Heat storage device matched with electric boiler
By designing a heat storage device in an electric heating boiler, using the heat absorption box and pre-temperature pipe to reuse the heat generated by heating, the problems of heat waste and insulation are solved, and the heating efficiency is improved.
Patent Information
- Application Number
- CN202420749399.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-11
AI Technical Summary
The heat generated by existing electric boilers during heating is difficult to store, resulting in waste of heat. At the same time, hot water is transferred through external pipes during transportation, and cannot be effectively insulated and utilized.
A supporting heat storage device for electric heating boilers is designed, including snake-shaped heat pipes, heat absorption box, insulation cotton, installation frame, pre-temperature pipe and micro pump body. The heat absorption box collects the heat from the conveyor pipe for preheating, and uses insulation to The cotton and mounting frame reduce temperature loss. The preheated water source enters the preheating pipe through the hose and heats it again, reducing the heating energy consumption of the heat pipe.
Effectively collect and reuse the heat generated by heating, reduce heat waste, reduce heating energy consumption of heat pipes, and improve heating efficiency and insulation effect.
Smart Images

Figure CN222085993U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of electric boilers, and in particular to a heat storage device supporting an electric boiler. Background Art
[0002] An electric boiler is a thermal device that converts electrical energy into thermal energy and heats water into pressurized hot water or steam. It does not require a furnace, flue or chimney, nor does it require a place to store fuel, greatly reducing the pollution caused by conventional coal-fired boilers.
[0003] The existing patent (publication number: CN218544381U) has been published.
[0004] During the use of the above-mentioned electric boiler, the water temperature will increase after the cold water flows through the pipe section of the water inlet pipe where the relay is placed, and will immediately enter the heating pipe section. The cold water is preheated by the temperature generated by the operation of the relay to save subsequent heating energy consumption. However, the heat generated by the relay is low and the effect is poor. The heat generated by the heating pipe section cannot be stored well, resulting in a waste of this part of the heat. At the same time, when transporting the heated water source, the hot water is easily transferred to the outside through the pipe wall of the external transport pipe, and it cannot be insulated and utilized. Utility Model Content
[0005] In view of the shortcomings of the prior art, the present application provides a heat storage device for an electric boiler, which has the advantages of preheating and energy saving, and solves the problem that the heat generated by the heating pipe section cannot be well stored, resulting in waste of this part of the heat. At the same time, when transporting the heated water source, the hot water is easily transferred to the outside through the pipe wall of the external transport pipe, and it cannot be insulated and utilized.
[0006] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a heat storage device for an electric boiler, comprising a furnace body, a heat pipe installed inside the furnace body, the heat pipe being serpentine, the right end of the heat pipe being in contact with a delivery pipe, the outer surface of the delivery pipe being in contact with two symmetrically arranged heat absorption boxes, the front side of the heat absorption box at the rear is fixedly connected with two connecting pipes, and the two connecting pipes are both plugged into the frontmost heat absorption box.
[0007] The outer surfaces of the two heat absorption boxes are both bonded with thermal insulation cotton, and the outer surfaces of the two thermal insulation cottons are both bonded with mounting frames. The left end of the frontmost heat absorption box is fixedly connected to a water inlet pipe, and the left end of the rearmost heat absorption box is fixedly connected to a water outlet pipe. A preheating pipe is fixedly embedded between the left and right inner walls of the furnace body.
[0008] Through the above scheme, through the setting of the heat absorption box, it is possible to collect the heat emitted by the delivery pipe to the outside, so as to achieve the effect of preheating the cold water inside the heat absorption box. At the same time, through the setting of the thermal insulation cotton and the installation frame, the delivery pipe can be insulated to reduce the loss of internal temperature. The preheated water source can enter the interior of the preheating pipe through the hose, and the heat generated by heating the water source through the heat pipe is preheated again. After preheating, it directly enters the heat pipe, which effectively reduces the heating energy consumption of the heat pipe.
[0009] Furthermore, the bottom end of the water outlet pipe is fixedly connected to a hose, and the other end of the hose is fixedly connected to the right end of the preheating pipe.
[0010] Through the above solution, by setting the hose, it is possible to transport the water source inside the heat absorption box into the preheating tube.
[0011] Furthermore, the left end of the preheating pipe is fixedly connected to the left end of the heat pipe.
[0012] Through the above scheme, by setting the preheating pipe, the purpose of heating the water source by preheating the furnace body can be achieved.
[0013] Furthermore, a one-way valve is fixedly installed at the left end of the preheating pipe, and the one-way valve opens backwards when under pressure.
[0014] Through the above solution, by setting the one-way valve, it is possible to prevent the water inside the heat pipe from flowing back into the interior of the preheating pipe.
