Concrete pouring guide pipe structure and concrete pouring auxiliary vehicle

By designing concrete pouring conduit structure and auxiliary vehicles, and using support plates and skateboards to adjust the pouring channel, the problem of the inability to control the concrete pouring amount in the existing technology is solved, and the free adjustment of the concrete pouring amount is achieved, which reduces waste and bubbles and improves the Concrete pouring quality and environmental protection.

CN222101502UActive Publication Date: 2024-12-03CHINA THREE GORGES RENEWABLES (GRP) CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420012286.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-12-03
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

The existing concrete pouring construction method cannot control the pouring amount of concrete per unit time, resulting in excess concrete flowing out when the pile foundation hole is soon completed, causing waste.

Method used

A concrete pouring conduit structure is designed, including concrete pouring control pipe, pouring control components and concrete pouring inlet pipe. The size of the pouring channel is adjusted through the sliding connection between the support plate and the slide plate to achieve the control of concrete flow, and combined with concrete pouring auxiliary vehicles Used to support and move the catheter structure.

Benefits of technology

It effectively reduces bubbles caused by excessive pouring amount per unit time during concrete pouring, improves the quality of concrete pouring, avoids concrete waste, and improves environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101502U_ABST
    Figure CN222101502U_ABST
Patent Text Reader

Abstract

The utility model provides a concrete pouring guide pipe structure and a concrete pouring auxiliary vehicle, and relates to the technical field of concrete pouring, the concrete pouring guide pipe structure comprises a concrete pouring control pipe, and a pouring channel is formed in the concrete pouring control pipe; the pouring control assembly comprises a supporting plate and a sliding plate, the supporting plate is installed on the inner wall of the concrete pouring control pipe, the sliding plate is inserted into the concrete pouring control pipe and slidably connected with the supporting plate, and the sliding plate slides relative to the supporting plate so that the size of the pouring channel can be adjusted, and then the flow of concrete in the concrete pouring control pipe can be controlled; and the concrete pouring ingress pipe is connected with one end of the concrete pouring control pipe so as to guide concrete to flow into the pile foundation hole. According to the concrete pouring guide pipe structure, the pouring amount of concrete in unit time can be freely adjusted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of concrete pouring, and in particular to a concrete pouring conduit structure and a concrete pouring auxiliary vehicle. Background Art

[0002] Concrete refers to a composite material made of cement that binds sand and gravel together. It is widely used in foundation treatment projects. In the construction of new energy projects, especially when it comes to foundation treatment projects such as wind turbine foundations, towers, and pile foundations, mechanical holes are usually drilled and steel cages are placed before concrete pouring.

[0003] At present, for concrete pouring construction, a commercial mixer truck is usually used to directly pour concrete into the pile foundation hole.

[0004] However, the above-mentioned concrete pouring construction method cannot control the pouring amount of concrete per unit time, so that when the pouring of the pile foundation hole is almost completed, excess concrete flows out of the hole, resulting in a waste of concrete. Utility Model Content

[0005] The present application provides a concrete pouring conduit structure and a concrete pouring auxiliary vehicle to realize free adjustment of the pouring amount of concrete per unit time.

[0006] In order to achieve the above objectives, the embodiments of the present application provide the following technical solutions:

[0007] The present application provides a concrete pouring conduit structure, comprising a concrete pouring control pipe, wherein a pouring channel is formed in the concrete pouring control pipe;

[0008] A pouring control assembly, the pouring control assembly comprising a support plate and a slide plate, the support plate being mounted on the inner wall of the concrete pouring control pipe, the slide plate being inserted on the concrete pouring control pipe and slidably connected to the support plate, the slide plate sliding relative to the support plate to adjust the size of the pouring channel, thereby controlling the flow of concrete in the concrete pouring control pipe;

[0009] A concrete pouring introduction pipe is connected to one end of the concrete pouring control pipe to guide the concrete to flow into the pile foundation hole.

[0010] In a possible implementation, a first sliding groove is provided on the support plate;

[0011] The slide plate is provided with a first pulley, which is located in the first slide groove and moves along the extension direction of the first slide groove to drive the slide plate to slide relative to the concrete pouring control pipe.

