Reinforcement cage structure for cast-in-situ bored pile construction
By using annular array steel cage structure and anti-floating components in the cast pile construction, the problem of steel cage floating caused by concrete pressure in cast piles with small pile diameter is solved, the construction stability and production efficiency are improved, and the pile body quality is ensured.
Patent Information
- Application Number
- CN202420498279.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-14
AI Technical Summary
In high-rise buildings, during the construction of cast piles with smaller pile diameters, the pressure of concrete turning out from the conduit causes the steel cage to float up, which increases construction difficulty, reduces production efficiency, and may damage the reinforced structure and affect the quality of the pile body.
A steel cage structure consisting of an annular array steel cage main rib, reinforcement rib and anti-floating assembly is designed. The anti-floating assembly consists of a mesh and a connecting piece. The mesh is connected to the reinforcement rib through iron wire, and the diameter of the bottom mesh is smaller than the top. , used to prevent the steel cage from floating and fix the steel cage by the impact force of concrete.
It effectively improves the stability of concrete pouring, reduces the risk of floating up the steel cage, improves construction efficiency and pile body quality, and avoids rework.
Smart Images

Figure CN222120214U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bored pile construction, in particular to a steel cage structure used for bored pile construction. Background Art
[0002] With the development of my country's modernization and the acceleration of urbanization, a large number of high-rise buildings have emerged. Reinforced concrete piles have many advantages such as high bearing capacity, high anti-deformation rigidity, and wide adaptability. Therefore, a large number of high-rise buildings use reinforced concrete piles as the main foundation of the building.
[0003] Concrete cast-in-place piles are made by drilling a pile hole with a drilling machine, hanging a steel cage in the hole, and then pouring concrete in the hole. After the steel cage is lowered, a conduit is usually used to pour concrete.
[0004] Some high-rise buildings use bored piles with smaller diameters. Since the reinforced cage of the pile body is lighter in weight, when the concrete of the pile body is poured, the poured concrete will flip out of the guide tube, forming a large bottom-up pressure. This pressure can easily cause the reinforced cage to float up. When the floating distance of the reinforced cage is small, it will increase the difficulty of construction and reduce production efficiency. When the floating distance of the reinforced cage is large, it will damage the reinforcement structure of the pile body, affect the quality of the pile body, and even require rework. Utility Model Content
[0005] In order to overcome the above-mentioned technical problems, the purpose of the utility model is to provide a steel cage structure for bored cast-in-place pile construction, so as to solve the problem in the prior art that the poured concrete flips out of the conduit, forming a large bottom-up pressure, which easily causes the steel cage to float up. When the floating distance of the steel cage is small, the construction difficulty will be increased and the production efficiency will be reduced; when the floating distance of the steel cage is large, the reinforcement structure of the pile body will be destroyed, affecting the quality of the pile body and even requiring rework.
[0006] The purpose of the utility model can be achieved through the following technical solutions:
[0007] A steel cage structure for bored cast-in-place pile construction comprises a plurality of groups of steel cage main bars and a plurality of groups of steel cage reinforcing bars in a circular array, wherein the plurality of groups of the steel cage reinforcing bars are fixedly connected to the outer wall of the steel cage main bars, and the plurality of groups of anti-floating components are connected to the inner wall position at the bottom of the plurality of groups of the steel cage main bars.
[0008] As a further solution of the utility model: there are multiple groups of anti-floating components, and the multiple groups of anti-floating components are respectively connected to multiple groups of steel cage reinforcement bars.
[0009] As a further solution of the utility model: the anti-floating component includes a mesh body, and the mesh body is connected to the reinforcement bars of the steel cage through multiple groups of connecting pieces.
[0010] As a further solution of the utility model: the connecting piece is a hook.
[0011] As a further solution of the utility model: an iron wire is connected between the mesh body and the connecting piece, and two ends of the iron wire are rotatably connected to the mesh body and the connecting piece respectively.
[0012] As a further solution of the utility model: multiple groups of the connecting pieces and multiple groups of main reinforcement bars of the reinforcement cage are arranged alternately.
