characterized in that: The steel pipe rack (5) is made of seamless steel pipes with a diameter of 42 mm and a wall thickness of 3.5 mm; the steel pipe rack (5) is composed of radial steel pipes (51), vertical steel pipes (52), horizontal steel pipes (53), floor-standing steel pipes (54), diagonal bracing steel pipes (55) and sweeping steel pipes (56), and the steel pipes are connected by fasteners; the longitudinal spacing of the vertical steel pipes (52) arranged on the crossbeam (3) is 90 cm, and the transverse spacing of the horizontal steel pipes (53) arranged on the vertical steel pipes (52) is 90 cm; the horizontal steel pipes are arranged on the side of the crossbeam (3) and ... The installation spacing near the template (6) is increased to 75 cm; the floor-standing steel pipes (54) are arranged outside the columns (1), and the longitudinal spacing between adjacent floor-standing steel pipes (54) is 90 cm; the radial steel pipes (51) are evenly distributed in the radial direction of the secondary lining (12) of the tunnel, and the circumferential spacing is 30 cm; the diagonal bracing steel pipes (55) are used to connect the vertical steel pipes (52), the horizontal steel pipes (53) and the floor-standing steel pipes (54); the sweeping steel pipes (56) are connected to the floor-standing steel pipes (54).
8. The tunnel secondary lining passable rework support structure according to claim 7 is characterized in that: The steel pipe rack (5) further comprises radial reinforcement steel pipes (57) and transverse connection steel pipes (59); a single row of the upright columns (1) is provided with a plurality of rows of the transverse connection steel pipes (59) spaced from bottom to top; the radial reinforcement steel pipes (57) are fixedly mounted on the transverse connection steel pipes (59) and the floor-standing steel pipes (54) to reinforce the radial steel pipes (51); and a ladder (11) is mounted on the steel pipe rack (5).
9. The tunnel secondary lining passable rework support structure according to claim 7, characterized in that: The front end of the radial steel pipe (51) is provided with a double longitudinal steel pipe (58) for supporting the template (6), and the front end of the radial steel pipe (51) is a telescopic supporting structure.
10. The tunnel secondary lining passable rework support structure according to claim 1, characterized in that: The template (6) is a wooden template with a length, width and thickness of 240*120*1.5 cm.