[0012] In a possible implementation, the support plate includes an upper support plate and a lower support plate, the slide plate is inserted between the upper support plate and the lower support plate, the first slide groove is provided on the surface of the upper support plate and the lower support plate facing the slide plate, the first pulley is provided on two opposite surfaces of the slide plate, and the first pulley is provided corresponding to the first slide groove.

[0013] In a possible implementation, the number of the slides is set to at least two, and each of the slides is provided with a grab ear, and the grab ear is located outside the concrete pouring control pipe, so that the slides can be driven to move closer to or away from each other through the grab ear.

[0014] In a possible implementation, the method further includes a concrete pouring container to contain the concrete;

[0015] The concrete pouring control pipe is arranged in a funnel shape, and the large diameter end of the concrete pouring control pipe is connected to the concrete pouring containing tank, and the small diameter end of the concrete pouring control pipe is connected to the concrete pouring introduction pipe.

[0016] On the other hand, the present application also provides a concrete pouring auxiliary vehicle, comprising a vehicle body and a concrete pouring duct structure as described in any of the above items, wherein the concrete pouring duct structure is installed on the vehicle body, and the vehicle body is used to support the concrete pouring duct structure and drive the concrete pouring duct structure to move.

[0017] In a possible implementation, the vehicle body includes a frame and a drive control mechanism, and the concrete pouring conduit structure is mounted on the frame;

[0018] The drive control mechanism includes a directional wheel, a steering wheel, a control rod and a drive motor. The directional wheel and the steering wheel are both installed at the bottom of the frame. The control rod is inserted into the frame and connected to the steering wheel to control the steering of the concrete pouring auxiliary vehicle. The drive end of the drive motor is connected to the directional wheel to drive the concrete pouring auxiliary vehicle to move.

[0019] In a possible implementation, it further includes a slip control mechanism;

[0020] The sliding control mechanism includes a sliding component and a driving component. The concrete pouring conduit structure is slidingly connected to the vehicle body through the sliding component. The driving component is arranged on the vehicle body to drive the concrete pouring conduit structure to slide relative to the vehicle body.

[0021] In a possible implementation, two sliding assemblies are provided, and are respectively located on the vehicle body on both sides of the concrete pouring conduit structure;

[0022] The sliding assembly includes a second pulley, a second slide groove and a connecting shaft. The second pulley is located in the second slide groove and moves along the extension direction of the second slide groove. The second slide groove is arranged on the vehicle body. The second pulley is installed on the outer side wall of the concrete pouring duct structure through the connecting shaft to drive the concrete pouring duct structure to slide relative to the vehicle body.

[0023] In a possible implementation, the number of the driving assemblies is two, and the driving assemblies are respectively located on the vehicle body on both sides of the concrete pouring conduit structure;

[0024] The driving assembly includes a driving wheel, a driven wheel and a driving belt. The driving wheel and the driven wheel are connected through the driving belt. The driving wheel and the driven wheel are both installed on the vehicle body. The outer side of the driving belt is connected to the concrete pouring conduit structure.

[0025] The present application provides a concrete pouring conduit structure and a concrete pouring auxiliary vehicle, including a concrete pouring control pipe, a pouring control assembly and a concrete pouring introduction pipe, wherein the pouring control assembly further includes a support plate and a slide plate. When the operator needs to perform pouring operations on the pile foundation hole, the concrete can pass through the pouring channel formed in the concrete pouring control pipe and flow into the pile foundation hole through the guidance of the concrete pouring introduction pipe. During the pouring process, since the slide plate is inserted into the concrete pouring control pipe, the support plate is installed on the inner wall of the concrete pouring control pipe, and the slide plate and the support plate are slidably connected, the operator can move the slide plate to change the position of the slide plate in the concrete pouring control pipe, thereby adjusting the cross-sectional area of ​​the pouring channel, and realizing the control of the pouring amount of concrete per unit time.

