Liquid flow energy storage cell panel and ionic membrane laser welding equipment
The laser welding device for liquid flow energy storage battery plates and ion membranes addresses the inconvenience and safety issues of existing equipment by incorporating a support table with slide rails and linear modules for automated loading and flexible welding, improving operational safety and efficiency.
Patent Information
- Application Number
- CN202420115952.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-01-17
AI Technical Summary
Existing laser welding equipment for liquid flow energy storage battery plates and ion membranes lacks convenience in loading and unloading operations and poses safety risks for workers during operation.
A laser welding device with a support table equipped with slide rails, linear modules, lifting cylinders, and a movable table, allowing for automated loading and unloading, and a laser welding head that can move in three axes for flexible welding operations.
Enables convenient and automated loading and unloading, enhances operational safety by preventing direct human interaction with the equipment, and ensures stable and flexible welding operations.
Smart Images

Figure CN222133796U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of laser welding of liquid flow energy storage battery plates and ion membranes, in particular to a laser welding device for liquid flow energy storage battery plates and ion membranes. Background Art
[0002] Liquid flow batteries are composed of a stack unit, electrolyte, electrolyte storage and supply unit, and management and control unit. Liquid flow batteries are high-performance batteries that separate and circulate positive and negative electrolytes. They have the characteristics of high capacity, wide application areas (environments), and long cycle life. Inside the stack, the positive and negative electrolytes are separated by ion exchange membranes (or ion diaphragms), and the battery is connected to an external load and power supply. Therefore, when manufacturing liquid flow batteries, laser welding equipment is required to weld the ion membrane to the flow field frame.
[0003] Existing laser welding equipment has shortcomings in the convenience of loading and unloading, and needs to be improved in improving the operating safety of workers. Utility Model Content
[0004] The utility model aims to provide a liquid flow energy storage battery plate and ion membrane laser welding device which can conveniently carry out loading and unloading operations and ensures safety when operating the device.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A liquid flow energy storage battery plate and ion membrane laser welding equipment, including a support table, two slide rails are fixedly installed on the upper surface of the support table, a movable table is slidably connected in the slide groove of the slide rail, a fourth linear module is fixedly installed on the upper surface of the support table, the fourth linear module is located between the two slide rails, the movable end of the fourth linear module is fixedly connected to the middle position of the lower surface of the movable table, a plurality of lifting cylinders are fixedly installed on the upper surface of the movable table, a downloading table is fixedly installed on the telescopic end of the lifting cylinder, a plurality of mounting holes are arranged on the upper surface of the downloading table, and a positioning rod is installed inside each mounting hole.
[0007] By adopting the above technical solution, loading and unloading operations can be conveniently performed, and at the same time, the unloading platform can automatically place the components to be welded at the welding position of the equipment, thereby improving the safety of the staff in operating the equipment.
[0008] Furthermore, a plurality of support rods are fixedly connected to the upper surface of the support platform, and the upper ends of the support rods are fixedly connected to an upper loading platform.
[0009] By adopting the above technical solution, the upper loading platform can be used to ensure that the welding operation can be carried out stably.
[0010] Furthermore, a plurality of support columns are fixedly connected to the upper surface of the support platform, and a first linear module is fixedly installed on the upper end of the support column. Two first linear modules are provided, and the two first linear modules are symmetrically distributed at two sides of the upper platform.
[0011] By adopting the above technical solution, the welding mechanism can move its longitudinal position on the horizontal plane.
[0012] Furthermore, a second linear module is disposed between the two first linear modules, two ends of the second linear module are respectively fixedly mounted on the moving ends of the two first linear modules, and the second linear module is vertically distributed to the first linear modules.
[0013] By adopting the above technical solution, the welding mechanism can be moved laterally on a horizontal plane.
[0014] Furthermore, the movable end of the second linear module is fixedly connected to a third linear module, and the third linear module is vertically distributed.
