Grounding elastic sheet of plastic base

By using multi-layer elastic wall and support bone position structure in the grounding shrapnel, the problem of easy deformation of the grounding shrapnel when stacking is solved, higher strength and lower production costs are achieved, and temporary stopping of the pressure limit is replaced. Fixed position.

CN222107040UActive Publication Date: 2024-12-03DONGGUAN GUOXIN PRECISION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420711172.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-12-03
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

The existing grounding shrapnel is susceptible to extrusion deformation when placed on stacking, resulting in poor contact effect, and increasing production costs and human resource consumption through temporary stopping limit fixation.

Method used

A plastic base grounding shrapnel is designed, adopting a multi-layer elastic wall and supporting bone position structure. Through the combination of elastic arms and air-avoiding grooves, the strength of the shrapnel body is enhanced, and the reverse-bent elastic arms are passed through the air-avoiding shrapnel. The grooves are compact in structure, instead of the temporary stopping plate limit fixation.

Benefits of technology

It effectively improves the structural strength of the grounding shrapnel, avoids deformation and damage, saves production costs and human resources, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222107040U_ABST
    Figure CN222107040U_ABST
Patent Text Reader

Abstract

The utility model discloses a plastic base grounding elastic sheet, and relates to the technical field of grounding elastic sheets. The spring comprises the first elastic wall, and the second elastic arm and the third elastic wall are arranged on the two sides of the first elastic wall respectively, so that the second elastic arm can be conveniently arranged on the first elastic wall, and the third elastic wall can be conveniently arranged on one side of the first elastic wall; and a fourth elastic arm is arranged on one side of the second elastic arm. According to the utility model, the twelfth elastic arm is reversely bent to pass through the interior of the third clearance groove of the fifth elastic arm, so that the structure of the grounding elastic sheet body is more compact, the strength of the structure of the grounding elastic sheet body is effectively improved, the problem that the grounding elastic sheet bodies are easy to deform and damage when stacked together is avoided, and the service life of the grounding elastic sheet body is prolonged. An existing mode of limiting and fixing the grounding elastic piece body through a temporary pressure stopping piece is replaced, production cost is saved, and manpower resources are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of grounding spring pieces, and in particular relates to a grounding spring piece of a plastic base. Background Art

[0002] With the progress and development of information technology, electronic products have become inseparable from our lives, such as mobile communication products, computers or audio-visual products, which occupy an irreplaceable position in our lives. In order to improve the quality and function of these electronic products, the operating frequency is constantly improved. However, due to the structural defects of the existing grounding springs, when the grounding springs are stacked, they are easily squeezed and deformed due to weight problems, resulting in poor contact effect of the grounding springs when in use. To prevent this problem, the operator installs a temporary pressure stop plate on each grounding spring to limit the elastic part of the grounding spring to prevent the grounding springs from being stacked together and being squeezed and deformed. After the grounding spring is installed on the product, the temporary pressure stop plate is removed. Although this method ensures the use effect of the grounding spring on the product, it invisibly increases production costs and human resources and reduces labor productivity.

[0003] Therefore, a plastic base grounding spring is proposed to solve the above drawbacks. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a grounding spring for a plastic base.

[0005] In order to solve the above technical problems, the basic concept of the technical solution adopted by the utility model is:

[0006] A plastic base grounding spring comprises a first elastic wall, a second elastic arm and a third elastic wall are respectively mounted on both sides of the first elastic wall, so that the second elastic arm is conveniently mounted on the first elastic wall, and the third elastic wall is conveniently mounted on one side of the first elastic wall, a fourth elastic arm is mounted on one side of the second elastic arm, and the fourth elastic arm is conveniently mounted on one side of the second elastic arm, a fifth elastic arm is mounted on one side of the third elastic wall, and the fifth elastic arm is conveniently mounted on one side of the third elastic wall, On the side, the sixth elastic arm is installed on one side of the fourth elastic arm, which is convenient for installing the sixth elastic arm on the side of the fourth elastic arm; the seventh elastic arm is installed on one side of the fifth elastic arm, which is convenient for installing the seventh elastic arm on the side of the fifth elastic arm; the eighth elastic arm is installed on one side of the sixth elastic arm, which is convenient for installing the eighth elastic arm on the side of the sixth elastic arm; the ninth elastic arm is installed on one side of the seventh elastic arm, which is convenient for installing the ninth elastic arm on one side of the seventh elastic arm.