[0026] Therefore, by arranging the concrete pouring control pipe, the pouring control assembly and the concrete pouring inlet pipe, the concrete pouring conduit structure and the concrete pouring auxiliary vehicle have the function of freely adjusting the pouring amount of concrete per unit time, which can effectively reduce the bubbles generated by excessive pouring amount per unit time during the concrete pouring process and improve the overall quality of concrete pouring. At the same time, it can also avoid the problem of concrete waste caused by excess concrete flowing out of the hole due to the inability to control the pouring amount of concrete per unit time when pouring to the pile foundation hole, thereby improving the environmental protection of concrete pouring. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following is a brief introduction to the drawings required for use in the embodiments or the prior art description. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. The drawings herein are incorporated into the specification and constitute a part of the specification, showing embodiments that conform to the present application, and are used together with the specification to explain the principles of the present application.

[0028] Figure 1 A schematic diagram of the structure of a concrete pouring conduit structure provided in an embodiment of the present application;

[0029] Figure 2 for Figure 1 A top view of the structure of the concrete pouring control pipe;

[0030] Figure 3 A schematic diagram of the structure of a concrete pouring auxiliary vehicle provided in an embodiment of the present application;

[0031] Figure 4 for Figure 3 Schematic diagram of the connection relationship between the middle sliding component and the concrete pouring control pipe;

[0032] Figure 5 for Figure 3 A schematic diagram of the structure of the middle sliding assembly;

[0033] Figure 6 for Figure 3 Schematic diagram of the connection relationship between the middle drive assembly and the concrete pouring container.

[0034] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments.

[0035] Description of reference numerals:

[0036] 100-concrete pouring control pipe;

[0037] 200- pouring control component;

[0038] 210-support plate;

[0039] 211-first slide slot; 212-upper support plate; 213-lower support plate;

[0040] 220-Skateboard;

[0041] 221-first pulley; 222-gripping lug;

[0042] 300-concrete pouring inlet pipe;

[0043] 400-concrete pouring tank;

[0044] 500-frame;

[0045] 600- drive control mechanism;

[0046] 610-directional wheel; 620-steering wheel; 630-control lever; 640-drive motor;

[0047] 700-slip control mechanism;

[0048] 710-sliding assembly;

[0049] 711-second pulley; 712-second slide slot; 713-connecting shaft;

[0050] 720- drive assembly;

[0051] 721 - driving wheel; 722 - driven wheel; 723 - driving belt. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the present application and how the technical solutions in the present application solve the above-mentioned technical problems will be clearly and completely described below with specific embodiments and in combination with the drawings in the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0053] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the application described herein can be implemented in an order other than those illustrated or described herein.

[0054] In the embodiments of the present application, the words "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0055] Concrete refers to a composite material made of cement that binds sand and gravel together. It is widely used in foundation treatment projects. In the construction of new energy projects, especially when it comes to foundation treatment projects such as wind turbine foundations, towers, and pile foundations, mechanical holes are usually drilled and steel cages are placed before concrete pouring.

[0056] At present, for concrete pouring construction, a commercial mixer truck is usually used to directly pour concrete into the pile foundation hole.

[0057] However, the above-mentioned concrete pouring construction method cannot control the pouring amount of concrete per unit time, so that when the pouring of the pile foundation hole is almost completed, excess concrete flows out of the hole, resulting in a waste of concrete.

[0058] Based on this, the present application provides a concrete pouring conduit structure and a concrete pouring auxiliary vehicle, including a concrete pouring control pipe, a pouring control assembly and a concrete pouring introduction pipe, wherein the pouring control assembly includes a support plate and a slide plate. When the operator needs to perform pouring operations on the pile foundation hole, the concrete can pass through the pouring channel formed in the concrete pouring control pipe and flow into the pile foundation hole through the guidance of the concrete pouring introduction pipe. During the pouring process, since the slide plate is inserted into the concrete pouring control pipe, the support plate is installed on the inner wall of the concrete pouring control pipe, and the slide plate and the support plate are slidably connected, the operator can move the slide plate to change the position of the slide plate in the concrete pouring control pipe, thereby adjusting the cross-sectional area of ​​the pouring channel to control the pouring amount of concrete per unit time.