[0013] As a further solution of the utility model: the mesh diameter of a group of mesh bodies located at the bottom of the main reinforcement of the steel cage is smaller than the mesh diameter of multiple groups of mesh bodies at the upper side.
[0014] As a further solution of the utility model: the outer wall of the main reinforcement of the steel cage is spirally wound with steel cage spiral reinforcement.
[0015] Beneficial effects of the utility model:
[0016] 1. In the utility model, the mesh bodies in the multiple groups of anti-floating components at the upper side are used to cut the concrete through the steel wires that are staggered to form mesh holes, so that the bubbles generated inside the concrete are discharged through the gaps generated by the cutting, thereby avoiding that the bubbles inside the concrete cannot be completely discharged and form pores, increasing the frictional resistance of the concrete, causing the steel cage to float, and improving the stability of concrete pouring.
[0017] 2. In the utility model, the mesh diameter of the mesh body in the anti-floating component at the bottom is smaller than the mesh diameter of the multiple groups of mesh bodies on the upper side. When concrete falls onto the mesh body, an impact force is generated on the mesh body, thereby driving the mesh body to sink downward. When too much concrete is accumulated on the mesh body, a downward pressure is also applied to the mesh body, thereby pulling the steel cage body and preventing the steel cage body from floating up, reducing the construction difficulty, improving production efficiency, and improving the quality of the pile body. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The utility model is further described below in conjunction with the accompanying drawings.
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 It is a schematic diagram of the top view structure of the utility model;
[0021] Figure 3 It is a schematic diagram of the structure of the anti-floating component in the utility model.
[0022] In the figure: 1. main reinforcement of steel cage; 2. reinforcing ribs of steel cage; 3. spiral reinforcement of steel cage; 4. anti-floating assembly; 401. mesh body; 402. connector; 403. iron wire. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] like Figure 1-Figure 3 As shown, a steel cage structure for bored cast-in-place pile construction includes multiple groups of steel cage main bars 1 and multiple groups of steel cage reinforcing bars 2 in a circular array, the outer wall of the steel cage main bars 1 is spirally wound with steel cage spiral bars 3, the multiple groups of steel cage reinforcing bars 2 are fixedly connected to the outer wall of the steel cage main bars 1, and the bottom inner wall of the multiple groups of steel cage main bars 1 is connected to multiple groups of anti-floating components 4, which are used to prevent the steel cage from floating when pouring concrete.
[0025] There are multiple groups of anti-floating components 4, and the multiple groups of anti-floating components 4 are respectively connected to the multiple groups of steel cage reinforcement bars 2.
[0026] The anti-floating component 4 includes a mesh body 401, which is woven from a steel wire mesh. The mesh weaving diameter of the mesh body 401 is selected according to the viscosity of the concrete used and the diameter of the particles contained therein. Then the mesh body 401 is connected to the steel cage reinforcement 2 through multiple groups of connectors 402 for installation and fixation.
[0027] like Figure 1 As shown, the connecting piece 402 mentioned above is a hook, which can be conveniently hung on the reinforcement rib 2 of the steel cage to install the mesh body 401. At the same time, the connecting piece 402 can also be fixedly installed by winding the steel wire around the outer wall of the reinforcement rib 2 of the steel cage. At the same time, an iron wire 403 is connected between the mesh body 401 and the connecting piece 402, and the two ends of the iron wire 403 are respectively rotatably connected to the mesh body 401 and the connecting piece 402. The two ends of the iron wire 403 are connected by rotation, so that the mesh body 401 has a certain degree of rotation buffer when it is impacted by concrete, thereby avoiding breakage caused by welding fixation.
[0028] like Figure 2 As shown, the multiple groups of connecting members 402 and the multiple groups of main reinforcement bars 1 of the reinforcement cage are arranged alternately. By arranging the multiple groups of connecting members 402, the stability of fixing the mesh body 401 is improved.
[0029] like Figure 2 and Figure 3 As shown, the mesh diameter of the group of mesh bodies 401 located at the bottom of the main reinforcement 1 of the steel cage is smaller than the mesh diameter of the multiple groups of mesh bodies 401 at the upper side, so that the mesh bodies 401 at the bottom become load-bearing parts to bear the concrete, while the multiple groups of mesh bodies 401 at the upper side can cut the concrete through the mesh holes thereon.