[0007] Optionally, a first supporting bone position is installed on one side of the first elastic wall, which facilitates the installation of the first supporting bone position on one side of the first elastic wall; the third elastic wall is installed on the first supporting bone position, which facilitates the installation of the third elastic wall on the first supporting bone position; a second supporting bone position is installed on the other side of the first elastic wall, which facilitates the installation of the second supporting bone position on the other side of the first elastic wall; one side of the second elastic arm is installed on one side of the second supporting bone position, which facilitates the installation of one side of the second elastic arm on one side of the second supporting bone position; a second air avoidance groove is opened on one side of the sixth elastic arm, and a third air avoidance groove is opened on one side of the fifth elastic arm.

[0008] Optionally, a tenth elastic arm is installed on one side of the eighth elastic arm, which facilitates the installation of the tenth elastic arm on the side of the eighth elastic arm; an eleventh elastic arm is installed on one side of the tenth elastic arm, which facilitates the installation of the eleventh elastic arm on one side of the tenth elastic arm; the tenth elastic arm is located on one side of the eighth elastic arm; a twelfth elastic arm is installed on one side of the ninth elastic arm, which facilitates the installation of the twelfth elastic arm on one side of the ninth elastic arm; one end of the twelfth elastic arm is located inside the third air avoidance groove, which facilitates the placement of one end of the twelfth elastic arm inside the third air avoidance groove; a reinforcing rib is installed at the contact point between the ninth elastic arm and the seventh elastic arm, which facilitates the installation of the reinforcing rib on one side of the contact point between the ninth elastic arm and the seventh elastic arm.

[0009] After adopting the above technical solution, the utility model has the following beneficial effects compared with the prior art. Of course, any product implementing the utility model does not necessarily need to achieve all the advantages described below at the same time:

[0010] The grounding spring clip body is reversely bent by the twelfth elastic arm and passes through the inside of the third air avoidance groove of the fifth elastic arm, so that the grounding spring clip body structure is more compact, and the strength of the grounding spring clip body structure is effectively improved, avoiding the problem of deformation and damage of the grounding spring clip body when stacked together, replacing the existing method of limiting and fixing the grounding spring clip body by temporary stop pressure plate, saving production costs and reducing human resources.

[0011] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The drawings described below are only some embodiments. For those skilled in the art, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0013] Figure 1 The three-dimensional structure of an embodiment of the utility model is shown in FIG. Figure 1 ;

[0014] Figure 2 The bottom view of the structure of an embodiment of the utility model is shown in FIG. Figure 1 ;

[0015] Figure 3 The three-dimensional structure of an embodiment of the utility model is shown in FIG. Figure 2 ;

[0016] Figure 4 The bottom view of the structure of an embodiment of the utility model is shown in FIG. Figure 2 .

[0017] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0018] The first elastic wall 1, the first air avoidance groove 101, the first supporting bone position 102, the second supporting bone position 103, the second elastic arm 104, the fourth elastic arm 105, the sixth elastic arm 106, the second air avoidance groove 107, the eighth elastic arm 108, the tenth elastic arm 110, the eleventh elastic arm 111, the third elastic wall 112, the fifth elastic arm 113, the third air avoidance groove 114, the seventh elastic arm 115, the ninth elastic arm 116, the reinforcing rib 117, and the twelfth elastic arm 118.

[0019] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but rather to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0020] The utility model will now be further described in detail with reference to the accompanying drawings.

[0021] See also Figure 1-4As shown, in this embodiment, a plastic base grounding spring is provided, including a first elastic wall 1, a second elastic arm 104 and a third elastic wall 112 are respectively installed on both sides of the first elastic wall 1, so that the second elastic arm 104 is conveniently installed on the first elastic wall 1, and the third elastic wall 112 is conveniently installed on one side of the first elastic wall 1, a fourth elastic arm 105 is installed on one side of the second elastic arm 104, so that the fourth elastic arm 105 is conveniently installed on one side of the second elastic arm 104, and a fifth elastic arm 113 is installed on one side of the third elastic wall 112, so that the fifth elastic arm 113 is conveniently installed on the third elastic wall 11 2, a sixth elastic arm 106 is installed on one side of the fourth elastic arm 105, which facilitates the installation of the sixth elastic arm 106 on one side of the fourth elastic arm 105, a seventh elastic arm 115 is installed on one side of the fifth elastic arm 113, which facilitates the installation of the seventh elastic arm 115 on one side of the fifth elastic arm 113, an eighth elastic arm 108 is installed on one side of the sixth elastic arm 106, which facilitates the installation of the eighth elastic arm 108 on one side of the sixth elastic arm 106, and a ninth elastic arm 116 is installed on one side of the seventh elastic arm 115, which facilitates the installation of the ninth elastic arm 116 on one side of the seventh elastic arm 115.