[0059] Therefore, by arranging the concrete pouring control pipe, the pouring control assembly and the concrete pouring inlet pipe, the concrete pouring conduit structure and the concrete pouring auxiliary vehicle have the function of freely adjusting the pouring amount of concrete per unit time, which can effectively reduce the bubbles generated by excessive pouring amount per unit time during the concrete pouring process and improve the overall quality of concrete pouring. At the same time, it can also avoid the problem of concrete waste caused by excess concrete flowing out of the hole due to the inability to control the pouring amount of concrete per unit time when pouring to the pile foundation hole, thereby improving the environmental protection of concrete pouring.

[0060] The technical solution of the present application is described in detail below with reference to the accompanying drawings using specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.

[0061] Reference Figure 1 to Figure 2As shown, the embodiment of the present application provides a concrete pouring conduit structure, including a concrete pouring control pipe 100, in which a pouring channel is formed; a pouring control assembly 200, the pouring control assembly 200 includes a support plate 210 and a slide plate 220, the support plate 210 is installed on the inner wall of the concrete pouring control pipe 100, the slide plate 220 is inserted on the concrete pouring control pipe 100, and is slidably connected to the support plate 210, the slide plate 220 slides relative to the support plate 210 to adjust the size of the pouring channel, thereby controlling the flow of concrete in the concrete pouring control pipe 100; a concrete pouring inlet pipe 300, the concrete pouring inlet pipe 300 is connected to one end of the concrete pouring control pipe 100 to guide the concrete to flow into the pile foundation hole.

[0062] In this application, reference is made to Figure 1 to Figure 2 As shown, when the operator needs to perform pouring operation on the pile foundation hole, the concrete can pass through the pouring channel formed in the concrete pouring control pipe 100 and flow into the pile foundation hole through the guidance of the concrete pouring introduction pipe 300. During the pouring process, since the slide plate 220 is inserted on the concrete pouring control pipe 100, the support plate 210 is installed on the inner wall of the concrete pouring control pipe 100, and the slide plate 220 and the support plate 210 are slidably connected, the operator can move the slide plate 220 to change the position of the slide plate 220 in the concrete pouring control pipe 100, and then adjust the cross-sectional area of ​​the pouring channel to control the pouring amount of concrete per unit time.

[0063] Therefore, by setting up the concrete pouring control pipe 100, the pouring control assembly 200 and the concrete pouring inlet pipe 300, the concrete pouring conduit structure and the concrete pouring auxiliary vehicle have the function of freely adjusting the pouring amount of concrete per unit time, which can effectively reduce the bubbles generated by excessive pouring amount per unit time during the concrete pouring process and improve the overall quality of concrete pouring. At the same time, it can also avoid the problem of waste of concrete caused by excess concrete flowing out of the hole due to the inability to control the pouring amount of concrete per unit time when pouring to the pile foundation hole, thereby improving the environmental protection of concrete pouring.

[0064] In some embodiments, a first slide groove 211 is provided on the support plate 210; a first pulley 221 is provided on the slide plate 220, and the first pulley 221 is located in the first slide groove 211 and moves along the extension direction of the first slide groove 211 to drive the slide plate 220 to slide relative to the concrete pouring control pipe 100.

[0065] In the present application, there is no restriction on the connection relationship between the support plate 210 and the slide plate 220, and the slide plate 220 can be directly placed on the support plate 210 to slide, etc. Specifically, in the present embodiment, a first slide groove 211 is provided on the support plate 210, and a first pulley 221 is provided on the slide plate 220. The first pulley 221 is in the first slide groove 211 and moves along the extension direction of the first slide groove 211. In this way, not only the first slide groove 211 is used to guide and limit the first pulley 221, so as to prevent the slide plate 220 from falling off when sliding on the support plate 210, but also the sliding connection between the support plate 210 and the slide plate 220 is changed into a rolling connection, so that the operator can move the slide plate 220 with less force, which is convenient for the operator to operate.

[0066] In some embodiments, the support plate 210 includes an upper support plate 212 and a lower support plate 213, and the skateboard 220 is inserted between the upper support plate 212 and the lower support plate 213. The upper support plate 212 and the lower support plate 213 are both provided with a first slide groove 211 on one side facing the skateboard 220, and the first pulley 221 is provided on two opposite sides of the skateboard 220, and the first pulley 221 is provided corresponding to the first slide groove 211.