[0015] By adopting the above technical solution, the welding mechanism can be moved in the vertical direction.
[0016] Furthermore, a laser welding head is fixedly mounted on the movable end of the third linear module.
[0017] By adopting the above technical solution, a laser welding head can be used for welding operations.
[0018] In summary, the beneficial technical effects of the utility model are:
[0019] 1. The utility model can use the fourth linear module to drive the movable table to slide in the slide groove of the slide rail, so that the movable table and the lifting cylinder and the unloading table on the movable table can be moved out from under the upper loading table in an orderly manner, so that the loading and unloading operations can be conveniently performed. During the whole process, the unloading table can transport the materials to be processed to the designated welding position on the equipment, realizing efficient automated processing operations while effectively preventing the staff from putting their hands into the equipment, and effectively improving the operational safety, and the overall operational convenience, safety, and practicality are effectively improved;
[0020] 2. The utility model can make the laser welding head flexibly and conveniently move in the three axes of X, Y and Z through the setting of the first linear module, the second linear module and the third linear module, thereby realizing welding operation of any trajectory, and the automated welding operation is effectively guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a first perspective view of the three-dimensional structure of the utility model;
[0022] Figure 2 This is a second viewing angle diagram of the three-dimensional structure of the utility model.
[0023] In the figure: 1. Support table; 2. Support column; 3. First linear module; 4. Second linear module; 5. Third linear module; 6. Laser welding head; 7. Slide rail; 8. Fourth linear module; 9. Movable table; 10. Lifting cylinder; 11. Support rod; 12. Loading table; 13. Unloading table; 14. Positioning rod. DETAILED DESCRIPTION
[0024] The method of the utility model is further described in detail below in conjunction with the accompanying drawings.
[0025] See attached Figure 1 , Attachment Figure 2 A liquid flow energy storage battery plate and ion membrane laser welding equipment, including a support table 1, two slide rails 7 are fixedly installed on the upper surface of the support table 1, and a movable table 9 is slidably connected in the slide groove of the slide rail 7. A fourth linear module 8 is fixedly installed on the upper surface of the support table 1, and the fourth linear module 8 is located between the two slide rails 7. The moving end of the fourth linear module 8 is fixedly connected to the middle position of the lower surface of the movable table 9. A plurality of lifting cylinders 10 are fixedly installed on the upper surface of the movable table 9, and a downloading platform 13 is fixedly installed on the telescopic end of the lifting cylinder 10. A plurality of mounting holes are arranged on the upper surface of the downloading platform 13, and a positioning rod 14 is installed inside each mounting hole. The upper surface of the support table 1 A plurality of support rods 11 are fixedly connected to the surface, and an upper loading platform 12 is fixedly connected to the upper end of the support rod 11, wherein the fourth linear module 8 can be used to drive the movable platform 9 to slide in the slide groove of the slide rail 7, so that the movable platform 9 and the lifting cylinder 10 and the unloading platform 13 on the movable platform 9 can be moved out from under the upper loading platform 12 in an orderly manner, so that loading and unloading operations can be carried out conveniently. During the whole process, the unloading platform 13 can transport the material to be processed to the designated welding position on the equipment, realizing efficient automated processing operations while effectively preventing the staff from putting their hands into the equipment, and the operational safety has been effectively improved, and the overall operational convenience, safety and practicality have been effectively improved.
[0026] Reference Figure 1A plurality of support columns 2 are fixedly connected to the upper surface of the support platform 1, and a first linear module 3 is fixedly installed on the upper end of the support column 2. Two first linear modules 3 are provided, and the two first linear modules 3 are symmetrically distributed at both sides of the upper platform 12. A second linear module 4 is provided between the two first linear modules 3, and both ends of the second linear module 4 are respectively fixedly installed on the moving ends of the two first linear modules 3. The second linear module 4 is vertically distributed with the first linear module 3, and the moving end of the second linear module 4 is fixedly connected with a third linear module 5. The third linear module 5 is vertically distributed, and a laser welding head 6 is fixedly installed on the moving end of the third linear module 5. Through the arrangement of the first linear module 3, the second linear module 4, and the third linear module 5, the laser welding head 6 can be flexibly and conveniently moved in the three axes of X, Y, and Z, so as to realize welding operations of any trajectory, and the automated welding operations are effectively guaranteed.