[0015] Furthermore, a micro pump body is installed on the back of the furnace body, the output end of the micro pump body is fixedly connected to a water supply pipe, and the other end of the water supply pipe is fixedly connected to a water inlet pipe.
[0016] Through the above solution, by setting up the micro pump body, it is possible to transport the external water source into the heat absorption box.
[0017] Furthermore, a first flange is fixedly mounted on the left end of the heat pipe.
[0018] Through the above solution, the first flange is provided to facilitate the user to connect with external pipelines.
[0019] Furthermore, a second flange is fixedly mounted on the right end of the heat pipe and the left end of the delivery pipe.
[0020] Through the above solution, by setting the second flange, the connection purpose of the delivery pipe and the heat pipe can be facilitated.
[0021] Furthermore, a plurality of fixing holes are provided on the front sides of the two installation frames, and a heat preservation plate is fixedly connected to the inner wall of the furnace body.
[0022] Through the above solution, the disassembly and assembly of the two fixing frames is facilitated by the provision of the fixing holes.
[0023] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0024] The heat storage device supporting the electric boiler can collect the heat radiated from the delivery pipe to the outside through the setting of the heat absorption box, so as to achieve the effect of preheating the cold water inside the heat absorption box. At the same time, through the setting of the thermal insulation cotton and the installation frame, the delivery pipe can be insulated to reduce the loss of internal temperature. The preheated water source can enter the interior of the preheating pipe through the hose, and the heat generated by heating the water source through the heat pipe is preheated again. After the preheating is completed, it directly enters the heat pipe, which effectively reduces the heating energy consumption of the heat pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of the heat pipe and pre-heating pipe structure of this application;
[0026] Figure 2 This is the front view of the furnace body of this application;
[0027] Figure 3 This is a schematic diagram of the transmission pipe structure for this application;
[0028] Figure 4 It is a cross-sectional view of the right side view of the conveying pipe structure of this application;
[0029] Figure 5 This is the rear view of the furnace body of this application;
[0030] Figure 6 This is a cross-sectional view of the bottom view of the furnace body of this application.
[0031] In the figure:
[0032] 1. Furnace body; 2. Heat pipe; 3. Delivery pipe; 4. Heat absorption box; 5. Connecting pipe; 6. Insulation cotton; 7. Installation frame; 8. Water inlet pipe; 9. Water outlet pipe; 10. Preheating pipe; 11. Hose; 12. One-way valve; 13. Micro pump body; 14. Water delivery pipe; 15. First flange; 16. Second flange; 17. Fixing hole; 18. Insulation board. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0034] See also Figure 1 , Figure 2 and Figure 4 In this embodiment, a heat storage device supporting an electric boiler includes a furnace body 1. A heat pipe 2 is installed inside the furnace body 1. The heat pipe 2 is serpentine. The right end of the heat pipe 2 contacts with a delivery pipe 3. The left end of the heat pipe 2 is fixedly installed with a first flange 15. The setting of the first flange 15 facilitates the user to connect with external pipelines. The outer side of the delivery pipe 3 contacts with two symmetrically arranged heat absorption boxes 4. The front of the heat absorption box 4 located at the rear is fixedly connected with two connecting pipes 5. The two connecting pipes 5 are both plugged with the front heat absorption box 4. The right end of the heat pipe 2 and the left end of the delivery pipe 3 are fixedly installed with a second flange 16. The setting of the second flange 16 can facilitate the connection purpose of the delivery pipe 3 and the heat pipe 2.
[0035] See also Figure 1 , Figure 3 and Figure 4 The outer surfaces of the two heat absorbing boxes 4 are bonded with insulation cotton 6, and the outer surfaces of the two insulation cottons 6 are bonded with installation frames 7. The front of the two installation frames 7 are provided with multiple fixing holes 17. The inner wall of the furnace body 1 is fixedly connected with an insulation board 18. The setting of the fixing holes 17 facilitates the disassembly and assembly of the two fixing frames. The left end of the frontmost heat absorbing box 4 is fixedly connected with a water inlet pipe 8.
[0036] See also Figure 1 , Figure 5 and Figure 6 In addition, a micro pump body 13 is installed on the back of the furnace body 1, and the output end of the micro pump body 13 is fixedly connected with a water supply pipe 14, and the other end of the water supply pipe 14 is fixedly connected with the water inlet pipe 8. Through the setting of the micro pump body 13, it is possible to transport the external water source into the heat absorption box 4, and the left end of the rearmost heat absorption box 4 is fixedly connected with a water outlet pipe 9, and the bottom end of the water outlet pipe 9 is fixedly connected with a hose 11, and the other end of the hose 11 is fixedly connected with the right end of the preheating pipe 10. Through the setting of the hose 11, it is possible to The water source inside the heat absorption box 4 is transported into the preheating tube 10, and the left end of the preheating tube 10 is fixedly connected to the left end of the heat pipe 2. Through the setting of the preheating tube 10, the purpose of heating the water source by preheating inside the furnace body 1 can be achieved. A one-way valve 12 is fixedly installed on the left end of the preheating tube 10, and the one-way valve 12 opens backward when pressurized. Through the setting of the one-way valve 12, the water inside the heat pipe 2 can be prevented from flowing back into the interior of the preheating tube 10. The preheating tube 10 is fixedly embedded between the left and right inner walls of the furnace body 1.
