Pollution-free bituminous pavement core drilling and sampling construction device

By using anti-fouling mechanism and sealing ring in the asphalt pavement drill core sampling construction device, combined with the sewage discharge hose to drain the sewage, the problem of sewage splashing on the drill pipe is solved, and more efficient anti-fouling effect and convenient operation are achieved.

CN222105100UActive Publication Date: 2024-12-03CHINA CONSTR FIRST BUILDING (GRP) CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420008802.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-12-03
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

When the existing asphalt pavement drill core sampling construction device is used, the high-speed rotating drill rod will splash sewage, causing contamination of the pavement surface layer. The use of sponge blocks and cotton yarn has poor anti-fouling effect and is seriously wasted.

Method used

A asphalt pavement drill core sampling construction device including an anti-fouling mechanism is designed, and a base and sealing ring are used to form a seal on the asphalt ground. It is combined with a sewage hose to divert the sewage to prevent sewage from splashing, and is convenient for the disassembled installation mechanism. Disassembly and assemble the drill pipe.

Benefits of technology

It effectively prevents sewage splash, reduces pollution, reduces material waste, improves the convenience of workers' operation and anti-fouling effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222105100U_ABST
    Figure CN222105100U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of asphalt sampling, in particular to a pollution-free asphalt pavement core drilling and sampling construction device, which comprises an anti-pollution mechanism, a drilling machine is arranged above the anti-fouling mechanism, a mounting mechanism is connected below the drilling machine, a drilling rod is arranged in the drilling machine, the drilling rod is arranged below the drilling machine, the base is placed at a place needing sampling, a sealing ring is extruded by gravity, the sealing ring is extruded on the asphalt ground for sealing, and a pollution discharge hose is communicated with a container or a sewer; by pushing a baffle ring downwards, aligning a buffer groove with a conical through groove, pulling out a square column, pushing a ball into the buffer groove through the inner wall of a clamping groove and disassembling the drill rod, by pushing the baffle ring downwards, inserting the square column into a T-shaped barrel and loosening the baffle ring, the ball is pushed into the clamping groove, and then the drill rod is disassembled; meanwhile, the conical through groove is sealed by the baffle ring, so that the drill rod is convenient to disassemble and assemble.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of asphalt sampling, in particular to a pollution-free asphalt pavement core drilling sampling construction device. Background Art

[0002] During the construction of the highway surface layer, it is necessary to core the surface layer to detect the thickness and compaction of the structural layer. During the operation of the coring machine, a large amount of water is needed to wet the drill bit and protect the core sample. The existing asphalt pavement core sampling construction device still has certain defects when used, such as;

[0003] When the asphalt pavement core sampling construction device is sampling, the high-speed rotating drill rod will splash sewage all around, causing pollution to the pavement surface. The existing asphalt pavement core sampling construction device generally uses sufficient sponge blocks and cotton yarn to block and absorb sewage, which will cause a lot of waste, is not conducive to workers' operation, and has a poor anti-pollution effect. Utility Model Content

[0004] The utility model aims to provide a pollution-free asphalt pavement core sampling construction device to solve the problem of poor anti-pollution effect of the asphalt pavement core sampling construction device currently on the market proposed in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pollution-free asphalt pavement core sampling construction device, comprising: an anti-pollution mechanism;

[0006] A drilling rig is arranged above the anti-pollution mechanism, and a mounting mechanism is connected to the bottom of the drilling rig. A drill rod is arranged in the mounting mechanism, and the drill rod is arranged under the drilling rig, and the drilling rig serves as a driving basis; the anti-pollution mechanism comprises: a base, and the base is arranged under the drill rod. A vertical cylinder is fixedly connected through the base, a sewage hose is connected to the back of the vertical cylinder, and an annular groove is opened at the bottom of the vertical cylinder, a spring is fixedly connected to the inner wall of the annular groove, a sealing ring is connected to the bottom of the spring, and the sealing ring is slidably connected in the annular groove. The vertical cylinder prevents sewage from scattering and splashing during sampling, causing pollution to the road surface around the coring part, and the sewage hose diverts and discharges the sewage in the vertical cylinder. The sealing ring adopts softer rubber or silicone to seal the asphalt ground to prevent water leakage.

[0007] As a preferred solution of the utility model, the installation mechanism includes: a T-shaped cylinder, which is fixedly connected to the bottom of the drilling rig, and a square column is slidably connected inside the drilling rig, and the square column is fixedly connected to the top of the drill rod, and the square column and the inside of the T-shaped cylinder are both directional to prevent idling.

