Stepped concrete mixing plant
By designing a stepped concrete mixing station on the slopes of mountain areas, we take advantage of the terrain to reduce the excavation of the mountain, solving the construction costs and safety issues, and achieving efficient and safe construction of a concrete mixing station.
Patent Information
- Application Number
- CN202420594023.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-26
AI Technical Summary
When building concrete mixing stations in mountainous slope environments, the existing technology is difficult to meet the site requirements, resulting in high excavation costs and poor safety.
Design a stepped concrete mixing station, adopting a stepped foundation to arrange mixing main machine, powder tank, batching machine and feeder to reduce mountain excavation, take advantage of the advantages of terrain, adopt a semi-civilized and semi-steel structure aggregate silo to reduce construction risk.
It has achieved efficient construction of concrete mixing stations on mountain slopes, reduced mountain excavation, reduced economic costs and safety risks, improved applicability, economy and safety, and has a compact structure, reasonable layout and low operating costs.
Smart Images

Figure CN222096554U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of concrete mixing stations, and in particular relates to a stepped concrete mixing station. Background Art
[0002] Concrete mixing station (building) is a combined device used for centralized mixing and production of concrete, also known as concrete prefabrication plant. Due to its high degree of mechanization and automation, it has high productivity, can ensure the quality of concrete and save cement, and is often used in large and medium-sized water conservancy, power, bridge and other projects with large concrete engineering volume, long construction period and concentrated construction sites.
[0003] Generally, concrete mixing plants are built on flat ground, with high site requirements and large construction area. When constructing on mountain slopes, if the conventional mixing plant layout method is used, the site requirements are too high and it is often difficult to choose a suitable construction site. If the slope is excavated and leveled on a large scale, the economic cost will be high and the safety will be poor.
[0004] Based on this, the applicant considered designing a stepped concrete mixing plant. Utility Model Content
[0005] In view of the above-mentioned deficiencies of the prior art, the technical problem to be solved by the present invention is: how to provide a stepped concrete mixing station to reduce the degree of mountain excavation, reduce construction risks and save costs when building a concrete mixing station on a mountain slope.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] A stepped concrete mixing station comprises a stepped foundation and a mixing main machine, a powder tank, a batching machine and a first horizontal conveyor arranged in sequence from low to high along the stepped foundation, wherein one end of the first horizontal conveyor is connected to an aggregate bin and the other end is connected to the batching machine, and a first inclined conveyor is connected between the batching machine and the mixing main machine.
[0008] Compared with the prior art, the utility model has the advantages of a stepped concrete mixing station:
[0009] By setting up a stepped foundation, it is possible to build a concrete mixing station on a mountain slope. The terrain can be fully utilized according to local conditions, mountain excavation can be reduced to a great extent, and the risks of landslides and collapses can be reduced. It is easy to build and has good applicability, economy and safety. The concrete mixing station has a compact structure and a reasonable layout.
[0010] The above-mentioned stepped concrete mixing station has the advantages of simple structure and easy implementation, is suitable for installation and use in concrete prefabrication sites in mountainous areas or sloping lands, and has low operating costs and high use benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 This is a schematic diagram of the stepped foundation layout structure of the utility model;
[0012] Figure 2 This is a schematic diagram of the cross-sectional structure of the installation position of the aggregate bin of the utility model;
[0013] Figure 3 This is a schematic diagram of the front step structure of the utility model;
[0014] Figure 4 for Figure 3 A schematic diagram of a top view structure of FIG.
[0015] Figure 5 It is a schematic diagram of the structure in which the powder tank is arranged on the first step;
[0016] Figure 6 This is a schematic diagram of the structure in which the powder tanks are arranged on the second step.
[0017] Description of Reference Numerals
[0018] 100 mixing main machine, 110 door frame
[0019] 200 powder tank
[0020] 300 batching machine
[0021] 400 first horizontal conveyor, 410 first inclined conveyor, 420 second horizontal conveyor, 430 second inclined conveyor
[0022] 500 aggregate silo, 510 unloading door, 520 steel structure support
[0023] 610 first step, 620 second step, 630 third step, 640 fourth step DETAILED DESCRIPTION
[0024] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0025] When implementing: Figure 1As shown, a stepped concrete mixing station includes a stepped foundation and a mixing main machine 100, a powder tank 200, a batching machine 300 and a first horizontal conveyor 400 arranged in sequence from low to high along the stepped foundation, wherein one end of the first horizontal conveyor 400 is connected to an aggregate bin 500, and the other end is connected to the batching machine 300, and a first inclined conveyor 410 is connected between the batching machine 300 and the mixing main machine 100.