[0030] The working principle of the utility model is as follows: when the user uses it, firstly, a plurality of groups of anti-floating components 4 are placed inside the circular surrounding of the main reinforcement 1 of the steel cage, and then a plurality of groups of steel cage reinforcement ribs 2 are fixedly connected to the outer wall of the main reinforcement 1 of the steel cage by welding and connected to the anti-floating components 4 for fixing. When pouring concrete, the mesh bodies 401 in the plurality of groups of anti-floating components 4 at the upper side are used to cut the concrete through the steel wires which are staggered to form mesh holes, so that the bubbles generated inside the concrete are discharged through the gaps generated by the cutting, thereby preventing the bubbles inside the concrete from being completely discharged and forming pores, increasing the frictional resistance of the concrete, causing the steel cage to float, and improving the stability of concrete pouring. Moreover, the impact of the falling concrete on the mesh body 401 causes the mesh body 401 generates a downward force on the reinforcement bars 2 and the main bars 1 of the steel cage, so that the steel cage floats up, and then the concrete with bubbles discharged impacts and falls on the anti-floating component 4 at the bottom of the main bars 1 of the steel cage. The mesh diameter of the mesh body 401 in the anti-floating component 4 at the bottom is smaller than the mesh diameter of the multiple groups of mesh bodies 401 on the upper side. When the concrete falls on the mesh body 401, an impact force is generated on the mesh body 401, which can drive the mesh body 401 to sink downward, and when too much concrete is accumulated on the mesh body 401, a downward pressure is also applied to the mesh body 401, thereby pulling the steel cage body to prevent the steel cage body from floating up, reducing the construction difficulty, improving production efficiency, and improving the quality of the pile body.
[0031] The above is a detailed description of an embodiment of the utility model, but the content is only a preferred embodiment of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.
Claims
1. A steel cage structure for bored pile construction, comprising a plurality of groups of steel cage main bars (1) and a plurality of groups of steel cage reinforcing bars (2) in an annular array, characterized in that: A plurality of groups of reinforcement bars (2) of the steel cage are fixedly connected to the outer wall of the main bars (1) of the steel cage, and a plurality of groups of anti-floating components (4) are connected to the inner wall positions at the bottom of the plurality of groups of main bars (1) of the steel cage.
2. A steel cage structure for bored pile construction according to claim 1, characterized in that: There are multiple groups of anti-floating components (4), and the multiple groups of anti-floating components (4) are respectively connected to multiple groups of steel cage reinforcement bars (2).
3. A steel cage structure for bored pile construction according to claim 1, characterized in that: The anti-floating component (4) comprises a mesh body (401), and the mesh body (401) is connected to the reinforcement bars (2) of the steel cage via a plurality of groups of connecting pieces (402).
4. A steel cage structure for bored pile construction according to claim 3, characterized in that: The connecting member (402) is a hook.
5. A steel cage structure for bored pile construction according to claim 3, characterized in that: An iron wire (403) is connected between the mesh body (401) and the connecting piece (402), and two ends of the iron wire (403) are rotatably connected to the mesh body (401) and the connecting piece (402) respectively.
6. A steel cage structure for bored pile construction according to claim 3, characterized in that: The plurality of groups of connecting pieces (402) and the plurality of groups of main reinforcement bars (1) of the reinforcement cage are arranged alternately.
7. A steel cage structure for bored pile construction according to claim 3, characterized in that: The mesh diameter of a group of mesh bodies (401) located at the bottom of the main reinforcement (1) of the steel cage is smaller than the mesh diameter of the multiple groups of mesh bodies (401) located at the upper side.
8. A steel cage structure for bored pile construction according to claim 1, characterized in that: The outer wall of the main reinforcement cage (1) is spirally wound with reinforcement cage spiral reinforcement (3).
Citation Information
Cited By
Reinforcement cage butt joint operation platform for cast-in-situ bored pile construction
CN119686334A