[0008] As a preferred solution of the utility model, a tapered through groove is provided on the inner wall of the T-shaped cylinder, a ball is movably connected in the tapered through groove, and the tapered through groove is tapered to prevent the ball from falling off.

[0009] As a preferred solution of the utility model, a slot is provided on one side of the square column, a ball is engaged in the slot, and the ball is squeezed in the slot to fix the square column in the T-shaped tube.

[0010] As a preferred solution of the utility model, a retaining ring is provided on one side of the ball, and the retaining ring is sleeved on the T-shaped cylinder. The retaining ring closes the conical through groove, limits the ball, and squeezes the ball into the slot.

[0011] As a preferred solution of the utility model, a buffer groove is provided on the inner wall of the retaining ring. The retaining ring is slid downward to align the buffer groove with the tapered through groove. When the square column is pulled off, the ball is pushed into the buffer groove.

[0012] As a preferred solution of the utility model, a return spring is connected to the bottom of the retaining ring, and the return spring is sleeved on the T-shaped tube. The return spring pushes the retaining ring upward to prevent it from sliding down.

[0013] As a preferred solution of the utility model, the tapered through groove, the ball, the clamping groove and the retaining ring constitute a fixed structure, and the retaining ring blocks the clamping groove to prevent the ball from moving and clamps the ball in the clamping groove.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. Place the base where sampling is required. The gravity of the base presses down the spring and the sealing ring. The spring pushes the sealing ring in the opposite direction, squeezing the sealing ring on the asphalt ground to seal it. Connect the sewage hose to the container or sewer to drain water, prevent sewage splashing, and then prevent pollution.

[0016] 2. Push the retaining ring downward to align the buffer groove with the tapered groove, pull out the square column, and the inner wall of the groove pushes the ball into the buffer groove to disassemble the drill rod. Push the retaining ring downward to squeeze the reset spring, insert the square column into the T-tube, then loosen the retaining ring, push the inner wall of the buffer groove onto the ball, and push the ball into the groove. At the same time, the retaining ring closes the tapered groove and fixes the square column, making it easier to disassemble and assemble the drill rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the sewage hose of the utility model;

[0019] Figure 3This is a schematic diagram of the main structure of the utility model;

[0020] Figure 4 For this utility model Figure 1 Enlarged view of the structure of part A.

[0021] In the figure: 1. Anti-fouling mechanism; 101. Base; 102. Vertical cylinder; 103. Drain hose; 104. Annular groove; 105. Spring; 106. Sealing ring; 2. Drilling rig; 3. Installation mechanism; 301. T-type cylinder; 302. Square column; 303. Conical through groove; 304. Ball; 305. Slot; 306. Retaining ring; 307. Buffer groove; 308. Return spring; 4. Drill rod. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1 , 2 and 3. The utility model provides a technical solution: a pollution-free asphalt pavement core sampling construction device, comprising: an anti-pollution mechanism 1;

[0024] A drilling rig 2 is arranged above the anti-pollution mechanism 1, and a mounting mechanism 3 is connected to the bottom of the drilling rig 2. A drill rod 4 is arranged in the mounting mechanism 3, and the drill rod 4 is arranged below the drilling rig 2, and the drilling rig 2 serves as a driving basis; the anti-pollution mechanism 1 includes: a base 101, the base 101 is arranged below the drill rod 4, a vertical cylinder 102 is fixedly connected through the base 101, a sewage hose 103 is connected to the back of the vertical cylinder 102, and an annular groove 104 is opened at the bottom of the vertical cylinder 102, a spring 105 is fixedly connected to the inner wall of the annular groove 104, a sealing ring 106 is connected to the bottom of the spring 105, and the sealing ring 106 is slidably connected in the annular groove 104.

[0025] Through the above structure: the base 101 is placed where sampling is required, and the gravity of the base 101 drives the spring 105 to squeeze the sealing ring 106 onto the asphalt ground, sealing it to prevent sewage from escaping, and the sewage in the vertical tube 102 is discharged from the sewage hose 103.