[0026] During implementation, the first horizontal conveyor 400 and the first inclined conveyor 410 are both belt conveyors.
[0027] Compared with the prior art, the utility model has the advantages of a stepped concrete mixing station:
[0028] By setting up a stepped foundation, it is possible to build a concrete mixing station on a mountain slope. The terrain can be fully utilized according to local conditions, mountain excavation can be reduced to a great extent, and the risks of landslides and collapses can be reduced. It is easy to build and has good applicability, economy and safety. The concrete mixing station has a compact structure and a reasonable layout.
[0029] The above-mentioned stepped concrete mixing station has the advantages of simple structure and easy implementation, is suitable for installation and use in existing concrete prefabrication sites, and has low operating costs and high use efficiency.
[0030] In this embodiment, Figure 1 As shown, the stepped foundation includes a first step 610, a second step 620, a third step 630 and a fourth step 640 which are arranged in sequence from low to high, the mixing main unit 100 is installed on the first step 610, the powder tank 200 is installed on the second step 620, the batching machine 300 is installed on the third step 630, and the first horizontal conveyor 400 is installed on the fourth step 640.
[0031] In this way, by setting the first step 610, the second step 620, the third step 630 and the fourth step 640, the mixing main unit 100, the powder tank 200, the batching machine 300 and the first horizontal conveyor 400 can be stably installed on the stepped foundation.
[0032] In this embodiment, the first step 610 includes a road.
[0033] In this way, the mixer truck can directly stop on the road to receive the mixing material delivered by the mixer main machine 100, which is convenient for transportation, does not need to occupy additional space, and has high resource utilization rate.
[0034] In this embodiment, Figure 1As shown, a gantry 110 is provided at the bottom of the mixing main machine 100 , and the mixing main machine 100 is erected on the road through the gantry 110 .
[0035] In this way, the main mixer 100 can be erected above the road surface through the gantry 110 to facilitate the passage of vehicles.
[0036] In this embodiment, Figure 1 As shown, the clearance width of the gantry 110 is greater than four meters.
[0037] In this way, the portal frame 110 has a clearance width of four meters, which is convenient for large transport vehicles to pass through.
[0038] In this embodiment, the aggregate bin 500 is built along the slope and arranged on the fourth step 640 . The bottom of the aggregate bin 500 is connected to a second horizontal conveyor 420 , and a second inclined conveyor 430 is connected between the first horizontal conveyor 400 and the second horizontal conveyor 420 .
[0039] During implementation, the second horizontal conveyor 420 is disposed on the third step 630 , the bottom end of the second inclined conveyor 430 is connected to the second horizontal conveyor 420 , and the top end of the second inclined conveyor 430 is connected to the first horizontal conveyor 400 .
[0040] During implementation, there are multiple aggregate bins 500, and the multiple aggregate bins 500 are arranged in sequence on the fourth step 640. The second horizontal conveyor 420 and the second inclined conveyor 430 are both belt conveyors, and the length direction of the second horizontal conveyor 420 is the same as the arrangement direction of the multiple aggregate bins 500.
[0041] In this way, the aggregates in the aggregate bin 500 can be transported to the batching machine 300 through the second horizontal conveyor 420 , the second inclined conveyor 430 and the first horizontal conveyor 400 in sequence.
[0042] In this embodiment, Figure 2 As shown, the aggregate bin 500 is funnel-shaped, and a discharge door 510 is provided at the bottom of the aggregate bin 500 for discharging materials to the second horizontal conveyor 420 .
[0043] During implementation, a feeding opening is provided on the top of the aggregate bin 500 for feeding materials into the aggregate bin 500 .