[0022] The grounding spring clip body is bent in reverse through the twelfth elastic arm 118 and passes through the inside of the third air avoidance groove 114 of the fifth elastic arm 113, making the grounding spring clip body structure more compact, effectively improving the strength of the grounding spring clip body structure, and avoiding the problem of deformation and damage of the grounding spring clip bodies when they are stacked together. It replaces the existing method of limiting and fixing the grounding spring clip body with a temporary stop pressure plate, saving production costs and reducing human resources.

[0023] In this embodiment, a first supporting bone position 102 is installed on one side of the first elastic wall 1, which facilitates the installation of the first supporting bone position 102 on one side of the first elastic wall 1; a third elastic wall 112 is installed on the first supporting bone position 102, which facilitates the installation of the third elastic wall 112 on the first supporting bone position 102; a second supporting bone position 103 is installed on the other side of the first elastic wall 1, which facilitates the installation of the second supporting bone position 103 on the other side of the first elastic wall 1; one side of the second elastic arm 104 is installed on one side of the second supporting bone position 103, which facilitates the installation of one side of the second elastic arm 104 on one side of the second supporting bone position 103; a second air avoidance groove 107 is opened on one side of the sixth elastic arm 106, and a third air avoidance groove 114 is opened on one side of the fifth elastic arm 113.

[0024] The tenth elastic arm 110 is installed on one side of the eighth elastic arm 108 of this embodiment, which facilitates the installation of the tenth elastic arm 110 on one side of the eighth elastic arm 108. The eleventh elastic arm 111 is installed on one side of the tenth elastic arm 110, which facilitates the installation of the eleventh elastic arm 111 on one side of the tenth elastic arm 110. The tenth elastic arm 110 is located on one side of the eighth elastic arm 108. The twelfth elastic arm 118 is installed on one side of the ninth elastic arm 116. It is convenient to install the twelfth elastic arm 118 on one side of the ninth elastic arm 116. One end of the twelfth elastic arm 118 is located inside the third air avoidance groove 114. It is convenient to place one end of the twelfth elastic arm 118 inside the third air avoidance groove 114. A reinforcing rib 117 is installed at the contact point between the ninth elastic arm 116 and the seventh elastic arm 115. It is convenient to install the reinforcing rib 117 on one side of the contact point between the ninth elastic arm 116 and the seventh elastic arm 115.

[0025] The present invention is not limited to the above-mentioned implementation modes. Anyone should be aware of the structural changes made under the inspiration of the present invention. Any technical solution that is the same or similar to the present invention falls within the protection scope of the present invention. The technology, shape, and structure that are not described in detail in the present invention are all known technologies.

Claims

1. A plastic base grounding spring, characterized in that: include: A first elastic wall (1), wherein a second elastic arm (104) and a third elastic wall (112) are respectively mounted on two sides of the first elastic wall (1), a fourth elastic arm (105) is mounted on one side of the second elastic arm (104), a fifth elastic arm (113) is mounted on one side of the third elastic wall (112), a sixth elastic arm (106) is mounted on one side of the fourth elastic arm (105), a seventh elastic arm (115) is mounted on one side of the fifth elastic arm (113), an eighth elastic arm (108) is mounted on one side of the sixth elastic arm (106), and a ninth elastic arm (116) is mounted on one side of the seventh elastic arm (115).

2. The plastic base grounding spring according to claim 1, characterized in that: A first supporting bone position (102) is mounted on one side of the first elastic wall (1), the third elastic wall (112) is mounted on the first supporting bone position (102), a second supporting bone position (103) is mounted on the other side of the first elastic wall (1), and one side of the second elastic arm (104) is mounted on one side of the second supporting bone position (103).

3. The grounding spring of a plastic base according to claim 1, characterized in that: A second air avoidance groove (107) is provided on one side of the sixth elastic arm (106), and a third air avoidance groove (114) is provided on one side of the fifth elastic arm (113).

4. The grounding spring of a plastic base according to claim 3, characterized in that: A tenth elastic arm (110) is mounted on one side of the eighth elastic arm (108), an eleventh elastic arm (111) is mounted on one side of the tenth elastic arm (110), and the tenth elastic arm (110) is located on one side of the eighth elastic arm (108).

5. The grounding spring of a plastic base according to claim 3, characterized in that: A twelfth elastic arm (118) is mounted on one side of the ninth elastic arm (116), and one end of the twelfth elastic arm (118) is located inside the third air avoidance groove (114).

6. The grounding spring of a plastic base according to claim 1, characterized in that: A reinforcing rib (117) is provided at the contact point between the ninth elastic arm (116) and the seventh elastic arm (115).