[0027] Working principle: When in use, first install the equipment at the designated position, then place the flow field frame on the downloading platform 13, then place the ion membrane on the flow field frame and spread it flat, then start the fourth linear module 8, and drive the movable platform 9 to slide in the slide groove of the slide rail 7 through the fourth linear module 8, so that the downloading platform 13 can be moved to the bottom of the upper loading platform 12, and then start the lifting cylinder 10, and use the extension of the lifting cylinder 10 to raise the height of the downloading platform 13, so that the downloading platform 13 can fit tightly on the lower surface of the upper loading platform 12, then start the laser welding head 6, and use the laser welding head 6 to perform welding operations. During this process, the first linear module 3, the second linear module 4, and the third linear module 5 can be used to make the laser welding head 6 move in the three axes of X, Y, and Z, so as to realize welding operations of any trajectory. After welding is completed, the downloading platform 13 is reset, and then the fourth linear module 8 moves the downloading platform 13 out from the bottom of the upper loading platform 12, which is convenient for unloading and loading operations for the next round of welding.
[0028] The embodiments of this specific implementation method are all preferred embodiments of the utility model, and are not intended to limit the protection scope of the utility model. Therefore, all equivalent changes made based on the structure, shape, and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A laser welding device for liquid flow energy storage battery plates and ion membranes, comprising a support platform (1), characterized in that: Two slide rails (7) are fixedly mounted on the upper surface of the support platform (1), and a movable platform (9) is slidably connected in the slide groove of the slide rail (7). A fourth linear module (8) is fixedly mounted on the upper surface of the support platform (1), and the fourth linear module (8) is located between the two slide rails (7). The movable end of the fourth linear module (8) is fixedly connected to the middle position of the lower surface of the movable platform (9). A plurality of lifting cylinders (10) are fixedly mounted on the upper surface of the movable platform (9), and a download platform (13) is fixedly mounted on the telescopic end of the lifting cylinder (10). A plurality of mounting holes are arranged on the upper surface of the download platform (13), and a positioning rod (14) is installed inside each mounting hole.
2. According to claim 1, a liquid flow energy storage battery plate and ion membrane laser welding equipment is characterized in that: A plurality of support rods (11) are fixedly connected to the upper surface of the support platform (1), and an upper loading platform (12) is fixedly connected to the upper ends of the support rods (11).
3. A liquid flow energy storage battery plate and ion membrane laser welding device according to claim 2, characterized in that: A plurality of support columns (2) are fixedly connected to the upper surface of the support platform (1), and a first linear module (3) is fixedly installed on the upper end of the support column (2). Two first linear modules (3) are provided, and the two first linear modules (3) are symmetrically distributed at two sides of the upper platform (12).
4. The laser welding equipment for liquid flow energy storage battery plate and ion membrane according to claim 3 is characterized in that: A second linear module (4) is arranged between the two first linear modules (3), two ends of the second linear module (4) are respectively fixedly mounted on the moving ends of the two first linear modules (3), and the second linear module (4) is vertically distributed with respect to the first linear modules (3).
5. The laser welding equipment for liquid flow energy storage battery plate and ion membrane according to claim 4 is characterized in that: The movable end of the second linear module (4) is fixedly connected to a third linear module (5), and the third linear module (5) is distributed vertically.
6. The laser welding equipment for liquid flow energy storage battery plate and ion membrane according to claim 5 is characterized in that: A laser welding head (6) is fixedly mounted on the movable end of the third linear module (5).