[0067] In the present application, an upper support plate 212 and a lower support plate 213 are provided, and the upper support plate 212 and the lower support plate 213 cooperate with each other, further strengthening the guiding and limiting effects of the first slide groove 211 on the first pulley 221, so that the first pulley 221 can move in a relatively closed space to prevent the slide plate 220 from falling off when sliding on the support plate 210.

[0068] In some embodiments, the number of slide plates 220 is set to at least two, and each slide plate 220 is provided with a gripping ear 222 , which is located outside the concrete pouring control pipe 100 , so that the gripping ear 222 can drive each slide plate 220 to move closer to or away from each other.

[0069] In the present application, multiple slides 220 are provided. Compared with the movement of a single slide 220, operators can move different slides 220 from both sides of the concrete pouring control pipe 100, thereby shortening the time required to adjust the cross-sectional area of ​​the pouring channel. At the same time, grab ears 222 are provided on each slide 220 to facilitate operators to move the slide 220.

[0070] In some embodiments, a concrete pouring container 400 is also included to accommodate concrete; the concrete pouring control pipe 100 is arranged in a funnel shape, and the large diameter end of the concrete pouring control pipe 100 is connected to the concrete pouring container 400, and the small diameter end of the concrete pouring control pipe 100 is connected to the concrete pouring inlet pipe 300.

[0071] In the present application, the concrete pouring control pipe 100 is arranged in a funnel shape, which can prevent concrete from accumulating in the concrete pouring control pipe 100 and thus affecting the normal function of the pouring control assembly 200 .

[0072] Reference Figures 3 to 6 As shown, an embodiment of the present application also provides a concrete pouring auxiliary vehicle, including a vehicle body and a concrete pouring duct structure, the concrete pouring duct structure is installed on the vehicle body, and the vehicle body is used to support the concrete pouring duct structure and drive the concrete pouring duct structure to move.

[0073] Among them, the concrete pouring conduit structure in the embodiment of the present application is the same as the structure of the concrete pouring conduit structure provided in any of the above embodiments, and can bring the same or similar technical effects, which will not be described one by one here, and the details can be referred to the description of the above embodiments.

[0074] In this application, reference is made to Figures 3 to 6 As shown, the concrete pouring conduit structure is installed on the vehicle body. When the operator needs to perform pouring operations on different pile foundation holes, the concrete pouring conduit structure can be aligned with the pile foundation holes by adjusting the vehicle body, thereby improving the efficiency of the pouring operation.

[0075] In some embodiments, the vehicle body includes a frame 500 and a drive control mechanism 600, and the concrete pouring duct structure is installed on the frame 500; the drive control mechanism 600 includes a directional wheel 610, a steering wheel 620, a control rod 630 and a drive motor 640, the directional wheel 610 and the steering wheel 620 are both installed at the bottom of the frame 500, the control rod 630 is inserted into the frame 500 and connected to the steering wheel 620 to control the steering of the concrete pouring auxiliary vehicle, and the driving end of the drive motor 640 is connected to the directional wheel 610 to drive the concrete pouring auxiliary vehicle to move.

[0076] In the present application, the control rod 630 is connected to the steering wheel 620, so that the control rod 630 can control the forward direction of the concrete pouring auxiliary vehicle. When the operator needs to perform pouring operations on different pile foundation holes, especially pile foundation holes that are distributed farther away, the forward direction of the concrete pouring auxiliary vehicle can be adjusted by controlling the control rod 630 so that the concrete pouring conduit structure is aligned with the pile foundation hole, thereby improving the efficiency of the pouring operation, and the drive motor 640 can provide power for the travel of the concrete pouring auxiliary vehicle.

[0077] In some embodiments, a sliding control mechanism 700 is also included; the sliding control mechanism 700 includes a sliding component 710 and a driving component 720, the concrete pouring duct structure is slidingly connected to the vehicle body through the sliding component 710, and the driving component 720 is arranged on the vehicle body to drive the concrete pouring duct structure to slide relative to the vehicle body.