[0044] In this way, the aggregates put into the aggregate bin 500 can slide along the bin wall into the discharge door 510 and the second horizontal conveyor 420 by their own weight, which is convenient for unloading, and the discharge door 510 can control the amount of material unloaded to the second horizontal conveyor 420.
[0045] In this embodiment, Figure 2As shown, the aggregate bin 500 is supported by a combination of slope soil and steel structure. One side of the outer wall of the aggregate bin 500 abuts against the foundation wall of the fourth step 640, and the other side is fixedly connected to a steel structure bracket 520.
[0046] During implementation, the foundation wall of the fourth step 640 is a civil engineering support wall, and another layer of the outer wall of the aggregate bin 500 is supported and arranged on the foundation wall through the steel structure support 520 .
[0047] In this way, the aggregate silo 500 is supported by the foundation wall of the fourth step 640 and the steel structure support 520 and built along the slope, and a semi-civil construction and semi-steel structure combination is adopted, which can minimize the excavation of the mountain.
[0048] In this embodiment, Figure 1 As shown, one end of the first inclined feeder 410 is installed on the third step 630 and is connected to the batching machine 300 for feeding, and the other end is connected to the top of the mixing main machine 100 for feeding.
[0049] In this way, the first inclined conveyor 410 can convey the material output from the batching machine 300 to the mixing main machine 100, and the conveying structure is simple and easy to implement.
[0050] In this embodiment, Figure 3 , Figure 4 and Figure 6 As shown, there are multiple powder tanks 200 , and the multiple powder tanks 200 are installed side by side on the first step 610 and the second step 620 .
[0051] When implementing, Figure 5 As shown, a door frame is also set up at the bottom of the powder tank 200 installed on the first step 610 to accommodate vehicles passing through.
[0052] In this way, the powder tank 200 can be stored on the first step 610 and the second step 620 to obtain more storage space.
[0053] The above are only preferred implementations of the present invention. It should be pointed out that a number of modifications and improved technical solutions made by those skilled in the art without departing from the technical solution should also be deemed to fall within the scope of protection required by the claims.
Claims
1. A stepped concrete mixing station, characterized in that: The invention comprises a stepped foundation and a main mixing machine, a powder tank, a batching machine and a first horizontal conveyor arranged in sequence from low to high along the stepped foundation. One end of the first horizontal conveyor is connected to an aggregate bin, and the other end is connected to the batching machine. A first inclined conveyor is connected between the batching machine and the main mixing machine.
2. A stepped concrete mixing station according to claim 1, characterized in that: The stepped foundation includes a first step, a second step, a third step and a fourth step arranged in sequence from low to high, the mixing main unit is installed on the first step, the powder tank is installed on the second step, the batching machine is installed on the third step, and the first horizontal conveyor is installed on the fourth step.
3. A stepped concrete mixing station according to claim 2, characterized in that: The first step includes a road.
4. A stepped concrete mixing station according to claim 3, characterized in that: A gantry is provided at the bottom of the mixing main machine, and the mixing main machine is erected on the road through the gantry.
5. The stepped concrete mixing station according to claim 4, characterized in that: The clearance width of the gantry is greater than four meters.
6. The stepped concrete mixing station according to claim 2, characterized in that: The aggregate bin is built along the slope and arranged on the fourth step. The bottom of the aggregate bin is connected to a second horizontal conveyor, and a second inclined conveyor is connected between the first horizontal conveyor and the second horizontal conveyor.
7. A stepped concrete mixing station according to claim 6, characterized in that: The aggregate bin is funnel-shaped, and a discharge door is provided at the bottom of the aggregate bin for discharging materials to the second horizontal conveyor.
8. The stepped concrete mixing station according to claim 6, characterized in that: The aggregate bin is supported by a combination of slope soil and steel structure. One side of the outer wall of the aggregate bin abuts against the foundation slope soil wall of the fourth step, and the other side is fixedly connected to a steel structure bracket.
9. The stepped concrete mixing station according to claim 2, characterized in that: One end of the first inclined feeder is installed on the third step and is connected to the batching machine for feeding, and the other end is connected to the top feeder of the mixing main machine.
10. A stepped concrete mixing station according to any one of claims 2 to 9, characterized in that: There are multiple powder tanks, and the multiple powder tanks are installed side by side on the first step and the second step.