[0026] See also Figure 1 , 3And 4, further, the mounting mechanism 3 includes: a T-shaped cylinder 301, the T-shaped cylinder 301 is fixedly connected to the bottom of the drilling rig 2, a square column 302 is slidably connected inside the drilling rig 2, the square column 302 is fixedly connected to the top of the drill rod 4, a tapered through groove 303 is provided on the inner wall of the T-shaped cylinder 301, a ball 304 is movably connected in the tapered through groove 303, a clamping groove 305 is provided on one side of the square column 302, the ball 304 is clamped in the clamping groove 305, a retaining ring 306 is provided on one side of the ball 304, the retaining ring 306 is sleeved on the T-shaped cylinder 301, a buffer groove 307 is provided on the inner wall of the retaining ring 306, a return spring 308 is connected to the bottom of the retaining ring 306, the return spring 308 is sleeved on the T-shaped cylinder 301, and the tapered through groove 303, the ball 304, the clamping groove 305 and the retaining ring 306 constitute a fixed structure.

[0027] Through the above structure: push down the retaining ring 306, align the buffer groove 307 with the tapered through groove 303, pull out the square column 302, and the inner wall of the slot 305 pushes the ball 304 into the buffer groove 307, so as to facilitate the disassembly of the drill rod 4.

[0028] Working principle: Figure 1-4 As shown, when using the pollution-free asphalt pavement core sampling construction device, a simple understanding of the device is carried out. First, push down the retaining ring 306 to squeeze the return spring 308, insert the square column 302 into the T-tube 301, then loosen the retaining ring 306, push the inner wall of the buffer groove 307 to the ball 304, push the ball 304 into the slot 305, and at the same time, the retaining ring 306 closes the conical groove 303, fixes the square column 302, and then places the base 101 on the surface where sampling is required. The gravity of the base 101 presses down the sealing ring 106, and the spring 105 pushes the sealing ring 106 to squeeze the sealing ring 106 on the asphalt ground. The sewage hose 103 is connected to the container or the sewer, and the drilling rig 2 is started to drive the installation mechanism 3 and the drill rod 4 to rotate, and the asphalt ground is drilled. Water is added into the vertical cylinder 102 to cool the drill rod 4, and then it is discharged from the sewage hose 103. The contents not described in detail in this specification belong to the existing technology known to professional and technical personnel in this field.

[0029] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A pollution-free asphalt pavement core sampling construction device, comprising: Antifouling mechanism (1), It is characterized by: A drilling rig (2) is arranged above the anti-fouling mechanism (1), a mounting mechanism (3) is connected below the drilling rig (2), a drill rod (4) is arranged inside the mounting mechanism (3), and the drill rod (4) is arranged below the drilling rig (2); the anti-fouling mechanism (1) comprises: a base (101), the base (101) is arranged below the drill rod (4), a vertical cylinder (102) is fixedly connected through the base (101), a sewage hose (103) is connected to the back of the vertical cylinder (102), and an annular groove (104) is provided at the bottom of the vertical cylinder (102), a spring (105) is fixedly connected to the inner wall of the annular groove (104), a sealing ring (106) is connected to the bottom of the spring (105), and the sealing ring (106) is slidably connected in the annular groove (104).

2. The pollution-free asphalt pavement core sampling construction device according to claim 1 is characterized by: The mounting mechanism (3) comprises a T-shaped cylinder (301), the T-shaped cylinder (301) being fixedly connected to the bottom of the drilling rig (2), a square column (302) being slidably connected inside the drilling rig (2), and the square column (302) being fixedly connected to the top of the drill rod (4).

3. A pollution-free asphalt pavement core sampling construction device according to claim 2, characterized in that: A conical through groove (303) is provided on the inner wall of the T-shaped cylinder (301), and a ball (304) is movably connected in the conical through groove (303).

4. The pollution-free asphalt pavement core sampling construction device according to claim 2 is characterized in that: A slot (305) is provided on one side of the square column (302), and a ball (304) is engaged in the slot (305).

5. The pollution-free asphalt pavement core sampling construction device according to claim 3 is characterized by: A retaining ring (306) is provided on one side of the ball (304), and the retaining ring (306) is sleeved on the T-shaped cylinder (301).

6. The pollution-free asphalt pavement core sampling construction device according to claim 5 is characterized by: A buffer groove (307) is provided on the inner wall of the retaining ring (306).

7. The pollution-free asphalt pavement core sampling construction device according to claim 5 is characterized by: A return spring (308) is connected to the bottom of the retaining ring (306), and the return spring (308) is sleeved on the T-shaped cylinder (301).

8. The pollution-free asphalt pavement core sampling construction device according to claim 5 is characterized by: The tapered through groove (303), the rolling ball (304), the clamping groove (305) and the retaining ring (306) constitute a fixed structure.