[0078] In the present application, a sliding control mechanism 700 is provided. When the operator needs to perform pouring operations on different pile foundation holes, especially those with densely distributed pile foundation holes, the sliding control mechanism 700 can be directly used to control the concrete pouring conduit structure to slide relative to the vehicle body, so that the concrete pouring conduit structure is aligned with the pile foundation hole without adjusting the vehicle body, thereby further improving the efficiency of the pouring operation.

[0079] In some embodiments, two sliding assemblies 710 are provided and are respectively located on the vehicle body on both sides of the concrete pouring duct structure; the sliding assembly 710 includes a second pulley 711, a second slide groove 712 and a connecting shaft 713, the second pulley 711 is located in the second slide groove 712 and moves along the extension direction of the second slide groove 712, the second slide groove 712 is provided on the vehicle body, and the second pulley 711 is installed on the outer wall of the concrete pouring duct structure through the connecting shaft 713 to drive the concrete pouring duct structure to slide relative to the vehicle body.

[0080] In the present application, there is no restriction on the specific structural relationship of the sliding assembly 710, which can be set as a gear rack transmission, etc. Specifically, in the present embodiment, the second slide groove 712 is set on the vehicle body, the second pulley 711 is installed on the outer wall of the concrete casting conduit structure through the connecting shaft 713, and the second pulley 711 is in the second slide groove 712 and moves along the extension direction of the second slide groove 712. In this way, not only the second slide groove 712 is used to guide and limit the second pulley 711, but also the concrete casting conduit structure can be prevented from falling off when sliding relative to the vehicle body. At the same time, the sliding connection between the concrete casting conduit structure and the vehicle body can be changed into a rolling connection, and the concrete casting conduit structure can be moved with a small force, so that the concrete casting introduction pipe 300 is easy to align with the pile foundation hole.

[0081] At the same time, since the concrete pouring conduit structure contains concrete, its weight is relatively large, so two sliding components 710 are set. Compared with a single-sided setting, the pressure brought by the concrete pouring conduit structure can be effectively dispersed, thereby improving the safety of the concrete pouring auxiliary vehicle.

[0082] In some embodiments, two drive assemblies 720 are provided and are respectively located on the vehicle body on both sides of the concrete pouring duct structure; the drive assembly 720 includes a driving wheel 721, a driven wheel 722 and a driving belt 723, the driving wheel 721 and the driven wheel 722 are connected by the driving belt 723, and the driving wheel 721 and the driven wheel 722 are both installed on the vehicle body, and the outer side of the driving belt 723 is connected to the concrete pouring duct structure.

[0083] In the present application, the specific structural relationship of the driving assembly 720 is not limited, and it can be set as a chain drive, etc. Specifically, in the present embodiment, the advantages of the belt drive having good flexibility and elasticity are utilized, so that the impact force generated during the transmission process can be absorbed and distributed, thereby ensuring smooth and noiseless transmission. At the same time, the belt drive has a simple structure, which is also convenient for daily repair and maintenance of operators.

[0084] At the same time, since the concrete pouring conduit structure contains concrete, its weight is relatively large, so two drive components 720 are set. Compared with the single-sided setting, it can avoid the concrete pouring conduit structure being too heavy, resulting in the drive component 720 being unable to drive it to slide.

[0085] So far, the technical solution of the present application has been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present application is obviously not limited to these specific embodiments. The above embodiments are only used to illustrate the technical solution of the present application, rather than to limit it. Although the present application has been described in detail with reference to the above embodiments, those skilled in the art will understand that the protection scope of the present application is obviously not limited to these specific embodiments.

[0086] It should be understood that it is still possible to modify the technical solutions recorded in the aforementioned embodiments, or to make equivalent replacements for some or all of the technical features therein; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of this application.

[0087] Those skilled in the art will readily appreciate other embodiments of the present application after considering the description and practicing the contents disclosed herein. The present application is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary technical means in the art that are not disclosed in the present application. The description and embodiments are only considered as exemplary, and the scope of the present application is limited only by the appended claims.