[0037] In the present embodiment, a heat storage device is provided for an electric boiler, and the heat dissipated from the delivery pipe 3 to the outside is collected by the arrangement of the heat absorption box 4, so as to achieve the effect of preheating the cold water inside the heat absorption box 4. At the same time, the delivery pipe 3 can be insulated by the arrangement of the thermal insulation cotton 6 and the installation frame 7, so as to reduce the loss of the internal temperature. The preheated water source can enter the interior of the preheating pipe 10 through the hose 11, and be preheated again by the heat generated by heating the water source by the heat pipe 2. After the preheating is completed, it directly enters the heat pipe 2, so as to effectively reduce the heating energy consumption of the heat pipe 2.
[0038] It should be noted that the input end of the micro pump body 13 is connected to an external water source pipe.
[0039] The working principle of the above embodiment is as follows: the water source enters the furnace body 1 through the heat pipe 2, the furnace body 1 and the heat pipe 2 are started, and the water source inside is heated. The heat generated by the heating can be well stored in the furnace body 1 by the insulation plate 18, and the heated water source enters the delivery pipe 3. During the delivery process, the heat of the water source is transferred outward through the wall of the delivery pipe 3, and the heat can be well stored in the heat absorption box 4 through the insulation surface and the mounting frame 7. Then the micro pump body 13 is started to draw cold water into the heat absorption box 4 for initial preheating. After the preheating is completed, the water outlet pipe 9 connected to the heat absorption box 4 enters the preheating pipe 10 through the hose 11. The preheating pipe 10 can be fully heated again by relying on the heat inside the furnace body 1, and then enters the left end of the heat pipe 2 and mixes with the cold water at its left end for heating, which effectively reduces the energy consumption of subsequent water source heating and makes full use of the remaining heat.
[0040] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0041] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A heat storage device for an electric boiler, comprising a furnace body (1), Features: A heat pipe (2) is installed inside the furnace body (1), the heat pipe (2) is serpentine, the right end of the heat pipe (2) contacts a delivery pipe (3), the outer side of the delivery pipe (3) contacts two symmetrically arranged heat absorption boxes (4), the front side of the heat absorption box (4) at the rear is fixedly connected to two connecting pipes (5), and the two connecting pipes (5) are plugged into the heat absorption box (4) at the front; The outer surfaces of the two heat absorbing boxes (4) are both bonded with heat insulation cotton (6), and the outer surfaces of the two heat insulation cottons (6) are both bonded with mounting frames (7). The left end of the frontmost heat absorbing box (4) is fixedly connected to a water inlet pipe (8), and the left end of the rearmost heat absorbing box (4) is fixedly connected to a water outlet pipe (9). A preheating pipe (10) is fixedly embedded between the left and right inner walls of the furnace body (1).
2. A heat storage device for an electric boiler according to claim 1, Features: The bottom end of the water outlet pipe (9) is fixedly connected to a hose (11), and the other end of the hose (11) is fixedly connected to the right end of the preheating pipe (10).
3. The heat storage device for an electric boiler according to claim 1, Features: The left end of the preheating pipe (10) is fixedly connected to the left end of the heat pipe (2).
4. The heat storage device for an electric boiler according to claim 1, Features: A one-way valve (12) is fixedly mounted on the left end of the preheating pipe (10), and the one-way valve (12) opens backwards when under pressure.
5. The heat storage device for an electric boiler according to claim 1, Features: A micro pump body (13) is installed on the back of the furnace body (1), the output end of the micro pump body (13) is fixedly connected to a water supply pipe (14), and the other end of the water supply pipe (14) is fixedly connected to a water inlet pipe (8).
6. The heat storage device for an electric boiler according to claim 1, Features: A first flange (15) is fixedly mounted on the left end of the heat pipe (2).
7. The heat storage device for an electric boiler according to claim 1, Features: The right end of the heat pipe (2) and the left end of the delivery pipe (3) are both fixedly mounted with a second flange (16).
8. The heat storage device for an electric boiler according to claim 1, Features: A plurality of fixing holes (17) are provided on the front sides of the two installation frames (7), and a heat-insulating plate (18) is fixedly connected to the inner wall of the furnace body (1).