Claims

1. A concrete pouring conduit structure, characterized in that: include: A concrete pouring control pipe, wherein a pouring channel is formed in the concrete pouring control pipe; A pouring control assembly, the pouring control assembly comprising a support plate and a slide plate, the support plate being mounted on the inner wall of the concrete pouring control pipe, the slide plate being inserted on the concrete pouring control pipe and slidably connected to the support plate, the slide plate sliding relative to the support plate to adjust the size of the pouring channel, thereby controlling the flow of concrete in the concrete pouring control pipe; A concrete pouring introduction pipe is connected to one end of the concrete pouring control pipe to guide the concrete to flow into the pile foundation hole.

2. The concrete pouring conduit structure according to claim 1, characterized in that: The support plate is provided with a first slide groove; The slide plate is provided with a first pulley, which is located in the first slide groove and moves along the extension direction of the first slide groove to drive the slide plate to slide relative to the concrete pouring control pipe.

3. The concrete pouring conduit structure according to claim 2, characterized in that: The support plate includes an upper support plate and a lower support plate, the slide plate is inserted between the upper support plate and the lower support plate, the upper support plate and the lower support plate are both provided with the first slide groove on one side facing the slide plate, the first pulley is provided on two opposite sides of the slide plate, and the first pulley is provided corresponding to the first slide groove.

4. The concrete pouring conduit structure according to any one of claims 1 to 3, characterized in that: The number of the slide plates is set to at least two, and each of the slide plates is provided with a gripping ear, and the gripping ear is located outside the concrete pouring control pipe, so that the slide plates can be driven to move closer to or farther from each other through the gripping ear.

5. The concrete pouring conduit structure according to any one of claims 1 to 3, characterized in that: Also includes a concrete pouring container to contain the concrete; The concrete pouring control pipe is arranged in a funnel shape, and the large diameter end of the concrete pouring control pipe is connected to the concrete pouring containing tank, and the small diameter end of the concrete pouring control pipe is connected to the concrete pouring introduction pipe.

6. A concrete pouring auxiliary vehicle, characterized in that: It comprises a vehicle body and the concrete pouring duct structure according to any one of claims 1 to 5, wherein the concrete pouring duct structure is mounted on the vehicle body, and the vehicle body is used to support the concrete pouring duct structure and drive the concrete pouring duct structure to move.

7. The concrete pouring auxiliary vehicle according to claim 6, characterized in that: The vehicle body comprises a frame and a drive control mechanism, and the concrete pouring conduit structure is mounted on the frame; The drive control mechanism includes a directional wheel, a steering wheel, a control rod and a drive motor. The directional wheel and the steering wheel are both installed at the bottom of the frame. The control rod is inserted into the frame and connected to the steering wheel to control the steering of the concrete pouring auxiliary vehicle. The drive end of the drive motor is connected to the directional wheel to drive the concrete pouring auxiliary vehicle to move.

8. The concrete pouring auxiliary vehicle according to claim 6, characterized in that: Also included is a slip control mechanism; The sliding control mechanism includes a sliding component and a driving component. The concrete pouring conduit structure is slidingly connected to the vehicle body through the sliding component. The driving component is arranged on the vehicle body to drive the concrete pouring conduit structure to slide relative to the vehicle body.

9. The concrete pouring auxiliary vehicle according to claim 8, characterized in that: The sliding components are provided in two numbers and are respectively located on the vehicle body at both sides of the concrete pouring conduit structure; The sliding assembly includes a second pulley, a second slide groove and a connecting shaft. The second pulley is located in the second slide groove and moves along the extension direction of the second slide groove. The second slide groove is arranged on the vehicle body. The second pulley is installed on the outer side wall of the concrete pouring duct structure through the connecting shaft to drive the concrete pouring duct structure to slide relative to the vehicle body.

10. The concrete pouring auxiliary vehicle according to claim 8, characterized in that: The driving components are provided in two numbers and are respectively located on the vehicle body at both sides of the concrete pouring conduit structure; The driving assembly includes a driving wheel, a driven wheel and a driving belt. The driving wheel and the driven wheel are connected by the driving belt, and both are installed on the vehicle body. The outer side of the driving belt is connected to the concrete pouring conduit structure.